Genetic algorithm for resource constrained construction project scheduling
•
1 like
•
72 views
AI-enhanced title
IRJET Journal
Follow
https://irjet.net/archives/V4/i7/IRJET-V4I7135.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 4
Download now
Download to read offline
Recommended
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET Journal
SCHEDULING AND INSPECTION PLANNING IN SOFTWARE DEVELOPMENT PROJECTS USING MUL...
SCHEDULING AND INSPECTION PLANNING IN SOFTWARE DEVELOPMENT PROJECTS USING MUL...
ijseajournal
COST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHOD
COST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHOD
International Journal of Technical Research & Application
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
IRJET Journal
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
IJERA Editor
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
ijtsrd
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
IAEME Publication
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
Recommended
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET Journal
SCHEDULING AND INSPECTION PLANNING IN SOFTWARE DEVELOPMENT PROJECTS USING MUL...
SCHEDULING AND INSPECTION PLANNING IN SOFTWARE DEVELOPMENT PROJECTS USING MUL...
ijseajournal
COST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHOD
COST CONTROL AND TRACKING OF A BUILDING BY EARNED VALUE METHOD
International Journal of Technical Research & Application
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
IRJET Journal
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
IJERA Editor
Earned Value Management for Design and Construction Project
Earned Value Management for Design and Construction Project
ijtsrd
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
AN INTEGRATED MANAGEMENT AND MEASUREMENT OF CUSTOMER FEASIBLILTY IN CONSTRUCT...
IAEME Publication
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET- Planning, Scheduling, and Optimization of Labor Resources in the C...
IRJET Journal
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
Ijciet 10 01_075
Ijciet 10 01_075
IAEME Publication
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
50120130405029
50120130405029
IAEME Publication
Estimation sharbani bhattacharya
Estimation sharbani bhattacharya
Sharbani Bhattacharya
D0365030036
D0365030036
theijes
Activity schedule and affective control of component based project
Activity schedule and affective control of component based project
eSAT Journals
Top down
Top down
Nino Ho
Insights on Research Techniques towards Cost Estimation in Software Design
Insights on Research Techniques towards Cost Estimation in Software Design
IJECEIAES
Comparison of available Methods to Estimate Effort, Performance and Cost with...
Comparison of available Methods to Estimate Effort, Performance and Cost with...
International Journal of Engineering Inventions www.ijeijournal.com
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programming
Mazen Ghareb
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
eSAT Journals
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET Journal
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa Diagram
IJAEMSJORNAL
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
eSAT Publishing House
EARLY STAGE SOFTWARE DEVELOPMENT EFFORT ESTIMATIONS – MAMDANI FIS VS NEURAL N...
EARLY STAGE SOFTWARE DEVELOPMENT EFFORT ESTIMATIONS – MAMDANI FIS VS NEURAL N...
cscpconf
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET Journal
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET Journal
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
IJMIT JOURNAL
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
IAEME Publication
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
IJSRD
More Related Content
What's hot
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET Journal
Ijciet 10 01_075
Ijciet 10 01_075
IAEME Publication
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
50120130405029
50120130405029
IAEME Publication
Estimation sharbani bhattacharya
Estimation sharbani bhattacharya
Sharbani Bhattacharya
D0365030036
D0365030036
theijes
Activity schedule and affective control of component based project
Activity schedule and affective control of component based project
eSAT Journals
Top down
Top down
Nino Ho
Insights on Research Techniques towards Cost Estimation in Software Design
Insights on Research Techniques towards Cost Estimation in Software Design
IJECEIAES
Comparison of available Methods to Estimate Effort, Performance and Cost with...
Comparison of available Methods to Estimate Effort, Performance and Cost with...
International Journal of Engineering Inventions www.ijeijournal.com
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programming
Mazen Ghareb
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
eSAT Journals
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET Journal
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa Diagram
IJAEMSJORNAL
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
eSAT Publishing House
EARLY STAGE SOFTWARE DEVELOPMENT EFFORT ESTIMATIONS – MAMDANI FIS VS NEURAL N...
EARLY STAGE SOFTWARE DEVELOPMENT EFFORT ESTIMATIONS – MAMDANI FIS VS NEURAL N...
cscpconf
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET Journal
What's hot
(18)
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
IRJET- Planning and Scheduling for a Multi-Storied Building using MS-Project
Ijciet 10 01_075
Ijciet 10 01_075
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
50120130405029
50120130405029
Estimation sharbani bhattacharya
Estimation sharbani bhattacharya
D0365030036
D0365030036
Activity schedule and affective control of component based project
Activity schedule and affective control of component based project
Top down
Top down
Insights on Research Techniques towards Cost Estimation in Software Design
Insights on Research Techniques towards Cost Estimation in Software Design
Comparison of available Methods to Estimate Effort, Performance and Cost with...
Comparison of available Methods to Estimate Effort, Performance and Cost with...
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programming
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa Diagram
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
EARLY STAGE SOFTWARE DEVELOPMENT EFFORT ESTIMATIONS – MAMDANI FIS VS NEURAL N...
EARLY STAGE SOFTWARE DEVELOPMENT EFFORT ESTIMATIONS – MAMDANI FIS VS NEURAL N...
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
Similar to Genetic algorithm for resource constrained construction project scheduling
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET Journal
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
IJMIT JOURNAL
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
IAEME Publication
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
IJSRD
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET Journal
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
IAEME Publication
EVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program Management
IRJET Journal
A Systematic Review On Software Cost Estimation In Agile Software Development
A Systematic Review On Software Cost Estimation In Agile Software Development
Brooke Heidt
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
IRJET Journal
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement c...
IAEME Publication
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
IAEME Publication
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
IRJET Journal
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET Journal
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
IJSRED
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET Journal
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
IRJET Journal
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET Journal
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
IAESIJEECS
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
IAESIJEECS
Similar to Genetic algorithm for resource constrained construction project scheduling
(20)
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
Efficient Indicators to Evaluate the Status of Software Development Effort Es...
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
Planning, Scheduling and Resource Optimization for A Villa by Using Ms-Projec...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
EVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program Management
A Systematic Review On Software Cost Estimation In Agile Software Development
A Systematic Review On Software Cost Estimation In Agile Software Development
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Planning and Scheduling of a Multi-Storeyed Residential Building with Convent...
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
Fuzzy Analytical Hierarchy Process Method to Determine the Project Performanc...
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
30 8948 prakash paper64 (edit ndit)
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
rakeshbaidya232001
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
srsj9000
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
upamatechverse
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ranjana rawat
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
GDSCAESB
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
pranjaldaimarysona
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
João Esperancinha
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
hassan khalil
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
rehmti665
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
AbhinavSharma374939
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Dr.Costas Sachpazis
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
ranjana rawat
Recently uploaded
(20)
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
Genetic algorithm for resource constrained construction project scheduling
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 765 Planning and Optimization of Resource Constrained Project Scheduling by Using Genetic Algorithm Vineetha. S1 , Manjusha. M2 1Student, Dept. Of Civil Engineering, Sri Vellappally Natesan Collage of Engineering , Kerala, India 2Assistant Professor, Dept of Civil Engineering, Sri Vellappally Natesan Collage of Engineering, Kerala, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Proper planning and scheduling are the top challenges in project management. Traditionalanalytical and heuristic approaches are inefficient and inflexible when solving construction scheduling problems . The proposed algorithm can effectively provide the optimal combination of construction resources by the starting and finishing dates of activities subjected to the objective of scheduling .The main objective of this project is to optimize the schedule of construction project activities in order to minimize the total cost with resource constraints using Genetic Algorithm. This project describes a genetic algorithm approach to project scheduling problems in construction industry .Using MatlabR2011 a genetic algorithm model is obtained by providing a method for automatically creating a working computer program from a high level problemstatementofthe problem. The major advantage of the procedure is its simple applicability within commercial project managementsystems to improve the performance. Key Words: Genetic algorithm, resource constraint scheduling, critical path method, delay , construction management. 1.INTRODUCTION Project planning is one of the most important aspects of construction project management in today’s economy . In order to manage a construction project effectively, we must havea plan which includeswhatis to be accomplished , the technology involved and the expected time for construction. The goal of planning is to minimize resource expenditureswhilesatisfactorily completing a given task. In each project schedule has its own precedence constraints, which means that each activity can be processed when all its predecessors are finished. The purpose of project scheduler is to minimize the completiontimeandsubjecttoprecedenceconstraints. So this paper brings out the drawback in existing project scheduling methods. The representation show that precedence constraints and the objective function which measures overall performance of the project. One of the main challenges of computer science is to get a computer to do what needs to be done , without telling it how to do it . Compared to the traditional methods , the genetic algorithm has more advantages as it can consider the objectives of project time and cost minimization. So that the new approach, employing the use of genetic algorithms has more flexibility to solve construction scheduling problems . 1.1 Need for the Study The traditional scheduling methods such as Critical Path Method (CPM) are not enough for scheduling because they cannot take resource constraints into account. In a resource constrained project, the amount of resources needed during one or more time periods is limited to less than required by two or more activities occurring simultaneously. A need arises for a new approach to optimize projects schedules which take into consideration the shortage of resource. 1.2 Scope This study aims is to develop a genetic algorithm optimization model to schedule project activities in order to minimize the total duration of the residential building project, subjected to both precedence and resources constraints by conducting a questionnaire survey among various engineers and contractors. 1.3 Objectives The various objectives include: To conduct a site visit to understand the property and geography of site. To analyse and design a residential building in STAAD Pro. Develop a computer model to automate the schedule of construction projects. Develop Genetic Algorithm optimization model to optimize the schedule of resource constrained construction projects scheduling. Implement the model on a scheduling of a residential building project Comparing the result of the model with result ofMS project approaches.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 766 2. LITERATURE REVIEW Shih and Liu [2] proposed a new scheduling model aiming for the minimization of total project cost, including resource usage and idle cost. But the model depends on providing external resources to provide planners with additional flexibility in arranging schedules and provide planners with diversity of resource supply, and also the model needs in- depth discussion on issues of determining the limit of internal resource to minimize operational costs. Senouci and Derham [2]presenteda genetic algorithm based multi-objectives optimization model for the scheduling of construction projects. But the model is valid for linear construction projectsonly,whichcharacterized byrepetitive activities. Okada et .al [3] proposed a random key-based genetic algorithm approach to solve optimization scheduling problems, but they did not showcomputational experiments to show the effectiveness of the proposed approach, and it was recommended in their publication to do this in the future research directions. 3. METHODOLOGY The detailed methodology adopted in this study isexplained below. The methodologyincludestheidentificationoffactors affecting the delay in construction project and to conduct a questionnaire survey . Further this data is used to develop genetic algorithm models for optimizing construction scheduling of a project. 3.1 Identification of Various Factors affecting Delay As the initial step previous research papers were reviewed to investigate various factors causing delay in construction building project . According the literature were studied and 45 major factors were identified which is listed in Annexure A . Which include poor planning , shortage of technical persons , poor coordination , strikes in construction etc. 3.2 Preparation of Questionnaire Survey and Identification of Critical Factors Various literature were studied and based on the preliminary investigation conducted at the outset of the study . A questionnaire was then drawn up and was divided in to two sections . Section A sought to know the general particulars of respondents while section B was focused on the effect of delay in construction project . The respondents were asked to rank the individual effect of delay based on frequency of occurrence according to their own judgment and local working experience . A four point scale is Adopted to facilitate ranking exercise and to facilitate the analysis of the responses , the following numerical values were assigned to the respondent rating . They were no prominent -0 , less prominent -1 , prominent -2 , highly prominent -3 , always prominent-4 . After conducting the questionnaire survey the data was analyzed and the critical factors affecting delay in construction project were identified using Relative Important Index (RII) method. A four point Likert scale of 0- 4 was adopted to assess the degree of agreement of each cause or scale of impact. Each factor was given a scale of 0 to 4, so that person could easily express the severity range or impact. i.e. 0 be the lowest and 4 be the highest. The scalefor impact is categorized into 5 types Which are shown in Table 1. Table -1: Assessment grades Scale of impact 0 Not prominent 1 Less prominent 2 prominent 3 Highly prominent 4 Always prominent The scale value for each factor was obtained and ranked based on Relative Importance Index (RII) of the responses are computed for their impact and significance. RII is calculated using the equation Where ΣW is the total weight given to each factor by the respondents, which ranges from 0 to 4 was calculated by an addition of the various weightings given to a factor by the entire respondent , H is the highest ranking available (i.e, 4 in this case ) and N is the total number of respondents that answered the question. Based on the RII value the factors were ranked and identify the most critical factors. 3.3 Preparation of Program Schedule in Microsoft Project Software Microsoft project is a project management software program, developed and sold by Microsoft , that is designed to assist a project manager in developing a plan , assigning resources to tasks, tracking progress , managing the budget and analysing workloads. The activity schedule and time duration in MS project of a residential building were obtained is shown in Annexure C . Data will be used in Genetic Algorithm model. The steps in MS Projects are first to determine major tasks, enter them in Task Name column (enter them in chronological order). Remember, these are tasks and must contain a verb. Avoid the verb “design” since this is ambiguous and is actually a process containing many tasks (it is not a single task) then highlight rows just below
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 767 the major tasks and hit the “insert” key to insert blank rows. Enter the subtasks for each major task (if there are any). Remember to use verbs. Then highlight the subtasks (for a given major task) and click on the “right arrow” key on the toolbar (see last page for comments on toolbar icons) and enter the duration for the subtasks. 3.4 Optimization of Scheduling by Genetic Algoritham A project such as a construction project consists of a network of activities and a node in network corresponds to an activity. Each activity in a project has corresponding duration and also needs certain amount of resourcessuchas labour material to execute itself with them.Activityduration is usually measured in integral increments of time called planning units. The normal duration of an activity refers to the time required to complete that activity under normal circumstances. The GA begins like any other optimization algorithm, by defining the optimization variables, the cost function, and the cost. It ends like other optimization algorithms too, by testing for convergence. In between,however,thisalgorithm is quite different. A path through the components of the GA is shown in the flowchart fig -1. Fig-1: Flowchart showing Genetic Algorithm Process 4. RESULTS AND DISCUSSION Questionnaire survey was conducted among 35 individuals, based on the degree of assessment about 51.7 % were responded as the shortage of skilled labour and poor communication betweenconstructionpartieshadhigheffect in construction projects whereas 33.28% people were responded as medium effect. Mistakes in design had high effect declared by 57.14% people whereas only 31.4 % declared as have only medium effect. For the case of late submission of nominated materials42.42%wereresponded as medium effect and 45.7% were responded as high effect. 4.1 Critical Factors Based on the degree of assessment the RII value was calculated and ranking was carried out according to the value. From the data obtained the value of RII varies from 37.14 to 81.90 for different factors. From the table4.1,it was noted that poor communication between construction 23 parties and shortage of skilled labourshadgotanRIIvalueof 89.10% and was indicated as rank 1. The impact of poor communication betweenindividualscausesvariousconflicts and which delays the construction work. Mistakes in design and poor workmanship . To overcome this problem proper design according to specifications should adopt. Improper planning, inadequate site investigation, misinterpretation of data, unaware of future needs are some of the causes for mistake in design. So proper planning, adequate investigation of site and accurate design procedure are needed to execute the project with high precession. 4.2 Microsoft Project Scheduling The project manager is developing a plan , assigning resources to task , tracking progress remanaging the budget and analysing workloads . In this way the construction of a residential building have 38 activity as per the planning,the construction of the residential building by conventional method can be completed by 185 days as shown in fig-2. Fig-2: Planned Activities for Conventional Building
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 768 4.3 Genetic Algorithm Optimized Data According to the scheduling data of the construction project with the help of optimizing program should developed by matrix manipulation , plotting of function and data , implementation of algorithm and creationofuserinterface . Model verification and validation are essential parts of the model development process if the model to be accepted and used to support decision making. Fig-3: Program Result for Optimized Schedule The total duration of the project is 172 days in Genetic Algorithm optimization program. No computational model will ever be fully verified guaranteeing 100% error free implementation. A high degree of statistical certainty is all that can be realized for any model as more cases as tested. The developed model was verified by more tests performed, errors were identified, and corrections were made to encountered errors. This took a long period of time, and a huge effort by the researcher to get a high degree of certainty about the model verification. Validation ensures that the model meets its intended requirements in terms of the methods employed and the results obtained. The ultimate goal of the model validation is to make the model useful in the sense that the model addresses the right problem, provides accurate information about the system being modeled, and finally to make the model accurately used. Table-2 Comparison between solution of the problem Solution Total duration No of Iteration CPM 136 ------ MS Project 185 ------ CPS Optimizer 172 10- 30 5. CONCLUSIONS An implementation of the GA developed model for residential building project scheduling has resulted in optimized output with reduced cost . A real time project solved using this optimization software shows that best converging result can be obtained . develop a genetic algorithm optimization model to schedule project activities in order to minimize the total duration of the project, subjected to precedence constraints. The problems are applied and the results are studied and compared with the results of previous studies and with the feature of “resource leveling” in the commercial construction management programs, which showed that the CPS Optimizer results meet the intended goal of achieving the best schedule with the minimum efforts. Crossover operator that suits the studied problem and creates feasible solutions. The total time duration of the project has 172 days in GA model but for MS project scheduling it has 185 days in that way the Genetic Algorithm method hasmoreeffectivetheMSProject. REFERENCES [1] K.C. Shin and S.S. Liu , Optimization model of external Resource Allocation for Resource Constrained Project Scheduling Problem . International Journal of Project Management, vol.19, 2008, pp. 62-69. [2] Senouci and H.R. Al- Derham , Genetic Algorithm Based multi-objective model for Scheduling of linear Construction Project. Advances in Engineering Software, Vol. 39, 2008, pp. 1023-1028. [3] S. Hartman , A competitive Genetic Algorithm for resource constrained project Scheduling. Nava Research logistics, vol.45, 1998, pp. 733-750.
Download now