Chapter 17 Operations Scheduling
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],OBJECTIVES
Work Center ,[object Object],[object Object]
Capacity and Scheduling ,[object Object],[object Object],[object Object],[object Object]
Types of Manufacturing Scheduling Processes and Scheduling Approaches Continuous  process Type of Process Typical Scheduling Approach High-volume manufacturing Med-volume manufacturing Low-volume manufacturing Finite forward  of process, machine limited Finite forward  of line, machined limited Infinite forward  of process, labor and machined limited Infinite forward  of jobs, labor and some machine limited
Typical Scheduling and Control Functions ,[object Object],[object Object],[object Object],[object Object]
Work-Center Scheduling Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Priority Rules for Job Sequencing   ,[object Object],[object Object],[object Object],[object Object],[object Object]
Priority Rules for Job Sequencing (Continued) ,[object Object],[object Object],[object Object]
Example of Job Sequencing: First-Come First-Served Suppose you have the four jobs to the right arrive for processing on one machine What is the FCFS schedule? No, Jobs B, C, and D are going to be late Do all the jobs get done on time? Answer: FCFS Schedule
Example of Job Sequencing: Shortest Operating Time Suppose you have the four jobs to the right arrive for processing on one machine What is the SOT schedule? No, Jobs A and B are going to be late Do all the jobs get done on time? Answer: Shortest Operating Time Schedule
Example of Job Sequencing: Earliest Due Date First Suppose you have the four jobs to the right arrive for processing on one machine What is the earliest due date first schedule? No, Jobs C and B are going to be late Do all the jobs get done on time? Answer: Earliest Due Date First
Example of Job Sequencing: Critical Ratio Method Suppose you have the four jobs to the right arrive for processing on one machine What is the CR schedule? No, but since there is a three-way tie, only the first job or two will be on time In order to do this schedule the CR’s have be calculated for each job. If we let today be Day 1 and allow a total of 15 days to do the work.  The resulting CR’s and order schedule are: CR(A)=(5-4)/15=0.06 (Do this job last) CR(B)=(10-7)/15=0.20 (Do this job first, tied with C and D) CR(C)=(6-3)/15=0.20 (Do this job first, tied with B and D) CR(D)=(4-1)/15=0.20 (Do this job first, tied with B and C) Do all the jobs get done on time?
Example of Job Sequencing: Last-Come First-Served Answer: Last-Come First-Served Schedule No, Jobs B and A are going to be late Suppose you have the four jobs to the right arrive for processing on one machine What is the LCFS schedule? Do all the jobs get done on time?
Example of Job Sequencing: Johnson’s Rule (Part 1) Suppose you have the following five jobs with time requirements in two stages of production.  What is the job sequence using Johnson’s Rule?   Time in Hours Jobs   Stage 1 Stage 2 A   1.50   1.25 B   2.00   3.00 C   2.50   2.00 D   1.00   2.00
Example of Job Sequencing: Johnson’s Rule  (Part 2) First, select the job with the smallest time in either stage. That is Job D with the smallest time in the first stage.  Place that job as early as possible in the unfilled job sequence below. Drop D out, select the next smallest time (Job A), and place it 4th in the job sequence. Drop A out, select the next smallest time.  There is a tie in two stages for two different jobs.  In this case, place the job with the smallest time in the first stage as early as possible in the unfilled job sequence.  Then place the job with the smallest time in the second stage as late as possible in the unfilled sequence. Job Sequence 1  2  3   4 Job Assigned D A B C   Time in Hours Jobs   Stage 1 Stage 2 A   1.50   1.25 B   2.00   3.00 C   2.50   2.00 D   1.00   2.00
Shop-Floor Control: Major Functions ,[object Object],[object Object],[object Object]
Shop-Floor Control: Major Functions (Continued) ,[object Object],[object Object],[object Object]
Input/Output Control ,[object Object],[object Object],Work Center Input Output
Principles of Work Center Scheduling ,[object Object],[object Object],[object Object],[object Object]
Principles of Job Shop Scheduling (Continued) ,[object Object],[object Object],[object Object],[object Object]
Principles of Job Shop Scheduling (Continued) ,[object Object],[object Object]
Personnel Scheduling in Services ,[object Object],[object Object],[object Object]
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer : d. All of the above
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: b. An infinite loading of work
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: d. All of the above
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: d. All of the above
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: a. Meeting due dates (Correct answer can also include minimizing WIP inventory, idle time, and job flow time.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: e. None of the above (Correct answer can is CR or critical ratio.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: e. All of the above (Correct answer can also include providing quantity by location and actual output data.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: d. All of the above (Correct answer can also include all status and exception reports and input/output control reports.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: a.  There is a direct equivalence between work flow and cash flow (There are nine other principles.)
End of Chapter 17

More Related Content

What's hot

MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
Junaid Hassan
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
Pratibha Khemchandani
 
Chapter 2 line_balancing no pics
Chapter 2 line_balancing no picsChapter 2 line_balancing no pics
Chapter 2 line_balancing no pics
Nirav Jadav
 

What's hot (20)

What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
Line balancing
Line balancingLine balancing
Line balancing
 
Line balancing
Line balancingLine balancing
Line balancing
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Process of Inventory management & control
Process of Inventory management & controlProcess of Inventory management & control
Process of Inventory management & control
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
MRP, MPS, Bill of Material, Numericals
MRP, MPS, Bill of Material, NumericalsMRP, MPS, Bill of Material, Numericals
MRP, MPS, Bill of Material, Numericals
 
Value stream mapping ppt
Value stream mapping pptValue stream mapping ppt
Value stream mapping ppt
 
Ppc
PpcPpc
Ppc
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil Kumar
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Chapter 2 line_balancing no pics
Chapter 2 line_balancing no picsChapter 2 line_balancing no pics
Chapter 2 line_balancing no pics
 
Scheduling
SchedulingScheduling
Scheduling
 

Viewers also liked

Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
Example Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work PlanningExample Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work Planning
SIS Group International
 
Thriller Opening Sequence Evaluation
Thriller Opening Sequence EvaluationThriller Opening Sequence Evaluation
Thriller Opening Sequence Evaluation
LaurenHunt17
 
Production control presentation
Production control presentationProduction control presentation
Production control presentation
kieran122
 
Computer integrated production planning system
Computer integrated production planning systemComputer integrated production planning system
Computer integrated production planning system
Trony Tron
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
senthil.G
 
Production control
Production controlProduction control
Production control
sadia saeed
 

Viewers also liked (20)

Scheduling process in production planning
Scheduling process in production planningScheduling process in production planning
Scheduling process in production planning
 
Sequencing and Scheduling With MS Project
Sequencing and Scheduling With MS ProjectSequencing and Scheduling With MS Project
Sequencing and Scheduling With MS Project
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
 
Production scheduling
Production schedulingProduction scheduling
Production scheduling
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Scheduling
SchedulingScheduling
Scheduling
 
Example Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work PlanningExample Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work Planning
 
Thriller Opening Sequence Evaluation
Thriller Opening Sequence EvaluationThriller Opening Sequence Evaluation
Thriller Opening Sequence Evaluation
 
Introduction to Pre Production - Sequence 2
Introduction to Pre Production - Sequence 2Introduction to Pre Production - Sequence 2
Introduction to Pre Production - Sequence 2
 
Scheduling ppt @ DOMS
Scheduling ppt @ DOMSScheduling ppt @ DOMS
Scheduling ppt @ DOMS
 
Production control presentation
Production control presentationProduction control presentation
Production control presentation
 
Ch17
Ch17Ch17
Ch17
 
The production sequence module 5
The production sequence module 5The production sequence module 5
The production sequence module 5
 
Computer integrated production planning system
Computer integrated production planning systemComputer integrated production planning system
Computer integrated production planning system
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Production control
Production controlProduction control
Production control
 
Sequencing problems in Operations Research
Sequencing problems in Operations ResearchSequencing problems in Operations Research
Sequencing problems in Operations Research
 

Similar to Chap017 Scheduling Edit

Scheduling
SchedulingScheduling
Scheduling
jaya_22
 

Similar to Chap017 Scheduling Edit (20)

Scheduling
SchedulingScheduling
Scheduling
 
Chapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of EngineeringChapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of Engineering
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
scheduling2.ppt
scheduling2.pptscheduling2.ppt
scheduling2.ppt
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Om chapter 14
Om chapter 14Om chapter 14
Om chapter 14
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
scheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptxscheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptx
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.com
 
Topic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptTopic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.ppt
 
Production Management and Scheduling
Production Management and SchedulingProduction Management and Scheduling
Production Management and Scheduling
 
OPS 571 HELP Education for Service--ops571help.com
 OPS 571 HELP Education for Service--ops571help.com OPS 571 HELP Education for Service--ops571help.com
OPS 571 HELP Education for Service--ops571help.com
 
UOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comUOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.com
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.com
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
chapter16.ppt
chapter16.pptchapter16.ppt
chapter16.ppt
 

More from Ricky Muchtar (8)

In Memoriam, Dasril Muchtar 18-12-1953 - 13-07-2014
In Memoriam, Dasril Muchtar 18-12-1953  -  13-07-2014In Memoriam, Dasril Muchtar 18-12-1953  -  13-07-2014
In Memoriam, Dasril Muchtar 18-12-1953 - 13-07-2014
 
Somethingbotheringyou
SomethingbotheringyouSomethingbotheringyou
Somethingbotheringyou
 
Doors Of Success
Doors Of SuccessDoors Of Success
Doors Of Success
 
Rakorbinpres Litbang
Rakorbinpres LitbangRakorbinpres Litbang
Rakorbinpres Litbang
 
Leadership And Entrepreneur
Leadership And EntrepreneurLeadership And Entrepreneur
Leadership And Entrepreneur
 
Strategi marketing dalam mengembangkan potensi pasar
Strategi marketing dalam mengembangkan potensi pasarStrategi marketing dalam mengembangkan potensi pasar
Strategi marketing dalam mengembangkan potensi pasar
 
Prospek pengembangan bisnis pariwisata di Kota Bandung
Prospek pengembangan bisnis pariwisata di Kota BandungProspek pengembangan bisnis pariwisata di Kota Bandung
Prospek pengembangan bisnis pariwisata di Kota Bandung
 
Final Exam Topics
Final Exam TopicsFinal Exam Topics
Final Exam Topics
 

Recently uploaded

Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
httgc7rh9c
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 

Recently uploaded (20)

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 

Chap017 Scheduling Edit

  • 1.  
  • 3.
  • 4.
  • 5.
  • 6. Types of Manufacturing Scheduling Processes and Scheduling Approaches Continuous process Type of Process Typical Scheduling Approach High-volume manufacturing Med-volume manufacturing Low-volume manufacturing Finite forward of process, machine limited Finite forward of line, machined limited Infinite forward of process, labor and machined limited Infinite forward of jobs, labor and some machine limited
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Example of Job Sequencing: First-Come First-Served Suppose you have the four jobs to the right arrive for processing on one machine What is the FCFS schedule? No, Jobs B, C, and D are going to be late Do all the jobs get done on time? Answer: FCFS Schedule
  • 12. Example of Job Sequencing: Shortest Operating Time Suppose you have the four jobs to the right arrive for processing on one machine What is the SOT schedule? No, Jobs A and B are going to be late Do all the jobs get done on time? Answer: Shortest Operating Time Schedule
  • 13. Example of Job Sequencing: Earliest Due Date First Suppose you have the four jobs to the right arrive for processing on one machine What is the earliest due date first schedule? No, Jobs C and B are going to be late Do all the jobs get done on time? Answer: Earliest Due Date First
  • 14. Example of Job Sequencing: Critical Ratio Method Suppose you have the four jobs to the right arrive for processing on one machine What is the CR schedule? No, but since there is a three-way tie, only the first job or two will be on time In order to do this schedule the CR’s have be calculated for each job. If we let today be Day 1 and allow a total of 15 days to do the work. The resulting CR’s and order schedule are: CR(A)=(5-4)/15=0.06 (Do this job last) CR(B)=(10-7)/15=0.20 (Do this job first, tied with C and D) CR(C)=(6-3)/15=0.20 (Do this job first, tied with B and D) CR(D)=(4-1)/15=0.20 (Do this job first, tied with B and C) Do all the jobs get done on time?
  • 15. Example of Job Sequencing: Last-Come First-Served Answer: Last-Come First-Served Schedule No, Jobs B and A are going to be late Suppose you have the four jobs to the right arrive for processing on one machine What is the LCFS schedule? Do all the jobs get done on time?
  • 16. Example of Job Sequencing: Johnson’s Rule (Part 1) Suppose you have the following five jobs with time requirements in two stages of production. What is the job sequence using Johnson’s Rule? Time in Hours Jobs Stage 1 Stage 2 A 1.50 1.25 B 2.00 3.00 C 2.50 2.00 D 1.00 2.00
  • 17. Example of Job Sequencing: Johnson’s Rule (Part 2) First, select the job with the smallest time in either stage. That is Job D with the smallest time in the first stage. Place that job as early as possible in the unfilled job sequence below. Drop D out, select the next smallest time (Job A), and place it 4th in the job sequence. Drop A out, select the next smallest time. There is a tie in two stages for two different jobs. In this case, place the job with the smallest time in the first stage as early as possible in the unfilled job sequence. Then place the job with the smallest time in the second stage as late as possible in the unfilled sequence. Job Sequence 1 2 3 4 Job Assigned D A B C Time in Hours Jobs Stage 1 Stage 2 A 1.50 1.25 B 2.00 3.00 C 2.50 2.00 D 1.00 2.00
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.