International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 883
DEVELOPMENT OF A NEURAL NETWORK BASED MODEL FOR
CONSTRUCTION PROJECT MANAGEMENT EFFECTIVENESS
Pooja Dudhe1, Prof. A.B. Ranit2, Prof. R.R. Wankhade3
1Research Scholar, M.E. Construction Engineering and Management, Prof. Ram Meghe College of Engineering and
Management Badnera-Amravati.
2Assistant Professor, Civil Engineering Department, Prof. Ram Meghe College of Engineering and Management
Badnera-Amravati.
3Assistant Professor, Civil Engineering Department, Prof. Ram Meghe College of Engineering and Management
Badnera-Amravati.
-------------------------------------------------------------------------***------------------------------------------------------------------------
Abstract - An artificial neural network based methodology is applied for predicting the level of organizational
effectiveness in a construction firm. The methodology uses the competing value approach to identify 12 variables. The
historical data of construction projects performance have been used to build the neural network model. Based on these
factors, the construction projects management effectiveness model was established. The model can serve as the
framework for further development of the construction management decision support system.
Key words: Artificial neural network, construction management
INTRODUCTION
In the competitive nature of construction, industry and its heuristic problem-solving needs, among other reasons, have
contributed to the development of some advanced decision-making tools. Research in artificial intelligence (AI), a branch
of computer science, has provided more suitable tools to the construction industry. Since its initial development, the
Artificial Intelligence has found large applicability in the field of engineering. In particular, the so-called soft computing
methods have been shown to be very effective in the analysis and solution of construction engineering problems. However,
the performance of these systems during the last decade is far from ideal. Neural networks research in AI has recently
provided powerful systems that work as a supplement or a complement to such conventional expert systems. In this
paper, neural networks are introduced as a promising management tool that can enhance current automation efforts in the
construction industry, including its applications in construction engineering. The approach of artificial neural network is
one of the empirical modelling technique that allows evaluation of the construction projects management effectiveness
and to determine the factors that influence the project effectiveness in terms of budget performance.
ARTIFICIAL NEURAL NETWORKS
In a broad sense, the artificial neural network (ANN) itself is a model because the topology and transfer functions of the
nodes are usually formulated to match the current problem. Many network architectures have been developed for various
applications. The performance of a neural network depends on its architecture and their parameter settings. There are
many parameters governing the architecture of the neural network including the number of layers, the number of nodes in
each layer, and the transfer function in each node, learning algorithm parameters and the weights which determine the
connectivity between nodes. There is no clearly defined theory which allows for the calculation of the ideal parameter
settings and as a rule even slight parameter changes can cause major variations in the behaviour of almost all networks. So
far, the technique in the use of the neural network for predicting software cost estimation is back propagation trained
multilayered feed forward networks with sigmoidal activation function. But, there are some limitations that prevent it
from being accepted as common practice in construction management effectiveness. The main reason for slow
convergence in back propagation is the sigmoid activation function used in its hidden and output layer units. Furthermore,
inappropriate selection of network patterns and learning rules may cause serious difficulties in network performance and
training. The problem at hand decides the number of layers and number of nodes in the layers and the learning algorithm
as well. However, the guiding criterion is to select the minimum nodes which would not impair the network performance
so that memory demand for storing the weights can be kept minimal. So, the number of layers and nodes should be
minimized to amplify the performance. A proper selection of tuning parameters such as momentum factor, learning
coefficient are required for efficient learning and designing of stable network.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 884
LITERATURE REVIEW
Chua et al. (1997) proposed a neural network approach to identify the key management factors that affect budget
performance in a project. This approach allowed the model to be built even if the functional interrelationships between
input factors and output performance could not be clearly defined. Altogether eight key determining factors were
identified covering areas related to the project manager, project team, and planning and control efforts, namely: number of
organizational levels between project manager and craftsmen, project manager experience on similar technical scope,
detailed design complete at start of construction, constructability program, project team turnover rate, frequency of
control meetings during construction, frequency of budget updates, and control system budget. The model can be used to
evaluate various management strategies and thus resources can be effectively deployed to strengthen these aspects of
project management.
Parminder Kaur (2016) proposed an ANN model that was prepared in order to predict the duration of any ongoing
project in addition to conventional techniques of project planning. A large number of trials were applied for model
training. The absolute variance of model’s results varies from 1.7% to 2.6% which is less than variance calculated by use of
PERT network technique (3.8 to 7.8%) in cases studied. Therefore the model testing is successfully passed and it can be
concluded that Artificial Neural Networks are an effective project management tool that can be used to effectively predict
the project duration and hence prevent scheduling and project duration overruns.
Megha Jain, KK Pathak (2014) concluded that ANNs have been successfully applied to many construction engineering
areas like prediction, risk analysis, decision-making, resources optimization, classification, and selection etc. Based on the
results of case studies, it is evident that ANNs perform better than, or at par to the conventional methods and also found
that ANN have a number of significant benefits that make them a powerful and practical tool for solving many problems in
the field of construction engineering and are expected to be applicable in future.
Baba Shehu Waziri, Kabir Bala and Shehu Ahmadu Bustani (2017) The study revealed successful applications of ANNs
in cost prediction, optimization and scheduling, risk assessment, claims and dispute resolution outcomes and decision
making. It was observed that ANN have been applied to problems that are difficult to solve with traditional mathematical
and statistical methods. The study provides comprehensive repute of ANN in construction engineering and management
for application in different areas for improved accuracy and reliable predictions.
QUESTIONNAIRE SURVEY AND DATA ANALYSIS
A questionnaire was developed to collect data from past projects to be used in developing a predictive model. It was
categorized into profile of the respondent and various factors which improve organizational performance. Questions in the
respondent profile were created to collect information such as name of company, contact information, type of
organization, projects per year and size of projects. The framework for the list of construction management effectiveness
factors covering areas related to project manager, project team, project planning, organization and control, safety
management , material management, financial Planning was selected from the research conducted by Jaselskis and Ashley
(1991), Kanchana Priyadarshani (2003), adnan enshassi(2009), aparna shruthi E (2017). However, the actuality of each
construction management factor was retested by interviewing construction management practitioners, engineers, and
contractors and the approach was modified according to the interviewers opinion. Construction project management
effectiveness factors described in Table 1 served as the independent input variables.
Table 1: Construction Project Management Effectiveness Factor
Category Project Management Factor Measure
Project manager (PM)
PM Meetings Number/month
PM time devoted hours/day
PM field visit Number/month
PM Subordinates Number
PM education level Years
PM experience as a Project Manager Number of projects
PM experience other than as PM Number of projects
Project team Monetary incentive to designer % of design contract
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 885
Construction cost variation criterion was used to measure construction project management effectiveness. The output
variable of that model - construction project cost variation Q- was calculated by equation:
Q = …….. (1)
where PI - estimated construction project cost; FI - actual construction project cost.
The present study is based on a set of data obtained in a questionnaire survey on construction project management
effectiveness factors from construction companies mostly in Amravati region and Yavatmal region. Personal contact was
the major communication tool used to get organizations participated in the study. The interviewees were construction and
project managers, engineers, consultant, and contractors. Information was collected on 99 completed projects. But only
information on 66 completed projects were used for training and testing purpose. Then the whole data set of 66 projects
was divided into two subsets: training and testing. The neural network model was trained with 54 project samples and
retested with 12 project samples. The input data - project management factors - were classified into seven groups and the
output data -the percentage of the construction cost variation in loss or profit - were classified into five groups (Table 2).
Table 2: Classification of project cost variation
Range of predicted
project cost variation Q
Class description
Q > +10% Very good
+3% < Q ≤ +10% Good
–3% ≤ Q ≤ +3% Average
–10% ≤ Q < –3% Poor
Q< –10% Very poor
Monetary incentive to engineer % of design contract
Monetary incentive to contractor % of design contract
Monetary incentive to sub contractor % of design contract
Planning Design complete at construction start Percent
Budget contingency Percent
Modularisation % of total constriction cost
Organisation and
control
Progress inspections Number/month
Quality inspections Number/month
Control system budget Percent of total budget
Schedule updates Number/year
Budget updates Number/year
Safety management Safety meetings Number/month
Accidents rate Number/project
Site safety inspection and supervision Number/month
Material management Inspection & documentation of
materials
Number/month
Material Requirement Planning Number/month
Financial Planning Meetings related to fund flow Number/month
Percentage of bank loans Percent
Cash flow statement Number/month
Percentage of advances from
customer
Per Month
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 886
MODEL DEVELOPMENT
The construction projects management effectiveness neural network model had been developed using the NEURAL
NETWORKS TOOLBOX by MATLAB. Preparation of the training data and statistical computations had been performed by
applying Microsoft Excel.
In our case we have used a ratio of 70% data for training and 30 % data for testing, where 54 samples has been train and
12 samples has been tested and same for the validation.
The neural network chosen in the present study is multilayered with neurons in all layers fully connected in the feed
forward manner. Sigmoid function is used as an activation function. The number of neurons in the input and output layer
was decided by the number of input and output variables of the construction project management effectiveness neural
network. Thus, the input layer had 28 neurons and the output layer had 5 neurons, representing five classes of the
construction cost variation. One hidden layer is chosen in which the number of neurons is decided during the training
process by trial and error (fig 2). The neural network was trained to solve the classification task by applying resilient back
propagation learning algorithm.
Figure 2 Network building for 28 inputs
All construction management effectiveness factors were incorporated into the model at the first stage of model
development. The initial network model comprised 28 neurons in the input layer with 1 neurons in the hidden layer and 5
neurons in the output layer. However, experimentation with an initial model that included all 28 variables resulted in a
model with poor performance, thus indicating that including all variables makes the model less sensitive to each of them.
Many experiments with various network architectures were performed during training in order to arrive at the best-
trained network. The insignificant factors were trimmed from the network at the stage of model development. This was
done gradually by eliminating the least important factors. Based on the classification error, the final neural network model
was built with 12 neurons in the input layer, 4 neurons in hidden layer and 5 neurons in the output layer.
CONCLUSIONS
A neural network for predicting construction project management effectiveness for the construction firm is developed.
Twelve variables were identified to predict effectiveness. The network is a valuable practical tool that can give
management of a construction firm operating in institutional and commercial construction a preproject view of their
performance. To improve the performance of the network, significant variables through statistical analysis are identified,
and then these variables are used in the input and hidden layers of the ANN. This has resulted in obtaining a simple and
computationally efficient network that can predict organizational effectiveness of the construction firm.
The established neural network model can be used during competitive bidding process to evaluate management risk of
construction project and predict construction budget performance. The model allows the construction project managers to
focus on the key success factors and reduce the level of construction risk. The model can serve as the framework for
further development of the construction management decision support system.
REFERENCES
[1] Sunil K. Sinha and Robert A. McKim, (2000) “Artificial Neural Network for Measuring Organizational Effectiveness”,
Journal of Computing in Civil Engineering, January 2000.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 887
[2] Parminder Kaur, (2016) “Artificial Neural Networks as an Effective Project Management Tool”, International Journal of
Advanced Technology in Engineering and Science, Vol No. 4, Issue No.07, July 2016.
[3] Baba Shehu Waziri, Kabir Bala and Shehu Ahmadu Bustani, (2017) “Artificial Neural Networks in Construction
Engineering and Management”, International Journal of Architecture, Engineering and Construction , Vol 6, No 1, March
2017, 50-60.
[4] Megha Jain, KK Pathak,(2014) “ Applications of Artificial Neural Network in Construction Engineering and
Management-A Review”, International Journal of Engineering Technology, Management and Applied Sciences, August
2014, Volume 2 Issue 3, ISSN 2349-447.
[5] Rasa Apanavičienė & Arvydas Juodis, (2012) “Construction Projects Management Effectiveness Modelling with Neural
Networks”, Journal of Civil Engineering and Management, 2003, Vol TX. No I, 59-67.
[6] Sang C. Lhee, Ian Flood, Raja R.A. Issa, (2014), “Development of A Two-Step Neural Network-Based Model to Predict
Construction Cost Contingency”, Journal of Information Technology in Construction - ISSN 1874-4753, ITcon Vol. 19
(2014), Lhee et al, pg. 399.
[7] D. K. H. Chua,Y. C. Kog, P. K. Loh, and E. J. Jaselskis, Associate Member, ASCE, (1997)
“Model for Construction Budget Performance-Neural Network Approach”, Journal of Construction Engineering and
Management , September 1997.
[8] Rifat N. Rustom and Mohammad I. Amer “Identification of the Factors Affecting Quality in Building Construction
Projects in Gaza Strip”.
[9] Kanchana Priyadarshani, Gayani Karunasena and Sajani Jayasuriya (2013) “Construction Safety Assessment
Framework for Developing Countries: A Case Study of Sri Lanka”, Journal of Construction in Developing Countries, 18(1),
33–51, 2013

More Related Content

What's hot

A Novel Optimization towards Higher Reliability in Predictive Modelling towar...
A Novel Optimization towards Higher Reliability in Predictive Modelling towar...A Novel Optimization towards Higher Reliability in Predictive Modelling towar...
A Novel Optimization towards Higher Reliability in Predictive Modelling towar...IJECEIAES
 
Paper shareing_Platform design framework conceptualisation and application
Paper shareing_Platform design framework conceptualisation and applicationPaper shareing_Platform design framework conceptualisation and application
Paper shareing_Platform design framework conceptualisation and applicationYOU SHENG CHEN
 
Developing a framework for
Developing a framework forDeveloping a framework for
Developing a framework forcsandit
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programmingIceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programmingMazen Ghareb
 
Paper sharing_Tapping into the wearable device revolution in the work environ...
Paper sharing_Tapping into the wearable device revolution in the work environ...Paper sharing_Tapping into the wearable device revolution in the work environ...
Paper sharing_Tapping into the wearable device revolution in the work environ...YOU SHENG CHEN
 
COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES
COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES
COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES ijseajournal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheorySenstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheoryIRJET Journal
 
IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...
IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...
IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...IRJET Journal
 
Application of Genetic Algorithm in Software Engineering: A Review
Application of Genetic Algorithm in Software Engineering: A ReviewApplication of Genetic Algorithm in Software Engineering: A Review
Application of Genetic Algorithm in Software Engineering: A ReviewIRJESJOURNAL
 
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET Journal
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...eSAT Publishing House
 
A Hybrid Approach to Expert and Model Based Effort Estimation
A Hybrid Approach to Expert and Model Based Effort Estimation  A Hybrid Approach to Expert and Model Based Effort Estimation
A Hybrid Approach to Expert and Model Based Effort Estimation CS, NcState
 
Risk factorserp sumner
Risk factorserp sumnerRisk factorserp sumner
Risk factorserp sumnerIIUM
 
IRJET- Interface Management and its Effect on Project Complexity in Constr...
IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...
IRJET- Interface Management and its Effect on Project Complexity in Constr...IRJET Journal
 
Optimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning SystemsOptimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning SystemsIJCSIS Research Publications
 
IRJET- Review on Scheduling using Dependency Structure Matrix
IRJET-  	  Review on Scheduling using Dependency Structure MatrixIRJET-  	  Review on Scheduling using Dependency Structure Matrix
IRJET- Review on Scheduling using Dependency Structure MatrixIRJET Journal
 

What's hot (20)

A Novel Optimization towards Higher Reliability in Predictive Modelling towar...
A Novel Optimization towards Higher Reliability in Predictive Modelling towar...A Novel Optimization towards Higher Reliability in Predictive Modelling towar...
A Novel Optimization towards Higher Reliability in Predictive Modelling towar...
 
Paper shareing_Platform design framework conceptualisation and application
Paper shareing_Platform design framework conceptualisation and applicationPaper shareing_Platform design framework conceptualisation and application
Paper shareing_Platform design framework conceptualisation and application
 
Developing a framework for
Developing a framework forDeveloping a framework for
Developing a framework for
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programmingIceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programming
 
Green Technology Journal - 2010
Green Technology Journal - 2010Green Technology Journal - 2010
Green Technology Journal - 2010
 
Paper sharing_Tapping into the wearable device revolution in the work environ...
Paper sharing_Tapping into the wearable device revolution in the work environ...Paper sharing_Tapping into the wearable device revolution in the work environ...
Paper sharing_Tapping into the wearable device revolution in the work environ...
 
COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES
COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES
COMPARATIVE STUDY OF SOFTWARE ESTIMATION TECHNIQUES
 
Thesis proposal
Thesis proposalThesis proposal
Thesis proposal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheorySenstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
 
IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...
IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...
IRJET- Application of Emerging Artificial Intelligence Methods in Structural ...
 
Application of Genetic Algorithm in Software Engineering: A Review
Application of Genetic Algorithm in Software Engineering: A ReviewApplication of Genetic Algorithm in Software Engineering: A Review
Application of Genetic Algorithm in Software Engineering: A Review
 
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...
 
A Hybrid Approach to Expert and Model Based Effort Estimation
A Hybrid Approach to Expert and Model Based Effort Estimation  A Hybrid Approach to Expert and Model Based Effort Estimation
A Hybrid Approach to Expert and Model Based Effort Estimation
 
Risk factorserp sumner
Risk factorserp sumnerRisk factorserp sumner
Risk factorserp sumner
 
IRJET- Interface Management and its Effect on Project Complexity in Constr...
IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...
IRJET- Interface Management and its Effect on Project Complexity in Constr...
 
Optimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning SystemsOptimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning Systems
 
IRJET- Review on Scheduling using Dependency Structure Matrix
IRJET-  	  Review on Scheduling using Dependency Structure MatrixIRJET-  	  Review on Scheduling using Dependency Structure Matrix
IRJET- Review on Scheduling using Dependency Structure Matrix
 

Similar to Neural network model predicts construction project effectiveness

Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewIRJET Journal
 
A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...IJECEIAES
 
IRJET- A Research Study on Critical Challenges in Agile Requirements Engineering
IRJET- A Research Study on Critical Challenges in Agile Requirements EngineeringIRJET- A Research Study on Critical Challenges in Agile Requirements Engineering
IRJET- A Research Study on Critical Challenges in Agile Requirements EngineeringIRJET Journal
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...IRJET Journal
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET Journal
 
Secured Scheduling Technique of Network Resource Management in Vehicular Comm...
Secured Scheduling Technique of Network Resource Management in Vehicular Comm...Secured Scheduling Technique of Network Resource Management in Vehicular Comm...
Secured Scheduling Technique of Network Resource Management in Vehicular Comm...Gagan Bansal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...IAEME Publication
 
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...IRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
Modeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projectsModeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projectsGafel Kareem
 
Application of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism modelApplication of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism modeleSAT Publishing House
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET Journal
 
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...IJMIT JOURNAL
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET Journal
 

Similar to Neural network model predicts construction project effectiveness (20)

Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...A systematic mapping study of performance analysis and modelling of cloud sys...
A systematic mapping study of performance analysis and modelling of cloud sys...
 
IRJET- A Research Study on Critical Challenges in Agile Requirements Engineering
IRJET- A Research Study on Critical Challenges in Agile Requirements EngineeringIRJET- A Research Study on Critical Challenges in Agile Requirements Engineering
IRJET- A Research Study on Critical Challenges in Agile Requirements Engineering
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
 
Secured Scheduling Technique of Network Resource Management in Vehicular Comm...
Secured Scheduling Technique of Network Resource Management in Vehicular Comm...Secured Scheduling Technique of Network Resource Management in Vehicular Comm...
Secured Scheduling Technique of Network Resource Management in Vehicular Comm...
 
Artificial Neural Networks for Construction Management: A Review
Artificial Neural Networks for Construction Management: A ReviewArtificial Neural Networks for Construction Management: A Review
Artificial Neural Networks for Construction Management: A Review
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
20320140507006
2032014050700620320140507006
20320140507006
 
20320140507006 2-3
20320140507006 2-320320140507006 2-3
20320140507006 2-3
 
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
 
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
 
A0340105
A0340105A0340105
A0340105
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
Modeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projectsModeling final costs of iraqi public school projects
Modeling final costs of iraqi public school projects
 
Application of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism modelApplication of ict benefits for building project management using ism model
Application of ict benefits for building project management using ism model
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
 
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
 
International Journal of Engineering Inventions (IJEI),
International Journal of Engineering Inventions (IJEI), International Journal of Engineering Inventions (IJEI),
International Journal of Engineering Inventions (IJEI),
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- Review
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Recently uploaded (20)

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 

Neural network model predicts construction project effectiveness

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 883 DEVELOPMENT OF A NEURAL NETWORK BASED MODEL FOR CONSTRUCTION PROJECT MANAGEMENT EFFECTIVENESS Pooja Dudhe1, Prof. A.B. Ranit2, Prof. R.R. Wankhade3 1Research Scholar, M.E. Construction Engineering and Management, Prof. Ram Meghe College of Engineering and Management Badnera-Amravati. 2Assistant Professor, Civil Engineering Department, Prof. Ram Meghe College of Engineering and Management Badnera-Amravati. 3Assistant Professor, Civil Engineering Department, Prof. Ram Meghe College of Engineering and Management Badnera-Amravati. -------------------------------------------------------------------------***------------------------------------------------------------------------ Abstract - An artificial neural network based methodology is applied for predicting the level of organizational effectiveness in a construction firm. The methodology uses the competing value approach to identify 12 variables. The historical data of construction projects performance have been used to build the neural network model. Based on these factors, the construction projects management effectiveness model was established. The model can serve as the framework for further development of the construction management decision support system. Key words: Artificial neural network, construction management INTRODUCTION In the competitive nature of construction, industry and its heuristic problem-solving needs, among other reasons, have contributed to the development of some advanced decision-making tools. Research in artificial intelligence (AI), a branch of computer science, has provided more suitable tools to the construction industry. Since its initial development, the Artificial Intelligence has found large applicability in the field of engineering. In particular, the so-called soft computing methods have been shown to be very effective in the analysis and solution of construction engineering problems. However, the performance of these systems during the last decade is far from ideal. Neural networks research in AI has recently provided powerful systems that work as a supplement or a complement to such conventional expert systems. In this paper, neural networks are introduced as a promising management tool that can enhance current automation efforts in the construction industry, including its applications in construction engineering. The approach of artificial neural network is one of the empirical modelling technique that allows evaluation of the construction projects management effectiveness and to determine the factors that influence the project effectiveness in terms of budget performance. ARTIFICIAL NEURAL NETWORKS In a broad sense, the artificial neural network (ANN) itself is a model because the topology and transfer functions of the nodes are usually formulated to match the current problem. Many network architectures have been developed for various applications. The performance of a neural network depends on its architecture and their parameter settings. There are many parameters governing the architecture of the neural network including the number of layers, the number of nodes in each layer, and the transfer function in each node, learning algorithm parameters and the weights which determine the connectivity between nodes. There is no clearly defined theory which allows for the calculation of the ideal parameter settings and as a rule even slight parameter changes can cause major variations in the behaviour of almost all networks. So far, the technique in the use of the neural network for predicting software cost estimation is back propagation trained multilayered feed forward networks with sigmoidal activation function. But, there are some limitations that prevent it from being accepted as common practice in construction management effectiveness. The main reason for slow convergence in back propagation is the sigmoid activation function used in its hidden and output layer units. Furthermore, inappropriate selection of network patterns and learning rules may cause serious difficulties in network performance and training. The problem at hand decides the number of layers and number of nodes in the layers and the learning algorithm as well. However, the guiding criterion is to select the minimum nodes which would not impair the network performance so that memory demand for storing the weights can be kept minimal. So, the number of layers and nodes should be minimized to amplify the performance. A proper selection of tuning parameters such as momentum factor, learning coefficient are required for efficient learning and designing of stable network.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 884 LITERATURE REVIEW Chua et al. (1997) proposed a neural network approach to identify the key management factors that affect budget performance in a project. This approach allowed the model to be built even if the functional interrelationships between input factors and output performance could not be clearly defined. Altogether eight key determining factors were identified covering areas related to the project manager, project team, and planning and control efforts, namely: number of organizational levels between project manager and craftsmen, project manager experience on similar technical scope, detailed design complete at start of construction, constructability program, project team turnover rate, frequency of control meetings during construction, frequency of budget updates, and control system budget. The model can be used to evaluate various management strategies and thus resources can be effectively deployed to strengthen these aspects of project management. Parminder Kaur (2016) proposed an ANN model that was prepared in order to predict the duration of any ongoing project in addition to conventional techniques of project planning. A large number of trials were applied for model training. The absolute variance of model’s results varies from 1.7% to 2.6% which is less than variance calculated by use of PERT network technique (3.8 to 7.8%) in cases studied. Therefore the model testing is successfully passed and it can be concluded that Artificial Neural Networks are an effective project management tool that can be used to effectively predict the project duration and hence prevent scheduling and project duration overruns. Megha Jain, KK Pathak (2014) concluded that ANNs have been successfully applied to many construction engineering areas like prediction, risk analysis, decision-making, resources optimization, classification, and selection etc. Based on the results of case studies, it is evident that ANNs perform better than, or at par to the conventional methods and also found that ANN have a number of significant benefits that make them a powerful and practical tool for solving many problems in the field of construction engineering and are expected to be applicable in future. Baba Shehu Waziri, Kabir Bala and Shehu Ahmadu Bustani (2017) The study revealed successful applications of ANNs in cost prediction, optimization and scheduling, risk assessment, claims and dispute resolution outcomes and decision making. It was observed that ANN have been applied to problems that are difficult to solve with traditional mathematical and statistical methods. The study provides comprehensive repute of ANN in construction engineering and management for application in different areas for improved accuracy and reliable predictions. QUESTIONNAIRE SURVEY AND DATA ANALYSIS A questionnaire was developed to collect data from past projects to be used in developing a predictive model. It was categorized into profile of the respondent and various factors which improve organizational performance. Questions in the respondent profile were created to collect information such as name of company, contact information, type of organization, projects per year and size of projects. The framework for the list of construction management effectiveness factors covering areas related to project manager, project team, project planning, organization and control, safety management , material management, financial Planning was selected from the research conducted by Jaselskis and Ashley (1991), Kanchana Priyadarshani (2003), adnan enshassi(2009), aparna shruthi E (2017). However, the actuality of each construction management factor was retested by interviewing construction management practitioners, engineers, and contractors and the approach was modified according to the interviewers opinion. Construction project management effectiveness factors described in Table 1 served as the independent input variables. Table 1: Construction Project Management Effectiveness Factor Category Project Management Factor Measure Project manager (PM) PM Meetings Number/month PM time devoted hours/day PM field visit Number/month PM Subordinates Number PM education level Years PM experience as a Project Manager Number of projects PM experience other than as PM Number of projects Project team Monetary incentive to designer % of design contract
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 885 Construction cost variation criterion was used to measure construction project management effectiveness. The output variable of that model - construction project cost variation Q- was calculated by equation: Q = …….. (1) where PI - estimated construction project cost; FI - actual construction project cost. The present study is based on a set of data obtained in a questionnaire survey on construction project management effectiveness factors from construction companies mostly in Amravati region and Yavatmal region. Personal contact was the major communication tool used to get organizations participated in the study. The interviewees were construction and project managers, engineers, consultant, and contractors. Information was collected on 99 completed projects. But only information on 66 completed projects were used for training and testing purpose. Then the whole data set of 66 projects was divided into two subsets: training and testing. The neural network model was trained with 54 project samples and retested with 12 project samples. The input data - project management factors - were classified into seven groups and the output data -the percentage of the construction cost variation in loss or profit - were classified into five groups (Table 2). Table 2: Classification of project cost variation Range of predicted project cost variation Q Class description Q > +10% Very good +3% < Q ≤ +10% Good –3% ≤ Q ≤ +3% Average –10% ≤ Q < –3% Poor Q< –10% Very poor Monetary incentive to engineer % of design contract Monetary incentive to contractor % of design contract Monetary incentive to sub contractor % of design contract Planning Design complete at construction start Percent Budget contingency Percent Modularisation % of total constriction cost Organisation and control Progress inspections Number/month Quality inspections Number/month Control system budget Percent of total budget Schedule updates Number/year Budget updates Number/year Safety management Safety meetings Number/month Accidents rate Number/project Site safety inspection and supervision Number/month Material management Inspection & documentation of materials Number/month Material Requirement Planning Number/month Financial Planning Meetings related to fund flow Number/month Percentage of bank loans Percent Cash flow statement Number/month Percentage of advances from customer Per Month
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 886 MODEL DEVELOPMENT The construction projects management effectiveness neural network model had been developed using the NEURAL NETWORKS TOOLBOX by MATLAB. Preparation of the training data and statistical computations had been performed by applying Microsoft Excel. In our case we have used a ratio of 70% data for training and 30 % data for testing, where 54 samples has been train and 12 samples has been tested and same for the validation. The neural network chosen in the present study is multilayered with neurons in all layers fully connected in the feed forward manner. Sigmoid function is used as an activation function. The number of neurons in the input and output layer was decided by the number of input and output variables of the construction project management effectiveness neural network. Thus, the input layer had 28 neurons and the output layer had 5 neurons, representing five classes of the construction cost variation. One hidden layer is chosen in which the number of neurons is decided during the training process by trial and error (fig 2). The neural network was trained to solve the classification task by applying resilient back propagation learning algorithm. Figure 2 Network building for 28 inputs All construction management effectiveness factors were incorporated into the model at the first stage of model development. The initial network model comprised 28 neurons in the input layer with 1 neurons in the hidden layer and 5 neurons in the output layer. However, experimentation with an initial model that included all 28 variables resulted in a model with poor performance, thus indicating that including all variables makes the model less sensitive to each of them. Many experiments with various network architectures were performed during training in order to arrive at the best- trained network. The insignificant factors were trimmed from the network at the stage of model development. This was done gradually by eliminating the least important factors. Based on the classification error, the final neural network model was built with 12 neurons in the input layer, 4 neurons in hidden layer and 5 neurons in the output layer. CONCLUSIONS A neural network for predicting construction project management effectiveness for the construction firm is developed. Twelve variables were identified to predict effectiveness. The network is a valuable practical tool that can give management of a construction firm operating in institutional and commercial construction a preproject view of their performance. To improve the performance of the network, significant variables through statistical analysis are identified, and then these variables are used in the input and hidden layers of the ANN. This has resulted in obtaining a simple and computationally efficient network that can predict organizational effectiveness of the construction firm. The established neural network model can be used during competitive bidding process to evaluate management risk of construction project and predict construction budget performance. The model allows the construction project managers to focus on the key success factors and reduce the level of construction risk. The model can serve as the framework for further development of the construction management decision support system. REFERENCES [1] Sunil K. Sinha and Robert A. McKim, (2000) “Artificial Neural Network for Measuring Organizational Effectiveness”, Journal of Computing in Civil Engineering, January 2000.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 12 | Dec 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 887 [2] Parminder Kaur, (2016) “Artificial Neural Networks as an Effective Project Management Tool”, International Journal of Advanced Technology in Engineering and Science, Vol No. 4, Issue No.07, July 2016. [3] Baba Shehu Waziri, Kabir Bala and Shehu Ahmadu Bustani, (2017) “Artificial Neural Networks in Construction Engineering and Management”, International Journal of Architecture, Engineering and Construction , Vol 6, No 1, March 2017, 50-60. [4] Megha Jain, KK Pathak,(2014) “ Applications of Artificial Neural Network in Construction Engineering and Management-A Review”, International Journal of Engineering Technology, Management and Applied Sciences, August 2014, Volume 2 Issue 3, ISSN 2349-447. [5] Rasa Apanavičienė & Arvydas Juodis, (2012) “Construction Projects Management Effectiveness Modelling with Neural Networks”, Journal of Civil Engineering and Management, 2003, Vol TX. No I, 59-67. [6] Sang C. Lhee, Ian Flood, Raja R.A. Issa, (2014), “Development of A Two-Step Neural Network-Based Model to Predict Construction Cost Contingency”, Journal of Information Technology in Construction - ISSN 1874-4753, ITcon Vol. 19 (2014), Lhee et al, pg. 399. [7] D. K. H. Chua,Y. C. Kog, P. K. Loh, and E. J. Jaselskis, Associate Member, ASCE, (1997) “Model for Construction Budget Performance-Neural Network Approach”, Journal of Construction Engineering and Management , September 1997. [8] Rifat N. Rustom and Mohammad I. Amer “Identification of the Factors Affecting Quality in Building Construction Projects in Gaza Strip”. [9] Kanchana Priyadarshani, Gayani Karunasena and Sajani Jayasuriya (2013) “Construction Safety Assessment Framework for Developing Countries: A Case Study of Sri Lanka”, Journal of Construction in Developing Countries, 18(1), 33–51, 2013