Project Definition Rating Index with Feasibility Study in
Infrastructure Projects
Mahirajsinh S. Parmar,
(Department of Civil Engineering, Dr.D.Y.Patil School of Engineering And Technology, Pune)
ABSTRACT
Project Definition Rating Index is a rating tool which helps in predicting the outcome of project. Infrastructure
projects are very complex as number of organizations involved is more, the money involved is also too big. In
spite of feasibility study done on infrastructure project there are many cases where huge projects have failed
having positive feasibility study. PDRI combined with feasibility study can help in achieving knowledge of
different hidden areas which might not be seen in feasibility study and vice versa. Combination of these two
predicting tools can help in making pre-planning work even better.
Keywords – Combination, Feasibility study, Infrastructure projects, PDRI, Predicting tools
I. INTRODUCTION
Project Definition Rating Index is a tool in
which a project is rated depending upon categories
and elements. There are two types of PDRI
Industrial PDRI and Building PDRI. Industrial
PDRI was developed in the year 1996 and Building
PDRI was developed in the year 1999. Industrial
PDRI consists of 70 elements and Building PDRI
consists of 64 elements.
Infrastructure PDRI is a mixture of both
industrial and building PDRI having a total of 68
elements. It consists of three sections with a total of
13 subsections and 68 elements.
In PDRI a low score corresponds to a project that
has good scope definition or a project having a better
chance for success and a high score corresponds to
poor scope definition and lesser chance for success.
Lower the score better is the project. Any project is
rated out of 1000 with 70 points least that can be
scored. A PDRI rating that is derived from
feasibility study can cover more points regarding
project aspects and will increase the success
percentage of project by identifying hidden risks
involved.
The PDRI sheet for infrastructure project is
derived by the work done by CII construction
industry institute. A good PDRI score sheet can help
in forecasting the completion rate, risks involved,
attracting investors. Conducting a PDRI study which
is derived from feasibility study have many
advantages which will help in completion of any
project with minimum problems.
II. METHODOLGY
The Methodology implemented to derive PDRI
from feasibility study to develop a score sheet
containing a total of 3 sections
1). BASIS OF PROJECT DESIGN
2). BASIS OF DESIGN
3). EXECUTION APPROACH
Section 1 contains five sub sections, section 2
contains four subsections and Section 3 contains
four subsections.
Score card is prepared by rating these elements
after studying the feasibility report and analyzing the
report arranging all data given in feasibility report
accordingly to the elements mentioned in score
sheet. If the data is irrelevant or not corresponding to
the project then it may be rated as NA= Not
Applicable. There are 5 definition levels according
to which rating is given starting from 1 to 5.
Definition levels are defined as
N/A= Not Applicable
1 = Complete Definition
2 = Minor Deficiencies
3 = Some Deficiencies
4 = Major Deficiencies
5 = Incomplete or Poor Definition
After allotting respective definitions to all the 68
elements final score is calculated any score less than
300 is acceptable. But lesser the score more feasible
the project will be.
SECTION I. BASIS OF PROJECT DECISION
A. Project Strategy
A.1 Need & Purpose Documentation
A.2 Investment Studies & Alternatives
Assessments
A.3 Key Team Member Coordination
A.4 Public Involvement
B. Owner/Operator Philosophies
B.1 Design Philosophy
RESEARCH ARTICLE OPEN ACCESS
Mahirajsinh S. Parmar Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 4, Issue 12( Part 3), December 2014, pp.94-96
www.ijera.com 2 | P a g e
B.2 Operating Philosophy
B.3 Maintenance Philosophy
B.4 Future Expansion & Alteration
Considerations
C. Project Funding and Timing
C.1 Funding & Programming
C.2 Preliminary Project Schedule
C.3 Contingencies
D. Project Requirements
D.1 Project Objectives Statement
D.2 Functional Classification & Use
D.3 Evaluation of Compliance Requirements
D.4 Existing Environmental Conditions
D.5 Site Characteristics Available vs. Required
D.6 Dismantling & Demolition Requirements
D.7 Determination of Utility Impacts
D.8 Lead/Discipline Scope of Work
E. Value Analysis
E.1 Value Engineering Procedures
E.2 Design Simplification
E.3 Material Alternatives Considered
E.4 Constructability Procedures
SECTION II. BASIS OF DESIGN
F. Site Information
F.1 Geotechnical Characteristics
F.2 Hydrological Characteristics
F.3 Surveys & Mapping
F.4 Permitting Requirements
F.5 Environmental Documentation
F.6 Environmental Commitments & Mitigation
F.7 Property Descriptions
F.8 Right-of-Way Mapping & Site Issues
G. Location and Geometry
G.1 Schematic Layouts
G.2 Horizontal & Vertical Alignment
G.3 Cross-Sectional Elements
G.4 Control of Access
H. Associated Structures and Equipment
H.1 Support Structures
H.2 Hydraulic Structures
H.3 Miscellaneous Elements
H.4 Equipment List
H.5 Equipment Utility Requirements
I. Project Design Parameters
I.1 Capacity
I.2 Safety & Hazards
I.3 Civil/Structural
I.4 Mechanical/Equipment
I.5 Electrical/Controls
I.6 Operations/Maintenance
SECTION III. EXECUTION APPROACH
J. Land Acquisition Strategy
J.1 Local Public Agencies Contracts &
Agreements
J.2 Long-Lead Parcel & Utility Adjustment
Identification & Acquisition
J.3 Utility Agreement & Joint-Use Contracts
J.4 Land Appraisal Requirements
J.5 Advance Land Acquisition Requirements
K. Procurement Strategy
K.1 Project Delivery Method & Contracting
Strategies
K.2 Long-Lead/Critical Equipment & Materials
Identification
K.3 Procurement Procedures & Plans
K.4 Procurement Responsibility Matrix
L. Project Control
L.1 Right-of-Way & Utilities Cost Estimates
L.2 Design & Construction Cost Estimates
L.3 Project Cost Control
L.4 Project Schedule Control
L.5 Project Quality Assurance & Control
M. Project Execution Plan
M.1 Safety Procedures
M.2 Owner Approval Requirements
M.3 Documentation/Deliverables
M.4 Computing & CADD/Model Requirements
M.5 Design/Construction Plan & Approach
M.6 Intercompany & Interagency Coordination
& agreements
M.7 Work Zone and Transportation Plan
M.8 Project Completion Requirements
These are the total 68 elements which will
be rated from 0 to 5. Some elements which are
irrelevant can be omitted from the score sheet
and new elements can be created according to
relevance with feasibility study or elements that
are better suited.
There is a cut off given of 200 points according
to which percentage can be mentioned.
Performance Parameter PDRI Score
< 200 > 200
Cost Over
Budget
1% 6%
Schedule Behind
Schedule
2% 12%
Change Order Total Cost 7% 10%
Calculation can be done accordingly about cost,
schedule and change order. Pre-Planning can be
done before hand keeping in mind such parameters.
There are some key elements out of 68 elements
which can influence the PDRI score more than other
elements. It should be noted that these elements are
given more preference while not only rating these
elements but also while doing feasibility study.
CONCLUSION
The investigation carried out proved that the
PDRI score card combined with feasibility report
showed better success rate then PDRI and feasibility
study done separately. Study was carried out on
Intermodal transit hub, Bangalore, India. Even
Mahirajsinh S. Parmar Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 4, Issue 12( Part 3), December 2014, pp.94-96
www.ijera.com 3 | P a g e
though there were some problems regarding revenue
generation from the project PDRI with feasibility
report combined were able to generate some strong
result.
REFERENCES
Journal Paper:
[1]. Peter R. Dumont, SCOPE MANAGEMENT
USING PROJECT DEFINITION RATING
INDEX.
Theses:
[2]. Evan Bingham, Development of the Project
Definition Rating Index (PDRI) For
Infrastructure Projects. ARIZONA STATE
UNIVERSITY, Dec-2010
[3]. Wang, Applying The Project Definition
Rating Index Into Project Risk
Management.Aug-2002
[4]. NASA pre-planning team, Project Definition
Rating Index Used On NASA Facilities. April-
2000

More Related Content

What's hot

IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...ijtsrd
 
“Investigation of Time-Cost Effectiveness on Construction Projects”
“Investigation of Time-Cost Effectiveness on Construction Projects”“Investigation of Time-Cost Effectiveness on Construction Projects”
“Investigation of Time-Cost Effectiveness on Construction Projects”IOSR Journals
 
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction ProjectsFactors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projectsijtsrd
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...IRJET Journal
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libreUTHM
 
Optimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning SystemsOptimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning SystemsIJCSIS Research Publications
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSIAEME Publication
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 

What's hot (18)

IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...
 
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
 
D012261521
D012261521D012261521
D012261521
 
“Investigation of Time-Cost Effectiveness on Construction Projects”
“Investigation of Time-Cost Effectiveness on Construction Projects”“Investigation of Time-Cost Effectiveness on Construction Projects”
“Investigation of Time-Cost Effectiveness on Construction Projects”
 
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction ProjectsFactors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projects
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
 
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction ProjectIRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
 
Ijciet 10 01_075
Ijciet 10 01_075Ijciet 10 01_075
Ijciet 10 01_075
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
 
Optimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning SystemsOptimizing Building Plan for a (9m X 12m) House Using Learning Systems
Optimizing Building Plan for a (9m X 12m) House Using Learning Systems
 
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 

Viewers also liked

Tracing Back The Botmaster
Tracing Back The BotmasterTracing Back The Botmaster
Tracing Back The BotmasterIJERA Editor
 
Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...
Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...
Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...IJERA Editor
 
Nine Level Inverter with Boost Converter from Renewable Energy Source
Nine Level Inverter with Boost Converter from Renewable Energy SourceNine Level Inverter with Boost Converter from Renewable Energy Source
Nine Level Inverter with Boost Converter from Renewable Energy SourceIJERA Editor
 
Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...
Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...
Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...IJERA Editor
 
A Survey on Using Artificial Intelligence Techniques in the Software Developm...
A Survey on Using Artificial Intelligence Techniques in the Software Developm...A Survey on Using Artificial Intelligence Techniques in the Software Developm...
A Survey on Using Artificial Intelligence Techniques in the Software Developm...IJERA Editor
 
Strategies for improving consumer satisfaction.
Strategies for improving consumer satisfaction.Strategies for improving consumer satisfaction.
Strategies for improving consumer satisfaction.Seung Hak Jeong
 
Платформа для проведения интернет конференций
Платформа для проведения интернет конференцийПлатформа для проведения интернет конференций
Платформа для проведения интернет конференцийSergey Maslennikov
 
Geanimeerd leren met scratch zonder filmpjes
Geanimeerd leren met scratch zonder filmpjesGeanimeerd leren met scratch zonder filmpjes
Geanimeerd leren met scratch zonder filmpjesDigitaal Laboratorium
 
госпрограмма постановление от 19 июля 2013 г. № 330 пп
госпрограмма постановление от 19 июля 2013 г. № 330 ппгоспрограмма постановление от 19 июля 2013 г. № 330 пп
госпрограмма постановление от 19 июля 2013 г. № 330 ппpatriot29
 

Viewers also liked (20)

Kongo ulke raporu_2013
Kongo ulke raporu_2013Kongo ulke raporu_2013
Kongo ulke raporu_2013
 
Tracing Back The Botmaster
Tracing Back The BotmasterTracing Back The Botmaster
Tracing Back The Botmaster
 
Sains kssr (1)
Sains kssr (1)Sains kssr (1)
Sains kssr (1)
 
Yrkesplugget 1, pdf
Yrkesplugget 1, pdfYrkesplugget 1, pdf
Yrkesplugget 1, pdf
 
Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...
Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...
Optimization of “T”-Shaped Fins Geometry Using Constructal Theory and “FEA” C...
 
Nine Level Inverter with Boost Converter from Renewable Energy Source
Nine Level Inverter with Boost Converter from Renewable Energy SourceNine Level Inverter with Boost Converter from Renewable Energy Source
Nine Level Inverter with Boost Converter from Renewable Energy Source
 
Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...
Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...
Effect of Dissolved Oxygen on Microbial Population and Settling of Dairy Acti...
 
A Survey on Using Artificial Intelligence Techniques in the Software Developm...
A Survey on Using Artificial Intelligence Techniques in the Software Developm...A Survey on Using Artificial Intelligence Techniques in the Software Developm...
A Survey on Using Artificial Intelligence Techniques in the Software Developm...
 
Strategies for improving consumer satisfaction.
Strategies for improving consumer satisfaction.Strategies for improving consumer satisfaction.
Strategies for improving consumer satisfaction.
 
V041203124126
V041203124126V041203124126
V041203124126
 
Wheeldens Press 2
Wheeldens Press 2Wheeldens Press 2
Wheeldens Press 2
 
Платформа для проведения интернет конференций
Платформа для проведения интернет конференцийПлатформа для проведения интернет конференций
Платформа для проведения интернет конференций
 
Letonya ulke raporu_2013
Letonya ulke raporu_2013Letonya ulke raporu_2013
Letonya ulke raporu_2013
 
Litvanya ulke raporu_2013
Litvanya ulke raporu_2013Litvanya ulke raporu_2013
Litvanya ulke raporu_2013
 
Mali ulke raporu_2013
Mali ulke raporu_2013Mali ulke raporu_2013
Mali ulke raporu_2013
 
Misir ulke raporu_2013
Misir ulke raporu_2013Misir ulke raporu_2013
Misir ulke raporu_2013
 
Appendix 9
Appendix 9Appendix 9
Appendix 9
 
Geanimeerd leren met scratch zonder filmpjes
Geanimeerd leren met scratch zonder filmpjesGeanimeerd leren met scratch zonder filmpjes
Geanimeerd leren met scratch zonder filmpjes
 
BusinessCard-GupCommerce-Fronte
BusinessCard-GupCommerce-FronteBusinessCard-GupCommerce-Fronte
BusinessCard-GupCommerce-Fronte
 
госпрограмма постановление от 19 июля 2013 г. № 330 пп
госпрограмма постановление от 19 июля 2013 г. № 330 ппгоспрограмма постановление от 19 июля 2013 г. № 330 пп
госпрограмма постановление от 19 июля 2013 г. № 330 пп
 

Similar to PDRI Feasibility Study Infrastructure Projects

IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projectsIRJET Journal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET Journal
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET Journal
 
Service Process Improvement Project
Service Process Improvement ProjectService Process Improvement Project
Service Process Improvement ProjectPrateek Gupta
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionIRJET Journal
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple ProjectsIRJET Journal
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...IRJET Journal
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...IRJET Journal
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.sanjeeev bahadur, m.tech,mba
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewIRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTIRJET Journal
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
 
Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...IRJET Journal
 

Similar to PDRI Feasibility Study Infrastructure Projects (20)

IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
IRJET - Scrutinizing Attributes Influencing Role of Information Communication...
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
 
Service Process Improvement Project
Service Process Improvement ProjectService Process Improvement Project
Service Process Improvement Project
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
Comparative Assessment of Delay Analysis Approaches in a Road Project: A Case...
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
 
Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...
 

Recently uploaded

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 

Recently uploaded (20)

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

PDRI Feasibility Study Infrastructure Projects

  • 1. Mahirajsinh S. Parmar Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 12( Part 3), December 2014, pp.94-96 www.ijera.com 1 | P a g e Project Definition Rating Index with Feasibility Study in Infrastructure Projects Mahirajsinh S. Parmar, (Department of Civil Engineering, Dr.D.Y.Patil School of Engineering And Technology, Pune) ABSTRACT Project Definition Rating Index is a rating tool which helps in predicting the outcome of project. Infrastructure projects are very complex as number of organizations involved is more, the money involved is also too big. In spite of feasibility study done on infrastructure project there are many cases where huge projects have failed having positive feasibility study. PDRI combined with feasibility study can help in achieving knowledge of different hidden areas which might not be seen in feasibility study and vice versa. Combination of these two predicting tools can help in making pre-planning work even better. Keywords – Combination, Feasibility study, Infrastructure projects, PDRI, Predicting tools I. INTRODUCTION Project Definition Rating Index is a tool in which a project is rated depending upon categories and elements. There are two types of PDRI Industrial PDRI and Building PDRI. Industrial PDRI was developed in the year 1996 and Building PDRI was developed in the year 1999. Industrial PDRI consists of 70 elements and Building PDRI consists of 64 elements. Infrastructure PDRI is a mixture of both industrial and building PDRI having a total of 68 elements. It consists of three sections with a total of 13 subsections and 68 elements. In PDRI a low score corresponds to a project that has good scope definition or a project having a better chance for success and a high score corresponds to poor scope definition and lesser chance for success. Lower the score better is the project. Any project is rated out of 1000 with 70 points least that can be scored. A PDRI rating that is derived from feasibility study can cover more points regarding project aspects and will increase the success percentage of project by identifying hidden risks involved. The PDRI sheet for infrastructure project is derived by the work done by CII construction industry institute. A good PDRI score sheet can help in forecasting the completion rate, risks involved, attracting investors. Conducting a PDRI study which is derived from feasibility study have many advantages which will help in completion of any project with minimum problems. II. METHODOLGY The Methodology implemented to derive PDRI from feasibility study to develop a score sheet containing a total of 3 sections 1). BASIS OF PROJECT DESIGN 2). BASIS OF DESIGN 3). EXECUTION APPROACH Section 1 contains five sub sections, section 2 contains four subsections and Section 3 contains four subsections. Score card is prepared by rating these elements after studying the feasibility report and analyzing the report arranging all data given in feasibility report accordingly to the elements mentioned in score sheet. If the data is irrelevant or not corresponding to the project then it may be rated as NA= Not Applicable. There are 5 definition levels according to which rating is given starting from 1 to 5. Definition levels are defined as N/A= Not Applicable 1 = Complete Definition 2 = Minor Deficiencies 3 = Some Deficiencies 4 = Major Deficiencies 5 = Incomplete or Poor Definition After allotting respective definitions to all the 68 elements final score is calculated any score less than 300 is acceptable. But lesser the score more feasible the project will be. SECTION I. BASIS OF PROJECT DECISION A. Project Strategy A.1 Need & Purpose Documentation A.2 Investment Studies & Alternatives Assessments A.3 Key Team Member Coordination A.4 Public Involvement B. Owner/Operator Philosophies B.1 Design Philosophy RESEARCH ARTICLE OPEN ACCESS
  • 2. Mahirajsinh S. Parmar Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 12( Part 3), December 2014, pp.94-96 www.ijera.com 2 | P a g e B.2 Operating Philosophy B.3 Maintenance Philosophy B.4 Future Expansion & Alteration Considerations C. Project Funding and Timing C.1 Funding & Programming C.2 Preliminary Project Schedule C.3 Contingencies D. Project Requirements D.1 Project Objectives Statement D.2 Functional Classification & Use D.3 Evaluation of Compliance Requirements D.4 Existing Environmental Conditions D.5 Site Characteristics Available vs. Required D.6 Dismantling & Demolition Requirements D.7 Determination of Utility Impacts D.8 Lead/Discipline Scope of Work E. Value Analysis E.1 Value Engineering Procedures E.2 Design Simplification E.3 Material Alternatives Considered E.4 Constructability Procedures SECTION II. BASIS OF DESIGN F. Site Information F.1 Geotechnical Characteristics F.2 Hydrological Characteristics F.3 Surveys & Mapping F.4 Permitting Requirements F.5 Environmental Documentation F.6 Environmental Commitments & Mitigation F.7 Property Descriptions F.8 Right-of-Way Mapping & Site Issues G. Location and Geometry G.1 Schematic Layouts G.2 Horizontal & Vertical Alignment G.3 Cross-Sectional Elements G.4 Control of Access H. Associated Structures and Equipment H.1 Support Structures H.2 Hydraulic Structures H.3 Miscellaneous Elements H.4 Equipment List H.5 Equipment Utility Requirements I. Project Design Parameters I.1 Capacity I.2 Safety & Hazards I.3 Civil/Structural I.4 Mechanical/Equipment I.5 Electrical/Controls I.6 Operations/Maintenance SECTION III. EXECUTION APPROACH J. Land Acquisition Strategy J.1 Local Public Agencies Contracts & Agreements J.2 Long-Lead Parcel & Utility Adjustment Identification & Acquisition J.3 Utility Agreement & Joint-Use Contracts J.4 Land Appraisal Requirements J.5 Advance Land Acquisition Requirements K. Procurement Strategy K.1 Project Delivery Method & Contracting Strategies K.2 Long-Lead/Critical Equipment & Materials Identification K.3 Procurement Procedures & Plans K.4 Procurement Responsibility Matrix L. Project Control L.1 Right-of-Way & Utilities Cost Estimates L.2 Design & Construction Cost Estimates L.3 Project Cost Control L.4 Project Schedule Control L.5 Project Quality Assurance & Control M. Project Execution Plan M.1 Safety Procedures M.2 Owner Approval Requirements M.3 Documentation/Deliverables M.4 Computing & CADD/Model Requirements M.5 Design/Construction Plan & Approach M.6 Intercompany & Interagency Coordination & agreements M.7 Work Zone and Transportation Plan M.8 Project Completion Requirements These are the total 68 elements which will be rated from 0 to 5. Some elements which are irrelevant can be omitted from the score sheet and new elements can be created according to relevance with feasibility study or elements that are better suited. There is a cut off given of 200 points according to which percentage can be mentioned. Performance Parameter PDRI Score < 200 > 200 Cost Over Budget 1% 6% Schedule Behind Schedule 2% 12% Change Order Total Cost 7% 10% Calculation can be done accordingly about cost, schedule and change order. Pre-Planning can be done before hand keeping in mind such parameters. There are some key elements out of 68 elements which can influence the PDRI score more than other elements. It should be noted that these elements are given more preference while not only rating these elements but also while doing feasibility study. CONCLUSION The investigation carried out proved that the PDRI score card combined with feasibility report showed better success rate then PDRI and feasibility study done separately. Study was carried out on Intermodal transit hub, Bangalore, India. Even
  • 3. Mahirajsinh S. Parmar Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 12( Part 3), December 2014, pp.94-96 www.ijera.com 3 | P a g e though there were some problems regarding revenue generation from the project PDRI with feasibility report combined were able to generate some strong result. REFERENCES Journal Paper: [1]. Peter R. Dumont, SCOPE MANAGEMENT USING PROJECT DEFINITION RATING INDEX. Theses: [2]. Evan Bingham, Development of the Project Definition Rating Index (PDRI) For Infrastructure Projects. ARIZONA STATE UNIVERSITY, Dec-2010 [3]. Wang, Applying The Project Definition Rating Index Into Project Risk Management.Aug-2002 [4]. NASA pre-planning team, Project Definition Rating Index Used On NASA Facilities. April- 2000