SlideShare a Scribd company logo
SEQUENCING 
- PORAS SANCHETI 201051 
- DEEPAK MALCHE 200932
What is Sequencing..?? 
Sequencing: Determine the order in which jobs at 
a work center will be processed. 
Requires order for sequencing at all work centers as well as sequencing 
at individual work centers. 
Workstation: An area where 
one person works, usually with special equipment, on a specialized job. 
Job time: Time needed for setup and processing of a job. 
Job Flow Time: The length of time a job is in the shop at 
a particular workstation or work center. 
Job Lateness: This is the length of time the job completion date is 
expected to exceed the date the job was due or promised to a customer.
PRODUCTION 
AND 
OPERATIONS MANAGEMENT 
Makespan: This is the total time needed to complete 
a group of jobs. It is the length of time between the start of 
the first job in the group and the completion of the last job in 
the group. 
Average Number of Jobs: Jobs that are considered in 
a shop are considered to be work in process inventory. 
Mathematically, 
Average Number of Jobs= Total Flow Time / Makespan
Priority Rules 
 FCFS - First Come, First Served: Jobs are processed in 
the order in which they arrive at a machine or work center. 
 SPT-Shortest 
Processing Time: Jobs are processed according to p 
rocessing time at a machine or work center, shortest job first. 
 DD - 
Due Date: Jobs are processed according to due date, earliest 
due date first. 
 CR - 
Critical Ratio: Jobs are processed according to smallest ratio 
of time remaining until due date to processing time remaining.
 S/O - Slack 
Per Operation: Jobs are processed according to average slack 
time (time until due date minus remaining time to process). 
Compute by dividing slack time by dividing slack time by 
number of remaining operations including the current one.
ASSUMPTIONS TO PRIORITY RULE 
S 
 The set of jobs is known, no new jobs arrive after processing 
begins and no jobs are canceled. 
 Setup time is deterministic 
 There will be no interruptions in processing such as machine 
breakdowns, accidents or worker illnesses.
FACTORS AFFECTING 
SCHEDULING 
A. Setup Times 
B. Processing Times 
C. Changes in the set of jobs. 
D. Breakdown Consequences. 
I. Production capacity is reduced : Orders are delayed. 
II. No production: Overhead continues. 
III. Cost per unit increases: Quality issues. 
IV. Product may be damaged. 
V. Safety issues. 
1. Injury to employees 
2. Injury to customers
OPERATIONS STRATEGY 
 Scheduling can hinder or help the Operations Strategy. 
 An on time delivery of a product or service is only possible if the 
Operations Managers is able to do effective scheduling. 
 An ineffective scheduling would result in inefficient use of resou 
rces and possible dissatisfied customers. 
 Scheduling as an operations strategy can provide an 
organization a competitive advantage over its competitors. 
 Time based competition depends on good scheduling.
TYPES OF SEQUENCING 
 ‘n’ Jobs and 1 Machine. 
 ‘n’ Jobs and 2 Machine. 
 ‘n’ Jobs and 3 Machine. 
 1 Jobs and ‘m’ Machine. 
 2 Jobs and ‘m’ Machine.
Two Resource Problems 
( ‘n’ Jobs and 2 Machines) 
Suppose you work with a classmate, Kim on multiple projects. 
In each project you do the research, and Kim writes the report 
You want to complete all projects as soon as possible. 
2 6 3 5 1 
4 3 5 4 2 
Processing time (you): 
Processing time (Kim): 
What should be the order 
for the projects?
Two Resource Problems 
Johnson’s Rule 
Sequences tasks to minimize makespan 
1. Find the smallest processing time. 
• If its on the 1st machine, assign the task at the beginning of the sequence and 
eliminate it from further consideration. 
• If its on the 2nd machine, assign the task at the end of the sequence and 
eliminate it from further consideration 
2. Repeat step 1 for all unassigned tasks 
2 6 3 5 1 
4 3 5 4 2 
Processing time (you): 
Processing time (Kim): 
What order should you 
do the projects in?
Two Resource Problems 
Johnson’s Rule 
Sequences tasks to minimize makespan 
2 6 3 5 
1 
4 3 5 4 2 
Processing time (you): 
Processing time (Kim): 
Sequence 
English 
1. Find the smallest processing time. 
• If its on the 1st machine, assign the task at the beginning of the sequence and 
eliminate it from further consideration. 
• If its on the 2nd machine, assign the task at the end of the sequence and 
eliminate it from further consideration 
2. Repeat step 1 for all unassigned tasks
Two Resource Problems 
Johnson’s Rule 
Sequences tasks to minimize makespan 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequence 
English 
Management 
1. Find the smallest processing time. 
• If its on the 1st machine, assign the task at the beginning of the sequence and 
eliminate it from further consideration. 
• If its on the 2nd machine, assign the task at the end of the sequence and 
eliminate it from further consideration 
2. Repeat step 1 for all unassigned tasks
Two Resource Problems 
Johnson’s Rule 
Sequences tasks to minimize makespan 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequence 
English 
Management 
Finance 
1. Find the smallest processing time. 
• If its on the 1st machine, assign the task at the beginning of the sequence and 
eliminate it from further consideration. 
• If its on the 2nd machine, assign the task at the end of the sequence and 
eliminate it from further consideration 
2. Repeat step 1 for all unassigned tasks
Johnson’s Rule 
Sequences tasks to minimize makespan 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequence 
Marketing 
1. Find the smallest processing time. 
• If its on the 1st machine, assign the task at the beginning of the sequence and 
eliminate it from further consideration. 
• If its on the 2nd machine, assign the task at the end of the sequence and 
eliminate it from further consideration 
2. Repeat step 1 for all unassigned tasks 
English 
Management 
Finance 
Two Resource Problems
Two Resource Problems 
Johnson’s Rule 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
1. Find the smallest processing time. 
• If its on the 1st machine, assign the task at the beginning of the sequence and 
eliminate it from further consideration. 
• If its on the 2nd machine, assign the task at the end of the sequence and 
eliminate it from further consideration 
2. Repeat step 1 for all unassigned tasks 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two resource problems 
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two resource problems 
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two resource problems 
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two resource problems 
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two resource problems 
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Sequences tasks to minimize makespan 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
Two resource problems 
Two Resource Problems 
Johnson’s Rule 
You 
Kim 
Sequences tasks to minimize makespan 
Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 
Processing time (you): 2 6 3 5 1 
4 3 5 4 2 
Processing time (Kim): 
Idle time 
SEQUENCE 
English 
Management 
Finance 
Accounting 
Marketing
INDUSTRIAL APPLICATIONS 
Automobile Industry 
DNA Sequencing
Genome Sequencing 
Tyre Manufacturing Industry
Thank You

More Related Content

What's hot

Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
Ashish Jain
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
Jorge Fuentes
 
C17
C17C17
C17
grane09
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
Sujeet TAMBE
 
scheduling
schedulingscheduling
scheduling
Anu Reddy
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
senthil.G
 
Scheduling
SchedulingScheduling
Scheduling
mrinalmanik64
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
RajThakuri
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
Md. IFTEKHARUL ISLAM
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
Shivangi Singh
 
Scheduling
SchedulingScheduling
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation scheduling
Kamal Subedi
 
Job scheduling
Job schedulingJob scheduling
Job scheduling
Sanjay Singh
 
Unit iii-2-sp
Unit iii-2-spUnit iii-2-sp
Unit iii-2-sp
Anurag Srivastava
 
Sequencing model
Sequencing modelSequencing model
Sequencing model
Devan P.D
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production scheduling
mrinalmanik64
 
Flowshop scheduling
Flowshop schedulingFlowshop scheduling
Flowshop scheduling
Kunal Goswami
 
7. scheduling
7. scheduling7. scheduling
7. scheduling
Sudipta Saha
 
Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...
Alexander Decker
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
Shriraj Deshpande
 

What's hot (20)

Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
 
C17
C17C17
C17
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
scheduling
schedulingscheduling
scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Presentation on operation scheduling
Presentation on operation schedulingPresentation on operation scheduling
Presentation on operation scheduling
 
Job scheduling
Job schedulingJob scheduling
Job scheduling
 
Unit iii-2-sp
Unit iii-2-spUnit iii-2-sp
Unit iii-2-sp
 
Sequencing model
Sequencing modelSequencing model
Sequencing model
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production scheduling
 
Flowshop scheduling
Flowshop schedulingFlowshop scheduling
Flowshop scheduling
 
7. scheduling
7. scheduling7. scheduling
7. scheduling
 
Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...Flow shop scheduling problem, processing time associated with probabilities i...
Flow shop scheduling problem, processing time associated with probabilities i...
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
 

Viewers also liked

Sequencing
SequencingSequencing
Sequencing
Rashmi Navaghane
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
Production & Operation Management Chapter33[1]
Production & Operation Management Chapter33[1]Production & Operation Management Chapter33[1]
Production & Operation Management Chapter33[1]
Hariharan Ponnusamy
 
Project crashing and job sequencing
Project crashing and job sequencingProject crashing and job sequencing
Project crashing and job sequencing
Buha Payal
 
Method Study
Method StudyMethod Study
Method Study
ajithsrc
 
New Generation Sequencing Technologies: an overview
New Generation Sequencing Technologies: an overviewNew Generation Sequencing Technologies: an overview
New Generation Sequencing Technologies: an overview
Paolo Dametto
 
บทที่ 4 การวางแผนกำลังการผลิต
บทที่ 4 การวางแผนกำลังการผลิตบทที่ 4 การวางแผนกำลังการผลิต
บทที่ 4 การวางแผนกำลังการผลิต
Rungnapa Rungnapa
 
Gantt Charts
Gantt ChartsGantt Charts
Gantt Charts
Nadine Fisher
 
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิตบทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
Teetut Tresirichod
 
บทที่ 1 การจัดการการผลิตและการปฏิบัติการ
บทที่ 1 การจัดการการผลิตและการปฏิบัติการบทที่ 1 การจัดการการผลิตและการปฏิบัติการ
บทที่ 1 การจัดการการผลิตและการปฏิบัติการ
Dr.Krisada [Hua] RMUTT
 
บทที่ 7 การวางแผนกระบวนการผลิต
บทที่ 7 การวางแผนกระบวนการผลิตบทที่ 7 การวางแผนกระบวนการผลิต
บทที่ 7 การวางแผนกระบวนการผลิต
Dr.Krisada [Hua] RMUTT
 
Sequencing 2017
Sequencing 2017Sequencing 2017
Sequencing 2017
Surya Saha
 
การบทที่ 4 การวางแผนและการจัดตารางการผลิตหลัก
การบทที่ 4 การวางแผนและการจัดตารางการผลิตหลักการบทที่ 4 การวางแผนและการจัดตารางการผลิตหลัก
การบทที่ 4 การวางแผนและการจัดตารางการผลิตหลัก
Teetut Tresirichod
 

Viewers also liked (13)

Sequencing
SequencingSequencing
Sequencing
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Production & Operation Management Chapter33[1]
Production & Operation Management Chapter33[1]Production & Operation Management Chapter33[1]
Production & Operation Management Chapter33[1]
 
Project crashing and job sequencing
Project crashing and job sequencingProject crashing and job sequencing
Project crashing and job sequencing
 
Method Study
Method StudyMethod Study
Method Study
 
New Generation Sequencing Technologies: an overview
New Generation Sequencing Technologies: an overviewNew Generation Sequencing Technologies: an overview
New Generation Sequencing Technologies: an overview
 
บทที่ 4 การวางแผนกำลังการผลิต
บทที่ 4 การวางแผนกำลังการผลิตบทที่ 4 การวางแผนกำลังการผลิต
บทที่ 4 การวางแผนกำลังการผลิต
 
Gantt Charts
Gantt ChartsGantt Charts
Gantt Charts
 
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิตบทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
บทที่ 5 การวางแผนความต้องการวัสดุและกำลังการผลิต
 
บทที่ 1 การจัดการการผลิตและการปฏิบัติการ
บทที่ 1 การจัดการการผลิตและการปฏิบัติการบทที่ 1 การจัดการการผลิตและการปฏิบัติการ
บทที่ 1 การจัดการการผลิตและการปฏิบัติการ
 
บทที่ 7 การวางแผนกระบวนการผลิต
บทที่ 7 การวางแผนกระบวนการผลิตบทที่ 7 การวางแผนกระบวนการผลิต
บทที่ 7 การวางแผนกระบวนการผลิต
 
Sequencing 2017
Sequencing 2017Sequencing 2017
Sequencing 2017
 
การบทที่ 4 การวางแผนและการจัดตารางการผลิตหลัก
การบทที่ 4 การวางแผนและการจัดตารางการผลิตหลักการบทที่ 4 การวางแผนและการจัดตารางการผลิตหลัก
การบทที่ 4 การวางแผนและการจัดตารางการผลิตหลัก
 

Similar to Mpc sequencing

production_scheduling_1.ppt
production_scheduling_1.pptproduction_scheduling_1.ppt
production_scheduling_1.ppt
VELMURUGANM19
 
Job Shop Scheduling.pptx
Job Shop Scheduling.pptxJob Shop Scheduling.pptx
Job Shop Scheduling.pptx
SyedAmirIqbal3
 
Topic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptTopic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.ppt
HassanHani5
 
SCHEDULING RULES DONE.pptx
SCHEDULING  RULES DONE.pptxSCHEDULING  RULES DONE.pptx
SCHEDULING RULES DONE.pptx
AgnibhaBanerjee1
 
scheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjj
scheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjjscheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjj
scheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjj
yiheyismulatu
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
Lauren Russell
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
videoaakash15
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
videoaakash15
 
Are we there yet?
Are we there yet?Are we there yet?
Are we there yet?
Mike Burrows
 
Scheduling
SchedulingScheduling
Scheduling
ROSHNI PRADHAN
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10pp
Taliya Hemanth
 
Operations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfOperations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdf
RoopaDNDandally
 
Improving processes
Improving processesImproving processes
Improving processes
Ron McFarland
 
Scrum for anyone - A 2-page introduction including an example of application
Scrum for anyone - A 2-page introduction including an example of applicationScrum for anyone - A 2-page introduction including an example of application
Scrum for anyone - A 2-page introduction including an example of application
CollectiveKnowledge
 
Sequencing Jobs with Priority Rules.pptx
Sequencing Jobs with Priority Rules.pptxSequencing Jobs with Priority Rules.pptx
Sequencing Jobs with Priority Rules.pptx
E Concepts
 
SCHEDULING
SCHEDULING  SCHEDULING
SCHEDULING
SupanShah2
 
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas BjorkholmAgile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
manssandstrom
 
Training of agile project management with scrum king leong lo (100188178)
Training of agile project management with scrum king leong lo (100188178)Training of agile project management with scrum king leong lo (100188178)
Training of agile project management with scrum king leong lo (100188178)
King Lo
 
Mythical Man Month Essays on Software Engineering
Mythical Man Month Essays on Software EngineeringMythical Man Month Essays on Software Engineering
Mythical Man Month Essays on Software Engineering
mustafa sarac
 
Sequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and ProblemsSequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and Problems
Sundar B N
 

Similar to Mpc sequencing (20)

production_scheduling_1.ppt
production_scheduling_1.pptproduction_scheduling_1.ppt
production_scheduling_1.ppt
 
Job Shop Scheduling.pptx
Job Shop Scheduling.pptxJob Shop Scheduling.pptx
Job Shop Scheduling.pptx
 
Topic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptTopic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.ppt
 
SCHEDULING RULES DONE.pptx
SCHEDULING  RULES DONE.pptxSCHEDULING  RULES DONE.pptx
SCHEDULING RULES DONE.pptx
 
scheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjj
scheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjjscheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjj
scheduling (1).pptgghghhhhhhhhhhhhhjjjjjjjj
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
Are we there yet?
Are we there yet?Are we there yet?
Are we there yet?
 
Scheduling
SchedulingScheduling
Scheduling
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10pp
 
Operations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfOperations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdf
 
Improving processes
Improving processesImproving processes
Improving processes
 
Scrum for anyone - A 2-page introduction including an example of application
Scrum for anyone - A 2-page introduction including an example of applicationScrum for anyone - A 2-page introduction including an example of application
Scrum for anyone - A 2-page introduction including an example of application
 
Sequencing Jobs with Priority Rules.pptx
Sequencing Jobs with Priority Rules.pptxSequencing Jobs with Priority Rules.pptx
Sequencing Jobs with Priority Rules.pptx
 
SCHEDULING
SCHEDULING  SCHEDULING
SCHEDULING
 
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas BjorkholmAgile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
 
Training of agile project management with scrum king leong lo (100188178)
Training of agile project management with scrum king leong lo (100188178)Training of agile project management with scrum king leong lo (100188178)
Training of agile project management with scrum king leong lo (100188178)
 
Mythical Man Month Essays on Software Engineering
Mythical Man Month Essays on Software EngineeringMythical Man Month Essays on Software Engineering
Mythical Man Month Essays on Software Engineering
 
Sequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and ProblemsSequential Models - Meaning, assumptions, Types and Problems
Sequential Models - Meaning, assumptions, Types and Problems
 

More from Pankaj Kumar

Basic Logic Gates
Basic Logic GatesBasic Logic Gates
Basic Logic Gates
Pankaj Kumar
 
Biomimicry
BiomimicryBiomimicry
Biomimicry
Pankaj Kumar
 
Ocean thermal energy conversion
Ocean thermal energy conversionOcean thermal energy conversion
Ocean thermal energy conversion
Pankaj Kumar
 
Vortex Flow / Turbine Fluid Sensor
Vortex Flow / Turbine Fluid SensorVortex Flow / Turbine Fluid Sensor
Vortex Flow / Turbine Fluid Sensor
Pankaj Kumar
 
Group technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain managementGroup technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain management
Pankaj Kumar
 
Computers in industrial engineering
Computers in industrial engineeringComputers in industrial engineering
Computers in industrial engineering
Pankaj Kumar
 
Synthetic Fibres & Plastics
Synthetic Fibres & PlasticsSynthetic Fibres & Plastics
Synthetic Fibres & Plastics
Pankaj Kumar
 
Microorganisms - Friend and Foe
Microorganisms - Friend and Foe Microorganisms - Friend and Foe
Microorganisms - Friend and Foe
Pankaj Kumar
 
Chemical effects of electric current
Chemical effects of electric currentChemical effects of electric current
Chemical effects of electric current
Pankaj Kumar
 
Biology pri
Biology priBiology pri
Biology pri
Pankaj Kumar
 
Operations research : Assignment problem (One's method) presentation
Operations research : Assignment problem (One's method) presentationOperations research : Assignment problem (One's method) presentation
Operations research : Assignment problem (One's method) presentation
Pankaj Kumar
 
MPC : Inventory control with case study of Dulux paints
MPC : Inventory control with case study of Dulux paintsMPC : Inventory control with case study of Dulux paints
MPC : Inventory control with case study of Dulux paints
Pankaj Kumar
 

More from Pankaj Kumar (12)

Basic Logic Gates
Basic Logic GatesBasic Logic Gates
Basic Logic Gates
 
Biomimicry
BiomimicryBiomimicry
Biomimicry
 
Ocean thermal energy conversion
Ocean thermal energy conversionOcean thermal energy conversion
Ocean thermal energy conversion
 
Vortex Flow / Turbine Fluid Sensor
Vortex Flow / Turbine Fluid SensorVortex Flow / Turbine Fluid Sensor
Vortex Flow / Turbine Fluid Sensor
 
Group technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain managementGroup technology _ flexible manufacturing system_supply chain management
Group technology _ flexible manufacturing system_supply chain management
 
Computers in industrial engineering
Computers in industrial engineeringComputers in industrial engineering
Computers in industrial engineering
 
Synthetic Fibres & Plastics
Synthetic Fibres & PlasticsSynthetic Fibres & Plastics
Synthetic Fibres & Plastics
 
Microorganisms - Friend and Foe
Microorganisms - Friend and Foe Microorganisms - Friend and Foe
Microorganisms - Friend and Foe
 
Chemical effects of electric current
Chemical effects of electric currentChemical effects of electric current
Chemical effects of electric current
 
Biology pri
Biology priBiology pri
Biology pri
 
Operations research : Assignment problem (One's method) presentation
Operations research : Assignment problem (One's method) presentationOperations research : Assignment problem (One's method) presentation
Operations research : Assignment problem (One's method) presentation
 
MPC : Inventory control with case study of Dulux paints
MPC : Inventory control with case study of Dulux paintsMPC : Inventory control with case study of Dulux paints
MPC : Inventory control with case study of Dulux paints
 

Recently uploaded

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 

Recently uploaded (20)

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 

Mpc sequencing

  • 1. SEQUENCING - PORAS SANCHETI 201051 - DEEPAK MALCHE 200932
  • 2. What is Sequencing..?? Sequencing: Determine the order in which jobs at a work center will be processed. Requires order for sequencing at all work centers as well as sequencing at individual work centers. Workstation: An area where one person works, usually with special equipment, on a specialized job. Job time: Time needed for setup and processing of a job. Job Flow Time: The length of time a job is in the shop at a particular workstation or work center. Job Lateness: This is the length of time the job completion date is expected to exceed the date the job was due or promised to a customer.
  • 3. PRODUCTION AND OPERATIONS MANAGEMENT Makespan: This is the total time needed to complete a group of jobs. It is the length of time between the start of the first job in the group and the completion of the last job in the group. Average Number of Jobs: Jobs that are considered in a shop are considered to be work in process inventory. Mathematically, Average Number of Jobs= Total Flow Time / Makespan
  • 4. Priority Rules  FCFS - First Come, First Served: Jobs are processed in the order in which they arrive at a machine or work center.  SPT-Shortest Processing Time: Jobs are processed according to p rocessing time at a machine or work center, shortest job first.  DD - Due Date: Jobs are processed according to due date, earliest due date first.  CR - Critical Ratio: Jobs are processed according to smallest ratio of time remaining until due date to processing time remaining.
  • 5.  S/O - Slack Per Operation: Jobs are processed according to average slack time (time until due date minus remaining time to process). Compute by dividing slack time by dividing slack time by number of remaining operations including the current one.
  • 6. ASSUMPTIONS TO PRIORITY RULE S  The set of jobs is known, no new jobs arrive after processing begins and no jobs are canceled.  Setup time is deterministic  There will be no interruptions in processing such as machine breakdowns, accidents or worker illnesses.
  • 7. FACTORS AFFECTING SCHEDULING A. Setup Times B. Processing Times C. Changes in the set of jobs. D. Breakdown Consequences. I. Production capacity is reduced : Orders are delayed. II. No production: Overhead continues. III. Cost per unit increases: Quality issues. IV. Product may be damaged. V. Safety issues. 1. Injury to employees 2. Injury to customers
  • 8. OPERATIONS STRATEGY  Scheduling can hinder or help the Operations Strategy.  An on time delivery of a product or service is only possible if the Operations Managers is able to do effective scheduling.  An ineffective scheduling would result in inefficient use of resou rces and possible dissatisfied customers.  Scheduling as an operations strategy can provide an organization a competitive advantage over its competitors.  Time based competition depends on good scheduling.
  • 9. TYPES OF SEQUENCING  ‘n’ Jobs and 1 Machine.  ‘n’ Jobs and 2 Machine.  ‘n’ Jobs and 3 Machine.  1 Jobs and ‘m’ Machine.  2 Jobs and ‘m’ Machine.
  • 10. Two Resource Problems ( ‘n’ Jobs and 2 Machines) Suppose you work with a classmate, Kim on multiple projects. In each project you do the research, and Kim writes the report You want to complete all projects as soon as possible. 2 6 3 5 1 4 3 5 4 2 Processing time (you): Processing time (Kim): What should be the order for the projects?
  • 11. Two Resource Problems Johnson’s Rule Sequences tasks to minimize makespan 1. Find the smallest processing time. • If its on the 1st machine, assign the task at the beginning of the sequence and eliminate it from further consideration. • If its on the 2nd machine, assign the task at the end of the sequence and eliminate it from further consideration 2. Repeat step 1 for all unassigned tasks 2 6 3 5 1 4 3 5 4 2 Processing time (you): Processing time (Kim): What order should you do the projects in?
  • 12. Two Resource Problems Johnson’s Rule Sequences tasks to minimize makespan 2 6 3 5 1 4 3 5 4 2 Processing time (you): Processing time (Kim): Sequence English 1. Find the smallest processing time. • If its on the 1st machine, assign the task at the beginning of the sequence and eliminate it from further consideration. • If its on the 2nd machine, assign the task at the end of the sequence and eliminate it from further consideration 2. Repeat step 1 for all unassigned tasks
  • 13. Two Resource Problems Johnson’s Rule Sequences tasks to minimize makespan Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequence English Management 1. Find the smallest processing time. • If its on the 1st machine, assign the task at the beginning of the sequence and eliminate it from further consideration. • If its on the 2nd machine, assign the task at the end of the sequence and eliminate it from further consideration 2. Repeat step 1 for all unassigned tasks
  • 14. Two Resource Problems Johnson’s Rule Sequences tasks to minimize makespan Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequence English Management Finance 1. Find the smallest processing time. • If its on the 1st machine, assign the task at the beginning of the sequence and eliminate it from further consideration. • If its on the 2nd machine, assign the task at the end of the sequence and eliminate it from further consideration 2. Repeat step 1 for all unassigned tasks
  • 15. Johnson’s Rule Sequences tasks to minimize makespan Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequence Marketing 1. Find the smallest processing time. • If its on the 1st machine, assign the task at the beginning of the sequence and eliminate it from further consideration. • If its on the 2nd machine, assign the task at the end of the sequence and eliminate it from further consideration 2. Repeat step 1 for all unassigned tasks English Management Finance Two Resource Problems
  • 16. Two Resource Problems Johnson’s Rule Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan 1. Find the smallest processing time. • If its on the 1st machine, assign the task at the beginning of the sequence and eliminate it from further consideration. • If its on the 2nd machine, assign the task at the end of the sequence and eliminate it from further consideration 2. Repeat step 1 for all unassigned tasks SEQUENCE English Management Finance Accounting Marketing
  • 17. Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 18. Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 19. Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 20. Two resource problems Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 21. Two resource problems Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 22. Two resource problems Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 23. Two resource problems Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 24. Two resource problems Two Resource Problems Johnson’s Rule You Kim Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Sequences tasks to minimize makespan SEQUENCE English Management Finance Accounting Marketing
  • 25. Two resource problems Two Resource Problems Johnson’s Rule You Kim Sequences tasks to minimize makespan Period 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Processing time (you): 2 6 3 5 1 4 3 5 4 2 Processing time (Kim): Idle time SEQUENCE English Management Finance Accounting Marketing
  • 26. INDUSTRIAL APPLICATIONS Automobile Industry DNA Sequencing
  • 27. Genome Sequencing Tyre Manufacturing Industry