International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1893
Efficiency Enhancement by Reducing Production and Machining Time
Preet Ramani
Student of BE in Mechanical Engineering from Marwadi Education Foundation
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - In the current 21st century, thedemandofglobal
market is rising very day. This demand leads to be reducing
machining cost, optimized lead time and perfect
manufacturing system to coup with increasing needs of
industries. Production is constantly unmistakable factor to be
considered as to run and build up an association respectful.
Lean assembling assumes a shorten job in methodology of
association viability concentrating on waste decrease and
improving profitability through utilization of different lean
instruments. The prerequisite of lean assembling is high
because of waste and occasional increment in the expense of
assembling products. Esteem stream mappingisoneofthe key
lean instruments used to distinguish the level of significant
worth included, non-esteem included and lead time in
procedures. Work institutionalization is critical in all
assembling divisions, which will give better work technique,
fabricating stream and answer for changeability amid
generation. The fundamental goal of this examination is to
consider the line adjusting device which is conveyed in CNC
machining chambers for adjusting the remainingtaskathand
among the specialists and expanding the representative's
usage.
Key Words: Grey Relation Analysis, Line Balancing, Cycle
Time, VSM
1. INTRODUCTION
In production plants across the globe, lean manufacturing
techniques are being used to meet increasing demands
placed on manufacturers. Originally developed as a
methodology to make production processes highly efficient,
lean techniques have been adopted by all mostverymachine
shops across the country. For many of these, the techniques
have helped them to dramatically increase theircompetitive
edge, while continuing to remove wasteful practices and
contribute to the bottom line. Lean manufacturing is a
continuous improvement philosophy which is synonymous
with Kaizen or Toyota production system. The idea behind
lean concept is maximizingcustomervaluewhileminimizing
wastes to increase value of the products. Lean
manufacturing focuses on cost reduction by identifying and
eliminating non value added activities, by eliminating waste
in manufacturing process and thereby reducing work in
progress. The chamber requires a standard work procedure
which decreases cycle time and is to be displayed in the
machine chambers. Work standardization was carried out
through time study, video analysis and work study. Line
balancing was taken into accountforbalancingtheworkload
between operators which would reduce the idle time of
operators and for analysis purpose simulation was used.
Line balancing was done for maintain workload foe better
production and better efficiency.
2. LITERATURE REVIEW
Lean assembling is an act based procedure utilized in
assembling ventures to expand benefit and aggressiveness
through taking out waste, lessening the processdurationand
diminishing the segment cost. Esteem Stream Mapping is a
procedure for breaking down the current situation and to
structure a future situation for confining the succession of
exercises that takes an item from its start through to the
shopper. VSM is utilized as a fundamentaldevicetorecognize
the open doors for different lean systems. Distinctive
research articles have talked about the different uses of VSM
procedurein variousassemblingenterprises.Theobjectiveof
lean assembling is to build the benefit and aggressiveness by
expanding, diminishing expense by dispensing with waste
and lessening process duration. The fundamentals of lean
assembling and VSM utilize nonstop improvement
procedures to concentrate on the disposal of the seven
squanders or non-esteem included exercises inside the
ventures. It is essentially a working environment the
executives system, which improves the workplace, human
abilities and subsequently expanding the profitability.
Nallusamy et al. examined about the improvement of
exercises that expand the general adequacy of gear,
procedures and plants through inflexible constraint of
misfortunes. The utilization of VSM and line adjusting in an
assembling industry brings a thought of setup time and
process duration decrease. Contextual analysis adjusts the
remaining task at hand between theadministratorsbytaking
out inert time. Manageabilityis vital factor foraccomplishing
aggressiveness to fulfill the client need at ideal time. Amid
determination of the best provider, numerous criteria are to
be viewed as that might be distinctive for various
methodologies for assembling. In light of the above
mentioned, the VSM think about was done in a CNC
machining cell situated at Chennai alongside line adjusting
and workinstitutionalization.Processdurationorleadtimeis
only the time between the arrival of a request from the client
and the time taken for accepting the completed item by the
client. An examination was done foreach machine activityby
utilizing the strategies of technique study and time ponder
which are identified with the subject of mechanical building
where each part associated with machining process like
employment setting time, device setting time, CNC program
stacking time, program running time, speeds, sustains,
profundity of cuts utilized forthe eachtask,devicelife,device
evolving time, work emptying time and so on. Work
institutionalizationsindifferentcreationenterprisesprompts
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1894
decrease in their lead time, process duration and setup time
and furthermore increment the rate of nature of the item.
Through a contextual investigation the different deformities
in a cast iron assembling industry were reviewed and the
required proposals were given to expel the imperfections.
3. PROBLEM DEFINITION AND METHODOLOGY
Issue has been characterized by dissecting on a nitty gritty
examination an apparatus box producing procedure and
lodging cell was distinguished as the bottleneck for the
assembling procedure which needs the improvement .Data
accumulation was finished byutilizingstopwatchtimestudy
and work considerwasfinishedbyvideoinvestigation.TAKT
time was determined dependent on the interest and after
that thought about against process duration. Esteem stream
mapping was done to break down the lead time utilizing I-
Grafix programming and Timer Pro was utilized for waste
recognizable proof and video examination. Esteem included
and non-esteem included exercises were distinguished and
potential measures were taken for development. Line
adjusting was accomplished for adjusting the remaining
burden among administrators and field bundle was utilized
for improving the outcomes. This examination centres in
CNC machining cells, where they produce lodgings for wind
factory gear box. The cell creates in excess of seven models
of rigging boxes and one model has been decided for this
examination reason.
4. VALUE STREAM MAPPING
Value stream mapping is a unique sort of streamdiagramuse
with images known as the language of shelter depicts and
build up the stream of stock and data. It is a unique kind of
stream diagram that used to assess the esteem included and
non-esteem included exercises from the procedure stream.
The information gathered for structure up of current state
esteem stream mapping are incorporates process duration,
setup time, change after some time, number of
administrators, level of significant worth and non-esteem
included exercises, request, stock, data stream. The present
state esteem stream mappingwith fundamentaldataandcell
perception is appeared in Figure. It was discovered that the
absolute lead time is 3012 minutes for a finish of assembling
process. AdditionallytheTAKTtimewaslikewisedetermined
according to the present information as pursues.
The time information and other CNC machining chamber
observations were as below.
Table-1: Time Information
Fig-1: VSM Diagram
5. VALUE ADDED AND NON-VALUE ADDED
ACTIVITIES
Process cycle time and video analysis assists to optimize
value added activities and to find the percentage of non-
value added activities present in the total operations. NVA
are classified as Clear Waste, Hidden Waste, Material
Handling and Cyclic Activities. The sum of VA and NVA were
calculated using video analysis software Timer-pro. Process
duration study and video breakingdownstreamlines esteem
included (VA) exercises, which client willing to pay and to
discover the level of NVA exercises present in whole
activities
Customer Demand: 1500/year
Working Day: 5 Working Days/Week
Customer TAKT Time: 5 Working Days/Week
Target Cycle Time: 183 minutes
Tolerance Time: 175minutes
Overall Equipment
Effectiveness:
87%
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1895
Fig. 2: NVA Diagram during operation 10
Fig. 3: NVA Diagram during operation 20
Fig. 4: NVA Diagram during operation 30
Non-value included exercises are presented by obvious
waste (OW), which should be dispensed with. HiddenWaste
(HW), which should be diminished and these squanders
can't be dispensed with from the procedure and changes
relies upon man and material. Material Handling (MH) care
of need to check whether it can move to coordination or join
the procedure to lessen the process duration. Intermittent
exercises are the present state simultaneously. The all out
procedure is classified by esteem included and non-esteem
included exercises for procedure AA, process BB,processCC
and debarring are appeared in Figure 2, 3 and 4 separately.
6. WORK STANDARDIZATION
Work standardization is required for fitting arranging and
situating of specialists, materials, machines, supporting
components and offices for acquiring flawlessness in
assembling condition. As indicated by Toyota creation
framework, the execution of institutionalized working
methodology will helpindiminishingNVAunderwaystream.
In light of work institutionalization approach four cycle of
process duration examine wereperformedamidinformation
accumulation. More than 10 to 20 upgrade thoughts were
discovered and Kaizen's was proposed to improve the
incentive in procedure. The process durationof160 minutes
got decreased from current process duration and potential
measures for upgrades were recommended. By adjusting
institutionalized workingmethodinlodgingchamber20%of
NVA has been decreased in the present procedure.
Fig. 5: cycle time Diagram for processes A,B
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1896
7. LINE BALANCING
Line balancing is the way toward doling out undertakings to
different workstations, with the goal that every one of the
workstations have aroundequal timeprerequisites.We used
the technique for line adjusting to-limit idle time-balance
bottlenecks. Based on the present line adjusting format, the
new design was proposed with a portion of the procedures
were combined into single station like M1 & M2, M3 & M4,
M5 & M6, M9 & M10, M17 with M18, PI with M21 and F2
with P. The proposed line adjustingdesignisappearedin Fig.
5. Subsequent to executingtheproposedlineadjustingit was
discovered that the development separation of the laborers
in the assembling zone was decreased to 104.2 meters
through consolidating the distinctive workstations.
Eventually, the lead time was likewise diminished by the
proposed line adjusting strategy.
The proposed line balancing idea was proposed and
reproduction has done after waste decreases in procedure
with the distribution of assets are appeared in Figure 16.
From this line adjusting idea man inert time is diminished
and the man and machine usage is adjusted to 80%. In
existing, amid procedure man engaged with work is 2 hours
and 18 minutes in the all-out process duration of 5 hours
and 35 minutes which is simply around 58% as it were. So
the single administrator for two machines can be utilized,
which is close-by offset with the man and machine usage. It
was seen that around 80% of use by both the machine and
man use is expanded up to 72% by the field reproduction.
8. CONCLUSIONS
The application of lean manufacturing tools in machining
and production cell was examined and dissected. The goal
was to distinguish and evacuate the losses in any exercises
that don't esteem added to the last item in the assembling
procedure and furthermore to lessen the general lead time.
In view of the investigation and examination the
accompanying ends were arrived.
• From the current scenario of VSM, it can been seen that
identified the esteem included and the non-value included
time for individual procedure.
• The process durationwasdiminishedbydistinguishing and
disposing of squanders through 5S usage.
• Expanding process has some more non-value movement
when contrasted with different procedures after their
improvement action usage.
• The development separate was decreased about 11.3
meters through the usage of proposed line adjusting.
• It was crystal clearly seen from the future of state VSMthat
the total production process duration was gradually reduce
300.45 seconds and monthly demandwasexpandedas4350
units rather than 3560 units for every month which is
expanded by about 20%.
REFERENCES
1. Oberhausen and Plapper, “Value stream
management in the lean manufacturinglaboratory”,
Procedia CIRP, vol. 32, pp. 144-149, 2015.
2. Hbaieb M, Othmani R, Bouzid W. (2010) Time
modeling in high-speed machining of mold pocket.
International Journal of Advanced Manufacturing
Technology;53:113–20.
3. V. Ramakrishnan, S. Nallusamy, IJAER ISSN 0973-
4562 Volume 12, Number 23 (2017)
4. R. Suganthini Rekha a *, P. Periyasamyb, S.
Nallusamy ICMAEM-2017 Materials Science and
Engineering 225 (2017) 012282
5. Dr. S. Nallusamy, International Journal of
Performability Engineering, Vol. 12, No. 5,
September 2016
6. ]. Dighe, S. B. and A. Kakirde. Lean Manufacturing
Implementation using Value Stream Mapping: A
Case Study of Pumps Manufacturing Company.
International Journal ofScienceandResearch,2014;
3(6): 2492-2498.
7. Neha, S., Singh M. G. and K. Simran. Lean
Manufacturing Tool and Techniques in Process
Industry. International Journal of Scientific
Research and Reviews, 2013; 2(1): 54-63.

More Related Content

What's hot

Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
Ricky Smith CMRP
 
Improving SMT Equipment Utilization
Improving SMT Equipment UtilizationImproving SMT Equipment Utilization
Improving SMT Equipment Utilization
imdiven
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryNishant Patil
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET Journal
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
Matthew Clemens
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
Dr. Munthear Alqaderi
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET Journal
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET Journal
 
Design of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysemDesign of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysem
Maheer Sohbat
 
Project management assignment evaluating the process in car manufacturing
Project management assignment  evaluating the process in car manufacturingProject management assignment  evaluating the process in car manufacturing
Project management assignment evaluating the process in car manufacturing
Total Assignment Help
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
Dr Fereidoun Dejahang
 
RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 Varun Rawal
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
Khairul Bashar
 
project-presentation
project-presentationproject-presentation
project-presentationronybste
 
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyValue Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
IRJET Journal
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGFuratAj
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET Journal
 

What's hot (20)

Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
Improving SMT Equipment Utilization
Improving SMT Equipment UtilizationImproving SMT Equipment Utilization
Improving SMT Equipment Utilization
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
 
Design of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysemDesign of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysem
 
Project management assignment evaluating the process in car manufacturing
Project management assignment  evaluating the process in car manufacturingProject management assignment  evaluating the process in car manufacturing
Project management assignment evaluating the process in car manufacturing
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Jy2417091713
Jy2417091713Jy2417091713
Jy2417091713
 
project-presentation
project-presentationproject-presentation
project-presentation
 
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case StudyValue Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
Value Analysis of A Rubber Hose Moulding and Assembly Line: A Case Study
 
PALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPINGPALCO INDUSTRY USING VALUE STREAM MAPPING
PALCO INDUSTRY USING VALUE STREAM MAPPING
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 

Similar to IRJET- Efficiency Enhancement by Reducing Production and Machining Time

IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET Journal
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET Journal
 
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization ProcessIRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET Journal
 
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
IRJET Journal
 
Checking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive IndustryChecking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive Industry
IRJET Journal
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
PERUMALSAMY M
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
IRJET Journal
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis Presentation
Sanchit Jain
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET Journal
 
A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEZubair Ali ali
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET Journal
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
IRJET Journal
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET Journal
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
Syed Jafri
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET Journal
 

Similar to IRJET- Efficiency Enhancement by Reducing Production and Machining Time (20)

IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization ProcessIRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization Process
 
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
 
Checking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive IndustryChecking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive Industry
 
synopsis
synopsissynopsis
synopsis
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis Presentation
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCE
 
Iss 9
Iss 9Iss 9
Iss 9
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
 
Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

IRJET- Efficiency Enhancement by Reducing Production and Machining Time

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1893 Efficiency Enhancement by Reducing Production and Machining Time Preet Ramani Student of BE in Mechanical Engineering from Marwadi Education Foundation ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - In the current 21st century, thedemandofglobal market is rising very day. This demand leads to be reducing machining cost, optimized lead time and perfect manufacturing system to coup with increasing needs of industries. Production is constantly unmistakable factor to be considered as to run and build up an association respectful. Lean assembling assumes a shorten job in methodology of association viability concentrating on waste decrease and improving profitability through utilization of different lean instruments. The prerequisite of lean assembling is high because of waste and occasional increment in the expense of assembling products. Esteem stream mappingisoneofthe key lean instruments used to distinguish the level of significant worth included, non-esteem included and lead time in procedures. Work institutionalization is critical in all assembling divisions, which will give better work technique, fabricating stream and answer for changeability amid generation. The fundamental goal of this examination is to consider the line adjusting device which is conveyed in CNC machining chambers for adjusting the remainingtaskathand among the specialists and expanding the representative's usage. Key Words: Grey Relation Analysis, Line Balancing, Cycle Time, VSM 1. INTRODUCTION In production plants across the globe, lean manufacturing techniques are being used to meet increasing demands placed on manufacturers. Originally developed as a methodology to make production processes highly efficient, lean techniques have been adopted by all mostverymachine shops across the country. For many of these, the techniques have helped them to dramatically increase theircompetitive edge, while continuing to remove wasteful practices and contribute to the bottom line. Lean manufacturing is a continuous improvement philosophy which is synonymous with Kaizen or Toyota production system. The idea behind lean concept is maximizingcustomervaluewhileminimizing wastes to increase value of the products. Lean manufacturing focuses on cost reduction by identifying and eliminating non value added activities, by eliminating waste in manufacturing process and thereby reducing work in progress. The chamber requires a standard work procedure which decreases cycle time and is to be displayed in the machine chambers. Work standardization was carried out through time study, video analysis and work study. Line balancing was taken into accountforbalancingtheworkload between operators which would reduce the idle time of operators and for analysis purpose simulation was used. Line balancing was done for maintain workload foe better production and better efficiency. 2. LITERATURE REVIEW Lean assembling is an act based procedure utilized in assembling ventures to expand benefit and aggressiveness through taking out waste, lessening the processdurationand diminishing the segment cost. Esteem Stream Mapping is a procedure for breaking down the current situation and to structure a future situation for confining the succession of exercises that takes an item from its start through to the shopper. VSM is utilized as a fundamentaldevicetorecognize the open doors for different lean systems. Distinctive research articles have talked about the different uses of VSM procedurein variousassemblingenterprises.Theobjectiveof lean assembling is to build the benefit and aggressiveness by expanding, diminishing expense by dispensing with waste and lessening process duration. The fundamentals of lean assembling and VSM utilize nonstop improvement procedures to concentrate on the disposal of the seven squanders or non-esteem included exercises inside the ventures. It is essentially a working environment the executives system, which improves the workplace, human abilities and subsequently expanding the profitability. Nallusamy et al. examined about the improvement of exercises that expand the general adequacy of gear, procedures and plants through inflexible constraint of misfortunes. The utilization of VSM and line adjusting in an assembling industry brings a thought of setup time and process duration decrease. Contextual analysis adjusts the remaining task at hand between theadministratorsbytaking out inert time. Manageabilityis vital factor foraccomplishing aggressiveness to fulfill the client need at ideal time. Amid determination of the best provider, numerous criteria are to be viewed as that might be distinctive for various methodologies for assembling. In light of the above mentioned, the VSM think about was done in a CNC machining cell situated at Chennai alongside line adjusting and workinstitutionalization.Processdurationorleadtimeis only the time between the arrival of a request from the client and the time taken for accepting the completed item by the client. An examination was done foreach machine activityby utilizing the strategies of technique study and time ponder which are identified with the subject of mechanical building where each part associated with machining process like employment setting time, device setting time, CNC program stacking time, program running time, speeds, sustains, profundity of cuts utilized forthe eachtask,devicelife,device evolving time, work emptying time and so on. Work institutionalizationsindifferentcreationenterprisesprompts
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1894 decrease in their lead time, process duration and setup time and furthermore increment the rate of nature of the item. Through a contextual investigation the different deformities in a cast iron assembling industry were reviewed and the required proposals were given to expel the imperfections. 3. PROBLEM DEFINITION AND METHODOLOGY Issue has been characterized by dissecting on a nitty gritty examination an apparatus box producing procedure and lodging cell was distinguished as the bottleneck for the assembling procedure which needs the improvement .Data accumulation was finished byutilizingstopwatchtimestudy and work considerwasfinishedbyvideoinvestigation.TAKT time was determined dependent on the interest and after that thought about against process duration. Esteem stream mapping was done to break down the lead time utilizing I- Grafix programming and Timer Pro was utilized for waste recognizable proof and video examination. Esteem included and non-esteem included exercises were distinguished and potential measures were taken for development. Line adjusting was accomplished for adjusting the remaining burden among administrators and field bundle was utilized for improving the outcomes. This examination centres in CNC machining cells, where they produce lodgings for wind factory gear box. The cell creates in excess of seven models of rigging boxes and one model has been decided for this examination reason. 4. VALUE STREAM MAPPING Value stream mapping is a unique sort of streamdiagramuse with images known as the language of shelter depicts and build up the stream of stock and data. It is a unique kind of stream diagram that used to assess the esteem included and non-esteem included exercises from the procedure stream. The information gathered for structure up of current state esteem stream mapping are incorporates process duration, setup time, change after some time, number of administrators, level of significant worth and non-esteem included exercises, request, stock, data stream. The present state esteem stream mappingwith fundamentaldataandcell perception is appeared in Figure. It was discovered that the absolute lead time is 3012 minutes for a finish of assembling process. AdditionallytheTAKTtimewaslikewisedetermined according to the present information as pursues. The time information and other CNC machining chamber observations were as below. Table-1: Time Information Fig-1: VSM Diagram 5. VALUE ADDED AND NON-VALUE ADDED ACTIVITIES Process cycle time and video analysis assists to optimize value added activities and to find the percentage of non- value added activities present in the total operations. NVA are classified as Clear Waste, Hidden Waste, Material Handling and Cyclic Activities. The sum of VA and NVA were calculated using video analysis software Timer-pro. Process duration study and video breakingdownstreamlines esteem included (VA) exercises, which client willing to pay and to discover the level of NVA exercises present in whole activities Customer Demand: 1500/year Working Day: 5 Working Days/Week Customer TAKT Time: 5 Working Days/Week Target Cycle Time: 183 minutes Tolerance Time: 175minutes Overall Equipment Effectiveness: 87%
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1895 Fig. 2: NVA Diagram during operation 10 Fig. 3: NVA Diagram during operation 20 Fig. 4: NVA Diagram during operation 30 Non-value included exercises are presented by obvious waste (OW), which should be dispensed with. HiddenWaste (HW), which should be diminished and these squanders can't be dispensed with from the procedure and changes relies upon man and material. Material Handling (MH) care of need to check whether it can move to coordination or join the procedure to lessen the process duration. Intermittent exercises are the present state simultaneously. The all out procedure is classified by esteem included and non-esteem included exercises for procedure AA, process BB,processCC and debarring are appeared in Figure 2, 3 and 4 separately. 6. WORK STANDARDIZATION Work standardization is required for fitting arranging and situating of specialists, materials, machines, supporting components and offices for acquiring flawlessness in assembling condition. As indicated by Toyota creation framework, the execution of institutionalized working methodology will helpindiminishingNVAunderwaystream. In light of work institutionalization approach four cycle of process duration examine wereperformedamidinformation accumulation. More than 10 to 20 upgrade thoughts were discovered and Kaizen's was proposed to improve the incentive in procedure. The process durationof160 minutes got decreased from current process duration and potential measures for upgrades were recommended. By adjusting institutionalized workingmethodinlodgingchamber20%of NVA has been decreased in the present procedure. Fig. 5: cycle time Diagram for processes A,B
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1896 7. LINE BALANCING Line balancing is the way toward doling out undertakings to different workstations, with the goal that every one of the workstations have aroundequal timeprerequisites.We used the technique for line adjusting to-limit idle time-balance bottlenecks. Based on the present line adjusting format, the new design was proposed with a portion of the procedures were combined into single station like M1 & M2, M3 & M4, M5 & M6, M9 & M10, M17 with M18, PI with M21 and F2 with P. The proposed line adjustingdesignisappearedin Fig. 5. Subsequent to executingtheproposedlineadjustingit was discovered that the development separation of the laborers in the assembling zone was decreased to 104.2 meters through consolidating the distinctive workstations. Eventually, the lead time was likewise diminished by the proposed line adjusting strategy. The proposed line balancing idea was proposed and reproduction has done after waste decreases in procedure with the distribution of assets are appeared in Figure 16. From this line adjusting idea man inert time is diminished and the man and machine usage is adjusted to 80%. In existing, amid procedure man engaged with work is 2 hours and 18 minutes in the all-out process duration of 5 hours and 35 minutes which is simply around 58% as it were. So the single administrator for two machines can be utilized, which is close-by offset with the man and machine usage. It was seen that around 80% of use by both the machine and man use is expanded up to 72% by the field reproduction. 8. CONCLUSIONS The application of lean manufacturing tools in machining and production cell was examined and dissected. The goal was to distinguish and evacuate the losses in any exercises that don't esteem added to the last item in the assembling procedure and furthermore to lessen the general lead time. In view of the investigation and examination the accompanying ends were arrived. • From the current scenario of VSM, it can been seen that identified the esteem included and the non-value included time for individual procedure. • The process durationwasdiminishedbydistinguishing and disposing of squanders through 5S usage. • Expanding process has some more non-value movement when contrasted with different procedures after their improvement action usage. • The development separate was decreased about 11.3 meters through the usage of proposed line adjusting. • It was crystal clearly seen from the future of state VSMthat the total production process duration was gradually reduce 300.45 seconds and monthly demandwasexpandedas4350 units rather than 3560 units for every month which is expanded by about 20%. REFERENCES 1. Oberhausen and Plapper, “Value stream management in the lean manufacturinglaboratory”, Procedia CIRP, vol. 32, pp. 144-149, 2015. 2. Hbaieb M, Othmani R, Bouzid W. (2010) Time modeling in high-speed machining of mold pocket. International Journal of Advanced Manufacturing Technology;53:113–20. 3. V. Ramakrishnan, S. Nallusamy, IJAER ISSN 0973- 4562 Volume 12, Number 23 (2017) 4. R. Suganthini Rekha a *, P. Periyasamyb, S. Nallusamy ICMAEM-2017 Materials Science and Engineering 225 (2017) 012282 5. Dr. S. Nallusamy, International Journal of Performability Engineering, Vol. 12, No. 5, September 2016 6. ]. Dighe, S. B. and A. Kakirde. Lean Manufacturing Implementation using Value Stream Mapping: A Case Study of Pumps Manufacturing Company. International Journal ofScienceandResearch,2014; 3(6): 2492-2498. 7. Neha, S., Singh M. G. and K. Simran. Lean Manufacturing Tool and Techniques in Process Industry. International Journal of Scientific Research and Reviews, 2013; 2(1): 54-63.