SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3713
Design of Manufacture of Fixtures for CNC Machine To Improve
Productivity by SMED Concept
Akshay Hasabe1, Akshay Kakde2, Ashish Khandagle3, Kiran Surve 4, Asst. Prof. Pankaj
Pardeshi5, Mr.Nilesh Khaire6
1,2,3,4Students, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Technology, Pimpri, Pune, India.
5Assistant Professor, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Techology, Pimpri,
Pune, India.
---------------------------------------------------------------------***----------------------------------------------------------------------
ABSTRACT– The competition in the current business
world is marked by torridity demonstration and severe
disputation. This agitated situation has made organizations
to refresh themselves by marching in different ways like
Lean, TPM, TQM etc .to keep them competitive in the market
as well to achieve their objectives positively. From the SMED
study carried on the CNC machine, it was studied that only
few portion of the setup time can be reduced by detaching
and transforming the internal operations to external
operations. The study of implementation of SMED
methodology and propose a set of solutions, gives the
optimum sequence, time saving etc. the new proposed
fixture designed for plug shell.
Key Words: changeover reduction, SMED concept ,
FMEA analysis , productivity Improvement, internal and
external functions, Quality Tools etc.
1. INTRODUCTION
A. Setup reduction
Setup is a set of activities to prepare for the next part to be
produced. Setup time is total elapsed time from
Completion of the good part from the previous setup to
the first good part from the new setup. Set-up reduction is
a kind of theory and method to reduce the setup time.
B. SMED (single minute exchange of die)
SMED, also known as Quick Changeover of Tools, was
developed by Shingo (1985), who characterized it as
scientific study for the reduction of setup times, and which
can be applied in any industrial unit and for any machine.
SMED is defined as the minimum amount of time
necessary to change the type of manufacture activity
taking into thought the instant in which the last piece of a
previous batch was produced or the first part is produced
by secondary operation. The objective of SMED is to try to
separate internal Operations to the external operations.
Ramp down time Run down period is the time between
the end of a lot production till the batch quantity is
completed.
Setup Time Setup time is the non production time in
which change over takes from one part to another.
Ramp uptime The time between setup is completed
and the full production is achieved.
Single Minute Exchange of Die (SMED) emphasizes on
setup time reduction to single minute. The need of SMED
is mandatory due to increased demand for variable
products and reduced product life cycles. It helps the
company to keep reduced inventory and effective
utilization of the equipment. SMED study has to be started
up with complete process map and time study. It needs
analyze everything that occurs during the changeover to
understand the possibilities of actions that can be moved
outside the changeover casement. Non worth added
activities has to be eliminated or to be converted to
external If an internal activity is predictable, it has to be
simplified with the help of jigs, fixtures etc.
accomplishment of SMED starts from identifying the
change over process and categorization it into internal and
external activity.
Internal activity Activities that are done after stopping
the machine.
External activity Operations that can be done without
stopping the machine. focus should be on optimizing
external activities. Maintaining of 5S is important at each
level of implementation.
2. OBJECTIVE OF PROJECT
 To propose the new fixture design that can solve
the problem.
 To reduce setup time.
 To improve productivity.
 To improve awareness to customer demand.
3. PROBLEM STATEMENT
 Higher setup time between parts from similar
family of the same part.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3714
 Based on customer demand, most of them want
the suppliers to deliver the product right after the
order is valid.
 Ovality due to clamping method.
4. METHODOLOGY:
The methodology of the project has been simply explained
by following flow diagram. From product concept to final
product.
5. DESIGN:
First step in designing fixture is material selection. As mild
steel have good tensile strength and corrosion resistance
and other significant properties.
 A)Material selection:
Material: Mild Steel
Properties:
• Carbon=0.16 to 0.18%
• Manganese=0.7 to 0.9%
• Silicon=0.4%
• Sulfur=0.04%
• Phosphorous=0.04%
• Modulus of elasticity = 210 GPa
• Density = 7860 kg/m^3
• Melting point = 1600^0C
5.1 Dimension
The following dimensions of different parts of new
fixture have been taken according to the FEA analysis
and type of job size
 Arbor body:
• Outer diameter (D1) =160mm
• Outer diameter (D2)=130mm
• Tapper diameter(D3)=90mm
• Taper angle =60 degree
• Outer diameter of thread =48mm
• Inner diameter of thread =46mm
• Thread length =13mm
• Length of body =180mm
 Lock nut :
• Outer diameter (D1)=55mm
• Inner diameter (d1)=46mm
• Thread length =25mm
• Outer diameter (D2)=37mm
• Inner diameter (d2)=25mm
• Length of lock nut=60mm
Fig 1. Drafting of Arbor Body
Fig 2. Drafting of Arbor
Fig 3. Drafting of Lock Nut
Fig 4. Drafting of Back Plate
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3715
After drafting of all parts of fixture, its assembly is done in
3D CAD software which have been shown in the following
picture:
After assembly of whole parts. We studied various stresses
and its effects, bending moments, deflections, strength,
factor of safety etc. and had taken corrective action against
them
After all, we started manufacturing of parts one by one as
follows:
Assembly of proposed fixture
Fig 5. CNC machine
Fig 6. Fixture mount on CNC machine
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3716
Fig 7. Old fixture
6. POSSIBLE OUTCOMES
A lot of time was wasted in changing of the fixture,
changing the clamping stud and zero dialing it. All this time
which was shattered is now saved with the recently
designed fixture by reducing the no of settings .It can be
concluded that the amount of saving to the company is
considerable in terms of time and money.
7. RESULTS
Table 1: Set up time reduction (minutes)
Sr.
No.
Setup time
before
implementati
on of SMED
(min)
Setup time
after
implementati
on of SMED
(min)
Set up
time
reduced
(min)
Set up
time
reduce
d (%)
1 200 95 105 52.5
As a result, the setup time has been reduced from 200
minutes to 95 minutes. Hence 105 minutes has been saved
for one setup and 52.5 % Setup change time has been
reduced due to successful implementation of SMED
methodology in a CNC machine. It is shown in above Table.
Table 2: Numbers of Jobs before and after implementation
of SMED
Sr.
No
.
Total no of Jobs
before
implementatio
n of SMED
Total no of Jobs
after
implementatio
n of SMED
Total no of Jobs
increased due
to
implementatio
n of SMED
1 300 380 80
Table shows the improvement of productivity of CNC
machine due to successful implementation of SMED
8. CONCLUSIONS
 It facilitates a fast and effective way of converting
a manufacturing process from first product to the
last product.
 It can be conclude that the amount of saving to the
company is considerable in terms of time and
money.
 The implemented fixture will satisfy researcher
production goal and increase the efficiency.
 It reduces the set uptime and increases the
productivity.
REFERENCES
1. Berna Ulutas, “An application of SMED
Methodology”, International Journal of Industrial
and Manufacturing Engineering, 5, (2011), 1194-
1197.
2. Arun Abraham,Ganpathi K.N., Kailash Motwani,
“Setup time reduction through SMED technique in
a stamping production line”, SASTECH journal, 11,
(2012), 47-52.
3. Mukesh Desai, A.M.Rawani, “Productivity
improvement of automobile industry by using
SMED”, ARPN Journal of Engineering and applied
science, 12, (2017), 2615-2629.
4. N.P.Maniar, D.P.Vakharia, “Design and
Development of Rotary Fixture for CNC”,
International Journal of Engineering a Science
Invention ,1, (2012), 32-43.
5. K.M.Viramgama, R.D.Makhawana, “A Study on
Design of Fixture for Valve Body for CNC
Machine”, International Journal of Advance
Engineering and Research Development, 1,
(2014), 42-46.

More Related Content

What's hot

IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET Journal
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET Journal
 
Design and fabrication of automation for stapling of wooden supports to corru...
Design and fabrication of automation for stapling of wooden supports to corru...Design and fabrication of automation for stapling of wooden supports to corru...
Design and fabrication of automation for stapling of wooden supports to corru...
eSAT Journals
 
Production technology ppt
Production technology pptProduction technology ppt
Production technology pptDivya Lattoo
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
IRJET Journal
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality control
Ahmad Bajwa
 
Design For Manufacture
Design For ManufactureDesign For Manufacture
Design For Manufacture
ahmad bassiouny
 
IRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed Manufacturing
IRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed ManufacturingIRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed Manufacturing
IRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed Manufacturing
IRJET Journal
 
Project management assignment evaluating the process in car manufacturing
Project management assignment  evaluating the process in car manufacturingProject management assignment  evaluating the process in car manufacturing
Project management assignment evaluating the process in car manufacturing
Total Assignment Help
 
RESUME FINAL
RESUME FINALRESUME FINAL
RESUME FINALGOBI S
 
@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@Pravin Sadare
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
bejayrocks
 
INDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECTINDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECT
Amir Mohammad Redzuan
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
paperpublications3
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
Khairul Bashar
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET Journal
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET Journal
 
IRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing System
IRJET Journal
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
Rakibul Hasan
 

What's hot (20)

IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
Design and fabrication of automation for stapling of wooden supports to corru...
Design and fabrication of automation for stapling of wooden supports to corru...Design and fabrication of automation for stapling of wooden supports to corru...
Design and fabrication of automation for stapling of wooden supports to corru...
 
Production technology ppt
Production technology pptProduction technology ppt
Production technology ppt
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality control
 
Design For Manufacture
Design For ManufactureDesign For Manufacture
Design For Manufacture
 
IRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed Manufacturing
IRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed ManufacturingIRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed Manufacturing
IRJET- Value Analysis Aimed at Cost Reduction in Wooden Bed Manufacturing
 
Project management assignment evaluating the process in car manufacturing
Project management assignment  evaluating the process in car manufacturingProject management assignment  evaluating the process in car manufacturing
Project management assignment evaluating the process in car manufacturing
 
RESUME FINAL
RESUME FINALRESUME FINAL
RESUME FINAL
 
@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@@Resume-Pravinkumar sadare@
@Resume-Pravinkumar sadare@
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
INDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECTINDUSTRIAL ENGINEERING DESIGN PROJECT
INDUSTRIAL ENGINEERING DESIGN PROJECT
 
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale IndustriesCase Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
IRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing SystemIRJET-Methodology for Modular Fixturing System
IRJET-Methodology for Modular Fixturing System
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
 

Similar to IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productivity by SMED Concept

IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET Journal
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
IRJET Journal
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IRJET Journal
 
FORGING HAMMER
FORGING HAMMERFORGING HAMMER
FORGING HAMMER
IRJET Journal
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET Journal
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET Journal
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET Journal
 
H012134550
H012134550H012134550
H012134550
IOSR Journals
 
Implementation of Lean Strategies in a Furniture Manufacturing Factory
Implementation of Lean Strategies in a Furniture Manufacturing Factory Implementation of Lean Strategies in a Furniture Manufacturing Factory
Implementation of Lean Strategies in a Furniture Manufacturing Factory
IOSR Journals
 
IRJET- Development of Ejection System to Improve Productivity
IRJET-  	  Development of Ejection System to Improve ProductivityIRJET-  	  Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
IRJET Journal
 
IRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
IRJET Journal
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET Journal
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET Journal
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET Journal
 
Manufacturing of Toggle Jack
Manufacturing of Toggle JackManufacturing of Toggle Jack
Manufacturing of Toggle Jack
IRJET Journal
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
ijsrd.com
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing Machine
IRJET Journal
 
IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.
IRJET Journal
 
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
IRJET Journal
 
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
IRJET Journal
 

Similar to IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productivity by SMED Concept (20)

IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
 
FORGING HAMMER
FORGING HAMMERFORGING HAMMER
FORGING HAMMER
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 
H012134550
H012134550H012134550
H012134550
 
Implementation of Lean Strategies in a Furniture Manufacturing Factory
Implementation of Lean Strategies in a Furniture Manufacturing Factory Implementation of Lean Strategies in a Furniture Manufacturing Factory
Implementation of Lean Strategies in a Furniture Manufacturing Factory
 
IRJET- Development of Ejection System to Improve Productivity
IRJET-  	  Development of Ejection System to Improve ProductivityIRJET-  	  Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
 
IRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
 
Manufacturing of Toggle Jack
Manufacturing of Toggle JackManufacturing of Toggle Jack
Manufacturing of Toggle Jack
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing Machine
 
IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.
 
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
Identification of Bottleneck and Reducing Cycle Time of an Industrial Oven by...
 
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 

Recently uploaded (20)

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

IRJET- Design of Manufacture of Fixtures for CNC Machine to Improve Productivity by SMED Concept

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3713 Design of Manufacture of Fixtures for CNC Machine To Improve Productivity by SMED Concept Akshay Hasabe1, Akshay Kakde2, Ashish Khandagle3, Kiran Surve 4, Asst. Prof. Pankaj Pardeshi5, Mr.Nilesh Khaire6 1,2,3,4Students, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Technology, Pimpri, Pune, India. 5Assistant Professor, Department of Mechanical Engineering, Dr. D. Y. Patil Institute of Techology, Pimpri, Pune, India. ---------------------------------------------------------------------***---------------------------------------------------------------------- ABSTRACT– The competition in the current business world is marked by torridity demonstration and severe disputation. This agitated situation has made organizations to refresh themselves by marching in different ways like Lean, TPM, TQM etc .to keep them competitive in the market as well to achieve their objectives positively. From the SMED study carried on the CNC machine, it was studied that only few portion of the setup time can be reduced by detaching and transforming the internal operations to external operations. The study of implementation of SMED methodology and propose a set of solutions, gives the optimum sequence, time saving etc. the new proposed fixture designed for plug shell. Key Words: changeover reduction, SMED concept , FMEA analysis , productivity Improvement, internal and external functions, Quality Tools etc. 1. INTRODUCTION A. Setup reduction Setup is a set of activities to prepare for the next part to be produced. Setup time is total elapsed time from Completion of the good part from the previous setup to the first good part from the new setup. Set-up reduction is a kind of theory and method to reduce the setup time. B. SMED (single minute exchange of die) SMED, also known as Quick Changeover of Tools, was developed by Shingo (1985), who characterized it as scientific study for the reduction of setup times, and which can be applied in any industrial unit and for any machine. SMED is defined as the minimum amount of time necessary to change the type of manufacture activity taking into thought the instant in which the last piece of a previous batch was produced or the first part is produced by secondary operation. The objective of SMED is to try to separate internal Operations to the external operations. Ramp down time Run down period is the time between the end of a lot production till the batch quantity is completed. Setup Time Setup time is the non production time in which change over takes from one part to another. Ramp uptime The time between setup is completed and the full production is achieved. Single Minute Exchange of Die (SMED) emphasizes on setup time reduction to single minute. The need of SMED is mandatory due to increased demand for variable products and reduced product life cycles. It helps the company to keep reduced inventory and effective utilization of the equipment. SMED study has to be started up with complete process map and time study. It needs analyze everything that occurs during the changeover to understand the possibilities of actions that can be moved outside the changeover casement. Non worth added activities has to be eliminated or to be converted to external If an internal activity is predictable, it has to be simplified with the help of jigs, fixtures etc. accomplishment of SMED starts from identifying the change over process and categorization it into internal and external activity. Internal activity Activities that are done after stopping the machine. External activity Operations that can be done without stopping the machine. focus should be on optimizing external activities. Maintaining of 5S is important at each level of implementation. 2. OBJECTIVE OF PROJECT  To propose the new fixture design that can solve the problem.  To reduce setup time.  To improve productivity.  To improve awareness to customer demand. 3. PROBLEM STATEMENT  Higher setup time between parts from similar family of the same part.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3714  Based on customer demand, most of them want the suppliers to deliver the product right after the order is valid.  Ovality due to clamping method. 4. METHODOLOGY: The methodology of the project has been simply explained by following flow diagram. From product concept to final product. 5. DESIGN: First step in designing fixture is material selection. As mild steel have good tensile strength and corrosion resistance and other significant properties.  A)Material selection: Material: Mild Steel Properties: • Carbon=0.16 to 0.18% • Manganese=0.7 to 0.9% • Silicon=0.4% • Sulfur=0.04% • Phosphorous=0.04% • Modulus of elasticity = 210 GPa • Density = 7860 kg/m^3 • Melting point = 1600^0C 5.1 Dimension The following dimensions of different parts of new fixture have been taken according to the FEA analysis and type of job size  Arbor body: • Outer diameter (D1) =160mm • Outer diameter (D2)=130mm • Tapper diameter(D3)=90mm • Taper angle =60 degree • Outer diameter of thread =48mm • Inner diameter of thread =46mm • Thread length =13mm • Length of body =180mm  Lock nut : • Outer diameter (D1)=55mm • Inner diameter (d1)=46mm • Thread length =25mm • Outer diameter (D2)=37mm • Inner diameter (d2)=25mm • Length of lock nut=60mm Fig 1. Drafting of Arbor Body Fig 2. Drafting of Arbor Fig 3. Drafting of Lock Nut Fig 4. Drafting of Back Plate
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3715 After drafting of all parts of fixture, its assembly is done in 3D CAD software which have been shown in the following picture: After assembly of whole parts. We studied various stresses and its effects, bending moments, deflections, strength, factor of safety etc. and had taken corrective action against them After all, we started manufacturing of parts one by one as follows: Assembly of proposed fixture Fig 5. CNC machine Fig 6. Fixture mount on CNC machine
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3716 Fig 7. Old fixture 6. POSSIBLE OUTCOMES A lot of time was wasted in changing of the fixture, changing the clamping stud and zero dialing it. All this time which was shattered is now saved with the recently designed fixture by reducing the no of settings .It can be concluded that the amount of saving to the company is considerable in terms of time and money. 7. RESULTS Table 1: Set up time reduction (minutes) Sr. No. Setup time before implementati on of SMED (min) Setup time after implementati on of SMED (min) Set up time reduced (min) Set up time reduce d (%) 1 200 95 105 52.5 As a result, the setup time has been reduced from 200 minutes to 95 minutes. Hence 105 minutes has been saved for one setup and 52.5 % Setup change time has been reduced due to successful implementation of SMED methodology in a CNC machine. It is shown in above Table. Table 2: Numbers of Jobs before and after implementation of SMED Sr. No . Total no of Jobs before implementatio n of SMED Total no of Jobs after implementatio n of SMED Total no of Jobs increased due to implementatio n of SMED 1 300 380 80 Table shows the improvement of productivity of CNC machine due to successful implementation of SMED 8. CONCLUSIONS  It facilitates a fast and effective way of converting a manufacturing process from first product to the last product.  It can be conclude that the amount of saving to the company is considerable in terms of time and money.  The implemented fixture will satisfy researcher production goal and increase the efficiency.  It reduces the set uptime and increases the productivity. REFERENCES 1. Berna Ulutas, “An application of SMED Methodology”, International Journal of Industrial and Manufacturing Engineering, 5, (2011), 1194- 1197. 2. Arun Abraham,Ganpathi K.N., Kailash Motwani, “Setup time reduction through SMED technique in a stamping production line”, SASTECH journal, 11, (2012), 47-52. 3. Mukesh Desai, A.M.Rawani, “Productivity improvement of automobile industry by using SMED”, ARPN Journal of Engineering and applied science, 12, (2017), 2615-2629. 4. N.P.Maniar, D.P.Vakharia, “Design and Development of Rotary Fixture for CNC”, International Journal of Engineering a Science Invention ,1, (2012), 32-43. 5. K.M.Viramgama, R.D.Makhawana, “A Study on Design of Fixture for Valve Body for CNC Machine”, International Journal of Advance Engineering and Research Development, 1, (2014), 42-46.