Submit Search
Upload
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
•
0 likes
•
34 views
IRJET Journal
Follow
https://www.irjet.net/archives/V4/i6/IRJET-V4I6421.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 7
Download now
Download to read offline
Recommended
Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
IRJET Journal
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
IJERA Editor
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
IRJET Journal
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET Journal
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
IJERA Editor
Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysis
eSAT Publishing House
Ijciet 08 04_220
Ijciet 08 04_220
IAEME Publication
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
ijceronline
Recommended
Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
IRJET Journal
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
IJERA Editor
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
IRJET Journal
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET Journal
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
IJERA Editor
Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysis
eSAT Publishing House
Ijciet 08 04_220
Ijciet 08 04_220
IAEME Publication
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
ijceronline
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
IRJET Journal
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
eSAT Publishing House
B1303020508
B1303020508
IOSR Journals
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
IJERA Editor
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
ijtsrd
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET Journal
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET Journal
Insights on Research Techniques towards Cost Estimation in Software Design
Insights on Research Techniques towards Cost Estimation in Software Design
IJECEIAES
IRJET- Comparative Analysis between Critical Path Method and Monte Carlo S...
IRJET- Comparative Analysis between Critical Path Method and Monte Carlo S...
IRJET Journal
Using multivariable linear regression technique
Using multivariable linear regression technique
Pemmasani Srinivas
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET Journal
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
IRJET Journal
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET Journal
Ijciet 10 01_075
Ijciet 10 01_075
IAEME Publication
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
IJSRED
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET Journal
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
IRJET Journal
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET Journal
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
IRJET Journal
More Related Content
What's hot
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
IRJET Journal
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
eSAT Publishing House
B1303020508
B1303020508
IOSR Journals
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
IJERA Editor
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
ijtsrd
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET Journal
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET Journal
Insights on Research Techniques towards Cost Estimation in Software Design
Insights on Research Techniques towards Cost Estimation in Software Design
IJECEIAES
IRJET- Comparative Analysis between Critical Path Method and Monte Carlo S...
IRJET- Comparative Analysis between Critical Path Method and Monte Carlo S...
IRJET Journal
Using multivariable linear regression technique
Using multivariable linear regression technique
Pemmasani Srinivas
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET Journal
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
IRJET Journal
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET Journal
Ijciet 10 01_075
Ijciet 10 01_075
IAEME Publication
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
IJSRED
What's hot
(18)
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
B1303020508
B1303020508
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
Insights on Research Techniques towards Cost Estimation in Software Design
Insights on Research Techniques towards Cost Estimation in Software Design
IRJET- Comparative Analysis between Critical Path Method and Monte Carlo S...
IRJET- Comparative Analysis between Critical Path Method and Monte Carlo S...
Using multivariable linear regression technique
Using multivariable linear regression technique
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
Ijciet 10 01_075
Ijciet 10 01_075
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Similar to Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET Journal
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
IRJET Journal
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET Journal
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
IRJET Journal
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...
IRJET Journal
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
IRJET Journal
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET Journal
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
IRJET Journal
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
IJERA Editor
Cost Forecasting of Construction Materials: A review
Cost Forecasting of Construction Materials: A review
IRJET Journal
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET Journal
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET Journal
IRJET- Decision Making in Construction Management using AHP and Expert Choice...
IRJET- Decision Making in Construction Management using AHP and Expert Choice...
IRJET Journal
Effective techniques in cost optimization of construction project an review
Effective techniques in cost optimization of construction project an review
eSAT Journals
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
IRJET Journal
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
IRJET Journal
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
Nat Rice
Similar to Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
(19)
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...
IRJET- Literature Review on Use of Simulation Modeling for Scheduling in ...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
Cost Forecasting of Construction Materials: A review
Cost Forecasting of Construction Materials: A review
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET - Fuzzy Logic Approach in Construction Delay Analysis
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Decision Making in Construction Management using AHP and Expert Choice...
IRJET- Decision Making in Construction Management using AHP and Expert Choice...
Effective techniques in cost optimization of construction project an review
Effective techniques in cost optimization of construction project an review
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
IRJET- Review on Study and Analysis of Various Automated Construction Mat...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Call Girls in Nagpur High Profile
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Soham Mondal
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
RajaP95
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
rknatarajan
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
KurinjimalarL3
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
RajkumarAkumalla
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
sanyuktamishra911
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
M Maged Hegazy, LLM, MBA, CCP, P3O
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
Recently uploaded
(20)
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2159 SENSTIVITY ANALYSIS OF PROJECT SCHEDULING USING FUZZY SET THEORY Batan Sharma1, Dr. Mukesh Pandey2 1PG scholar’s, Civil Engineering Department, ITM University, Gwalior 2HOD, Civil Engineering Department, ITM University, Gwalior ----------------------------------------------------------------------***------------------------------------------------------------------------- ABSTRACT: - This paper describes an application of fuzzy logic in analysis of delays in construction projects using Fuzzy set linguistic values as well as membership values. There are wide range of factor which effect construction project. In this paper we use the fuzzy logic to estimate delay by using weather good(g), medium(m), bad(b) and labor experience high(h), medium(m), low(l). we know that project scheduling use either probabilistic method or deterministic method for measuring schedule duration time. These membership values help us in determining the total effect on the duration of project due to different reason in construction project. This method helps us to understand the total delay through critical path method and program evaluation and review technique. One of the main advantages of the proposed technique is that it can be easily implemented in existing computer programs for project scheduling. We know that some of the activity are delay due to some external factor, which are considered by the software earlier using critical path method using fuzzy logic. Keywords: - Linguistic Values, Fuzzy logic. 1. INTRODUCTION The Fuzzy set theory has been studying nearly the past 55 years. Most of an early interest in fuzzy set theory pertained to representing uncertainty in human cognitive processes according Zadeh (1965)). Fuzzy set theory is now used to minimize problems in engineering, business, medical and related health sciences, and the natural sciences. In an effort to gain a better understanding of the use of fuzzy set theory in construction industry management research and to provide a basis for future research, a literature review of fuzzy set theory in construction industry management has been conducted. While similar survey efforts have been undertaken for other topical areas, there is a need in construction industry management for the same. Over the years there are successful applications and implementations of fuzzy set theory in construction industry management. Fuzzy set theory has been recognized as an important problem modeling and solution technique. A summary of the findings of fuzzy set theory in construction industry management research may benefit researchers in the construction industry and management field. In 1956, the critical path method (CPM) was implemented on a computer to schedule construction project. In 1957, a technique implements called the program evaluation review technique (PERT) has developed to integrate the coordinate contractor working on a single project. Recently a method called graphical evaluation and review techniques (GERT) was developed. It is the simplest method to say the dovetailed in the construction industry. It is useful when performance of all the operations is not necessary for the completion of projects. All these methods have been broadly divided into two groups deterministic and probabilistic. When the information is used for a particular method and which is known during the analysis is called as deterministic and most of the information is used in this method is non deterministic in nature. Using CPM this method can be used. In the probabilistic method every parameter is generally expressing in terms of mean, coefficient of variation, standard deviation etc. PERT and GERT can be classified as a probabilistic method. 2. LITERATURE REVIEW For solving the problems using fuzzy logic different paper or different literature are studied for solving the problem of delay duration in construction industry. These literature helps me to find out the reasons behind the delay duration and the use of fuzzy logic in the construction industry.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2160 Bilal M. Ayyab and Achintya Haldar “The Project Scheduling Using Fuzzy Set Concepts” this paper analyzed the project scheduling method using fuzzy set which helps us to find out the delay duration in any completed project. In this paper author use the linguistic function along with membership function to find out the delay duration in any project. one of the important use of this technique is that it can be easily implemented in existing computer programs for project scheduling. Pandey M.K, Dandotiya A, Trivedi M.K, Bhadoriya S.S, Ramasesh G.R. “Delay Computation Using Fuzzy Logic Approach” the author use the fuzzy logic set theory, which helps the author to find out the total delay duration on the construction site. Initially the research is basedon the real project executed in Gwalior (mp), and find the delay duration due to shortage of materials and lack of operators. after that the author apply the fuzzy set theory on project with linguistic and membership values. The writer gets the nearly same value in his research O Brien J.J “CPM In Construction Management” this paper analyzed that construction have many techniques, with varying degrees of complexity to maintain the construction project. bar charts is important tool of project scheduling, it used in simulation, value engineering, statistical quality, time and motion studies etc. and the other use of CPM in construction management. In 1956 the CPM is first implemented on computer to schedule construction project. Shruti singh, dr. M.K trivedi “Application of Fuzzy Logic in Delay Analysis in Construction” this paper represents the application of fuzzy logic in analysis of delays in construction industry using fuzzy toolbox of MATLAB program software. The author takes the different factor of delay labor related, project related, consultant related, contractor related, external factor, owner related, material related, environment related, design related, equipment related etc. a case study and an interview was done by an author in housing project in Gwalior, to determine causes of delay with a help of questionnaire survey. The value of factor ranging from 1 to 100 as a probability of schedule delay (01 for very low and 100 for very high). L.A Zadeh “Fuzzy Sets Information and Control “The author LA Zadeh introduced the concept of fuzzy in 1965 first time in the history of construction. And represent the non-control methodology of partial set memberships function other than crisp set membership function or non- memberships function. He tells that each object has it own membership value which determine the degree, through which object related to the fuzzy set. also determine the use of fuzzy in different sector other than construction industry. H.N.Ahuja “Construction Performance Control by Network” The author suggests after CPM the another technique program evaluation and review technique (PERT) is introduced to coordinate contractors working on the project. the PERT is enables works of project without knowledge of probability of occurrence of events. after some time, new method is developed called Graphical Evaluation and review Techniques which helps in a relative operation in construction projects. Adriana V. Ordonez Oliveros and Aminah Robinson Fayek “Fuzzy logic approach for Activity Delay Analysis and Schedule updating” the research aims to make a fuzzy logic model for modifying activity durations and the model integrates daily site reporting of activity progress and delays with a schedule updating and forecasting system for construction project monitoring and control. These are some important paper which helps me in understanding the problem related to the fuzzy logic and with the help of these paper we find out the delay durations. 3. PROBLEM DESCRIPTION The construction industry plays an important role in the developed country. The construction project divided into different activity and all are present in the form of network. for completion of these activity we need the
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2161 certain amount of resources like labor, time money and material. The objective given staff person which are working on the construction site is to reduce the total cost laying on the different activity and they are also mention that the work can be completed on given time. For estimating the time of each activity using CPM, PERT the probability distribution and parameters of duration can be measures. There are many factors which effect the duration of activity are labor, weather, client, consumer, transportation and other factor but we are consider on two factor labor and weather. Weather can be divide into different level good, medium, bad but the labor can be divide in different categories labor are based on level of experience. In the construction project the project engineers estimate the duration of activity on the bases of judgment and experience, finally the judgment effect in completion of project. In this paper the quality of the activity duration to any of these factors is measured in the linguistic terms. The linguistic values can be converted into the mathematical measures by fuzzy set and system theory. Here we are using the different membership values and find out the effect of these changes on the duration of activity, which helps us to find out the delay before starts the project. 4. ELEMENT OF FUZZY SET THEORY Let X is a subset of element, and A is the subset of X each value of X is related to the membership value to the subset of A. µA(x). So membership function is given by µA(x) = 1 if X belong to ‘A’ 0 if X not belongs to ‘A’ There are two possible values of element X either being a member of A µa(x)=1 or not a member of A. µa(x) =0. Therefore, a have a sharp boundary, on the other hand if the membership function is between (0,1) is called a fuzzy set. Now A has not a sharp boundary. Let “X” is be the level of experience of labor. It is excellent experience i.e. x=1.0 and low experience means x=0.1, A has a linguistic variable, x 1=1.0, µA(x1)=0.0 x 2=0.9, µA(x2)=0.0 x3=0.8, µA(x3)=0.0 x4=0.7, µA(x4)=0.0 x5=0.6, µA(x5) =0.0 x6=0.5, µA(x6)=0.0 x7=0.4, µA(x7)=0.2 x8=0.3, µA(x8)=0.6 x9=0.2, µA(x9)=0.8 x10=0.1, µA(x10)=0.9 x11=0.0, µA(x11)=1.0 For short experience, {A= 0.4|0.1, 0.3|0.4, 0.2|0.6,0.1|0.8, 0.0|0.9} The value of X are 0.4,0.3,0.2,0.1,0.0 and corresponding membership values are 0.1,0.4,0.6,0.8,0.9 . For long experience, {B=1.0|0.9,0.9|0.8,0.8|0.7,0.7|0.1,0.6|0.1}. 5. EXAMPLE In this example a procedure is presented for estimating the probability mass function of the duration of an activity, which is the basis of any probabilistic project scheduling method. There are many factor which affect the duration of an activity, as we know. There are mostly two factors which affect the duration of construction activity. (01) weather: -Good (G), Medium (M), Bad (B). (02) labor experience: - High (H), Medium (M) Low (L) The frequency of occurrence is called “F”, for a preceding factor and adverse consequence “C” on the duration of an activity are estimated in linguistic term. Now we estimate the duration of a activity and the impact of these factor on the duration. QUENTITATIVE DESCRIPTION OF FEQUENCY OF OCCURANCE AND CONNSEQUENCE S .no Factor Frequency of occurrence (f) Adverse consequence of duration (C) 01 Weather bad Small Large 02 Weather medium Medium Medium 03 Weather good Medium Very small 04 Labor low Large Medium 05 Labor medium Medium Quite small 06 Labor high Quite small Very small
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2162 The membership value of each project is different at each place of different project. the following translation of linguistic variable into fuzzy subset are assumed as follow. Now combining the frequency of occurrence “F” and the adverse consequence “C” for each factor , i = 1….6 by using previsions technique . (01) Now, we apply a all fuzzy operation, fuzzy relation on different linguistic value as on increasing the value by 10% = Large = { 0.8|0.6, 0.9|1.0, 01|1.0} medium = { 0.3|0.3, 0.4|0.9, 0.5|1.0, 0.6|0.9, 0.7|0.3} small = { 0.0|1.0, 0.1|1.0, 0.2|0.6} quite small= (small) ^1.25 = { 0.0|1.0, 0.1|1.0, 0.2|0.54} Very small= (small) ^ 2 = { 0.0|1.0, 0.1|1.0, 0.2|0.36} Very large= (large) ^2 = {0.8|0.36, 0.9|1.0, 01|1.0} the total effect of all factor on activity duration is obtained by UNION operation method. So total effect, T=(f1*c1)υ(f2*c2)υ…………..(f6*c6) FREQUENCY*CONSEQUENCES 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 0.0 1.0 1.0 0.36 0.0 0.0 0.0 0.0 0.0 0.6 1.0 1.0 0.1 1.0 1.0 0.36 0.0 0.0 0.0 0.0 0.0 0.6 1.0 1.0 0.2 0.54 0.54 0.36 0.0 0.0 0.0 0.0 0.0 0.6 0.6 0.6 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.4 0.9 0.9 0.54 0.3 0.9 0.9 0.9 0.3 0.0 0.0 0.0 0.5 1.0 1.0 0.54 0.3 0.9 1.0 0.9 0.3 0.0 0.0 0.0 0.6 0.9 0.9 0.54 0.3 0.9 0.9 0.9 0.3 0.0 0.0 0.0 0.7 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.3 0.6 0.6 0.6 0.3 0.0 0.0 0.0 0.9 0.0 0.0 0.0 0.3 0.9 1.0 0.9 0.3 0.0 0.0 0.0 1.0 0.0 0.0 0.0 0.3 0.9 1.0 0.9 0.3 0.0 0.0 0.0
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2163 We establish a fuzzy relation R (c, da) between the fuzzy subse-t of consequence “C” and the fuzzy subset of duration of the activity in days (da). We know that the consequence is directly proportional to duration of activity. Let, the duration be very large if the consequence are large; let the duration be large if the consequence are medium; and let the duration be small if the consequence are small that are, R: Da = very large = {15|0.09, 20|0.81, 25|1.0} “C “is large R: Da = large = {15|0.3, 20|0.9, 25|1.0} “C” is medium R: Da = small = {20|0.3, 15|0.6, 10|1.0} “C” is small Large = {0.8|0.6, 0.9|1.0, 01|1.0} medium = {0.3|0.3, 0.4|0.9, 0.5|1.0, 0.6|0.9, 0.7|0.3} small = { 0.0|1.0, 0.1|1.0, 0.2|0.6} now taking a UNION matrix of rows R1 , R2 ,R3 , the relation “R” is obtain:- CONSEQUENCES* DURATION 10 15 20 25 0.0 1.0 0.6 0.3 0.0 0.1 1.0 0.6 0.3 0.0 0.2 0.6 0.6 0.3 0.0 0.3 0.0 0.3 0.3 0.3 0.4 0.0 0.3 0.9 0.9 0.5 0.0 0.3 0.9 1.0 0.6 0.0 0.3 0.9 0.9 0.7 0.0 0.3 0.3 0.3 0.8 0.0 0.09 0.6 0.6 0.9 0.0 0.09 0.81 1.0 1.0 0.0 0.09 0.81 1.0 A subjective estimation of the duration can be calculated by taking the composition of “T” and “R” so, ToR = Know use a operation, µR o S = (xi, zk) = max yj {min (xi, yj), µs (yj, zk)} …………. The membership value of different duration: - Fuzzy composition: - max {min (xi, yj )………} ToR : FREQUENCY* DURATION 10 15 20 25 Row summation 0.0 1.0 0.6 0.81 1.0 3.41 0.1 1.0 0.6 0.81 1.0 3.41 0.2 0.54 0.54 0.6 0.6 2.28 0.3 0.3 0.3 0.3 0.3 1.2 0.4 0.9 0.6 0.9 0.9 3.3 0.5 1.0 0.6 0.9 1.0 3.5 0.6 0.9 0.6 0.9 0.9 3.3 0.7 0.3 0.3 0.3 0.3 1.2 0.8 0.0 0.3 0.6 0.6 1.5 0.9 0.0 0.3 0.9 1.0 1.3 1.0 0.0 0.3 0.9 0.9 2.1
6.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2164 The membership values for different durations of the activity and frequencies of occurrence considering the total effect of the factors given in” quantitative description of frequency of occurrences and consequences” . According to Yao, a subset, Da can be chosen from above equation, as a fuzzy representation of the duration of the activity. The membership value for each value of the duration of the activity in Da is equal to the largest membership value in the corresponding column for that duration in equation. However, if Yao's method is used for this case, some of the information given in equation would not be considered, i.e., the frequency of occurrence of the total effect of the factors. Therefore, the writers suggest the following method: choose from equation, a row (subset) which maximizes the product of the row summation given in given equation and the corresponding frequency. So Frequency Row summation Row summation* corresponding frequency 0.0 3.41 0.0 0.1 3.41 0.341 0.2 2.28 0.456 0.3 1.2 0.36 0.4 3.3 1.32 0.5 3.5 1.75 0.6 3.3 1.98 0.7 1.2 0.84 0.8 1.5 1.2 0.9 1.3 1.17 1.0 2.1 2.1 The last row of equation gives a maximum value of product of row summation to the corresponding frequency, so we can use it . Da = activity duration Da = 10|0.0,15|0.3,20|0.9,25|0.9 According to zadah, the probability mass function of the duration activity can be calculated as follow: - P(da=10) = {0.0/0.0+0.30+0.90+0.90} = 0.0 P(da=15) = {0.30/0.0+0.30+0.90+0.90} = 0.14 P(da=20) = {0.9/0.0+0.30+0.90+0.90} = 0.42 P(da=25) = {0.9/0.0+0.3+0.9+0.9} = 0.42 Now, estimates of the mean value “d‾a” and the standard deviation of the duration σDa of the activity duration and calculated as follow :- Activity duration, d‾a = {10*0.0+15*0.14+20*0.42+25*0.42} = 21 days σ^2da= {10^2*0.0+15^2*0.14+20^2*0.42+25^2*0.42}- {21^2} = 21 days σda=(21)^1/2 = 4.58 days CoV = σda/ d‾a = 4.58/21 = 0.21 (02) Now in a next case we apply a all fuzzy operation, fuzzy relation on different membership value as on decreasing the value by 10% :- Large = 0.8|0.4, 0.9|0.8, 01|0.9 medium = 0.3|0.1, 0.4|0.7, 0.5|0.9, 0.6|0.7, 0.7|0.1 small = 0.0|0.9, 0.1|0.8, 0.2|0.4 quite small= (small) ^1.25 = 0.0|0.88, 0.1|0.72, 0.2|0.34 Very small= (small) ^2 = 0.0|0.81, 0.1|0.64, 0.2|0.16 Very large= (large) ^2 = 0.8|0.16, 0.9|0.64, 01|0.81 R: Da = very large = {15|0.01, 20|0.49, 25|0.81} “C “ is large R: Da = large = {15|0.1, 20|0.7, 25|0.9} “C” is medium R: Da = small = {20|0.1, 15|0.4, 10|0.9} “C” is small d‾a = 21.95 days cov = 0.183 (03) Now in a next case we apply a all fuzzy operation, fuzzy relation on different membership value as on given by Bilal M. Ayyub Large = 0.8|0.5, 0.9|0.9, 01|1.0 Medium=0.3|0.2,0.4|0.8,0.5|1.0,0.6|0.8, 0.7|0.2 small = 0.0|1.0, 0.1|0.9, 0.2|0.5 quite small= (small) ^1.25 = 0.0|1.0, 0.1|0.88, 0.2|0.42 Very small= (small) ^2 = 0.0|1.0, 0.1|0.81, 0.2|0.25
7.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2165 Very large= (large) ^2 = 0.8|0.25, 0.9|0.81, 01|1.0 R: Da = very large = {15|0.04, 18|0.64, 20|1.0} “C “ is large R: Da = large = {15|0.2, 18|0.8, 20|1.0} “C” is medium R: Da = small = {18|0.2, 15|0.5, 10|1.0} “C” is small d‾a = 18.7 days cov = 0.083 6. RESULT The delay duration for different membership function is different. in this paper we analysis the different delay duration using different membership function by increasing or decreasing the membership function and we get the result. in order to increase or decrease the membership function by 10%, there will be not a certain difference in delay duration. If we decrease the membership value by 10% (Bilal M. Ayyub) the delay duration will be increased by 17.3%. and in increased case, delay duration increased by 12.29%. this delay percentage is different for every membership value. 7. CONCLUSION This paper totally deal with the different probabilistic methods with various degrees of complexity are used in the construction engineering. When we used the linguistic term other than the mathematical terms the probability theory fails so, we translated linguistic term into mathematical by fuzzy set. In this paper we find out the different delay duration due to labor experience and weather conditions with different memberships functions. This approach helps the site engineer, contractor and other to find out the delay duration before the work start on site. 8. REFERENCES (01). Adriana V. Ordonez Oliveros and Aminah Robinson Fayek “Fuzz logic approach for Activity delay analysis and schedule updating” (2005) pp.42-51. (02). Bilal M. Ayyub and Achintya Halder “project scheduling using fuzzy set concept” j. constr. Eng. manage.,(1984), pp .110(02). 189-204. (03). L. A Zadeh “Fuzzy sets” information and control, vol.8 (1965), pp. 338-353. (04) J.J O Brein “Schedduling Handdook” Mc graw- hill book co. New York N.Y., (1969). (05) H.N Ahuja. “Construction Performance Control by Network”, John Wiley & sons, inc, New York. (1976), pp.23- 126. (06). Pandey M.K, Dandotiya A, Trivedi M.K, Bhadoriya S.S, Ramasesh G.R. “Delay Computation Using Fuzzy Logic Approach” (07). M.H.Sebt ,H.Rajaei, M.M Pakseresht “A Fuzzy modeling approach to weather delays analysis in construction projects” (08). Shurti Singh, Dr. M.K Trivedi “Application of fuzzy logic in delay analysis in construction”.
Download now