PROGRESS REPORT OF ACCOMPLISHMENTS
FOR THE PERIOD OF: JULY - SEPTEMBER 2012

              REGION: VII




                   1
PROGRESS REPORT OF ACCOMPLISHMENTS
                               FOR THE PERIOD OF: JULY - SEPTEMBER 2012

                                                REGION: VII


1.0. INTRODUCTION

         The Regional Monitoring, Evaluation and Adjustment is done periodically to determine the progress
of the region in its delivery of education services as well as its performance as an organization. The lead
functional division to conduct quarter RMEA is the Quality Assurance and Accountability Division using the
STRIVE RMEA technology with the participation of the various functional as well as administrative units of
the region with the end-point of obtaining information for the regional management to make decisions on
adjusting its work plans and strategies.

       Unnumbered Regional Memorandum dated October 2, 2012 was issued to all Regional Personnel
Concerned for the CY 2012 Third Quarter Regional Monitoring, Evaluation and Plan Adjustment. All RO Units
were directed to prepare the monitoring and evaluation report which aimed to establish information as
basis for determining appropriate approach / strategy to improve organizational performance in fulfillment of
the regional mandate and strengthen collective actions to service better the divisions and schools within the
accountability of the Region and present information regarding organization resource support to the region
management that will support decisions and adjustments to plans (e.g. budget, personnel, physical facilities
plan) and strategies to ensure appropriate allocation of resources to support performance efficiency and
effectiveness.


2.0. SCOPE

    With the implementation framework of the system now in place and accepted by the Regional
Management, an important part of the process is its implementation. The two - day live-out Third Quarter
RMEA was conducted on October 10-11, 2012 and quantitative and qualitative information per RO unit
were gathered, analyzed, interpreted and to be presented to the Regional Management. But prior to the
actual conduct of the RMEA, there was Pre-RMEA conducted on October 8-9, 2012. Necessary
adjustments on the Work plan of every functional division/RO unit was done in the afternoon on the second
day of the RMEA on October 11, 2012.

         The coverage of the Monitoring and Evaluation report is from July to September, 2012 as indicated
in the Work Plan of every Functional division and RO Unit. The focus of this report is on area on
Organizational Performance/Health along its Organizational Effectiveness which pertains to individual,
team and organizational effectiveness of the region. Outputs achieved per individual RO Unit and those
co-implemented by at least 2 or more RO units, Implementation Issues of each regional unit/functional
division regarding work plan implementation, Institutional issues that involves multiple functional divisions

                                                      2
and Lessons Learned are tracked down while Organizational Resource Support concerns mainly with
availability and adequacy of resource requirements for the region to carry out its mandate efficiently and
effectively. This includes the analysis of how the region best optimizes its financial, human and
organizational capabilities in performing its functions by individual units and as a team.



3.0. METHODOLOGY

        The weeklong live-out Third Quarter RMEA was conducted following the STRIVE RMEA
technology . Purposely it was conducted for the participants to have established quantitative information on
the accomplishment of every RO unit, identified and clarified issues encountered and lessons learned and
adjusted the work plan of each Functional division/RO unit.

         During the Pre-work activity on October 8-9, 2012 at DepED Conference Room, Cebu City, all
Chiefs, Internal M & E of every RO unit and QAAD personnel and in every RO unit assigned in every RO
unit convened and did actual data collection on quantitative and qualitative information to gather initial
reports on Physical Accomplishment. Tools were given for easy data collection following established
standards.

         In plenary during the Pre-RMEA, the following instructions were given for the simultaneous
division/unit group work:
 Each functional division/unit must have a designated official documenter
 Based on the accomplished FD/Unit Output Matrix in Table 1-A, each FD computed the division/unit’s
  physical accomplishment using the Table 1-B on Programs and Projects, Table 1-C on FDs Physical
  Accomplishment, Table 1-D on Budget and Finance and Admin.
 In plenary, consolidation of the functional division /unit physical accomplishment using Table 1-E was
  done.
 Each FD reported the balance of physical outputs and identified reasons for variance using Table 1-F.
 Then, every FD has to identified the value added contributions using the Table 1-H

        A physical output can only be credited if it meets standard/s and has MOV/s.

        Each QAAD personnel was given assignment on what RO Unit to facilitate for easy data
gathering, analysis and interpretation using the recommended tools : CLMD by Dr. Estela B. Susvilla, T and
DD and RMSPPD by Dr. Joy Kenneth Biasong, FED by Dr. Eduardo Bacaltos, QAAD by Ms. Rosa
Cabotaje, PPRD by Ms. Merden Bryant, BFD and Admin by Mr. Sinfronio Thelmo. Dr. Marcial Degamo
was the over-all Chairman.

        The actual conduct of RMEA took place on October 10-11, 2012 at the same venue DepED
Conference Room, Cebu City. The quantitative and qualitative information gathered during the Pre-RMEA
were validated by the all members of the RO Units before the actual reporting.


                                                     3
Day 1 of the RMEA proper was reporting by all Chiefs of the RO Units on their accomplishments,
balances, value added contributions, issues, lessons learned and proposed recommendations. They were
made to identify the outputs that can be considered as their technical assistance made to the Schools
Division Offices.

        Different sessions were facilitated by the QAAD personnel. Session I on Quantitative Information
was facilitated by Dr. Estela Susvilla, Session 2 , on Issues and Proposed Resolutions by Ms. Merden
Bryant, Session 3 on Lessons Learned by Ms. Rosa Cabotaje, Session 4 on Organizational Resources by
Mr. Sinfronio Thelmo and Session 5 on Proposed Recommendations was handled Dr. Joy Kenneth
Biasong. After every presentation of the different sessions, workshop was conducted simultaneously.
Tools were given to gather and consolidate the data.

       The quantitative and qualitative information gathered were consolidated, analyzed and interpreted
and presented by Dr. Marcial Degamo, Chief of Quality Assurance and Accountability Division to the top
management for actions and adjustments. Inputs from the Technical Advisers of SEMIT were noted down.



4.0. Findings

4.1. Organizational Effectiveness

4.1.1 Expected outputs

Overall percentage of accomplishment of the region
         Third Quarter (July - September) of this Calendar Year 2012 was a good quarter for Region 7 in
terms of its overall percentage of accomplishment. The Work Plan of every functional division was the
basis in counting the physical accomplishments. Based on its results, the region had 88.98% which has an
increase of 4.44% from the previous quarter which is 84.54%. The region as an organization is
satisfactorily doing well despite of the inadequacies in terms of personnel, office equipment and other
resources of the newly structured regional office.
        As shown in the Table I below, Planning, Policy and Research Division and Administrative Division
performed the highest, followed by the Resource Mobilization and Special Programs and Project Division,
then by Training and Development and by the Field Effectiveness Division. Almost all of the Regional
Divisions/Units showed better performance as expected.
       The functional divisions showing relatively greater performance are the Quality Assurance and
Accountability Division, Budget and Finance Division, and Curriculum and Learning Management Division.




                                                    4
Table I

                  RO UNIT                                   Percentage of Accomplishment
 Planning, Policy, and Research Division                                97.04%
          Administrative Division                                       98.71%
    Training & Development Division                                     57.14%
       Field Effectiveness Division                                     96.00%
  Curriculum and Learning Management
                                                                        96.00%
                 Division
    Resource Mobilization and Special
                                                                        88.00%
     Programs and Projects Division
  Quality Assurance and Accountability
                                                                        90.00%
                 Division
      Budget and Finance Division                               To be reported in Q4 yet
                   Total                                                88.98%



        The performance of all functional divisions/units and the over-all performance of the region in
Quarter 3 is shown in the graph below.




Percentage of Unaccomplished Outputs
    There are only very few targeted outputs that were not accomplished during the first quarter of this
year. The table below shows that only 11.02% left unaccomplished and noted to be done on the fourth



                                                      5
quarter of this year. It shows that every functional division/unit did their share of accomplishing their targets
despite of the limited resources in the region.

                     RO UNIT                                     Percentage of Unaccomplishment
    Planning, Policy, and Research Division                                    2.96
             Administrative Division                                           1.29
        Training & Development Division                                       42.86
          Field Effectiveness Division                                         4.00
 Curriculum and Learning Management Division                                   4.00
  Resource Mobilization and Special Programs
              and Projects Division                                           12.00
 Quality Assurance and Accountability Division                                10.00
          Budget and Finance Division                                To be reported in Q4 yet
                     TOTAL                                                    11.02




        The unaccomplished outputs can be very well understood in the graph below.




REASONS FOR BALANCE

                                                        6
Common reasons for the balances of outputs of Third Quarter RMEA were delayed downloading
of SPHERE funds. Failure to complete the targeted outputs is one of the considerations in the making of
adjustment Work Plan for the CY 2012.
   4.1.2 Unexpected /Value Added Outputs

         Shown in the Table III below are the outputs which were not targeted in the Work Plan but were
done for some reasons that there were instructions from the top management to do so. Only Curriculum
and Learning Management Division has declared of having value-added outputs. The rest of the functional
divisions, there’s none.

                                         Table III: VALUE-ADDED OUTPUTS

       RO UNIT                   VALUE-ADDED OUTPUTS                      REASONS FOR ACHIEVING THEM
                                                                     Funds originally charged to SEMIT
                     Capacitated Division MTB-MLE Writers/Editors    Additional funds downloaded from
                                                                     the CO
                     Identified Issues/Concerns/Priorities of        Problems encountered that crop-up
                     MISOSA Implementation                           during the RFTAT
                     MISOSA Resource Package for TOT                 Provision of TA
                     Capacitated MISOSA Implementers                 Provision of TA
        CLMD         Capacitated Division Trainers on DORP           Provision of TA
                     Implementation as part of SBM
                     Harmonized Multi-sectoral Values Education      Due to different implementation of
                     Program in Region VII                           the Values Education Program
                     Capacitated Division Trainer on Assessment      Due to request from the field for a
                     and Learning Based Outcomes                     unified and clear Assessment of
                                                                     performance of the K to 12 learner.
                     Capacitated K-12 Grade 2 LM&TG Writers          Preparing for the Grade 2
                                                                     implementation
        QAAD         One QAAD Member served as trainer on the
                     Regional Training of School Paper Advisers      Regional Director’s order
                     and Campus Journalists on September 25-
                     26,2012 , DepED Ecotech Center, Cebu city
                     Chief and One QAAD member attended the          Regional Director’s order
                     Capability Building on Impact Evaluation
                     Chief QAAD attended PEACE Tech                  Regional Director’s order
                     Incorporated
                     One QAAD member attended the 3rd RIACAP
                     for person with disability conference           Regional Director’s order
                     September 25,2012
                     One QAAD member served as Regional Sub
                     Committee for the Council Welfare Children
                     ( RSCWC) 3rd Interagency for the Regional       Regional Director’s order
                     Sub- committee for Council Welfare for

                                                     7
Children
              September 26,2012

              One QAAD Member served as Chairman of
              the Board on the Selection of the Ten              Regional Director order
              Outstanding Boy Scout of the Philippines
              (BSP) for National Qualifier
              August 18, 2012
              One QAAD member attended the BSP
              Executive Meeting as Region representative         Regional Director order
              July to September ,2012
              One QAAD member served as an evaluator on
              the selection of presidential award for Child      Regional Director order
              Friendly Cities , first to fourth municipalities
              category July 2012
              Two QAAD members prepared SG and PPT               Regional Director order
              and for the CB on SH K to 12 implementation
              19 Division CFSS coordinators and 6 RFTATs         Regional Director order
              leaders and members oriented
              One QAAD member served as evaluator of             Regional Director order
              Brigada Eskwela Regional Qualifiers
              Four QAAD members participated the
              Benchmarking of DMEA in Tagbilaran and             Regional Director order
              Bohol Divisions
RMSPPD
              Facilitated intermissions on dances, songs         Request from the central office
              and jingle during the go education campaign
              Gathered topics and materials per resource         To be presented for the CVRAA
              speaker on unpublished folkdance, folksong         2012 cultural show
              and composition of “Balitaw”.
CULTURE
              Identified division who will open school for the   Every division should open school
AND ARTS
              arts                                               for the arts because that is one of
                                                                 the major programs / projects
              Identified trainers on the seminar on how to       Selection of potential trainers
              open school for the arts on their respective
              topics and instructional materials
              Put up of unpublished folkdance, folksongs         To attain the objectives of localized
              and composed “Balitaw”                             folk dances and folk songs based
                                                                 on K-12 curriculum
HEALTH AND    Conducted training roll –out on HIV/Aids           Compliant to DepED Order No. 45 &
NUTRITITION   orientation in the workplace in the nine (10)      47 s. 2012.
UNIT          schools division of RO-VII
              Conducted world food day poster making             Advocacy on food security
              contest Sept. 11,2012)


                                              8
TLE/HELE        Conducted national search for sustainable       Mitigating climate change and
                and eco-friendly schools                        practicing solid waste management
                Launched the 8th animal welfare week            Advocating the law that protects the
                celebration                                     right of animals.

T&D D           Prepared 2 Program Designs for CB on the        Utilized the expertise of Regional
                Implementation of Grade I and Grade 7 K to 12   and Division T&D teams and writers
                Curriculum for School Heads
                Developed 2 Resource Packages for CB on         Utilized the expertise of Regional
                the Implementation of Grade I and Grade 7 K     and Division T&D teams and writers
                to 12 Curriculum
                Refined Session Guides, PowerPoint              Committed and dedicated Regional
                presentations for CB on the Implementation of   and Division Writers
                Grade I and Grade 7 K to 12 Curriculum for
                School Heads
                Quality assured Session Guides, PowerPoint      Tapped the expertise of LRMDS
                presentations for CB on the Implementation of   and ICT Personnel
                Grade I and Grade 7 K to 12 Curriculum for
                School Heads
                17 additional Regional Personnel attended the   The Regional Director’s presence
                CB on Basic Computer Application Skills         as an active participant motivated
                                                                the Regional personnel to attend
                                                                the CB
                Partnered with Field Effectiveness Division     Strong tandem between FED and
                (FED) Division in the management of the         T&D teams
                Regional Training of Trainers (TOT) on e-
                Tracking on SARDOs
                Served as Program Hosts/Master of               One of the functions, roles, and
                Ceremonies/coordinators of various regional     responsibilities of the T&D team
                level activities, such as:                      members
                     • Benchmarking of Region IV-A, Region
                         III, CARAGA, Region X
                     • Go! Education Advocacy
                     • Seminar on Professional Development
                         for SDSs, ASDSs, and Regional
                         Chiefs on public speaking
                Served as Resource Speakers during the          One of the functions, roles, and
                following workshops:                            responsibilities of the T&D team
                     • Establishment for the School for Arts    members
                         in the 19 schools divisions
                     • Unpublished Folkdances and Folk
                         Songs
  4.1.3    Issues


                                              9
In the Third Quarter Regional Monitoring Evaluation and Adjustment of the year 2012, lack of personnel is the
most noticeable recurring issue that is shared by several divisions. The functional/support divisions affected by the
disproportionate volume/demands of work and number of available personnel are Training and Development Division
(T&DD), Resource Mobilization Special Programs and Projects Division (RMSPPD) and Budget and Finance Division
(BFD).

          Another issue that has recurred in the Third Quarter is the lack of promptness in submission of reports. The
functional and support divisions that are mainly affected by this issue are the Policy Planning and Research Division
(PPRD), Quality Assurance and Accountability Division (QAAD), Field Effectiveness Division (FED), and Budget and
Finance Division (BFD).

         The table below shows the implementation issues of the different functional/support divisions and the resolutions
they propose/recommend to the Chiefs, Regional Management and/or Senior Management/External Stakeholders.

                                Table IV: Consolidated Issues and Proposed Resolutions




                                                           10
PROPOSED
RO UNIT      ISSUES /CONCERNS                  CATEGORY             CLASSIFICATION           RESOLUTIONS/
                                                                                           RECOMMENDATION
          No LCD to use during
                                           Environmental/Infrastr   Beyond the Unit's   Request for provision of
 CLMD     trainings and other related
                                                  ucture                Control         LCD
          activities
                                                                                        Request authority /authority
          Undermanned/ Lack of                                      Beyond the Unit's
  AD                                            Institutional                             to fill up non-teaching
          Personnel due to RAT Plan                                     Control
                                                                                                   positions
          Exhausted computer
                                           Environmental/Infrastr   Beyond the Unit's   Request for a provision of
 CLMD     memory causing slow
                                                  ucture                Control         external hard drive
          performance
          Out-of-order photocopying                                 Beyond the Unit's   Replacement/repair of
 CLMD                                         Environmental
          machine                                                       Control         photocopying machine
          Insufficiency of focal                                                        Time management and
                                                                    Beyond the Unit's
 CLMD     personnel (ALS, TLE,                  Institutional                           provision of additional
                                                                        Control
          APEH)                                                                         personnel.
          Instructional materials for
          uploading and publishing
                                                                                        Review and redevelop
          need review due to non-                                   Within the Unit's
 CLMD                                            Technical                              materials for alignment to K
          compliance to K to 12                                         Control
                                                                                        to 12
          competencies and
          standards.
                                                                    Within the Unit's
 FED      Conflict of Schedules                 Institutional                           Prioritize activities
                                                                        Control
                                              Environmental/        Beyond the Unit's
 FED      No printer                                                                    Request provision of printer
                                               Infrastructure           Control
                                                                    Beyond the Unit's
 FED      No support staff                       Technical                              Request for support staff
                                                                        Control
                                              Environmental/        Beyond the Unit's   Follow up regional
 FED      FED Comfort Room
                                               Institutional            Control         management
          Photocopier always
          malfunctions and repair             Environmental/        Beyond the Unit's   Request for heavy-duty
 QAAD
          (oftentimes delayed) is not          Institutional            Control         copier as replacement
          long-lasting
          Purchase Request
          submitted specifying the
                                              Environmental/        Beyond the Unit's   Request for a facilitated
 QAAD     replacement of 3 chargers of
                                               Institutional            Control         purchase and delivery
          QAAD laptops (2 HP and 1
          Lenovo) not yet acted
          Defective printer returned for
                                              Environmental/        Beyond the Unit's   Request for prioritization of
 QAAD     repair/replacement not
                                               Institutional            Control         this request
          returned/ replaced yet
          Telephone always out-of-                                                      Request for immediate
                                              Environmental/        Beyond the Unit's
 QAAD     order and requests for repair                                                 repair or replacement of
                                               Institutional            Control
          not immediately acted                                                         telephone line
                                                                                        Request for access that is
                                                                                        limited only to the numbers
          Telephone no access for                                   Beyond the Unit's
 QAAD                                         Environmental                             of the 19 schools divisions
          long distance calls                                           Control
                                                                                        and Central Office (arrange
                                                                                        with Tel Co.)
                                                      11
4.1.4    Lessons Learned

           At the course of the implementation of the targets in the Work Plan of every functional division/unit
in the region for the FY 2012, lessons were generated. The lessons learned serve as part of the essential
considerations for plan adjustments in the following quarter. These could either be derived either from the
facilitating factors or hindering factors encountered during its implementation of the newly restructured
Regional Office. These may provide information on how the Functional Divisions can limit strategies for the
accomplishment of Work plans and highlight factors contributory to the targets.
         Table V below shows the facilitating, hindering factors and lessons learned of the functional
divisions/units which were noted down during the conduct of the Third Quarter RMEA.

                                    Table V. Recommended Lessons Learned

            FD/RO Unit                                      LESSONS LEARNED

                               Observance of proper protocol establishes harmonious relationship between
                               and among regional and division personnel leads to quick submission of
                               required documents.
                PPRD           Delivery of activities as scheduled promotes work efficiency and
                               effectiveness.
                               Adherence to the schedule set by the Central Office has motivated the
                               Schools Divisions to submit required documents promptly.
                               Intrinsic motivation and individual accountability of T&D personnel leads to
                TDD            the accomplishment of tasks
                               Quality outputs are guaranteed when done with transparency and honesty
                               Practicing the 5S improves the delivery of services.
                ADMIN          Serving with a smile promotes client satisfaction .
                               Adherence to DepED policies, guidelines, rules and regulations assures
                               quality services.
                               Time management is essential in the accomplishment of the desired output.
                CLMD           Quality time is needed in planning activities so that agreement will be
                               established such that the order of importance is carefully pursued.
            RMSPPD             Consultation and coordination among the functional divisions minimize
                               overlapping of activities.
                               Interdependence and collaboration among RMSPPD personnel facilitate the
                               realization of goals despite diversified functions.

                                                      12
Prioritization of activities /workloads leads to the efficient and effective
                                implementation of programs and projects.
                                Consistency in carrying out planned activities leads to the improvement of
                                performance.
              QAAD              Good working attitude of personnel promotes work efficiency and
                                effectiveness.
                                Smooth relationship among members contributes to the attainment of targets.


        It is recommended to continue the good practices as observed in the past three months.


There are factors that had surfaced during the conduct of Q3 RMEA which hindered the accomplishment of
the targeted outputs such as:
      No LCD to use during trainings and other related activities;

     Lack of personnel/manpower in some divisions which delays the implementation of targets ;

     Unfocused and lack of coordination between FDs and RFTATs members;

    Specifically in the TDD, they have identified factors which hindered the accomplishment of their desired
    outputs, like;

     Absence of NCBSSH-TNASH to be used in conducting the workshop/CB program
     Delayed schedule of joint activities, viz:
    • Joint workshop (Regions 6, 7, & 8) on TDIS enhancement

    •   Joint workshop of Regions 6, 7, & 8 on the Development of Program Design and Resource
        Package on the Capability Building on JEL Advising

     Lack of T&D personnel



However, there are some factors facilitated the accomplishments of targets as seen across FDs, like:
    Intrinsic motivation and individual accountability of T&D personnel leads to the accomplishment of
      tasks;
     Transparency and honesty in performing the assigned tasks;
     Open communication and collaboration among the team members;
     Good camaraderie (symbiotic), strong collaboration, and trust among the FD members will give
      clear directions;
     Maximum engagement of the FDs Personnel;

     Coordination among staff facilitates successful operation and on time submission of reports;

                                                         13
 Firm commitment, work attitude and principle of harmonious good understanding were being
       observed;

      Well planned and good preparation as well as in the implementation of PAPs; and

      Well crafted resource packages facilitated the successful conduct of CBs and trainings.


4.2. Organizational Resource Support
     4.2.1. Expected Outputs

    The Administrative Division, being the support division is composed of Personnel, Legal, Cashier,
Records, Supplies and General Services.

     Table VI below shows the reported accomplishments of the Administrative Division.

                                             Table VI: Administrative Division

                                                                                                              STATUS
FD’s Outputs                                                                                              Done    On-going
     1)   Collection of the Registry of Qualified Applicants (RQA) of the 19 Schools Division              
     2)   Consolidate and Validate report on vacancies due to retirement, resignation, death, promotion    
          and transfer (19 DOs)
     3)   Process approved ERF and reclassification for implementation (for submission to DBM)             
     4)   Determine the number of vacant positions in the Regional Office                                  
     5)   Coordinate in the conduct of Employees General Assembly for the months of July, August and       
          September 2012
     6)   Process requests for correction of name and date of birth                                        
                                                                                                           
SUPPLY SECTION
      1) Process Purchase Request                                                                          
      2) Process Purchase Order                                                                            
      3) Conduct quarterly inventory of office equipment and materials (8 offices in the R.O.              
RECORDS SECTION                                                                                            
    1. Track received documents                                                                            
    2. Release of documents                                                                                
    3. Process of CAV                                                                                      
CASH SECTION                                                                                               
    1. PREPARE REPORT ON CHECK ISSUED (RCI)                                                                
    2. ISSUE O.R.                                                                                          
    3. Disburse salaries of DepED RO employees                                                             
        (plantilla, casual, contractual and job order)
                                                                                                           

         The Administrative Division performed greatly their mandated functions as revealed in the recent
conduct of Third Quarter RMEA while the Budget and Finance Division has yet to report on the next quarter
due to the conflict of activities. It can be noted in the Table VII below that the over-all performance of the


                                                                   14
Administrative Division which is 98.71% which means they have been doing satisfactorily for the Third
Quarter of 2012.


                           Table VII – Computed Performance of the Administrative Division



                         RO UNIT                                   % of Accomplishment
    AD 1: Administrative Division                                          98.71%
    AD 2: Budget and Finance Division                     Has yet to be reported on the next quarter




5.0 RECOMMENDATIONS

.
       In light of the reported physical outputs, issues and lessons learned presented during the conduct
of the Third Quarter Regional Monitoring, Evaluation and Adjustment (RMEA), the following
recommendations were proposed:


Recommendations for Unaccomplished Outputs

All Functional and Support Divisions

       All balances of the Physical Outputs for Third Quarter of CY 2012 to be carried over to the Fourth
        Quarter of CY 2012

Recommendations on the Unaccomplished Outputs by FDs
        After analyzing the physical accomplishment of outputs by functional division, its balances and
issues, a summary of recommendations is shown in the Table VII below.
                                    Table VIII Summary of Recommendations

     FD/ SD        Recommendations on Unaccomplished Outputs                       Remarks
      T&D          Orientation on NCBSHS-TDNASH                               • Carry over in Q4
                   JEL-Advising
       FED        First SBM General Assembly                                   • Carry over in Q4



                                                     15
AD        Outputs of Legal Section                                       • To be reported in Q4
     PPRD       Access to Learner Reference Numbers (esp. for                  • To be considered in
                those who transfer into/out of the region)                        Quarter 4 as suggested
                                                •                                 by the Body
                Monitoring of e-BEIS updates
      BFD       Quarter 3 accomplishments                                      • To be reported in Q4


.




         Recommendations on Lessons Learned by FDs

    FD/ SD                             Recommendations on Lessons Learned

PPRD         Observance of proper protocol establishes harmonious relationship between and among
             regional and division personnel leads to quick submission of required documents.


             Delivery of activities as scheduled promotes work efficiency and effectiveness.
             Adherence to the schedule set by the Central Office has motivated the Schools Divisions to
             submit required documents promptly.
T&DD         Intrinsic motivation and individual accountability of T&D personnel leads to the
             accomplishment of tasks.

             Quality outputs are guaranteed when done with transparency and honesty.
FED          Distribution of specific tasks to every member facilitates the accomplishment of given
             assignments.

Administr    Practicing the 5S improves the delivery of services.
ative
Division     Serving with a smile promotes client satisfaction.



                                                    16
Adherence to DepED policies, guidelines, rules and regulations assures quality services.




        Recommendations on Issues

                                                                              PROPOSED
                                                                  UNIT'S
RO UNIT    IMPLEMENTATION ISSUES                 CATEGORY                     RESOLUTIONS/
                                                                 CONTROL
                                                                              RECOMMENDATION
           RECURRING ISSUE: No LCD to
CLMD,                                           Environment/                  Request for provision of
           use during trainings and other                          Beyond
QAAD                                            Infrastructure                LCD
           related activities
                                                                              Replacement/ repair of
           Out-of-order        photocopying     Environment/
CLMD                                                               Beyond     photocopying machine
           machine                              Infrastructure
QAAD,      Photocopier always malfunctions
                                                Environment/                  Request for heavy-duty
RMSPPD     and repair (oftentimes delayed) is                      Beyond
                                                Infrastructure                copier as replacement
           not long-lasting
           Purchase Request submitted
           specifying the replacement of 3
                                                Environment/                  Request for a facilitated
 QAAD      chargers of QAAD laptops--2 HP                          Beyond
                                                Infrastructure                purchase and delivery
           and 1 Lenovo-- (urgent/ serious/
           grave need) not yet acted
           RECURRING ISSUE:
           Defective printer returned for       Environment/                  Request for prioritization
 QAAD                                                              Beyond
           repair/replacement not returned/     Infrastructure                of this request
           replaced yet
                                                Environment/                  Request provision of
  FED      No printer                                              Beyond
                                                Infrastructure                printer
                                                Environment/                  Provision of additional
RMSPPD Lack of Printer                                             Beyond
                                                Infrastructure                printer
           RECURRING ISSUE:
           Defective printer returned for       Environment/                  Request for prioritization
 QAAD                                                              Beyond
           repair/replacement not returned/     Infrastructure                of this request
           replaced yet
           Telephone always out-of-order                                      Request for immediate
                                                Environment/
 QAAD      and requests for repair not                             Beyond     repair or replacement of
                                                Infrastructure
           immediately acted                                                  telephone line
                                                                              Request for access that is
                                                                              limited only to the
 QAAD, Telephone no access for long                                           numbers of the 19 schools
                                                Environment        Beyond
RMSPPD distance calls                                                         divisions and Central
                                                                              Office (arrange with Tel
                                                                              Co.)
 QAAD      Telephone always out-of-order        Environment/       Beyond     Request for immediate

                                                  17
and requests for repair not                                  repair or replacement of
                                              Infrastructure
           immediately acted                                            telephone line
           RECURRING                ISSUE:                              Time management and
 CLMD      Insufficiency of focal personnel   Institutional    Beyond   provision of additional
           (ALS, TLE, APEH)                                             personnel.
                                                                        Request authority
           Undermanned/ Lack of Personnel
  AD                                          Institutional    Beyond   /authority to fill up non-
           due to RAT Plan
                                                                        teaching positions
       RECURRING ISSUE (3 years
       old): Due to the increasing
       demands of M&E and the
       provision of TAs in the 19
       schools divisions vis-à-vis the
       delivery of training programs, the     Institutional              Request for 4 additional
 TDD                                                           Beyond
       T&D has deprived groups in need                                  personnel even on detail.
       of T&D services because of lack
       of personnel and reduced its
       caring capacity of the office that
       will sacrifice the quality of
       outputs.
       RECURRING ISSUE (3 years
       old): Due to the increasing
       demands of M&E and the
       provision of TAs in the 19
       schools divisions vis-à-vis the
       delivery of training programs, the                                Request for 4 additional
 TDD                                          Institutional    Beyond
       T&D has deprived groups in need                                  personnel even on detail.
       of T&D services because of lack
       of personnel and reduced its
       caring capacity of the office that
       will sacrifice the quality of
       outputs.
  FED  No support staff                        Technical       Beyond   Request for support staff
       RECURRING ISSUE: Lack of                Institutional
                                                                        Provision of additional
RMSPPD professional & technical Staff for                      Beyond
                                                                        manpower
       PFU
       RECURRING ISSUE: Conflict of            Institutional
  FED                                                          Within   Prioritize activities
       Schedules
       RECURRING                   ISSUE:      Institutional
                                                                           Chiefs of Functional
       Reconciliation of activities across
                                                                          Divisions to coordinate
 TDD   functional divisions (Scheduling                        Within
                                                                           and prepare Monthly
       should be done collaboratively to
                                                                            Matrix of Activities
       avoid conflict of schedules)
       RECURRING ISSUE:                         Financial/              Prompt release of SARO
RMSPPD                                                         Beyond
       Delayed release of SARO                IInstitutional            by concerned agency
RMSPPD Delayed processing of Billing           Financial /     Beyond   Assistance from SDS to

                                                18
monitor processing of
                                                   Institutional
                                                                                billing
            RECURRING ISSUE:                      Environment/                  Follow up regional
  FED                                                               Beyond
            FED Comfort Room                       Institutional                management
                                                                                Request regional
            The proximity of office to the e-                                   management to transfer
                                                  Environment/
  TDD       DTR     machine       for    daily                      Beyond      T&DD Office at the newly
                                                  Infrastructure
            attendance                                                          refurbished 3rd floor of the
                                                                                RO
                                                                                Request Regional
                                                                                Management to discuss in
                                                                    Beyond      the EXECON Thorough
                                                  Environment./
RMSPPD School Site Problems                                        the Unit's   assessment of sites
                                                   Institutional
                                                                    Control     before inclusion to priority
                                                                                list to avoid realignment &
                                                                                delay.
                                                                                Provision of Logistic
       RECURRING ISSUE: Logistic                    Financial
                                                                                support for technical
RMSPPD support for technical personnel`s           /Transpo./       Beyond
                                                                                personnel`s mobility (c/o
       mobility                                    Equipment
                                                                                SDSs)

Technical Advisers’ Comment:

         Maam Twila made mentioned on the TDD’s accomplishment only 57.14% due to the reason that
only three people work for TDD.

        It is suggested to add personnel on detail to augment the workforce at TDD.


Comparative Results of 2012 RMEA

       Table VIII below shows the comparative performance of the region for the past three quarters of
CY 2012.

                            Table IX - Comparative Results of 2012 RMEA
                                   2012 Quarterly Performance
        RO Units                                 Percentage of Accomplishment
                                     Q1                       Q2                            Q3
       PPRD                         98.00                   100.00                        97.04%
         AD                         98.20                   100.00                        98.71%
       T&DD                         95.00                    88.89                        57.14%
        FED                         94.70                    84.31                        96.00%
       CLMD                         93.30                    50.00                        96.00%
      RMSPPD                        91.70                    95.90                        88.00%
       QAAD                         88.50                    82.35                        90.00%

                                                    19
To be reported in
         BFD                         85.70                       80.75
                                                                                             Q4
      Regional
                                    93.20%                      84.54%                      88.98%
    Performance


        The regional performance in the Quarter 1 is 93.20%, Very Satisfactory, while it went down to
84.54% in the Quarter 2 and raise to 88.98% in Quarter 3. It is understandably due to some limitations and
there are still more time to accomplish the remaining outputs in the next quarter.




Management Response

         Dr. Carmelita T. Dulangon , Officer-in-Charge to the Office of the Regional Director accepted all the
recommendations proposed by the functional divisions and support divisions to increase efficiency and
effectiveness in the delivery of quality services to the clientele and produce quality outputs and results.

        To solve the lack of personnel in some functional divisions, she asked for recommendees, who can
be detailed to the regional office without additional compensation.

        For the unaccomplished outputs, she suggested when you plan, stick to your plan, to consider the
requirements like the personnel to do the planned activities and other considerations.

        She instructed the Admin Officer to look into the availability of laptops and printers that can be
used by other RO offices which need equipment. FED has to share the comfort room of the CLMD.

       For those personnel who rendered services on weekends may avail of Compensatory Time Off
(CTO) provided that it is indicated at the Regional Memorandum.

         The management commented on the oneness of the regional personnel. Each one contributes to
the attainment of the desired goals.




                                                      20

RMEPA Progress Report of Accomplishments for the 3rd Quarter of Calendar Year 2012

  • 1.
    PROGRESS REPORT OFACCOMPLISHMENTS FOR THE PERIOD OF: JULY - SEPTEMBER 2012 REGION: VII 1
  • 2.
    PROGRESS REPORT OFACCOMPLISHMENTS FOR THE PERIOD OF: JULY - SEPTEMBER 2012 REGION: VII 1.0. INTRODUCTION The Regional Monitoring, Evaluation and Adjustment is done periodically to determine the progress of the region in its delivery of education services as well as its performance as an organization. The lead functional division to conduct quarter RMEA is the Quality Assurance and Accountability Division using the STRIVE RMEA technology with the participation of the various functional as well as administrative units of the region with the end-point of obtaining information for the regional management to make decisions on adjusting its work plans and strategies. Unnumbered Regional Memorandum dated October 2, 2012 was issued to all Regional Personnel Concerned for the CY 2012 Third Quarter Regional Monitoring, Evaluation and Plan Adjustment. All RO Units were directed to prepare the monitoring and evaluation report which aimed to establish information as basis for determining appropriate approach / strategy to improve organizational performance in fulfillment of the regional mandate and strengthen collective actions to service better the divisions and schools within the accountability of the Region and present information regarding organization resource support to the region management that will support decisions and adjustments to plans (e.g. budget, personnel, physical facilities plan) and strategies to ensure appropriate allocation of resources to support performance efficiency and effectiveness. 2.0. SCOPE With the implementation framework of the system now in place and accepted by the Regional Management, an important part of the process is its implementation. The two - day live-out Third Quarter RMEA was conducted on October 10-11, 2012 and quantitative and qualitative information per RO unit were gathered, analyzed, interpreted and to be presented to the Regional Management. But prior to the actual conduct of the RMEA, there was Pre-RMEA conducted on October 8-9, 2012. Necessary adjustments on the Work plan of every functional division/RO unit was done in the afternoon on the second day of the RMEA on October 11, 2012. The coverage of the Monitoring and Evaluation report is from July to September, 2012 as indicated in the Work Plan of every Functional division and RO Unit. The focus of this report is on area on Organizational Performance/Health along its Organizational Effectiveness which pertains to individual, team and organizational effectiveness of the region. Outputs achieved per individual RO Unit and those co-implemented by at least 2 or more RO units, Implementation Issues of each regional unit/functional division regarding work plan implementation, Institutional issues that involves multiple functional divisions 2
  • 3.
    and Lessons Learnedare tracked down while Organizational Resource Support concerns mainly with availability and adequacy of resource requirements for the region to carry out its mandate efficiently and effectively. This includes the analysis of how the region best optimizes its financial, human and organizational capabilities in performing its functions by individual units and as a team. 3.0. METHODOLOGY The weeklong live-out Third Quarter RMEA was conducted following the STRIVE RMEA technology . Purposely it was conducted for the participants to have established quantitative information on the accomplishment of every RO unit, identified and clarified issues encountered and lessons learned and adjusted the work plan of each Functional division/RO unit. During the Pre-work activity on October 8-9, 2012 at DepED Conference Room, Cebu City, all Chiefs, Internal M & E of every RO unit and QAAD personnel and in every RO unit assigned in every RO unit convened and did actual data collection on quantitative and qualitative information to gather initial reports on Physical Accomplishment. Tools were given for easy data collection following established standards. In plenary during the Pre-RMEA, the following instructions were given for the simultaneous division/unit group work:  Each functional division/unit must have a designated official documenter  Based on the accomplished FD/Unit Output Matrix in Table 1-A, each FD computed the division/unit’s physical accomplishment using the Table 1-B on Programs and Projects, Table 1-C on FDs Physical Accomplishment, Table 1-D on Budget and Finance and Admin.  In plenary, consolidation of the functional division /unit physical accomplishment using Table 1-E was done.  Each FD reported the balance of physical outputs and identified reasons for variance using Table 1-F.  Then, every FD has to identified the value added contributions using the Table 1-H A physical output can only be credited if it meets standard/s and has MOV/s. Each QAAD personnel was given assignment on what RO Unit to facilitate for easy data gathering, analysis and interpretation using the recommended tools : CLMD by Dr. Estela B. Susvilla, T and DD and RMSPPD by Dr. Joy Kenneth Biasong, FED by Dr. Eduardo Bacaltos, QAAD by Ms. Rosa Cabotaje, PPRD by Ms. Merden Bryant, BFD and Admin by Mr. Sinfronio Thelmo. Dr. Marcial Degamo was the over-all Chairman. The actual conduct of RMEA took place on October 10-11, 2012 at the same venue DepED Conference Room, Cebu City. The quantitative and qualitative information gathered during the Pre-RMEA were validated by the all members of the RO Units before the actual reporting. 3
  • 4.
    Day 1 ofthe RMEA proper was reporting by all Chiefs of the RO Units on their accomplishments, balances, value added contributions, issues, lessons learned and proposed recommendations. They were made to identify the outputs that can be considered as their technical assistance made to the Schools Division Offices. Different sessions were facilitated by the QAAD personnel. Session I on Quantitative Information was facilitated by Dr. Estela Susvilla, Session 2 , on Issues and Proposed Resolutions by Ms. Merden Bryant, Session 3 on Lessons Learned by Ms. Rosa Cabotaje, Session 4 on Organizational Resources by Mr. Sinfronio Thelmo and Session 5 on Proposed Recommendations was handled Dr. Joy Kenneth Biasong. After every presentation of the different sessions, workshop was conducted simultaneously. Tools were given to gather and consolidate the data. The quantitative and qualitative information gathered were consolidated, analyzed and interpreted and presented by Dr. Marcial Degamo, Chief of Quality Assurance and Accountability Division to the top management for actions and adjustments. Inputs from the Technical Advisers of SEMIT were noted down. 4.0. Findings 4.1. Organizational Effectiveness 4.1.1 Expected outputs Overall percentage of accomplishment of the region Third Quarter (July - September) of this Calendar Year 2012 was a good quarter for Region 7 in terms of its overall percentage of accomplishment. The Work Plan of every functional division was the basis in counting the physical accomplishments. Based on its results, the region had 88.98% which has an increase of 4.44% from the previous quarter which is 84.54%. The region as an organization is satisfactorily doing well despite of the inadequacies in terms of personnel, office equipment and other resources of the newly structured regional office. As shown in the Table I below, Planning, Policy and Research Division and Administrative Division performed the highest, followed by the Resource Mobilization and Special Programs and Project Division, then by Training and Development and by the Field Effectiveness Division. Almost all of the Regional Divisions/Units showed better performance as expected. The functional divisions showing relatively greater performance are the Quality Assurance and Accountability Division, Budget and Finance Division, and Curriculum and Learning Management Division. 4
  • 5.
    Table I RO UNIT Percentage of Accomplishment Planning, Policy, and Research Division 97.04% Administrative Division 98.71% Training & Development Division 57.14% Field Effectiveness Division 96.00% Curriculum and Learning Management 96.00% Division Resource Mobilization and Special 88.00% Programs and Projects Division Quality Assurance and Accountability 90.00% Division Budget and Finance Division To be reported in Q4 yet Total 88.98% The performance of all functional divisions/units and the over-all performance of the region in Quarter 3 is shown in the graph below. Percentage of Unaccomplished Outputs There are only very few targeted outputs that were not accomplished during the first quarter of this year. The table below shows that only 11.02% left unaccomplished and noted to be done on the fourth 5
  • 6.
    quarter of thisyear. It shows that every functional division/unit did their share of accomplishing their targets despite of the limited resources in the region. RO UNIT Percentage of Unaccomplishment Planning, Policy, and Research Division 2.96 Administrative Division 1.29 Training & Development Division 42.86 Field Effectiveness Division 4.00 Curriculum and Learning Management Division 4.00 Resource Mobilization and Special Programs and Projects Division 12.00 Quality Assurance and Accountability Division 10.00 Budget and Finance Division To be reported in Q4 yet TOTAL 11.02 The unaccomplished outputs can be very well understood in the graph below. REASONS FOR BALANCE 6
  • 7.
    Common reasons forthe balances of outputs of Third Quarter RMEA were delayed downloading of SPHERE funds. Failure to complete the targeted outputs is one of the considerations in the making of adjustment Work Plan for the CY 2012. 4.1.2 Unexpected /Value Added Outputs Shown in the Table III below are the outputs which were not targeted in the Work Plan but were done for some reasons that there were instructions from the top management to do so. Only Curriculum and Learning Management Division has declared of having value-added outputs. The rest of the functional divisions, there’s none. Table III: VALUE-ADDED OUTPUTS RO UNIT VALUE-ADDED OUTPUTS REASONS FOR ACHIEVING THEM Funds originally charged to SEMIT Capacitated Division MTB-MLE Writers/Editors Additional funds downloaded from the CO Identified Issues/Concerns/Priorities of Problems encountered that crop-up MISOSA Implementation during the RFTAT MISOSA Resource Package for TOT Provision of TA Capacitated MISOSA Implementers Provision of TA CLMD Capacitated Division Trainers on DORP Provision of TA Implementation as part of SBM Harmonized Multi-sectoral Values Education Due to different implementation of Program in Region VII the Values Education Program Capacitated Division Trainer on Assessment Due to request from the field for a and Learning Based Outcomes unified and clear Assessment of performance of the K to 12 learner. Capacitated K-12 Grade 2 LM&TG Writers Preparing for the Grade 2 implementation QAAD One QAAD Member served as trainer on the Regional Training of School Paper Advisers Regional Director’s order and Campus Journalists on September 25- 26,2012 , DepED Ecotech Center, Cebu city Chief and One QAAD member attended the Regional Director’s order Capability Building on Impact Evaluation Chief QAAD attended PEACE Tech Regional Director’s order Incorporated One QAAD member attended the 3rd RIACAP for person with disability conference Regional Director’s order September 25,2012 One QAAD member served as Regional Sub Committee for the Council Welfare Children ( RSCWC) 3rd Interagency for the Regional Regional Director’s order Sub- committee for Council Welfare for 7
  • 8.
    Children September 26,2012 One QAAD Member served as Chairman of the Board on the Selection of the Ten Regional Director order Outstanding Boy Scout of the Philippines (BSP) for National Qualifier August 18, 2012 One QAAD member attended the BSP Executive Meeting as Region representative Regional Director order July to September ,2012 One QAAD member served as an evaluator on the selection of presidential award for Child Regional Director order Friendly Cities , first to fourth municipalities category July 2012 Two QAAD members prepared SG and PPT Regional Director order and for the CB on SH K to 12 implementation 19 Division CFSS coordinators and 6 RFTATs Regional Director order leaders and members oriented One QAAD member served as evaluator of Regional Director order Brigada Eskwela Regional Qualifiers Four QAAD members participated the Benchmarking of DMEA in Tagbilaran and Regional Director order Bohol Divisions RMSPPD Facilitated intermissions on dances, songs Request from the central office and jingle during the go education campaign Gathered topics and materials per resource To be presented for the CVRAA speaker on unpublished folkdance, folksong 2012 cultural show and composition of “Balitaw”. CULTURE Identified division who will open school for the Every division should open school AND ARTS arts for the arts because that is one of the major programs / projects Identified trainers on the seminar on how to Selection of potential trainers open school for the arts on their respective topics and instructional materials Put up of unpublished folkdance, folksongs To attain the objectives of localized and composed “Balitaw” folk dances and folk songs based on K-12 curriculum HEALTH AND Conducted training roll –out on HIV/Aids Compliant to DepED Order No. 45 & NUTRITITION orientation in the workplace in the nine (10) 47 s. 2012. UNIT schools division of RO-VII Conducted world food day poster making Advocacy on food security contest Sept. 11,2012) 8
  • 9.
    TLE/HELE Conducted national search for sustainable Mitigating climate change and and eco-friendly schools practicing solid waste management Launched the 8th animal welfare week Advocating the law that protects the celebration right of animals. T&D D Prepared 2 Program Designs for CB on the Utilized the expertise of Regional Implementation of Grade I and Grade 7 K to 12 and Division T&D teams and writers Curriculum for School Heads Developed 2 Resource Packages for CB on Utilized the expertise of Regional the Implementation of Grade I and Grade 7 K and Division T&D teams and writers to 12 Curriculum Refined Session Guides, PowerPoint Committed and dedicated Regional presentations for CB on the Implementation of and Division Writers Grade I and Grade 7 K to 12 Curriculum for School Heads Quality assured Session Guides, PowerPoint Tapped the expertise of LRMDS presentations for CB on the Implementation of and ICT Personnel Grade I and Grade 7 K to 12 Curriculum for School Heads 17 additional Regional Personnel attended the The Regional Director’s presence CB on Basic Computer Application Skills as an active participant motivated the Regional personnel to attend the CB Partnered with Field Effectiveness Division Strong tandem between FED and (FED) Division in the management of the T&D teams Regional Training of Trainers (TOT) on e- Tracking on SARDOs Served as Program Hosts/Master of One of the functions, roles, and Ceremonies/coordinators of various regional responsibilities of the T&D team level activities, such as: members • Benchmarking of Region IV-A, Region III, CARAGA, Region X • Go! Education Advocacy • Seminar on Professional Development for SDSs, ASDSs, and Regional Chiefs on public speaking Served as Resource Speakers during the One of the functions, roles, and following workshops: responsibilities of the T&D team • Establishment for the School for Arts members in the 19 schools divisions • Unpublished Folkdances and Folk Songs 4.1.3 Issues 9
  • 10.
    In the ThirdQuarter Regional Monitoring Evaluation and Adjustment of the year 2012, lack of personnel is the most noticeable recurring issue that is shared by several divisions. The functional/support divisions affected by the disproportionate volume/demands of work and number of available personnel are Training and Development Division (T&DD), Resource Mobilization Special Programs and Projects Division (RMSPPD) and Budget and Finance Division (BFD). Another issue that has recurred in the Third Quarter is the lack of promptness in submission of reports. The functional and support divisions that are mainly affected by this issue are the Policy Planning and Research Division (PPRD), Quality Assurance and Accountability Division (QAAD), Field Effectiveness Division (FED), and Budget and Finance Division (BFD). The table below shows the implementation issues of the different functional/support divisions and the resolutions they propose/recommend to the Chiefs, Regional Management and/or Senior Management/External Stakeholders. Table IV: Consolidated Issues and Proposed Resolutions 10
  • 11.
    PROPOSED RO UNIT ISSUES /CONCERNS CATEGORY CLASSIFICATION RESOLUTIONS/ RECOMMENDATION No LCD to use during Environmental/Infrastr Beyond the Unit's Request for provision of CLMD trainings and other related ucture Control LCD activities Request authority /authority Undermanned/ Lack of Beyond the Unit's AD Institutional to fill up non-teaching Personnel due to RAT Plan Control positions Exhausted computer Environmental/Infrastr Beyond the Unit's Request for a provision of CLMD memory causing slow ucture Control external hard drive performance Out-of-order photocopying Beyond the Unit's Replacement/repair of CLMD Environmental machine Control photocopying machine Insufficiency of focal Time management and Beyond the Unit's CLMD personnel (ALS, TLE, Institutional provision of additional Control APEH) personnel. Instructional materials for uploading and publishing Review and redevelop need review due to non- Within the Unit's CLMD Technical materials for alignment to K compliance to K to 12 Control to 12 competencies and standards. Within the Unit's FED Conflict of Schedules Institutional Prioritize activities Control Environmental/ Beyond the Unit's FED No printer Request provision of printer Infrastructure Control Beyond the Unit's FED No support staff Technical Request for support staff Control Environmental/ Beyond the Unit's Follow up regional FED FED Comfort Room Institutional Control management Photocopier always malfunctions and repair Environmental/ Beyond the Unit's Request for heavy-duty QAAD (oftentimes delayed) is not Institutional Control copier as replacement long-lasting Purchase Request submitted specifying the Environmental/ Beyond the Unit's Request for a facilitated QAAD replacement of 3 chargers of Institutional Control purchase and delivery QAAD laptops (2 HP and 1 Lenovo) not yet acted Defective printer returned for Environmental/ Beyond the Unit's Request for prioritization of QAAD repair/replacement not Institutional Control this request returned/ replaced yet Telephone always out-of- Request for immediate Environmental/ Beyond the Unit's QAAD order and requests for repair repair or replacement of Institutional Control not immediately acted telephone line Request for access that is limited only to the numbers Telephone no access for Beyond the Unit's QAAD Environmental of the 19 schools divisions long distance calls Control and Central Office (arrange with Tel Co.) 11
  • 12.
    4.1.4 Lessons Learned At the course of the implementation of the targets in the Work Plan of every functional division/unit in the region for the FY 2012, lessons were generated. The lessons learned serve as part of the essential considerations for plan adjustments in the following quarter. These could either be derived either from the facilitating factors or hindering factors encountered during its implementation of the newly restructured Regional Office. These may provide information on how the Functional Divisions can limit strategies for the accomplishment of Work plans and highlight factors contributory to the targets. Table V below shows the facilitating, hindering factors and lessons learned of the functional divisions/units which were noted down during the conduct of the Third Quarter RMEA. Table V. Recommended Lessons Learned FD/RO Unit LESSONS LEARNED Observance of proper protocol establishes harmonious relationship between and among regional and division personnel leads to quick submission of required documents. PPRD Delivery of activities as scheduled promotes work efficiency and effectiveness. Adherence to the schedule set by the Central Office has motivated the Schools Divisions to submit required documents promptly. Intrinsic motivation and individual accountability of T&D personnel leads to TDD the accomplishment of tasks Quality outputs are guaranteed when done with transparency and honesty Practicing the 5S improves the delivery of services. ADMIN Serving with a smile promotes client satisfaction . Adherence to DepED policies, guidelines, rules and regulations assures quality services. Time management is essential in the accomplishment of the desired output. CLMD Quality time is needed in planning activities so that agreement will be established such that the order of importance is carefully pursued. RMSPPD Consultation and coordination among the functional divisions minimize overlapping of activities. Interdependence and collaboration among RMSPPD personnel facilitate the realization of goals despite diversified functions. 12
  • 13.
    Prioritization of activities/workloads leads to the efficient and effective implementation of programs and projects. Consistency in carrying out planned activities leads to the improvement of performance. QAAD Good working attitude of personnel promotes work efficiency and effectiveness. Smooth relationship among members contributes to the attainment of targets. It is recommended to continue the good practices as observed in the past three months. There are factors that had surfaced during the conduct of Q3 RMEA which hindered the accomplishment of the targeted outputs such as:  No LCD to use during trainings and other related activities;  Lack of personnel/manpower in some divisions which delays the implementation of targets ;  Unfocused and lack of coordination between FDs and RFTATs members; Specifically in the TDD, they have identified factors which hindered the accomplishment of their desired outputs, like;  Absence of NCBSSH-TNASH to be used in conducting the workshop/CB program  Delayed schedule of joint activities, viz: • Joint workshop (Regions 6, 7, & 8) on TDIS enhancement • Joint workshop of Regions 6, 7, & 8 on the Development of Program Design and Resource Package on the Capability Building on JEL Advising  Lack of T&D personnel However, there are some factors facilitated the accomplishments of targets as seen across FDs, like:  Intrinsic motivation and individual accountability of T&D personnel leads to the accomplishment of tasks;  Transparency and honesty in performing the assigned tasks;  Open communication and collaboration among the team members;  Good camaraderie (symbiotic), strong collaboration, and trust among the FD members will give clear directions;  Maximum engagement of the FDs Personnel;  Coordination among staff facilitates successful operation and on time submission of reports; 13
  • 14.
     Firm commitment,work attitude and principle of harmonious good understanding were being observed;  Well planned and good preparation as well as in the implementation of PAPs; and  Well crafted resource packages facilitated the successful conduct of CBs and trainings. 4.2. Organizational Resource Support 4.2.1. Expected Outputs The Administrative Division, being the support division is composed of Personnel, Legal, Cashier, Records, Supplies and General Services. Table VI below shows the reported accomplishments of the Administrative Division. Table VI: Administrative Division STATUS FD’s Outputs Done On-going 1) Collection of the Registry of Qualified Applicants (RQA) of the 19 Schools Division  2) Consolidate and Validate report on vacancies due to retirement, resignation, death, promotion  and transfer (19 DOs) 3) Process approved ERF and reclassification for implementation (for submission to DBM)  4) Determine the number of vacant positions in the Regional Office  5) Coordinate in the conduct of Employees General Assembly for the months of July, August and  September 2012 6) Process requests for correction of name and date of birth   SUPPLY SECTION 1) Process Purchase Request  2) Process Purchase Order  3) Conduct quarterly inventory of office equipment and materials (8 offices in the R.O.  RECORDS SECTION  1. Track received documents  2. Release of documents  3. Process of CAV  CASH SECTION  1. PREPARE REPORT ON CHECK ISSUED (RCI)  2. ISSUE O.R.  3. Disburse salaries of DepED RO employees  (plantilla, casual, contractual and job order)  The Administrative Division performed greatly their mandated functions as revealed in the recent conduct of Third Quarter RMEA while the Budget and Finance Division has yet to report on the next quarter due to the conflict of activities. It can be noted in the Table VII below that the over-all performance of the 14
  • 15.
    Administrative Division whichis 98.71% which means they have been doing satisfactorily for the Third Quarter of 2012. Table VII – Computed Performance of the Administrative Division RO UNIT % of Accomplishment AD 1: Administrative Division 98.71% AD 2: Budget and Finance Division Has yet to be reported on the next quarter 5.0 RECOMMENDATIONS . In light of the reported physical outputs, issues and lessons learned presented during the conduct of the Third Quarter Regional Monitoring, Evaluation and Adjustment (RMEA), the following recommendations were proposed: Recommendations for Unaccomplished Outputs All Functional and Support Divisions  All balances of the Physical Outputs for Third Quarter of CY 2012 to be carried over to the Fourth Quarter of CY 2012 Recommendations on the Unaccomplished Outputs by FDs After analyzing the physical accomplishment of outputs by functional division, its balances and issues, a summary of recommendations is shown in the Table VII below. Table VIII Summary of Recommendations FD/ SD Recommendations on Unaccomplished Outputs Remarks T&D Orientation on NCBSHS-TDNASH • Carry over in Q4 JEL-Advising FED First SBM General Assembly • Carry over in Q4 15
  • 16.
    AD Outputs of Legal Section • To be reported in Q4 PPRD Access to Learner Reference Numbers (esp. for • To be considered in those who transfer into/out of the region) Quarter 4 as suggested • by the Body Monitoring of e-BEIS updates BFD Quarter 3 accomplishments • To be reported in Q4 . Recommendations on Lessons Learned by FDs FD/ SD Recommendations on Lessons Learned PPRD Observance of proper protocol establishes harmonious relationship between and among regional and division personnel leads to quick submission of required documents. Delivery of activities as scheduled promotes work efficiency and effectiveness. Adherence to the schedule set by the Central Office has motivated the Schools Divisions to submit required documents promptly. T&DD Intrinsic motivation and individual accountability of T&D personnel leads to the accomplishment of tasks. Quality outputs are guaranteed when done with transparency and honesty. FED Distribution of specific tasks to every member facilitates the accomplishment of given assignments. Administr Practicing the 5S improves the delivery of services. ative Division Serving with a smile promotes client satisfaction. 16
  • 17.
    Adherence to DepEDpolicies, guidelines, rules and regulations assures quality services. Recommendations on Issues PROPOSED UNIT'S RO UNIT IMPLEMENTATION ISSUES CATEGORY RESOLUTIONS/ CONTROL RECOMMENDATION RECURRING ISSUE: No LCD to CLMD, Environment/ Request for provision of use during trainings and other Beyond QAAD Infrastructure LCD related activities Replacement/ repair of Out-of-order photocopying Environment/ CLMD Beyond photocopying machine machine Infrastructure QAAD, Photocopier always malfunctions Environment/ Request for heavy-duty RMSPPD and repair (oftentimes delayed) is Beyond Infrastructure copier as replacement not long-lasting Purchase Request submitted specifying the replacement of 3 Environment/ Request for a facilitated QAAD chargers of QAAD laptops--2 HP Beyond Infrastructure purchase and delivery and 1 Lenovo-- (urgent/ serious/ grave need) not yet acted RECURRING ISSUE: Defective printer returned for Environment/ Request for prioritization QAAD Beyond repair/replacement not returned/ Infrastructure of this request replaced yet Environment/ Request provision of FED No printer Beyond Infrastructure printer Environment/ Provision of additional RMSPPD Lack of Printer Beyond Infrastructure printer RECURRING ISSUE: Defective printer returned for Environment/ Request for prioritization QAAD Beyond repair/replacement not returned/ Infrastructure of this request replaced yet Telephone always out-of-order Request for immediate Environment/ QAAD and requests for repair not Beyond repair or replacement of Infrastructure immediately acted telephone line Request for access that is limited only to the QAAD, Telephone no access for long numbers of the 19 schools Environment Beyond RMSPPD distance calls divisions and Central Office (arrange with Tel Co.) QAAD Telephone always out-of-order Environment/ Beyond Request for immediate 17
  • 18.
    and requests forrepair not repair or replacement of Infrastructure immediately acted telephone line RECURRING ISSUE: Time management and CLMD Insufficiency of focal personnel Institutional Beyond provision of additional (ALS, TLE, APEH) personnel. Request authority Undermanned/ Lack of Personnel AD Institutional Beyond /authority to fill up non- due to RAT Plan teaching positions RECURRING ISSUE (3 years old): Due to the increasing demands of M&E and the provision of TAs in the 19 schools divisions vis-à-vis the delivery of training programs, the Institutional Request for 4 additional TDD Beyond T&D has deprived groups in need personnel even on detail. of T&D services because of lack of personnel and reduced its caring capacity of the office that will sacrifice the quality of outputs. RECURRING ISSUE (3 years old): Due to the increasing demands of M&E and the provision of TAs in the 19 schools divisions vis-à-vis the delivery of training programs, the Request for 4 additional TDD Institutional Beyond T&D has deprived groups in need personnel even on detail. of T&D services because of lack of personnel and reduced its caring capacity of the office that will sacrifice the quality of outputs. FED No support staff Technical Beyond Request for support staff RECURRING ISSUE: Lack of Institutional Provision of additional RMSPPD professional & technical Staff for Beyond manpower PFU RECURRING ISSUE: Conflict of Institutional FED Within Prioritize activities Schedules RECURRING ISSUE: Institutional Chiefs of Functional Reconciliation of activities across Divisions to coordinate TDD functional divisions (Scheduling Within and prepare Monthly should be done collaboratively to Matrix of Activities avoid conflict of schedules) RECURRING ISSUE: Financial/ Prompt release of SARO RMSPPD Beyond Delayed release of SARO IInstitutional by concerned agency RMSPPD Delayed processing of Billing Financial / Beyond Assistance from SDS to 18
  • 19.
    monitor processing of Institutional billing RECURRING ISSUE: Environment/ Follow up regional FED Beyond FED Comfort Room Institutional management Request regional The proximity of office to the e- management to transfer Environment/ TDD DTR machine for daily Beyond T&DD Office at the newly Infrastructure attendance refurbished 3rd floor of the RO Request Regional Management to discuss in Beyond the EXECON Thorough Environment./ RMSPPD School Site Problems the Unit's assessment of sites Institutional Control before inclusion to priority list to avoid realignment & delay. Provision of Logistic RECURRING ISSUE: Logistic Financial support for technical RMSPPD support for technical personnel`s /Transpo./ Beyond personnel`s mobility (c/o mobility Equipment SDSs) Technical Advisers’ Comment: Maam Twila made mentioned on the TDD’s accomplishment only 57.14% due to the reason that only three people work for TDD. It is suggested to add personnel on detail to augment the workforce at TDD. Comparative Results of 2012 RMEA Table VIII below shows the comparative performance of the region for the past three quarters of CY 2012. Table IX - Comparative Results of 2012 RMEA 2012 Quarterly Performance RO Units Percentage of Accomplishment Q1 Q2 Q3 PPRD 98.00 100.00 97.04% AD 98.20 100.00 98.71% T&DD 95.00 88.89 57.14% FED 94.70 84.31 96.00% CLMD 93.30 50.00 96.00% RMSPPD 91.70 95.90 88.00% QAAD 88.50 82.35 90.00% 19
  • 20.
    To be reportedin BFD 85.70 80.75 Q4 Regional 93.20% 84.54% 88.98% Performance The regional performance in the Quarter 1 is 93.20%, Very Satisfactory, while it went down to 84.54% in the Quarter 2 and raise to 88.98% in Quarter 3. It is understandably due to some limitations and there are still more time to accomplish the remaining outputs in the next quarter. Management Response Dr. Carmelita T. Dulangon , Officer-in-Charge to the Office of the Regional Director accepted all the recommendations proposed by the functional divisions and support divisions to increase efficiency and effectiveness in the delivery of quality services to the clientele and produce quality outputs and results. To solve the lack of personnel in some functional divisions, she asked for recommendees, who can be detailed to the regional office without additional compensation. For the unaccomplished outputs, she suggested when you plan, stick to your plan, to consider the requirements like the personnel to do the planned activities and other considerations. She instructed the Admin Officer to look into the availability of laptops and printers that can be used by other RO offices which need equipment. FED has to share the comfort room of the CLMD. For those personnel who rendered services on weekends may avail of Compensatory Time Off (CTO) provided that it is indicated at the Regional Memorandum. The management commented on the oneness of the regional personnel. Each one contributes to the attainment of the desired goals. 20