SlideShare a Scribd company logo
1 of 63
2
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Ron Prychitko,
P.Eng.
Regional Engineer
Prairies
Armtec, Drainage
Solutions
Lorne Mielty
Technical Sales
Representative
Western
Armtec, Drainage
Solutions
CORRUGATED STEEL
BRIDGE & TUNNEL SOLUTIONS
FRIDAY MAY 8 TH, 2015 / 9AM PST / 11AM CST / 12PM EST
AN OVERVIEW
5
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
CPD CREDIT CERTIFICATES
• CPD Credit Certificates will be given out for attending Live Webinars
• Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical
Informal
• Formal completion certificates are emailed within one week of attending
• Check your local guidelines if unsure of your requirements
Email your complete attendee list should there be multiple individuals
viewing the same screen.:
• Full Name
• Title
• Email
webinars@armtec.com
Armtec will send certificate to all participants
6
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Armtec is one of Canada’s largest infrastructure
company supplying precast, corrugated steel and HDPE
products and solutions. Every day, our proven products,
engineered solutions and dedicated people are counted
on to support construction and infrastructure projects in
communities everywhere. With a national presence and a
local focus on exceptional customer service, we are
dedicated to building excellence.
ABOUT ARMTEC
12
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
YOUR SPEAKERS
Ron Prychitko P.Eng.
Region Engineer
Armtec, Drainage Solutions
Ron.Prychitko@armtec.com
Lorne Mielty
Technical Sales Representative,
Armtec, Drainage Solutions
Lorne.Mielty@armtec.com
13
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
AGENDA
• Introduction of Shallow & Deep Corrugated Plates
• Coatings for Durability
• Case Study Projects
• Benefits of Corrugated Plate Structures
• Questions
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
14
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Multi-Plate (SPCSP)
(152 mm x 51 mm)Bridge-Plate (DCSP)
(400 mm x 150 mm)
STRUCTURAL PLATE - CORRUGATIONS
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
15
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
MULTI-PLATE
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Dia. / Span - 1.5 m to 7 m
Design & Installation
• CAN/CSA S6-14 – Section 7 Buried Structures
• Referred to as “Shallow Corrugations”
16
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Box Culverts
• Spans - 4m to 14m
• Highway Loading
• Low Cover Applications
BRIDGE-PLATE
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Design & Installation
• CAN/CSA S6-14 – Section 7 Buried Structures
• Referred to as “Deep Corrugations”
Arches
• Spans 6m to 21m
• Single Radius + Low
& High Profile shapes
Rounds
• Diameters – 6m to 15m
• Horiz. Ellipse shapes
also available
17
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
CAT – “CORROSION ARRESTING TECHNOLOGY”
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
WHAT IS STRATA-CAT COATING?
18
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
STRATA-CAT COATING PROCESS
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
19
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
STRATA-CAT - R & D
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Example test site
20
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
STRATA-CAT - INVERT PROTECTION
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Multi-Plate
• Location: Route 158 Mirabel QC
• Features: 5540 Diameter Round
• Location: Essex County ON
• Features: 5.05m Span x 3.33 Rise Pipe
Arch Shape
21
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PERFORMANCE GUIDELINE
BURIED STEEL PLATE STRUCTURES
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
www.cspi.ca
22
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Corrugated Steel Pipe Products
Materials, Fabrication, Inspection & Repair …….
• Helical Pipe Products (CSP & SRP)
• Structural Plate Products (SPCSP, DCSP, Liner Plate)
• Coatings
• Galv. & Aluminized (metallic)
• Polymer Coating
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
CSA STANDARD - G401-14
23
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
BRIDGE-PLATE BOX CULVERT
• Location: Muskoka Road 50, ON
• Product: Armtec 34H Bridge-Plate box culvert w/ Polymer coated side plates
• Dimensions: 12000 span x 2800 rise x 18m long
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
24
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
BRIDGE REPLACEMENT – MUSKOKA RD 50
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
25
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
T - SHAPED FOOTINGS
• Scour Protection
• Elevate Plate above Streambed
• Cast-in-Place or Precast
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
26
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
GRANT BROOK, NS
Products used:
• 5180 Span x 2690 Rise Multi-Plate single radius Arch c/w MSE wire mesh
Headwalls
• Installed on T-Shaped cast-in-place footings
• Polymer coated plates to above HWL
27
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PETOPEKO CREEK – BLOODVEIN, MB
EAST SIDE ROAD
28
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Read Creek – MacArthur River Mine SK
Bridge Plate LP Arch
29
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
You don’t even
know you are
travelling over a
Bridge
30
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
ST-LIBOIRE, QC (MTQ)
• HORIZONTAL ELLIPSE MULTI-PLATE 7460 SPAN X 4460 RISE (20.117 M LONG) POLYMER
COATED PLATE
• C/W 33 DEG SKEW CUT ENDS,
• CAST-IN-PLACE HEADWALLS
31
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
CANAL CROSSING APPLICATIONS
• Location: Blackstrap Lake, Sask.
• Product used: 48N Horizontal Ellipse Multi-Plate 4430 span x 2800 Rise (42 m long)
polymer coated c/w square ends
32
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
• Conception Bay North Bypass & Lady
Lake Road
ARCH – TUNNEL (LOCAL ROAD) UNDERPASS
• TCH & Long Harbour Road
Interchange
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
• 11.6m Span x 6.5 Rise Bridge-Plate Arches
33
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
BRIDGE-PLATE ROUND – RAILWAY BRIDGE
• Twin – 9050 diameter Round
Bridge-Plates x 19.3m long
• Ironstone River
• E90 Railway Live Load
• Invert Bury 2.0 m
• Near Labrador City, Labrador
• 6610 Bridge-Plate x 72m long
• E80 Railway Live Load
• Rail Terminal Facility
• Hardisty, Alberta
34
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
MAPLE CREEK SK - TRANS-CAN HWY #1
35
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Product: Bridge-Plate Low Profile Arch
11740 mm span x 110.5 m long – c/w full
Raft footing (Stage Constructed)
MAPLE CREEK, SK
36
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
THUNDER BAY, ON – BELROSE RD.
Before
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
37
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
THUNDER BAY, ON – BELROSE RD
After
38
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
SHEPPARD LANDFILL
Calgary AB - 68th Street SE
6100 x 1400 Bridge-Plate Box
Culvert
38
39
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
LINER PLATE
• Lightweight Bolted Segmental Plate
• Circumferential flanges allow assembly
from the inside
• Application - Relining drainage pipe &
water crossing structures
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
40
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
CAPE BRETON RAIL BRIDGE REHABILITATION
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
41
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
TUNNEL LINER PLATE
Custom shapes for Relines
42
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
ALUMINUM BOX CULVERT
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
OLD PERLICAN, NL –ALUMINUM BOX CULVERT – C/W FULL INVERT - 6286 SPAN X
1614 RISE x 12344 long
43
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
ALUMINUM BOX CULVERT
OLD PERLICAN, NL – ALUMINUM BOX CULVERT –C/W FULL INVERT - 6286 SPAN X
1614 RISE x 12344 long
44
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
ALUMINUM BOX CULVERTS
COUNTY OF WETASKIWIN, ALBERTA
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Pipestone Creek
Before
45
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
ALUMINUM BOX CULVERTS
COUNTY OF WETASKIWIN, ALBERTA
Wetaskiwin, AB – Aluminum Box Culvert (Series #140) – 35 ft. span x 11 ft. rise - 58’-9”
long c/w full invert (scour Protection Plates) and full headwall / wingwall Package
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
46
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Address Forces due to:
• Hydraulic Uplift
• Erosion / undermining
• Piping thru the backfill
BRIDGE CULVERT END TREATMENTS ARE
ESSENTIAL
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Piping
Erosion
Hydraulic
Uplift
47
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
END TREATMENT EXAMPLES
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
48
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PENNASK CREEK - KELOWNA, BC
Owner: BC MOTI
Consultant: Associated Engineering
Contractor: PW Trenchless
Location: Pennask Tributary Creek, 50km outside
of Kelowna, BC along Highway 97C
Existing Culvert:
2440mm Span x 1739mm Rise Galvanized Multi-
Plate pipe arch
Rehabilitated Culvert:
• 2046 mm x 1538 mm rise x 97m length
• 4.0mm crown plates x 6mm bottom plates
• Strata-CAT® polymer-coated
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
49
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PENNASK CREEK - KELOWNA, BC
Challenges & Constraints
• Restore structural capacity of the culvert
• Approximately 30m surcharge
• 75+ year service life
• Timeline – difficult winter conditions
• Major highway
• Max. water velocity  3.0 m/sec with sand
and gravel bedloads
• Acidic drain rock
• Water inside conduit:
• Leachate from acidic surcharge
around conduit/grout
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
50
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PENNASK CREEK - KELOWNA, BC
51
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
DICK BOOTH CROSSING - HWY 4 PORT HARDY,
BC
Owner: BC MOTI & MFLNRO
Consultants:
• Onsite Engineering (Engineers of Record)
• Terratech Consulting (GRS)
• Pacificus Biological Services Ltd.
(Environmental Monitoring)
• Levelton Consultants Ltd (Quality Control)
Contractors:
• PW Trenchless
• Newcastle Structures (SPCPS and Concrete)
• West Bridge Corp. (Removal of Acrow Bridge)
• LC Stoneworks Ltd. (Installation Lock + Load)
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Project Description:
• Access to the community of Holberg, BC was cut during a rain event in which 300mm
of rain fell in a 24 hour period and washed away a 2.0m CSP
• BC MoTI quickly installed a temporary single lane bridge to re-open the road and
maintain essential services.
52
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
DICK BOOTH CROSSING - HWY 4 PORT HARDY,
BC
Issues:
• Water infiltration through
the embankment was a
concern
• Bedrock was relatively
close to the surface
• Implied subsurface erosion
was likely, due to piping
(percolation of water along
the bedrock surface).
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Resolution:
• Impervious cast-in-place concrete cut-off wall was anchored into the bedrock.
• Cut-off wall ensured the water takes the path of least resistance – through the Multi-
Plate structure
53
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
DICK BOOTH CROSSING - HWY 4 PORT HARDY,
BC
Multi-Plate used:
• Multi Plate® c/w Strata-Cat® polymer
coating
• Corrugation = 152mm x 51mm
• 4.920m dia x 4.0mm width x 25.28m length
Project Materials Supplied by Armtec
• Multi Plate® c/w Strata-Cat® polymer
coating
• Lock + Load retaining wall
• GRS Basket
• Geotextile
• W-Beam Guardrail
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
54
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PARKDALE CREEK – LANGFORD, BC
Project description:
• Parkdale Creek is an environmentally sensitive fish-bearing stream that meanders
through the heart of the Westhills subdivision.
• In order to join the two halves of the neighborhood it required a structure that would
span the creek in an aesthetic and environmentally friendly way.
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
55
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PARKDALE CREEK – LANGFORD, BC
Structure description:
• Bridge-Plate® arch structure
• 12.0m span x 5.948m rise x 36.0m long
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
• Entire assembly only required eight
days.
• Assembly crew preassembled
complete rings of the arch in a
staging area while the skew collar &
footing designs were completed.
56
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
PARKDALE CREEK – LANGFORD, BC
Project description:
• This project incorporated a green wall system that used Mirafi 5XT uniaxial geogrid
reinforcement.
57
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
THOMPSON’S CREEK - HOUSTON BC
Existing structure:
• 2 x 900mm dia. CSP
• 1 x 600mm dia. CSP
• Constricting a 4.2m creek channel
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
Replacement structure:
• 7.0m span x 24m long open bottom
arch.
58
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
THOMPSON’S CREEK - HOUSTON BC
Project success:
• Project has restored fish access to over five kilometers of high value spawning and
rearing habitat in the Thompson Creek mainstream
• A further estimated two kilometers of habitat in four smaller tributary streams located
upstream of the Yellowhead Highway 16 also have restored fish access.
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
59
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
KLUSKUS ROAD - VANDERHOOF, BC
Project description:
• Road re-alignment project. Structure needed to be outside the wetted perimeter of the
creek as this is a fish bearing stream.
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
60
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
KLUSKUS ROAD - VANDERHOOF, BC
Solution:
• 15 metre span, 7.4m rise Bridge-Plate®
• Single Radius Arch
• 5mm thick throughout
• Concrete footing/headwall – Designed
by McElhanney
• Bin-wall – Design A,B,C
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
61
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
HIGHLAND VALLEY COPPER MINE - BC
Owner: Teck Highland Valley Copper
Partnership
Consultants:
• Sade Engineering Associates
Limited
• Terratech Consulting Limited
Contractors:
• Newport Structures Limited
• TLC Stoneworks Limited
Project Challenges:
• Winter construction on a 24 / 7
schedule to avoid frozen backfill.
• Temperatures as low as -25C.
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
62
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
HIGHLAND VALLEY COPPER MINE - BC
Solution Specifications:
• The Bridge-Plate two-radius arch design parameters were:
Span = 15.0 m, Rise = 6.7 m, Length = 58.9 m
• 8.0 mm thick corrugated plate
• Minimum Cover = 3.0 m
• Maximum Cover = 9.1 m
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
63
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
HIGHLAND VALLEY COPPER MINE - BC
Solution Characteristics:
• Mine haul truck overpass
• 1,400,000-lb. loaded CAT 797
• Structurally efficient design
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
64
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
BENEFITS OF CORRUGATED STRUCTURAL STEEL
PLATE PRODUCTS
• Customized shapes to fit the application
• Cost efficient
• Low life cycle cost
• Economically shipped to remote
locations
• Ease of installation w/o large cranes
• Less design & construction time is required
• Can be designed for a wide range of loading
conditions
a) Deep bury
b) Heavy Live Loads (haul trucks, track
vehicles)
c) Typically have reserve capacity for
overload conditions
d) Seismic forces
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
65
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
• Eliminates bridge decks & icy
deck problems
• Eliminates maintenance of
bridge approaches
• Permits the use of a constant
roadway section in the vicinity of
the structure
• Roadway extension can be
easily accommodated
• Cost Effective
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
BENEFITS OF CORRUGATED STRUCTURAL STEEL
PLATE PRODUCTS
66
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
DESIGN CONSIDERATIONS
CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
• Culvert Sizing (clearance & hydraulics)
• Culvert Durability
• Alignment & culvert location
• End treatment
• Environmental Impact Mitigation
67
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Contact Your Local Sales Rep:
www.armtec.com/sales-offices/
Todays Speakers:
Ron Prychitko
Ron.Prychitko@armtec.com
Lorne Mielty
Lorne.Mielty@armtec.com
68
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
UPCOMING WEBINARS
Stay connected or get involved
with Armtec events. We are
dedicated to the continuing
education of our customers,
colleagues and fellow employees
through personalized lunch and
learns and free online webinars.
For more info please visit
www.armtec.com/events
69
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Follow us on social media to learn more
about our company, projects and people,
while getting all the latest Armtec and
industry news.
Webinars will be posted with in five business days from the broadcast date. We will notify all
subscribers over our social media channels.
Today’s session will be available on YouTube and SlideShare
JOIN US ON SOCIAL MEDIA!
71
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Corrugated Steel Bridge and Tunnel Solutions
QUESTIONS?
72
© 2015 Armtec Infrastructure Inc. • Confidential & Proprietary
Contact Your Local Sales Rep:
www.armtec.com/sales-offices/
Todays Speakers:
Ron Prychitko
Ron.Prychitko@armtec.com
Lorne Mielty
Lorne.Mielty@armtec.com

More Related Content

What's hot

Diagrid Structures: Introduction & Literature Survey
Diagrid Structures: Introduction & Literature SurveyDiagrid Structures: Introduction & Literature Survey
Diagrid Structures: Introduction & Literature SurveyUday Mathe
 
Case study steel composite structure
Case study  steel composite structureCase study  steel composite structure
Case study steel composite structureShahin MB
 
Design of concrete structures-Nilson-15th-Edition
Design of concrete structures-Nilson-15th-EditionDesign of concrete structures-Nilson-15th-Edition
Design of concrete structures-Nilson-15th-EditionBahzad5
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.Suhailkhan204
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Columnমু সা
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsPath Marketing Inc.
 
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural SystemsCE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural SystemsFawad Najam
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-Bhaskar Alapati
 
crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimationKumar Anjneya
 
Analysis and design of multystory building
Analysis and design of multystory buildingAnalysis and design of multystory building
Analysis and design of multystory buildingAwat Hasan Ra
 
Diagrid structural system
Diagrid structural systemDiagrid structural system
Diagrid structural systemvivek bhathee
 

What's hot (20)

Diagrid Structures: Introduction & Literature Survey
Diagrid Structures: Introduction & Literature SurveyDiagrid Structures: Introduction & Literature Survey
Diagrid Structures: Introduction & Literature Survey
 
Case study steel composite structure
Case study  steel composite structureCase study  steel composite structure
Case study steel composite structure
 
Design of concrete structures-Nilson-15th-Edition
Design of concrete structures-Nilson-15th-EditionDesign of concrete structures-Nilson-15th-Edition
Design of concrete structures-Nilson-15th-Edition
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
 
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural SystemsCE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
 
Design project
Design projectDesign project
Design project
 
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8 ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
Design of two-way slab
Design of two-way slabDesign of two-way slab
Design of two-way slab
 
Etabs example-rc building seismic load response-
Etabs example-rc building seismic load  response-Etabs example-rc building seismic load  response-
Etabs example-rc building seismic load response-
 
Roof trusses
Roof trussesRoof trusses
Roof trusses
 
crack control and crack width estimation
crack control and crack width estimationcrack control and crack width estimation
crack control and crack width estimation
 
Analysis and design of multystory building
Analysis and design of multystory buildingAnalysis and design of multystory building
Analysis and design of multystory building
 
Diagrid structural system
Diagrid structural systemDiagrid structural system
Diagrid structural system
 

Viewers also liked

Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel liningMahesh Raj Bhatt
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessityShashank Gaurav
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Mohit Shukla
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODADIL BIN AYOUB
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringJunaida Wally
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge SystemAltosMarketing
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineFilipe Mello
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignUmer Farooq
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Let's Tute
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machineNaquiakhter
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machineVISHAL KUMAR SINGH
 

Viewers also liked (20)

Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
Tunneling
Tunneling  Tunneling
Tunneling
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
 
Bridges precast
Bridges precastBridges precast
Bridges precast
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
 
Precast segmental concrete bridges a
Precast segmental concrete bridges aPrecast segmental concrete bridges a
Precast segmental concrete bridges a
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHOD
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineering
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge System
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Bridge
BridgeBridge
Bridge
 
Guidelines
GuidelinesGuidelines
Guidelines
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Top down construction presentation
Top down construction presentationTop down construction presentation
Top down construction presentation
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
 
tunnel boring machine
tunnel boring machinetunnel boring machine
tunnel boring machine
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machine
 

Similar to Corrugated Steel Bridge and Tunnel Solutions

Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesCommunications Branding
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Agata Woźniak
 
Innovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage ProjectsInnovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage ProjectsCommunications Branding
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarCommunications Branding
 
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for MiningBig Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for MiningCommunications Branding
 
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining Agata Woźniak
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Agata Woźniak
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationTunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationCommunications Branding
 
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Communications Branding
 
Armtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design ReviewArmtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design ReviewCommunications Branding
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Communications Branding
 
Precast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecPrecast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecCommunications Branding
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAayoghEngineering
 
Brent Golemiec resume march 2016
Brent Golemiec resume march 2016Brent Golemiec resume march 2016
Brent Golemiec resume march 2016brent golemiec
 
Armtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsArmtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsCommunications Branding
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Agata Woźniak
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Communications Branding
 

Similar to Corrugated Steel Bridge and Tunnel Solutions (20)

Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 
Innovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage ProjectsInnovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage Projects
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels Webinar
 
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for MiningBig Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining
 
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation
 
Tunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and RehabilitationTunnel Liners, Relines and Rehabilitation
Tunnel Liners, Relines and Rehabilitation
 
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
 
Armtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design ReviewArmtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design Review
 
Earth Retention Solutions
Earth Retention SolutionsEarth Retention Solutions
Earth Retention Solutions
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
 
Precast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecPrecast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - Armtec
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdf
 
Brent Golemiec resume march 2016
Brent Golemiec resume march 2016Brent Golemiec resume march 2016
Brent Golemiec resume march 2016
 
Armtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsArmtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End Treatments
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
 
ColumnsBrochure
ColumnsBrochureColumnsBrochure
ColumnsBrochure
 
Custom Fabricated Carts & Totes
Custom Fabricated Carts & TotesCustom Fabricated Carts & Totes
Custom Fabricated Carts & Totes
 

More from Communications Branding

Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentCommunications Branding
 
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...Communications Branding
 
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016Communications Branding
 
Linear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsLinear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsCommunications Branding
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsCommunications Branding
 
Transportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationTransportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationCommunications Branding
 
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)Communications Branding
 
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...Communications Branding
 
Stormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecStormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecCommunications Branding
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Communications Branding
 
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Communications Branding
 

More from Communications Branding (11)

Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
 
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
 
Linear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsLinear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain Applications
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
 
Transportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationTransportation & Environmental Noise Mitigation
Transportation & Environmental Noise Mitigation
 
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
Bridge-Plate & Multi-Plate Applications and Case Studies (Ron Prychitko, P.Eng.)
 
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
Bridge-Plate & Multi-Plate Applications and Case Studies (Randy McDonald, P.E...
 
Stormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecStormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - Armtec
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
 

Recently uploaded

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Corrugated Steel Bridge and Tunnel Solutions

  • 1. 2 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Ron Prychitko, P.Eng. Regional Engineer Prairies Armtec, Drainage Solutions Lorne Mielty Technical Sales Representative Western Armtec, Drainage Solutions CORRUGATED STEEL BRIDGE & TUNNEL SOLUTIONS FRIDAY MAY 8 TH, 2015 / 9AM PST / 11AM CST / 12PM EST AN OVERVIEW
  • 2. 5 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary CPD CREDIT CERTIFICATES • CPD Credit Certificates will be given out for attending Live Webinars • Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical Informal • Formal completion certificates are emailed within one week of attending • Check your local guidelines if unsure of your requirements Email your complete attendee list should there be multiple individuals viewing the same screen.: • Full Name • Title • Email webinars@armtec.com Armtec will send certificate to all participants
  • 3. 6 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Armtec is one of Canada’s largest infrastructure company supplying precast, corrugated steel and HDPE products and solutions. Every day, our proven products, engineered solutions and dedicated people are counted on to support construction and infrastructure projects in communities everywhere. With a national presence and a local focus on exceptional customer service, we are dedicated to building excellence. ABOUT ARMTEC
  • 4. 12 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary YOUR SPEAKERS Ron Prychitko P.Eng. Region Engineer Armtec, Drainage Solutions Ron.Prychitko@armtec.com Lorne Mielty Technical Sales Representative, Armtec, Drainage Solutions Lorne.Mielty@armtec.com
  • 5. 13 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary AGENDA • Introduction of Shallow & Deep Corrugated Plates • Coatings for Durability • Case Study Projects • Benefits of Corrugated Plate Structures • Questions CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 6. 14 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Multi-Plate (SPCSP) (152 mm x 51 mm)Bridge-Plate (DCSP) (400 mm x 150 mm) STRUCTURAL PLATE - CORRUGATIONS CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 7. 15 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary MULTI-PLATE CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Dia. / Span - 1.5 m to 7 m Design & Installation • CAN/CSA S6-14 – Section 7 Buried Structures • Referred to as “Shallow Corrugations”
  • 8. 16 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Box Culverts • Spans - 4m to 14m • Highway Loading • Low Cover Applications BRIDGE-PLATE CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Design & Installation • CAN/CSA S6-14 – Section 7 Buried Structures • Referred to as “Deep Corrugations” Arches • Spans 6m to 21m • Single Radius + Low & High Profile shapes Rounds • Diameters – 6m to 15m • Horiz. Ellipse shapes also available
  • 9. 17 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary CAT – “CORROSION ARRESTING TECHNOLOGY” CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS WHAT IS STRATA-CAT COATING?
  • 10. 18 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary STRATA-CAT COATING PROCESS CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 11. 19 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary STRATA-CAT - R & D CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Example test site
  • 12. 20 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary STRATA-CAT - INVERT PROTECTION CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Multi-Plate • Location: Route 158 Mirabel QC • Features: 5540 Diameter Round • Location: Essex County ON • Features: 5.05m Span x 3.33 Rise Pipe Arch Shape
  • 13. 21 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PERFORMANCE GUIDELINE BURIED STEEL PLATE STRUCTURES CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS www.cspi.ca
  • 14. 22 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Corrugated Steel Pipe Products Materials, Fabrication, Inspection & Repair ……. • Helical Pipe Products (CSP & SRP) • Structural Plate Products (SPCSP, DCSP, Liner Plate) • Coatings • Galv. & Aluminized (metallic) • Polymer Coating CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS CSA STANDARD - G401-14
  • 15. 23 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary BRIDGE-PLATE BOX CULVERT • Location: Muskoka Road 50, ON • Product: Armtec 34H Bridge-Plate box culvert w/ Polymer coated side plates • Dimensions: 12000 span x 2800 rise x 18m long CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 16. 24 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary BRIDGE REPLACEMENT – MUSKOKA RD 50 CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 17. 25 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary T - SHAPED FOOTINGS • Scour Protection • Elevate Plate above Streambed • Cast-in-Place or Precast CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 18. 26 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary GRANT BROOK, NS Products used: • 5180 Span x 2690 Rise Multi-Plate single radius Arch c/w MSE wire mesh Headwalls • Installed on T-Shaped cast-in-place footings • Polymer coated plates to above HWL
  • 19. 27 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PETOPEKO CREEK – BLOODVEIN, MB EAST SIDE ROAD
  • 20. 28 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Read Creek – MacArthur River Mine SK Bridge Plate LP Arch
  • 21. 29 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary You don’t even know you are travelling over a Bridge
  • 22. 30 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary ST-LIBOIRE, QC (MTQ) • HORIZONTAL ELLIPSE MULTI-PLATE 7460 SPAN X 4460 RISE (20.117 M LONG) POLYMER COATED PLATE • C/W 33 DEG SKEW CUT ENDS, • CAST-IN-PLACE HEADWALLS
  • 23. 31 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary CANAL CROSSING APPLICATIONS • Location: Blackstrap Lake, Sask. • Product used: 48N Horizontal Ellipse Multi-Plate 4430 span x 2800 Rise (42 m long) polymer coated c/w square ends
  • 24. 32 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary • Conception Bay North Bypass & Lady Lake Road ARCH – TUNNEL (LOCAL ROAD) UNDERPASS • TCH & Long Harbour Road Interchange CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS • 11.6m Span x 6.5 Rise Bridge-Plate Arches
  • 25. 33 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary BRIDGE-PLATE ROUND – RAILWAY BRIDGE • Twin – 9050 diameter Round Bridge-Plates x 19.3m long • Ironstone River • E90 Railway Live Load • Invert Bury 2.0 m • Near Labrador City, Labrador • 6610 Bridge-Plate x 72m long • E80 Railway Live Load • Rail Terminal Facility • Hardisty, Alberta
  • 26. 34 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary MAPLE CREEK SK - TRANS-CAN HWY #1
  • 27. 35 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Product: Bridge-Plate Low Profile Arch 11740 mm span x 110.5 m long – c/w full Raft footing (Stage Constructed) MAPLE CREEK, SK
  • 28. 36 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary THUNDER BAY, ON – BELROSE RD. Before CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 29. 37 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary THUNDER BAY, ON – BELROSE RD After
  • 30. 38 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary SHEPPARD LANDFILL Calgary AB - 68th Street SE 6100 x 1400 Bridge-Plate Box Culvert 38
  • 31. 39 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary LINER PLATE • Lightweight Bolted Segmental Plate • Circumferential flanges allow assembly from the inside • Application - Relining drainage pipe & water crossing structures CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 32. 40 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary CAPE BRETON RAIL BRIDGE REHABILITATION CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 33. 41 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary TUNNEL LINER PLATE Custom shapes for Relines
  • 34. 42 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary ALUMINUM BOX CULVERT CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS OLD PERLICAN, NL –ALUMINUM BOX CULVERT – C/W FULL INVERT - 6286 SPAN X 1614 RISE x 12344 long
  • 35. 43 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary ALUMINUM BOX CULVERT OLD PERLICAN, NL – ALUMINUM BOX CULVERT –C/W FULL INVERT - 6286 SPAN X 1614 RISE x 12344 long
  • 36. 44 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary ALUMINUM BOX CULVERTS COUNTY OF WETASKIWIN, ALBERTA CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Pipestone Creek Before
  • 37. 45 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary ALUMINUM BOX CULVERTS COUNTY OF WETASKIWIN, ALBERTA Wetaskiwin, AB – Aluminum Box Culvert (Series #140) – 35 ft. span x 11 ft. rise - 58’-9” long c/w full invert (scour Protection Plates) and full headwall / wingwall Package CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 38. 46 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Address Forces due to: • Hydraulic Uplift • Erosion / undermining • Piping thru the backfill BRIDGE CULVERT END TREATMENTS ARE ESSENTIAL CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Piping Erosion Hydraulic Uplift
  • 39. 47 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary END TREATMENT EXAMPLES CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 40. 48 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PENNASK CREEK - KELOWNA, BC Owner: BC MOTI Consultant: Associated Engineering Contractor: PW Trenchless Location: Pennask Tributary Creek, 50km outside of Kelowna, BC along Highway 97C Existing Culvert: 2440mm Span x 1739mm Rise Galvanized Multi- Plate pipe arch Rehabilitated Culvert: • 2046 mm x 1538 mm rise x 97m length • 4.0mm crown plates x 6mm bottom plates • Strata-CAT® polymer-coated CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 41. 49 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PENNASK CREEK - KELOWNA, BC Challenges & Constraints • Restore structural capacity of the culvert • Approximately 30m surcharge • 75+ year service life • Timeline – difficult winter conditions • Major highway • Max. water velocity  3.0 m/sec with sand and gravel bedloads • Acidic drain rock • Water inside conduit: • Leachate from acidic surcharge around conduit/grout CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 42. 50 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PENNASK CREEK - KELOWNA, BC
  • 43. 51 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary DICK BOOTH CROSSING - HWY 4 PORT HARDY, BC Owner: BC MOTI & MFLNRO Consultants: • Onsite Engineering (Engineers of Record) • Terratech Consulting (GRS) • Pacificus Biological Services Ltd. (Environmental Monitoring) • Levelton Consultants Ltd (Quality Control) Contractors: • PW Trenchless • Newcastle Structures (SPCPS and Concrete) • West Bridge Corp. (Removal of Acrow Bridge) • LC Stoneworks Ltd. (Installation Lock + Load) CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Project Description: • Access to the community of Holberg, BC was cut during a rain event in which 300mm of rain fell in a 24 hour period and washed away a 2.0m CSP • BC MoTI quickly installed a temporary single lane bridge to re-open the road and maintain essential services.
  • 44. 52 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary DICK BOOTH CROSSING - HWY 4 PORT HARDY, BC Issues: • Water infiltration through the embankment was a concern • Bedrock was relatively close to the surface • Implied subsurface erosion was likely, due to piping (percolation of water along the bedrock surface). CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Resolution: • Impervious cast-in-place concrete cut-off wall was anchored into the bedrock. • Cut-off wall ensured the water takes the path of least resistance – through the Multi- Plate structure
  • 45. 53 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary DICK BOOTH CROSSING - HWY 4 PORT HARDY, BC Multi-Plate used: • Multi Plate® c/w Strata-Cat® polymer coating • Corrugation = 152mm x 51mm • 4.920m dia x 4.0mm width x 25.28m length Project Materials Supplied by Armtec • Multi Plate® c/w Strata-Cat® polymer coating • Lock + Load retaining wall • GRS Basket • Geotextile • W-Beam Guardrail CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 46. 54 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PARKDALE CREEK – LANGFORD, BC Project description: • Parkdale Creek is an environmentally sensitive fish-bearing stream that meanders through the heart of the Westhills subdivision. • In order to join the two halves of the neighborhood it required a structure that would span the creek in an aesthetic and environmentally friendly way. CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 47. 55 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PARKDALE CREEK – LANGFORD, BC Structure description: • Bridge-Plate® arch structure • 12.0m span x 5.948m rise x 36.0m long CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS • Entire assembly only required eight days. • Assembly crew preassembled complete rings of the arch in a staging area while the skew collar & footing designs were completed.
  • 48. 56 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary PARKDALE CREEK – LANGFORD, BC Project description: • This project incorporated a green wall system that used Mirafi 5XT uniaxial geogrid reinforcement.
  • 49. 57 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary THOMPSON’S CREEK - HOUSTON BC Existing structure: • 2 x 900mm dia. CSP • 1 x 600mm dia. CSP • Constricting a 4.2m creek channel CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS Replacement structure: • 7.0m span x 24m long open bottom arch.
  • 50. 58 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary THOMPSON’S CREEK - HOUSTON BC Project success: • Project has restored fish access to over five kilometers of high value spawning and rearing habitat in the Thompson Creek mainstream • A further estimated two kilometers of habitat in four smaller tributary streams located upstream of the Yellowhead Highway 16 also have restored fish access. CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 51. 59 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary KLUSKUS ROAD - VANDERHOOF, BC Project description: • Road re-alignment project. Structure needed to be outside the wetted perimeter of the creek as this is a fish bearing stream. CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 52. 60 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary KLUSKUS ROAD - VANDERHOOF, BC Solution: • 15 metre span, 7.4m rise Bridge-Plate® • Single Radius Arch • 5mm thick throughout • Concrete footing/headwall – Designed by McElhanney • Bin-wall – Design A,B,C CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 53. 61 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary HIGHLAND VALLEY COPPER MINE - BC Owner: Teck Highland Valley Copper Partnership Consultants: • Sade Engineering Associates Limited • Terratech Consulting Limited Contractors: • Newport Structures Limited • TLC Stoneworks Limited Project Challenges: • Winter construction on a 24 / 7 schedule to avoid frozen backfill. • Temperatures as low as -25C. CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 54. 62 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary HIGHLAND VALLEY COPPER MINE - BC Solution Specifications: • The Bridge-Plate two-radius arch design parameters were: Span = 15.0 m, Rise = 6.7 m, Length = 58.9 m • 8.0 mm thick corrugated plate • Minimum Cover = 3.0 m • Maximum Cover = 9.1 m CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 55. 63 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary HIGHLAND VALLEY COPPER MINE - BC Solution Characteristics: • Mine haul truck overpass • 1,400,000-lb. loaded CAT 797 • Structurally efficient design CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 56. 64 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary BENEFITS OF CORRUGATED STRUCTURAL STEEL PLATE PRODUCTS • Customized shapes to fit the application • Cost efficient • Low life cycle cost • Economically shipped to remote locations • Ease of installation w/o large cranes • Less design & construction time is required • Can be designed for a wide range of loading conditions a) Deep bury b) Heavy Live Loads (haul trucks, track vehicles) c) Typically have reserve capacity for overload conditions d) Seismic forces CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS
  • 57. 65 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary • Eliminates bridge decks & icy deck problems • Eliminates maintenance of bridge approaches • Permits the use of a constant roadway section in the vicinity of the structure • Roadway extension can be easily accommodated • Cost Effective CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS BENEFITS OF CORRUGATED STRUCTURAL STEEL PLATE PRODUCTS
  • 58. 66 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary DESIGN CONSIDERATIONS CORRUGATED STEEL BRIDGE AND TUNNEL SOLUTIONS • Culvert Sizing (clearance & hydraulics) • Culvert Durability • Alignment & culvert location • End treatment • Environmental Impact Mitigation
  • 59. 67 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Contact Your Local Sales Rep: www.armtec.com/sales-offices/ Todays Speakers: Ron Prychitko Ron.Prychitko@armtec.com Lorne Mielty Lorne.Mielty@armtec.com
  • 60. 68 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary UPCOMING WEBINARS Stay connected or get involved with Armtec events. We are dedicated to the continuing education of our customers, colleagues and fellow employees through personalized lunch and learns and free online webinars. For more info please visit www.armtec.com/events
  • 61. 69 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Follow us on social media to learn more about our company, projects and people, while getting all the latest Armtec and industry news. Webinars will be posted with in five business days from the broadcast date. We will notify all subscribers over our social media channels. Today’s session will be available on YouTube and SlideShare JOIN US ON SOCIAL MEDIA!
  • 62. 71 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Corrugated Steel Bridge and Tunnel Solutions QUESTIONS?
  • 63. 72 © 2015 Armtec Infrastructure Inc. • Confidential & Proprietary Contact Your Local Sales Rep: www.armtec.com/sales-offices/ Todays Speakers: Ron Prychitko Ron.Prychitko@armtec.com Lorne Mielty Lorne.Mielty@armtec.com