DEVELOPING COST PREDICTION MODEL FOR BUILDING PROJECT
Dr. S Kanchana 1, Ms. Sisira Ramesh2
1Head of the Department, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India,
2PG Student, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India
-------------------------------------------------------------------------***------------------------------------------------------------------------
Abstract - The critical problem in the constructionindustry
is that building projects are completed at cost much higher
than estimated project cost, hence it is essential to develop a
cost prediction model that imprison all factorscontributingto
the project cost using multiple regression analysis throughset
of objectives such as: to locate the factors affecting the project
cost; analyze the significance of the factors and develop cost
predictive model. Literature review on the study designated
that nature of clients, professional involved in a project and
their resolution regarding design, function, duration,
technology and execution have significanteffectontheoverall
project cost. The study points out the seven most exceptional
factors to project cost among the design related variables as:
design related factors, time or cost related factors, parties
experience related factors, financial issues related factors,
bidding situations related factors , project characteristics
related factors and estimating process related factors. These
selected key factors are to be used for cost predictive model.
The cost prediction model can be developed with the help of
SPSS software, the factors governing the project cost are
determined with the help of questionnairesurvey. Seven major
factors have been selected for the cost prediction modeling.
Key Words: Multiple regression analysis,costprediction
model, SPSS
1. INTRODUCTION
A successful project means that the project has been
completed within budgetary costs and within the available
schedule. But it is found out that in construction work
always the project completion cost is much higher than the
estimated project cost. This have not only led to the loss in
project but also delays the project. And also the client is
concerned with quality, cost andtimeandwantsthebuilding
to be constructed at a reasonable cost and within a specified
period of time. For these reasons, the contractors should
exercise great care and skill in the design of the project with
constant checks on cost. Therefore integrated efforts of the
various parties and their resolutions regarding the design,
technology and execution of the project can have significant
effect on the overall project cost. Therefore it is importantto
examine the wide discrepanciesbetweenplannedandactual
construction cost due to lack of effective prediction cost
models.
The major part of a construction project is its financial
demands. Therefore a better examination and study of
construction project, all cost – associated variables have to
be analyzed prior to the analysis of the final cost.
Construction project duration is one of the important
variables in construction project cost. However, precise
studies of construction projects are difficulttodosincethere
have been many factors varying from one project to another
such as: project size type, location, season of the year,
material type, structure, and method of construction.
Therefore, in this study an attempt is to be performed to
predict the future cost of construction project.
The main objectives of this study are:
[1]Identifying factors affecting the accuracy of cost
estimation of building project, and
[2]To examine the importance of theidentifiedfactors based
on significance of their contribution.
2. LITERATURE REVIEW
Afshin Firouzi et.al., (2016) Construction projects are
typically carried out in highly uncertain environments with
the risk of cost and time overruns, and subsequent disputes
between stakeholders. One of common risk factors is that
most cost items of a projectaredependentrandomvariables.
Thus, correlations between basic cost items need to be
considered in predicting the total cost of the project. This
paper intends to propose a generic copula-based Monte
Carlo simulation method for prediction of construction
projects‟ total costs withdependentcostitems. Analgorithm
to generate the joint probability distribution function of
correlated cost items is developed and two examples are
presented to demonstrate the applicability of copulas in
modeling construction costs as random variables.
Chang Yoon Ji et.al., (2015) For any construction project
to succeed, it is very important to accurately estimate the
construction cost during the project’s initial stage. This is
why there has been much interest lately in cost prediction
models that use case-based reasoning CBR. It has been
pointed out, however, that existing CBR-based cost
prediction models may yield inaccurate results even though
they could survey optimal similar cases, if the number of
cases in the case base is not enough. As opposed to the
existing CBR-based constructioncostpredictionmodels,this
study developed a CBR revision model that reflects the
“revise” phase of the CBR cycle retrieve, reuse, revise, and
retain_ based on nine multifamily housing projects executed
recently by “A” HousingCorporation.Toverifythedeveloped
model, a case study was performed using threecaseprojects
completed by “B” and “C” Housing Corporations. The result
showed that the prediction error ratioaftertheRevisephase
decreased from 97.44 to 22.58%. Thismodel canbe effective
when there are insufficient established cases in the case
base.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1033
Dikko H.A (2002) Housing and infrastructuredevelopment
represent an important aspect of capital development that
Governments all over must pay attention to as part of their
social responsibilities. Developed and developing countries
are constantly engaged in activities aimed at maintaining,
improving or adding new stock to their housing and
infrastructure amongst others in order to help overall
developmental goals. As stated earlier, development in this
area is continuous over many, many years. It follows that in
any country or location there exist a wealth of information
on previously executed projects. The objective of this paper
is to highlight in general terms the services that could be
offered by the Quantity Surveyor or Cost Engineer in
organizing the available information into a data bank and
use it as a basis to plan for future projects, including cost
control activities at the implementation stage. We will also
highlight the fact cost control models are more critical to
developing countries, largely because of the unstablenature
of their economies. This in turn led to the failure of many
projects.
Hany Shoukry Tawfek et.al., (2012) Many definitionsfor
quality were provided by experts. Among these definitions
are: quality is the fitness for use, conformance to
requirements, quality is a predictable degree of uniformity
and dependability, at low cost and suited to the market.Cost
of quality is an essential element of the total cost of any
construction project. Consequently,theaccurateassessment
of such cost of quality can materially affect the reliability of
the estimated cost of any construction project. Stated
differently, the accurate and reliable cost estimating for any
construction projects is not really possible without the deep
investigation for the expected cost of quality of this project.
Cost of quality is generally affected by many factors. Any
attempt to assess the cost of quality of any project should
take the different cost of quality factors into consideration.
The main objective of this paper is to establish a neural
network model that will enable the construction firms to
assess cost of quality for any future building project.
Huawang Shi et.al., (2014) Construction cost estimation
and prediction, the basis of cost budgeting and cost
management, is crucial for construction firms to surviveand
grow in the industry. The objective of thispaperistopresent
a novel method integrating rough sets (RS) theory and an
artificial neural network (ANN) to forecast construction
project cost. Because there are many factors affecting the
cost of building and some of the factors are related and
redundant, rough sets theory is applied to find relevant
factors to the cost, which are used as inputs of an artificial
neural-network to predict the cost of construction project.
Therefore, the maincharacteristic attributeswere withdraw,
the complexity of neural network system and thecomputing
time was reduced, as well. A case study was carried out on
the cost estimate of a sample project using the model.
Khaled Hesham Hyari et.al., (2015) Cost estimation for
public projects includes, but is not limited to, construction
costs and engineering services costs. The available cost
estimation models for these projects focus on the
construction phase, with little or no consideration given to
engineering services. This paper presentsanartificial neural
network model for the conceptual cost estimation of
engineering services for public construction projects that
considers both design costs and construction supervision
costs. In developing the model, the authors first identify the
factors that influence the cost of engineering services, and
then apply a suitable artificial neural network for a cost
estimation model.Themodel predictsthecostofengineering
services as a percentage of construction cost based on
project type, engineering services category, projectlocation,
and project scope.
Krzysztof Zima et.al., (2016) The paper presents
calculation of a unit price of construction elements or works
with the use of the case-based reasoning (CBR) method. The
primary source of knowledge in the CBR method is a
collection of cases encountered in previous problems and
retained in memory. The solution to a completely new
problem is generated by finding the most suitable cases and
adjusting them to the new case. A method of a unit price
calculation will be shown which uses the prices found in the
accessible set of previously occurring cases, i.e. it uses the
prices listed in estimations presented in offer bids. The CBR
systems consist of data bases in which the cases are stored
along with their solutions. So the paperpresentsa concept of
a knowledge base supporting the process of cost estimation
at the preliminary stage of a construction.
Li Liu et.al., (2010) Central to cost-based competitionisthe
capability to accurately predict the cost of delivering a
project. Most literatureoncostestimationfocusesonspecific
estimation methods as generic techniques and little
attention has been paid to the unique requirements at each
project stage. This note attempts to identify the critical
factors for effective estimation at various stages of typical
construction projects. Drawing from organization control
theory and cost estimating literature, this note develops a
theoretical framework that identifies the critical factors for
effective cost estimation during each project phase of a
conventional construction project.
Lowe D.J. et.al., (2006) This paper describes the
development of linear regression models to predict the
construction cost of buildings, based on 286 sets of data
collected in the United Kingdom. The same data have been
used to develop neural network model and purpose of
developing the regression models was to provide a
benchmark against which the neural networks could be
compared. Raw cost is rejected as a suitable dependent
variable and models are developed for three alternatives –
cost/m2, log of cost and log of cost/m2. Both forward and
backward stepwise regression analyses were performed to
produce a total of six models.
Muhammad T. Hatamleh et.al., (2018) Cost estimating
process is an important element within the project lifecycle.
Comprehensive information, expanded knowledge,
considerable expertise, and continuous improvement are
needed to obtain accurate cost estimation. The purpose of
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1034
this paper is to identify the critical factors that affect
accuracy of cost estimation and evaluatethedegreeto which
these factors are important from contractors' and
consultants' viewpoints. Qualitative and quantitative
research approaches were adopted in collecting and
analyzing the data, and testing the hypotheses. Based on the
literature review, a questionnaire was prepared and then
was modified according to the results of face-to-face open-
ended interviews conducted with 11 project managers. The
final version of the questionnaire was distributed to a
random sample of 265 respondents. The analysis revealed
that there is a strong agreement between contractors and
consultants in the ranking of the factors related to
consultant, contractor, design parameters, and information.
A slightly weak agreement between contractors and
consultants was noted regarding the factors related to
market conditions and factors related to project
characteristics. Furthermore, the results show that the top
ten factors affecting the accuracy of cost estimate are clear
and detail drawings and specification, pricing experience of
construction projects, perception of estimation importance,
equipment project complexity, clear scope definition,
accuracy and reliability of cost information, site constraints
material availability, financial capabilities of the client, and
availability of database of bids on similar project.
Nicharat Kuljaroenwirat et.al., (2016) Cost overrunisthe
important issue in the construction industry that gets
attention in several countries. This study focusesonaffected
construction company to examinethecostoverrunfactorsof
a public construction project, such as dredge and road. The
prediction model for cost overrun in pretender phase was
developed base on artificial neural networks (ANN), case-
based reasoning (CBR), and hybrid ANN-CBR byusingactual
information collected from the construction contract and
experts interviewing. The evaluation result during model
development process shows that ANN was more accurate
than CBR. On the other hand, the result of each model
validated with 12 unseen projects shown that ANN and CBR
with factor weights averaged from the best ANN model also
have acceptable accuracy. However, CBR is more useful to
support constructors‟ decision, since CBR itself could
produce results with similarity score included as the
probability percentage.
Seokjin Choi et.al., (2013) Long-term transportation
policies require government officials to predict the costs of
public road construction during the conceptual planning
phase. However, early cost prediction is often inaccurate
because public officials are not familiar with cost
engineering practices, and moreover, have limited time and
insufficient information for estimating the possible range of
the cost distribution. This study develops a conceptual cost
prediction model by combining rough settheory,case-based
reasoning, and genetic algorithms to better predict costs in
the conceptual planning phase. Rough set theory and
qualitative in-depth interviews are integrated to select the
proper input attributes for the cost prediction model. Case-
based reasoning is then applied to predict road construction
costs by considering users‟ difficulties in the conceptual
policy planning phase. A genetic algorithm is also used to
assist the rough set model and case-based reasoning model
to obtain optimal solutions.
Sherif M. Hafez et.al., (2015) The increased interest in
using Building Information Modeling (BIM) in detailed
construction cost estimates calls for methodologies to
evaluate the effectiveness of BIM-Assisted Detailed
Estimating (BADE) tools in generating detailed construction
cost estimates. The focus of this research is on developing a
quantified evaluation methodtomeasuretheimpactofthese
BADE tools. Further, in order to understand the cognitive
details of the estimator, this research also tested and
evaluated the impact of the visualization factor and the
compound impact of the visualization factor and aggregated
calculation factor on the construction cost estimating
process. Two cases study were tested, building and bridge.
Three methods were applied on each case study, method
1the manual estimating method, method 2 used a BADE tool
without a calculation function (i.e., the quantities of the
individual building components can be read as propertiesof
the component), method 3 used a BADEtool withcalculation
functions that allowed the user to directly
calculate/aggregate the query results of the BIM database in
the MS Excel spreadsheet. Results obtained from the test
cases helped to reinforce the reliability of the observations
and the evaluation. Four parameters were used to evaluate
the performance results individually in the first step:
generality, flexibility, efficiency, and accuracy. Then a multi-
attribute utility model, which took into account the four
individual parameters, was developed and used to evaluate
the overall performance of BIM assisted estimating versus
the performance of the traditional estimating method on
quantity takeoffs. The research concluded that the BIM-
assisted estimate demonstrated better performance over
traditional estimating methods. Both the visualization and
aggregation functions of the BADE tool had significant
impact on the performance of the detailed estimate.
Yu Wenhui et.al., (2015) Considering the shortcomings of
conventional cost prediction methods, neural network was
adopted to establish the cost prediction model ofequipment
system, which could efficiently solve the problems on the
determination of network structure. And due to the
importance of parameters optimization in Neural Network
model, rough set was used to optimize the model
parameters. The experiment results show that method can
quickly obtain the optimal parameters satisfying the
precision requirement with a simple calculation, which
solves the problem of complex calculationandempiricismin
conventional methods. The evaluation on the testing cases
shows the neural network model with rough set has a good
generalization performance and can be popularized in cost
prediction. At last, the experimentonanindependenttesting
case shows the model optimized by neural network
combined with rough set has a better prediction
performance.
Yu-Ren Wang et.al., (2011) The construction projects
have become larger in scale and more complex in system
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1035
engineering in the past few decades. The researchers and
industry practitioners have recognized its potential impact
to final project outcomes and started to put more emphasis
on early planning process. Nevertheless, the early planning
practice varies significantly throughout the industry. This
research intends to benchmark the early planning practice
for the building construction industryinTaiwananddevelop
ANN-ensemble classification models to predict project
success using survey data.
3. CONCLUSION
Different aspects of various authors on cost estimation and
cost prediction models were discussed and analyzed. Based
on these information gathered from literaturesearch,eighty
factors were identified and used for the study. Other studies
on the research designated that nature of clients and the
professionals involved on a project and their collective
resolution regarding the design, function, duration,
technology and execution of the project have significant
effect on the overall project cost The study have point out
the seven most exceptional factors among thedesignrelated
variables as : Design related factors, Time or Cost related
factors, Parties experience related, Financial issues, Bidding
situations, Project Characteristics,EstimatingProcess.These
amounts to seven key factors and all these factors are to be
used for the cost prediction model. The major conclusion is
that cost overrun in building construction is still a critical
problem due to various reasons. Therefore, there is an
urgent need for developing an advanced cost predictive
model in building construction that should yield better
result.
REFERENCES
[1] Afshin Firouzi, Wei Yang, and Chun-Qing (2016),
‘Prediction of Total Cost of Construction Project with
Dependent Cost Items’, ASCE.
[2] Chang Yoon Ji, Tae Hoon Hong, and Chang Taek Hyun.
(2014),’CBR Revision Model for Improving Cost
Prediction Accuracy in Multifamily Housing Projects’,
ASCE.
[3] Dikko H.A. (2002), ‘Cost Control ModelsforHousing and
Infrastructure Development’, Avail. On
http//www.fig.net/pub/fig.-2002/ISIO-1_dikkoPDF
(accessed 2nd July, 2007).
[4] Hany Shoukry Tawfek , Hossam El-Deen H. Mohammed
and Mohamed E. Abdel Razek. (2012), ‘Assessment of
the expected cost of quality (COQ) in construction
projects in Egypt using artificial neural network model’,
HBRC, Journal 8.
[5] Huawang Shi Wanqing Li (2014), ‘The Integrated
Methodology of Rough Set Theory and Artificial Neural-
Network for Construction Project CostPrediction’,IEEE.
[6] Khaled Hesham Hyari, Ahmad Al-Daraiseh, and
Mohammad ElMashaleh (2015), ‘Conceptual Cost
Estimation Model for Engineering Services in Public
Construction Projects’, ASCE.
[7] Krzysztof Zima (2015), ‘The Case-Based Reasoning
Model Of Cost Estimation At The Preliminary Stage Of A
Construction Project’, Science Direct, 122.
[8] Li Liu1 and Kai Zhu (2014),‘ImprovingCostEstimatesof
Construction Projects Using Phased Cost Factors’,ASCE.
[9] Lowe, D.J., Emsley M.W. and Harding, A. (2006),
‘Predicting construction cost using multiple regression
techniques’, Journal of Construction Engineering and
Management, ASCE.
[10] Muhammad T. Hatamleh, Mohammed Hiyassat, Ghaleb
Jalil Sweis and Rateb Jalil Sweis, (2018) ‘Factors
affecting the accuracy of cost estimate: case of Jordan’,
Engineering, Construction and Architectural
Management, Vol. 25 Issue: 1, pp.113-131.
[11] Nicharat Kuljaroenwirat and Pusadee Seresangtakul
(2016), ‘Model for Predicting Cost Overrun in Small and
Medium-Sized Public Construction Project’, IEEE.
[12] SeokjinChoi, Du Y. Kim, Seung H. Han, and Young
HoonKwak (2013), ‘Conceptual Cost-Prediction Model
for Public Road Planningvia RoughSet TheoryandCase-
Based Reasoning’, ASCE.
[13] Sherif M. Hafez, Remon F. Aziz and Elin A. Eldars(2015),
‘Construction cost prediction by using building
information modelling’, Int. Journal of Engineering
Research and Applications ISSN: 2248-9622, Vol. 5,
Issue 8, (Part - 2) August 2015, pp.67-77.
[14] Yu Wenhui (2014), ‘A Novel Neural Network Combined
with Rough Set to Predicting Construction Cost’, IEEE.
[15] Yu-Ren Wang, Chun-Yin Yu (2014), ‘The Case-Based
Reasoning Model Of Cost Estimation At The Preliminary
Stage Of A Construction Project’, IEEE.

More Related Content

What's hot

Construction Entrepreneurs in Nepal
 Construction Entrepreneurs in Nepal Construction Entrepreneurs in Nepal
Construction Entrepreneurs in NepalSuresh Adhikari
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - FinalRifan Fhazi
 
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Mohammad Lemar ZALMAÄ°
 
Forecasting the final cost of iraqi public school projects using regression a...
Forecasting the final cost of iraqi public school projects using regression a...Forecasting the final cost of iraqi public school projects using regression a...
Forecasting the final cost of iraqi public school projects using regression a...Gafel Kareem
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET Journal
 
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheorySenstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheoryIRJET Journal
 
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case StudyTime-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Studyijceronline
 
The Bateman Approach towards achieving economic and financial requirements fo...
The Bateman Approach towards achieving economic and financial requirements fo...The Bateman Approach towards achieving economic and financial requirements fo...
The Bateman Approach towards achieving economic and financial requirements fo...Steve Burks
 
Man hour based strategy
Man hour based strategyMan hour based strategy
Man hour based strategyDheeraj Sehgal
 
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...IAEME Publication
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...World-Academic Journal
 
Cost Effective Construction Techniques By Stephen Rayment
Cost Effective Construction Techniques By Stephen RaymentCost Effective Construction Techniques By Stephen Rayment
Cost Effective Construction Techniques By Stephen RaymentStephen Rayment UK
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...IRJET Journal
 
Risk Contingency Evaluation in International Construction Projects (Real Case...
Risk Contingency Evaluation in International Construction Projects (Real Case...Risk Contingency Evaluation in International Construction Projects (Real Case...
Risk Contingency Evaluation in International Construction Projects (Real Case...IJLT EMAS
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libreUTHM
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET Journal
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET Journal
 
time-cost-quality.pdf
time-cost-quality.pdftime-cost-quality.pdf
time-cost-quality.pdfsam26a
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionIRJET Journal
 

What's hot (20)

Construction Entrepreneurs in Nepal
 Construction Entrepreneurs in Nepal Construction Entrepreneurs in Nepal
Construction Entrepreneurs in Nepal
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - Final
 
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
Performance Evaluation of Construction Projects by EVM Method, Using Primaver...
 
Forecasting the final cost of iraqi public school projects using regression a...
Forecasting the final cost of iraqi public school projects using regression a...Forecasting the final cost of iraqi public school projects using regression a...
Forecasting the final cost of iraqi public school projects using regression a...
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
B1303020508
B1303020508B1303020508
B1303020508
 
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheorySenstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
 
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case StudyTime-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
 
The Bateman Approach towards achieving economic and financial requirements fo...
The Bateman Approach towards achieving economic and financial requirements fo...The Bateman Approach towards achieving economic and financial requirements fo...
The Bateman Approach towards achieving economic and financial requirements fo...
 
Man hour based strategy
Man hour based strategyMan hour based strategy
Man hour based strategy
 
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...  A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
A STUDY OF VARIOUS FACTORS AFFECTING CONTRACTOR’S PERFORMANCE IN LOWEST BID...
 
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
 
Cost Effective Construction Techniques By Stephen Rayment
Cost Effective Construction Techniques By Stephen RaymentCost Effective Construction Techniques By Stephen Rayment
Cost Effective Construction Techniques By Stephen Rayment
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
 
Risk Contingency Evaluation in International Construction Projects (Real Case...
Risk Contingency Evaluation in International Construction Projects (Real Case...Risk Contingency Evaluation in International Construction Projects (Real Case...
Risk Contingency Evaluation in International Construction Projects (Real Case...
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
 
IRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction ProjectsIRJET- Study on Scope Variances in Construction Projects
IRJET- Study on Scope Variances in Construction Projects
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
time-cost-quality.pdf
time-cost-quality.pdftime-cost-quality.pdf
time-cost-quality.pdf
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
 

Similar to Cost Prediction Model for Building Projects

IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewIRJET Journal
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET-  	  Importance of Proper Cost Management in Construction IndustryIRJET-  	  Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction IndustryIRJET Journal
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in constructionDr Ezzat Mansour
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET Journal
 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...Nat Rice
 
IRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential BuildingIRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential BuildingIRJET Journal
 
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET-  	  Development of a Neural Network based Model for Construction Proje...IRJET-  	  Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...IRJET Journal
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET Journal
 
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...IRJET Journal
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
Cost Effective Methods in Construction Engineering
Cost Effective Methods in Construction EngineeringCost Effective Methods in Construction Engineering
Cost Effective Methods in Construction Engineeringcivejjour
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriaNewman Jonathan
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 

Similar to Cost Prediction Model for Building Projects (20)

IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET-  	  Importance of Proper Cost Management in Construction IndustryIRJET-  	  Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction Industry
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in construction
 
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting InflationIRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
IRJET- Effects of Project Cost Analysis and Factors Affecting Inflation
 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
 
IRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential BuildingIRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential Building
 
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET-  	  Development of a Neural Network based Model for Construction Proje...IRJET-  	  Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
 
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
IRJET- Factor Analysis of the Significant Drivers Causing Cost Variation in B...
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
H1303055462
H1303055462H1303055462
H1303055462
 
Cost Effective Methods in Construction Engineering
Cost Effective Methods in Construction EngineeringCost Effective Methods in Construction Engineering
Cost Effective Methods in Construction Engineering
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 

Cost Prediction Model for Building Projects

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1032 DEVELOPING COST PREDICTION MODEL FOR BUILDING PROJECT Dr. S Kanchana 1, Ms. Sisira Ramesh2 1Head of the Department, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India, 2PG Student, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India -------------------------------------------------------------------------***------------------------------------------------------------------------ Abstract - The critical problem in the constructionindustry is that building projects are completed at cost much higher than estimated project cost, hence it is essential to develop a cost prediction model that imprison all factorscontributingto the project cost using multiple regression analysis throughset of objectives such as: to locate the factors affecting the project cost; analyze the significance of the factors and develop cost predictive model. Literature review on the study designated that nature of clients, professional involved in a project and their resolution regarding design, function, duration, technology and execution have significanteffectontheoverall project cost. The study points out the seven most exceptional factors to project cost among the design related variables as: design related factors, time or cost related factors, parties experience related factors, financial issues related factors, bidding situations related factors , project characteristics related factors and estimating process related factors. These selected key factors are to be used for cost predictive model. The cost prediction model can be developed with the help of SPSS software, the factors governing the project cost are determined with the help of questionnairesurvey. Seven major factors have been selected for the cost prediction modeling. Key Words: Multiple regression analysis,costprediction model, SPSS 1. INTRODUCTION A successful project means that the project has been completed within budgetary costs and within the available schedule. But it is found out that in construction work always the project completion cost is much higher than the estimated project cost. This have not only led to the loss in project but also delays the project. And also the client is concerned with quality, cost andtimeandwantsthebuilding to be constructed at a reasonable cost and within a specified period of time. For these reasons, the contractors should exercise great care and skill in the design of the project with constant checks on cost. Therefore integrated efforts of the various parties and their resolutions regarding the design, technology and execution of the project can have significant effect on the overall project cost. Therefore it is importantto examine the wide discrepanciesbetweenplannedandactual construction cost due to lack of effective prediction cost models. The major part of a construction project is its financial demands. Therefore a better examination and study of construction project, all cost – associated variables have to be analyzed prior to the analysis of the final cost. Construction project duration is one of the important variables in construction project cost. However, precise studies of construction projects are difficulttodosincethere have been many factors varying from one project to another such as: project size type, location, season of the year, material type, structure, and method of construction. Therefore, in this study an attempt is to be performed to predict the future cost of construction project. The main objectives of this study are: [1]Identifying factors affecting the accuracy of cost estimation of building project, and [2]To examine the importance of theidentifiedfactors based on significance of their contribution. 2. LITERATURE REVIEW Afshin Firouzi et.al., (2016) Construction projects are typically carried out in highly uncertain environments with the risk of cost and time overruns, and subsequent disputes between stakeholders. One of common risk factors is that most cost items of a projectaredependentrandomvariables. Thus, correlations between basic cost items need to be considered in predicting the total cost of the project. This paper intends to propose a generic copula-based Monte Carlo simulation method for prediction of construction projects‟ total costs withdependentcostitems. Analgorithm to generate the joint probability distribution function of correlated cost items is developed and two examples are presented to demonstrate the applicability of copulas in modeling construction costs as random variables. Chang Yoon Ji et.al., (2015) For any construction project to succeed, it is very important to accurately estimate the construction cost during the project’s initial stage. This is why there has been much interest lately in cost prediction models that use case-based reasoning CBR. It has been pointed out, however, that existing CBR-based cost prediction models may yield inaccurate results even though they could survey optimal similar cases, if the number of cases in the case base is not enough. As opposed to the existing CBR-based constructioncostpredictionmodels,this study developed a CBR revision model that reflects the “revise” phase of the CBR cycle retrieve, reuse, revise, and retain_ based on nine multifamily housing projects executed recently by “A” HousingCorporation.Toverifythedeveloped model, a case study was performed using threecaseprojects completed by “B” and “C” Housing Corporations. The result showed that the prediction error ratioaftertheRevisephase decreased from 97.44 to 22.58%. Thismodel canbe effective when there are insufficient established cases in the case base.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1033 Dikko H.A (2002) Housing and infrastructuredevelopment represent an important aspect of capital development that Governments all over must pay attention to as part of their social responsibilities. Developed and developing countries are constantly engaged in activities aimed at maintaining, improving or adding new stock to their housing and infrastructure amongst others in order to help overall developmental goals. As stated earlier, development in this area is continuous over many, many years. It follows that in any country or location there exist a wealth of information on previously executed projects. The objective of this paper is to highlight in general terms the services that could be offered by the Quantity Surveyor or Cost Engineer in organizing the available information into a data bank and use it as a basis to plan for future projects, including cost control activities at the implementation stage. We will also highlight the fact cost control models are more critical to developing countries, largely because of the unstablenature of their economies. This in turn led to the failure of many projects. Hany Shoukry Tawfek et.al., (2012) Many definitionsfor quality were provided by experts. Among these definitions are: quality is the fitness for use, conformance to requirements, quality is a predictable degree of uniformity and dependability, at low cost and suited to the market.Cost of quality is an essential element of the total cost of any construction project. Consequently,theaccurateassessment of such cost of quality can materially affect the reliability of the estimated cost of any construction project. Stated differently, the accurate and reliable cost estimating for any construction projects is not really possible without the deep investigation for the expected cost of quality of this project. Cost of quality is generally affected by many factors. Any attempt to assess the cost of quality of any project should take the different cost of quality factors into consideration. The main objective of this paper is to establish a neural network model that will enable the construction firms to assess cost of quality for any future building project. Huawang Shi et.al., (2014) Construction cost estimation and prediction, the basis of cost budgeting and cost management, is crucial for construction firms to surviveand grow in the industry. The objective of thispaperistopresent a novel method integrating rough sets (RS) theory and an artificial neural network (ANN) to forecast construction project cost. Because there are many factors affecting the cost of building and some of the factors are related and redundant, rough sets theory is applied to find relevant factors to the cost, which are used as inputs of an artificial neural-network to predict the cost of construction project. Therefore, the maincharacteristic attributeswere withdraw, the complexity of neural network system and thecomputing time was reduced, as well. A case study was carried out on the cost estimate of a sample project using the model. Khaled Hesham Hyari et.al., (2015) Cost estimation for public projects includes, but is not limited to, construction costs and engineering services costs. The available cost estimation models for these projects focus on the construction phase, with little or no consideration given to engineering services. This paper presentsanartificial neural network model for the conceptual cost estimation of engineering services for public construction projects that considers both design costs and construction supervision costs. In developing the model, the authors first identify the factors that influence the cost of engineering services, and then apply a suitable artificial neural network for a cost estimation model.Themodel predictsthecostofengineering services as a percentage of construction cost based on project type, engineering services category, projectlocation, and project scope. Krzysztof Zima et.al., (2016) The paper presents calculation of a unit price of construction elements or works with the use of the case-based reasoning (CBR) method. The primary source of knowledge in the CBR method is a collection of cases encountered in previous problems and retained in memory. The solution to a completely new problem is generated by finding the most suitable cases and adjusting them to the new case. A method of a unit price calculation will be shown which uses the prices found in the accessible set of previously occurring cases, i.e. it uses the prices listed in estimations presented in offer bids. The CBR systems consist of data bases in which the cases are stored along with their solutions. So the paperpresentsa concept of a knowledge base supporting the process of cost estimation at the preliminary stage of a construction. Li Liu et.al., (2010) Central to cost-based competitionisthe capability to accurately predict the cost of delivering a project. Most literatureoncostestimationfocusesonspecific estimation methods as generic techniques and little attention has been paid to the unique requirements at each project stage. This note attempts to identify the critical factors for effective estimation at various stages of typical construction projects. Drawing from organization control theory and cost estimating literature, this note develops a theoretical framework that identifies the critical factors for effective cost estimation during each project phase of a conventional construction project. Lowe D.J. et.al., (2006) This paper describes the development of linear regression models to predict the construction cost of buildings, based on 286 sets of data collected in the United Kingdom. The same data have been used to develop neural network model and purpose of developing the regression models was to provide a benchmark against which the neural networks could be compared. Raw cost is rejected as a suitable dependent variable and models are developed for three alternatives – cost/m2, log of cost and log of cost/m2. Both forward and backward stepwise regression analyses were performed to produce a total of six models. Muhammad T. Hatamleh et.al., (2018) Cost estimating process is an important element within the project lifecycle. Comprehensive information, expanded knowledge, considerable expertise, and continuous improvement are needed to obtain accurate cost estimation. The purpose of
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1034 this paper is to identify the critical factors that affect accuracy of cost estimation and evaluatethedegreeto which these factors are important from contractors' and consultants' viewpoints. Qualitative and quantitative research approaches were adopted in collecting and analyzing the data, and testing the hypotheses. Based on the literature review, a questionnaire was prepared and then was modified according to the results of face-to-face open- ended interviews conducted with 11 project managers. The final version of the questionnaire was distributed to a random sample of 265 respondents. The analysis revealed that there is a strong agreement between contractors and consultants in the ranking of the factors related to consultant, contractor, design parameters, and information. A slightly weak agreement between contractors and consultants was noted regarding the factors related to market conditions and factors related to project characteristics. Furthermore, the results show that the top ten factors affecting the accuracy of cost estimate are clear and detail drawings and specification, pricing experience of construction projects, perception of estimation importance, equipment project complexity, clear scope definition, accuracy and reliability of cost information, site constraints material availability, financial capabilities of the client, and availability of database of bids on similar project. Nicharat Kuljaroenwirat et.al., (2016) Cost overrunisthe important issue in the construction industry that gets attention in several countries. This study focusesonaffected construction company to examinethecostoverrunfactorsof a public construction project, such as dredge and road. The prediction model for cost overrun in pretender phase was developed base on artificial neural networks (ANN), case- based reasoning (CBR), and hybrid ANN-CBR byusingactual information collected from the construction contract and experts interviewing. The evaluation result during model development process shows that ANN was more accurate than CBR. On the other hand, the result of each model validated with 12 unseen projects shown that ANN and CBR with factor weights averaged from the best ANN model also have acceptable accuracy. However, CBR is more useful to support constructors‟ decision, since CBR itself could produce results with similarity score included as the probability percentage. Seokjin Choi et.al., (2013) Long-term transportation policies require government officials to predict the costs of public road construction during the conceptual planning phase. However, early cost prediction is often inaccurate because public officials are not familiar with cost engineering practices, and moreover, have limited time and insufficient information for estimating the possible range of the cost distribution. This study develops a conceptual cost prediction model by combining rough settheory,case-based reasoning, and genetic algorithms to better predict costs in the conceptual planning phase. Rough set theory and qualitative in-depth interviews are integrated to select the proper input attributes for the cost prediction model. Case- based reasoning is then applied to predict road construction costs by considering users‟ difficulties in the conceptual policy planning phase. A genetic algorithm is also used to assist the rough set model and case-based reasoning model to obtain optimal solutions. Sherif M. Hafez et.al., (2015) The increased interest in using Building Information Modeling (BIM) in detailed construction cost estimates calls for methodologies to evaluate the effectiveness of BIM-Assisted Detailed Estimating (BADE) tools in generating detailed construction cost estimates. The focus of this research is on developing a quantified evaluation methodtomeasuretheimpactofthese BADE tools. Further, in order to understand the cognitive details of the estimator, this research also tested and evaluated the impact of the visualization factor and the compound impact of the visualization factor and aggregated calculation factor on the construction cost estimating process. Two cases study were tested, building and bridge. Three methods were applied on each case study, method 1the manual estimating method, method 2 used a BADE tool without a calculation function (i.e., the quantities of the individual building components can be read as propertiesof the component), method 3 used a BADEtool withcalculation functions that allowed the user to directly calculate/aggregate the query results of the BIM database in the MS Excel spreadsheet. Results obtained from the test cases helped to reinforce the reliability of the observations and the evaluation. Four parameters were used to evaluate the performance results individually in the first step: generality, flexibility, efficiency, and accuracy. Then a multi- attribute utility model, which took into account the four individual parameters, was developed and used to evaluate the overall performance of BIM assisted estimating versus the performance of the traditional estimating method on quantity takeoffs. The research concluded that the BIM- assisted estimate demonstrated better performance over traditional estimating methods. Both the visualization and aggregation functions of the BADE tool had significant impact on the performance of the detailed estimate. Yu Wenhui et.al., (2015) Considering the shortcomings of conventional cost prediction methods, neural network was adopted to establish the cost prediction model ofequipment system, which could efficiently solve the problems on the determination of network structure. And due to the importance of parameters optimization in Neural Network model, rough set was used to optimize the model parameters. The experiment results show that method can quickly obtain the optimal parameters satisfying the precision requirement with a simple calculation, which solves the problem of complex calculationandempiricismin conventional methods. The evaluation on the testing cases shows the neural network model with rough set has a good generalization performance and can be popularized in cost prediction. At last, the experimentonanindependenttesting case shows the model optimized by neural network combined with rough set has a better prediction performance. Yu-Ren Wang et.al., (2011) The construction projects have become larger in scale and more complex in system
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1035 engineering in the past few decades. The researchers and industry practitioners have recognized its potential impact to final project outcomes and started to put more emphasis on early planning process. Nevertheless, the early planning practice varies significantly throughout the industry. This research intends to benchmark the early planning practice for the building construction industryinTaiwananddevelop ANN-ensemble classification models to predict project success using survey data. 3. CONCLUSION Different aspects of various authors on cost estimation and cost prediction models were discussed and analyzed. Based on these information gathered from literaturesearch,eighty factors were identified and used for the study. Other studies on the research designated that nature of clients and the professionals involved on a project and their collective resolution regarding the design, function, duration, technology and execution of the project have significant effect on the overall project cost The study have point out the seven most exceptional factors among thedesignrelated variables as : Design related factors, Time or Cost related factors, Parties experience related, Financial issues, Bidding situations, Project Characteristics,EstimatingProcess.These amounts to seven key factors and all these factors are to be used for the cost prediction model. The major conclusion is that cost overrun in building construction is still a critical problem due to various reasons. Therefore, there is an urgent need for developing an advanced cost predictive model in building construction that should yield better result. REFERENCES [1] Afshin Firouzi, Wei Yang, and Chun-Qing (2016), ‘Prediction of Total Cost of Construction Project with Dependent Cost Items’, ASCE. [2] Chang Yoon Ji, Tae Hoon Hong, and Chang Taek Hyun. (2014),’CBR Revision Model for Improving Cost Prediction Accuracy in Multifamily Housing Projects’, ASCE. [3] Dikko H.A. (2002), ‘Cost Control ModelsforHousing and Infrastructure Development’, Avail. On http//www.fig.net/pub/fig.-2002/ISIO-1_dikkoPDF (accessed 2nd July, 2007). [4] Hany Shoukry Tawfek , Hossam El-Deen H. Mohammed and Mohamed E. Abdel Razek. (2012), ‘Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model’, HBRC, Journal 8. [5] Huawang Shi Wanqing Li (2014), ‘The Integrated Methodology of Rough Set Theory and Artificial Neural- Network for Construction Project CostPrediction’,IEEE. [6] Khaled Hesham Hyari, Ahmad Al-Daraiseh, and Mohammad ElMashaleh (2015), ‘Conceptual Cost Estimation Model for Engineering Services in Public Construction Projects’, ASCE. [7] Krzysztof Zima (2015), ‘The Case-Based Reasoning Model Of Cost Estimation At The Preliminary Stage Of A Construction Project’, Science Direct, 122. [8] Li Liu1 and Kai Zhu (2014),‘ImprovingCostEstimatesof Construction Projects Using Phased Cost Factors’,ASCE. [9] Lowe, D.J., Emsley M.W. and Harding, A. (2006), ‘Predicting construction cost using multiple regression techniques’, Journal of Construction Engineering and Management, ASCE. [10] Muhammad T. Hatamleh, Mohammed Hiyassat, Ghaleb Jalil Sweis and Rateb Jalil Sweis, (2018) ‘Factors affecting the accuracy of cost estimate: case of Jordan’, Engineering, Construction and Architectural Management, Vol. 25 Issue: 1, pp.113-131. [11] Nicharat Kuljaroenwirat and Pusadee Seresangtakul (2016), ‘Model for Predicting Cost Overrun in Small and Medium-Sized Public Construction Project’, IEEE. [12] SeokjinChoi, Du Y. Kim, Seung H. Han, and Young HoonKwak (2013), ‘Conceptual Cost-Prediction Model for Public Road Planningvia RoughSet TheoryandCase- Based Reasoning’, ASCE. [13] Sherif M. Hafez, Remon F. Aziz and Elin A. Eldars(2015), ‘Construction cost prediction by using building information modelling’, Int. Journal of Engineering Research and Applications ISSN: 2248-9622, Vol. 5, Issue 8, (Part - 2) August 2015, pp.67-77. [14] Yu Wenhui (2014), ‘A Novel Neural Network Combined with Rough Set to Predicting Construction Cost’, IEEE. [15] Yu-Ren Wang, Chun-Yin Yu (2014), ‘The Case-Based Reasoning Model Of Cost Estimation At The Preliminary Stage Of A Construction Project’, IEEE.