Review on Study and Analysis of Various Automated Construction
Materials Tracking Technology
Shubham Bhagwat1,Rakesh kathe2, Amol Gojare3, Digvijay Patil4, Pranay Khare5
1,2,3,4Under Graduation Student, Department of Civil Engineering DYPSOET Pune, Maharashtra India
5Professor, Department of Civil Engineering, DYPSOET Pune, Maharashtra, India
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - This paper covers the literature review of various
automated construction materials tracking technology by
various researches on in field of construction project as the
proper amount of inventory will ensure that all construction
activities will be able to carry out according to the planned
schedules. Inadequate amount of inventory will result in job
stoppage due to materials required for conducting the work
could not be specified at time they are needed, waste of
labour working hours, and schedule delays Efficient
progress monitoring systems can help automate progress
inspections, reduce the risks of error, facilitate proper and
timely corrective actions, and prevent deviations in terms of
cost and schedule. This will help to understand the need of
implanting the automated monitoring system Paper shows
the reveal that there is a need for more proper technology to
be implemented in construction project in order to facilitate
materials tracking process and at the same time, reduce
dependency on paper work reports in inventory
management.
Key Words: material tracking, Inventory management ,
construction projects
1. INTRODUCTION
The Construction Industry Institute (CII) (CII 1986) has
defined materials management as “the planning and
controlling of all necessary efforts to insure that the
correct quality and quantity of materials and equipment
are appropriately specified in a timely manner, are
obtained at a reasonable cost, and are available when
needed.” Materials management is a system, not the
organization responsible for performing these tasks It is
an indispensable part of the project management which
can be integrated with engineering to provide an end
product that meets the client’s requirements and is cost
effective(Saurabh 2016). Accurate and timely information
of the progress in a regular repeated basis is needed for a
well maintained and efficient project control that will
ensure cost and time efficiency of the project. Hence, an
efficient on site data collection, a timely data analysis and
a communication of the results in a well interpreted way
are major concerns for construction
companies(loannies2015)
Recently, there have been efforts on automating
project monitoring which have shown the potential for
effective construction project control. One of the
automations applied to the construction industry is the
adoption of Building Information Modelling (BIM).
Commercial inspection software packages that use BIM
model to facilitate inspection process such as LATISTA,
Autodesk BIM 360 Field, Field 3D, xbim, etc. Offer to the
inspector the ability to use a mobile device (Tablet PC)
instead of paper documents. These software packages are
very effective at issues regarding document management,
but the inspection process itself has not been automated
since the inspector still has to manually navigate around
the BIM model while visually inspecting the building.
The lack and incomplete of up-to-date
information regarding on-site stock is caused by the poor
tracking and locating of materials in construction sites.
Thus, there is a need for a proper inventory management
in order for the materials to be tracked and located easily;
and without employing additional costs. Tracking of
materials and components in construction project is not
an easy task (saurabh2016) agreed that materials tracking
still remain as a big problem in construction jobsites.
(sang2018) in their research examined three case studies
of subcontractor-fabricator relations. In two of the cases,
there were work stoppages due to lack of materials. They
calculated baseline productivity and the loss of labour
efficiency in each case. Their research concluded that
inefficient materials management could lead to an
increase in the field labour hours of 50% or more.
This can eliminate paperwork, lower product and
operational costs, and reduce cycle times. However, there
is not much use of modern ict tools (e.g. Wireless
communication, bar-coding and radio frequency
identification (RFID). To the facilitate materials
management processes for tracking materials quickly,
accurately and easily (narimah2015)
1.1 AIM
Various Automated Construction Materials
Tracking Technology by which process or procedure is
performed inventory management of material
2. LITERATURE REVIEW
Sang young lee, research about the various radio-
frequency identification (RFID) process automation
reducing the labour, speeding work of execution of critical
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3426
business processes. RFID recognition about 99 % of input
and output and location indicated based on tracking
management system it helps improve supply chain
efficiency.[ I ]
Pradip D. Nimbalkar, studied the automated
monitoring system in construction of road project and his
research work about the need of implementing various
automated monitoring system, creating awareness and
interest about learning and implementation rapid
developing monitoring system of road project. Bell and
mccullouch (1988) suggest the barcode application in
construction industry [ II ]
Saurabh Badjate he was found various automated
tracking system can be successful the project and 50 % of
the reducing inventory management cost.His used RFID
Tags, Readers, Barcodes, GPS, GIS collect data about the
material with reasonable accurancy, Identify, material
tracking, location of material. [ III ]
Mingyuan Zhang, Study the various sensor-based
technology adopted in construction industry for the safety
management like various accidents in construction
projects, locating sensor based technology.
Purpose of safety management
 Quality inspection of construction
material
 Management for workers like health and
safety.
 Structural health monitoring.
 Safety training and education.
 Highly dangerous operations
management.[ IV ]
Piotr Nowotarskia, Real Time Location System,
(RTLS) can be used in construction for tracking people and
assets. This idea with results of the research performed
with Bluetooth RTLS system used for tracking objects in
the building planned renovation. [ V ]
3. CONCLUSION
Overview of literature that shows the automated
materials tracking system was found feasible and can be
successfully applied on future construction projects. The
integrated, automated materials tracking system
consisting of passive RFID tags, reader. Handheld pc is
able to collect data about the materials with reasonable
accuracy, identify and track materials, and locate materials
in the supply chain
ACKNOWLEDGEMENT
I have a great pleasure to express my deep sense of
gratitude and sincere regards to my Guide Prof. Pranay
Khare) for his guidance and friendly discussion which
helped me immensely in selecting this topic. His generous
encouragement throughout my dissertation work helped
me in completing this project work. I would like to thank
our Head of Civil Engineering Department Dr. Nagesh
shelke for allowing me to do this project. He has
immensely helped in providing all opportunities and
facilities for the project work. I would also like to thank Dr.
Ashok Kasnale, Principal, Dr D Y Patil School of
Engineering and Technology, for providing all facilities at
the right period of time. I am thankful to all the faculty
members of Civil Engineering and library staff for helping
me in this work. Finally, I would like to thank all those who
directly or indirectly helped me during my work.
REFERENCES
1 Sang Young Lee, “RFID Materials for the logistic
Information.”, International Journal of Applied
Engineering Research ISSN 0973-4562 Volume 13,
Number 1 (2018)
2 Piotr Nowotarskia Jerzy Pasławskia Maciej
Skrzypczakb Radosław Krygier, “RTLS systems as a
Lean Management tool for productivity
improvement.” 34th International Symposium on
Automation and Robotics in Construction (ISARC
2017)
3 Mingyuan Zhang, Tianzhuo Cao and Xuefeng Zhao,
“Applying Sensor-Based Technology to Improve
Construction Safety Management, Department of
Construction Management, Dalian University of
Technology, Dalian 116000, China(2017)
4 Saurabh Badjate, Prof. Pranay Khare “Survey and
Analysis of Automated Civil Construction Material
Tracking.” International Engineering Research
Journal (IERJ) Volume 1 Issue 11 Page 1517-1520,
2015, ISSN 2395-1621(2016)
5 Saurabh Badjate1, Pranay Khare, “Study of Various
Automated Construction Materials Tracking
Technology.”(2016)
6 Saurabh Badjat, Prof. Pranay Khare, “A Model On
Automated Construction Material Tracking.”
International Journal on Recent and Innovation
Trends in Computing and Communication, Volume: 4
Issue: 6, ISSN: 2321-8169,page 445 – 446,2016
7 Pradip D. Nimbalkar, S. S. Valunjkar, Amarsinh B.
Landage “A Review of Automated Monitoring System
in Construction of Road Project, Proc. of the 32nd CIB
W78 Conference 2015, 27th-29th 2015, Eindhoven,
The Netherlands,2015
8 Narimah Kasim, “Intelligent Materials Tracking
System for Construction Projects Management,
International Journal of Engineering Research
Volume No.5, ISSN:2319-6890(online),2347-
5013,Issue Special 1 pp : 197-199
8 & 9 Jan 2016
9 Marianna Kopsida, oannis Brilakis , Patricio Antonio
Vela “A Review of Automated Construction Progress
Monitoring and Inspection Methods, Copyright ©2015
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3427
Published by ITB Journal Publisher, ISSN: 2337-
5779,The 2nd International Conference on
Sustainable Infrastructure & Built Environment
(SIBE), 19-20 November 2013, Bandung, Indonesia.
10 Akinci, B., Patton, M., and Ergen, E. (2002). “Utilizing
radio frequency identification on precast concrete
components – supplier’s perspective.” Proceedings of
19th ISARC, Washington, DC, 381-386.
11 Aziz, Z., Anumba, C., Ruikar, D., Carrillo, P. And
Bouchlaghem, D. ‘‘Intelligent wireless web services for
construction—a review of the enabling technologies’’,
Autom. Constr., 15(2), pp. 113–123 (2006)
12 Caron, F., Navabzadeh Razavi, S., Song, J., Vanheeghe,
P., Duflos, E., Caldas, C.H., Haas, C.T. (2006). “Models
for locating RFID nodes.” Joint International
Conference on Computing and Decision Making in
Civil and Building Engineering (ICCCBE), Montreal,
Canada.
13 Caldas, C.H., Torrent, D.J. and Haas, C.T. ‘‘Using global
positioning system to improve materials-processing
on industrial projects’’, J. Constr. Eng. Manage., ASCE,
132(7), pp. 741–749 (2006).
14 Construction Industry Institute (CII). (1988). “Project
materials management primer.” Publication 7-2,
November 1988
15 Javad Majrouhi Sardroud, “Influence of RFID
technology on automated management of
construction materials and components”, Scientia
Iranica, Open Access funded by Sharif University of
Technology, 30 April 2012, pages 381-392.
16 Narimah Kasim, Aryani Ahmad Latiffi, Mohamad
Syazli Fathi , “RFID Technology for Materials
Management in Construction Projects – A Review”,
international Journal of Construction Engineering and
Management, Dated 2nd September 2013, Pages 7-12
17 Narimah Kasim, Rozlin Zaina, Alina Shamsuddin,
Naadira Che Kamarudin, “Implementation of RFID
Technology for Real-Time Materials Tracking Process
in Construction Projects”, 2012 IEEE Colloquium on
Humanities, Science & Engineering Research (CHUSER
2012), December 3-4, 2012, Kota Kinabalu, Sabah,
Malaysia, Pages 472-476
18 Kasim, N. B. (2008). Improving Materials Management
on Construction Projects. Loughborough University:
phd Thesis. Kasim, N. B. (2010). Towards a
Framework for ICT-Enabled Materials Management in
Complex Projects. Journal of Techno-Social.
19 Saee, G., Brown, A., Knight, M. And Winchester, M.
‘‘Delivery of pedestrian real-time location and routing
information to mobile architectural guide’’, Autom.
Constr., 19(4), pp. 502–517 (2010).
20 Song, J. (2005). Tracking the Location of Materials on
Construction Projects. University of Texas: phd Thesis.
21 Song, J., Haas, C. T., & Caldas, C. H. (2006). Tracking the
Location of Materials on Construction Job Sites.
Journal of Construction Engineering and
Management,132(9), pp. 911-918.
22 T. Phani Madhavi , Steve Varghese Mathew, Roy
Sasidharan, “Material Management in Construction –
A Case Study”, IJRET: International Journal of
Research in Engineering and Technology,November-
2013, pages-401 to 403.
23 Patel, K. V. & Vyas, C. M. (2011). Construction
Materials Management on Project Sites. National
Conference on Recent Trends in Engineering &
Technology, Gujarat.
24 Http://www.corerfid.com/
25 Https://www.atlasrfidstore.com/
26 Http://www.technovelgy.com/ct/technology-
article.asp
[1] Http://www.impinj.com/resources/about-rfid/

More Related Content

What's hot

New approaches of Data Mining for the Internet of things with systems: Litera...
New approaches of Data Mining for the Internet of things with systems: Litera...New approaches of Data Mining for the Internet of things with systems: Litera...
New approaches of Data Mining for the Internet of things with systems: Litera...IRJET Journal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
IRJET- Instant Exam Paper Generator
IRJET- Instant Exam Paper GeneratorIRJET- Instant Exam Paper Generator
IRJET- Instant Exam Paper GeneratorIRJET Journal
 
Electronics health records and business analytics a cloud based approach
Electronics health records and business analytics a cloud based approachElectronics health records and business analytics a cloud based approach
Electronics health records and business analytics a cloud based approachIAEME Publication
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET-  	  Development of a Neural Network based Model for Construction Proje...IRJET-  	  Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...IRJET Journal
 

What's hot (7)

New approaches of Data Mining for the Internet of things with systems: Litera...
New approaches of Data Mining for the Internet of things with systems: Litera...New approaches of Data Mining for the Internet of things with systems: Litera...
New approaches of Data Mining for the Internet of things with systems: Litera...
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET- Instant Exam Paper Generator
IRJET- Instant Exam Paper GeneratorIRJET- Instant Exam Paper Generator
IRJET- Instant Exam Paper Generator
 
Electronics health records and business analytics a cloud based approach
Electronics health records and business analytics a cloud based approachElectronics health records and business analytics a cloud based approach
Electronics health records and business analytics a cloud based approach
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET-  	  Development of a Neural Network based Model for Construction Proje...IRJET-  	  Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
 

Similar to IRJET- Review on Study and Analysis of Various Automated Construction Materials Tracking Technology

Material management – using barcode system
Material management – using barcode systemMaterial management – using barcode system
Material management – using barcode systemvivatechijri
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET Journal
 
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheorySenstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheoryIRJET Journal
 
Student Attendance Management System by Using Fingerprint Reader
Student Attendance Management System by Using Fingerprint ReaderStudent Attendance Management System by Using Fingerprint Reader
Student Attendance Management System by Using Fingerprint ReaderIRJET Journal
 
IRJET - Development of Cloud System for IoT Applications
IRJET - Development of Cloud System for IoT ApplicationsIRJET - Development of Cloud System for IoT Applications
IRJET - Development of Cloud System for IoT ApplicationsIRJET Journal
 
Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...Ricardo Magno Antunes
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...IJECEIAES
 
Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...IAEME Publication
 
STOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKET
STOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKETSTOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKET
STOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKETIRJET Journal
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
Cloud management and monitoring: a systematic mapping study
Cloud management and monitoring: a systematic mapping  studyCloud management and monitoring: a systematic mapping  study
Cloud management and monitoring: a systematic mapping studynooriasukmaningtyas
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
IRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysisIRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysisIRJET Journal
 
SMART WASTE MANAGEMENT SYSTEM
SMART WASTE MANAGEMENT SYSTEMSMART WASTE MANAGEMENT SYSTEM
SMART WASTE MANAGEMENT SYSTEMIRJET Journal
 
A Smart ITS based Sensor Network for Transport System with Integration of Io...
A Smart ITS based Sensor Network for Transport System with Integration of  Io...A Smart ITS based Sensor Network for Transport System with Integration of  Io...
A Smart ITS based Sensor Network for Transport System with Integration of Io...IRJET Journal
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...IRJET Journal
 
Data Management for Internet of things : A Survey and Discussion
Data Management for Internet of things : A Survey and DiscussionData Management for Internet of things : A Survey and Discussion
Data Management for Internet of things : A Survey and DiscussionIRJET Journal
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...IRJET Journal
 

Similar to IRJET- Review on Study and Analysis of Various Automated Construction Materials Tracking Technology (20)

matecconf_iconbee2019_05001.pdf
matecconf_iconbee2019_05001.pdfmatecconf_iconbee2019_05001.pdf
matecconf_iconbee2019_05001.pdf
 
Radio frequency identification based materials tracking system for construct...
Radio frequency identification based materials tracking system  for construct...Radio frequency identification based materials tracking system  for construct...
Radio frequency identification based materials tracking system for construct...
 
Material management – using barcode system
Material management – using barcode systemMaterial management – using barcode system
Material management – using barcode system
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set TheorySenstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
 
Student Attendance Management System by Using Fingerprint Reader
Student Attendance Management System by Using Fingerprint ReaderStudent Attendance Management System by Using Fingerprint Reader
Student Attendance Management System by Using Fingerprint Reader
 
IRJET - Development of Cloud System for IoT Applications
IRJET - Development of Cloud System for IoT ApplicationsIRJET - Development of Cloud System for IoT Applications
IRJET - Development of Cloud System for IoT Applications
 
Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...Envision of an Integrated Information System for Projectdriven Production in ...
Envision of an Integrated Information System for Projectdriven Production in ...
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...
 
Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...Development of a web based decision support system for materials selection in...
Development of a web based decision support system for materials selection in...
 
STOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKET
STOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKETSTOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKET
STOCKSENTIX: A MACHINE LEARNING APPROACH TO STOCKMARKET
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
Cloud management and monitoring: a systematic mapping study
Cloud management and monitoring: a systematic mapping  studyCloud management and monitoring: a systematic mapping  study
Cloud management and monitoring: a systematic mapping study
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysisIRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysis
 
SMART WASTE MANAGEMENT SYSTEM
SMART WASTE MANAGEMENT SYSTEMSMART WASTE MANAGEMENT SYSTEM
SMART WASTE MANAGEMENT SYSTEM
 
A Smart ITS based Sensor Network for Transport System with Integration of Io...
A Smart ITS based Sensor Network for Transport System with Integration of  Io...A Smart ITS based Sensor Network for Transport System with Integration of  Io...
A Smart ITS based Sensor Network for Transport System with Integration of Io...
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
Data Management for Internet of things : A Survey and Discussion
Data Management for Internet of things : A Survey and DiscussionData Management for Internet of things : A Survey and Discussion
Data Management for Internet of things : A Survey and Discussion
 
IRJET- Efficient Techniques of Construction Material Management in Constr...
IRJET-  	  Efficient Techniques of Construction Material Management in Constr...IRJET-  	  Efficient Techniques of Construction Material Management in Constr...
IRJET- Efficient Techniques of Construction Material Management in Constr...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 

Recently uploaded (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

IRJET- Review on Study and Analysis of Various Automated Construction Materials Tracking Technology

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3425 Review on Study and Analysis of Various Automated Construction Materials Tracking Technology Shubham Bhagwat1,Rakesh kathe2, Amol Gojare3, Digvijay Patil4, Pranay Khare5 1,2,3,4Under Graduation Student, Department of Civil Engineering DYPSOET Pune, Maharashtra India 5Professor, Department of Civil Engineering, DYPSOET Pune, Maharashtra, India ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - This paper covers the literature review of various automated construction materials tracking technology by various researches on in field of construction project as the proper amount of inventory will ensure that all construction activities will be able to carry out according to the planned schedules. Inadequate amount of inventory will result in job stoppage due to materials required for conducting the work could not be specified at time they are needed, waste of labour working hours, and schedule delays Efficient progress monitoring systems can help automate progress inspections, reduce the risks of error, facilitate proper and timely corrective actions, and prevent deviations in terms of cost and schedule. This will help to understand the need of implanting the automated monitoring system Paper shows the reveal that there is a need for more proper technology to be implemented in construction project in order to facilitate materials tracking process and at the same time, reduce dependency on paper work reports in inventory management. Key Words: material tracking, Inventory management , construction projects 1. INTRODUCTION The Construction Industry Institute (CII) (CII 1986) has defined materials management as “the planning and controlling of all necessary efforts to insure that the correct quality and quantity of materials and equipment are appropriately specified in a timely manner, are obtained at a reasonable cost, and are available when needed.” Materials management is a system, not the organization responsible for performing these tasks It is an indispensable part of the project management which can be integrated with engineering to provide an end product that meets the client’s requirements and is cost effective(Saurabh 2016). Accurate and timely information of the progress in a regular repeated basis is needed for a well maintained and efficient project control that will ensure cost and time efficiency of the project. Hence, an efficient on site data collection, a timely data analysis and a communication of the results in a well interpreted way are major concerns for construction companies(loannies2015) Recently, there have been efforts on automating project monitoring which have shown the potential for effective construction project control. One of the automations applied to the construction industry is the adoption of Building Information Modelling (BIM). Commercial inspection software packages that use BIM model to facilitate inspection process such as LATISTA, Autodesk BIM 360 Field, Field 3D, xbim, etc. Offer to the inspector the ability to use a mobile device (Tablet PC) instead of paper documents. These software packages are very effective at issues regarding document management, but the inspection process itself has not been automated since the inspector still has to manually navigate around the BIM model while visually inspecting the building. The lack and incomplete of up-to-date information regarding on-site stock is caused by the poor tracking and locating of materials in construction sites. Thus, there is a need for a proper inventory management in order for the materials to be tracked and located easily; and without employing additional costs. Tracking of materials and components in construction project is not an easy task (saurabh2016) agreed that materials tracking still remain as a big problem in construction jobsites. (sang2018) in their research examined three case studies of subcontractor-fabricator relations. In two of the cases, there were work stoppages due to lack of materials. They calculated baseline productivity and the loss of labour efficiency in each case. Their research concluded that inefficient materials management could lead to an increase in the field labour hours of 50% or more. This can eliminate paperwork, lower product and operational costs, and reduce cycle times. However, there is not much use of modern ict tools (e.g. Wireless communication, bar-coding and radio frequency identification (RFID). To the facilitate materials management processes for tracking materials quickly, accurately and easily (narimah2015) 1.1 AIM Various Automated Construction Materials Tracking Technology by which process or procedure is performed inventory management of material 2. LITERATURE REVIEW Sang young lee, research about the various radio- frequency identification (RFID) process automation reducing the labour, speeding work of execution of critical
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3426 business processes. RFID recognition about 99 % of input and output and location indicated based on tracking management system it helps improve supply chain efficiency.[ I ] Pradip D. Nimbalkar, studied the automated monitoring system in construction of road project and his research work about the need of implementing various automated monitoring system, creating awareness and interest about learning and implementation rapid developing monitoring system of road project. Bell and mccullouch (1988) suggest the barcode application in construction industry [ II ] Saurabh Badjate he was found various automated tracking system can be successful the project and 50 % of the reducing inventory management cost.His used RFID Tags, Readers, Barcodes, GPS, GIS collect data about the material with reasonable accurancy, Identify, material tracking, location of material. [ III ] Mingyuan Zhang, Study the various sensor-based technology adopted in construction industry for the safety management like various accidents in construction projects, locating sensor based technology. Purpose of safety management  Quality inspection of construction material  Management for workers like health and safety.  Structural health monitoring.  Safety training and education.  Highly dangerous operations management.[ IV ] Piotr Nowotarskia, Real Time Location System, (RTLS) can be used in construction for tracking people and assets. This idea with results of the research performed with Bluetooth RTLS system used for tracking objects in the building planned renovation. [ V ] 3. CONCLUSION Overview of literature that shows the automated materials tracking system was found feasible and can be successfully applied on future construction projects. The integrated, automated materials tracking system consisting of passive RFID tags, reader. Handheld pc is able to collect data about the materials with reasonable accuracy, identify and track materials, and locate materials in the supply chain ACKNOWLEDGEMENT I have a great pleasure to express my deep sense of gratitude and sincere regards to my Guide Prof. Pranay Khare) for his guidance and friendly discussion which helped me immensely in selecting this topic. His generous encouragement throughout my dissertation work helped me in completing this project work. I would like to thank our Head of Civil Engineering Department Dr. Nagesh shelke for allowing me to do this project. He has immensely helped in providing all opportunities and facilities for the project work. I would also like to thank Dr. Ashok Kasnale, Principal, Dr D Y Patil School of Engineering and Technology, for providing all facilities at the right period of time. I am thankful to all the faculty members of Civil Engineering and library staff for helping me in this work. Finally, I would like to thank all those who directly or indirectly helped me during my work. REFERENCES 1 Sang Young Lee, “RFID Materials for the logistic Information.”, International Journal of Applied Engineering Research ISSN 0973-4562 Volume 13, Number 1 (2018) 2 Piotr Nowotarskia Jerzy Pasławskia Maciej Skrzypczakb Radosław Krygier, “RTLS systems as a Lean Management tool for productivity improvement.” 34th International Symposium on Automation and Robotics in Construction (ISARC 2017) 3 Mingyuan Zhang, Tianzhuo Cao and Xuefeng Zhao, “Applying Sensor-Based Technology to Improve Construction Safety Management, Department of Construction Management, Dalian University of Technology, Dalian 116000, China(2017) 4 Saurabh Badjate, Prof. Pranay Khare “Survey and Analysis of Automated Civil Construction Material Tracking.” International Engineering Research Journal (IERJ) Volume 1 Issue 11 Page 1517-1520, 2015, ISSN 2395-1621(2016) 5 Saurabh Badjate1, Pranay Khare, “Study of Various Automated Construction Materials Tracking Technology.”(2016) 6 Saurabh Badjat, Prof. Pranay Khare, “A Model On Automated Construction Material Tracking.” International Journal on Recent and Innovation Trends in Computing and Communication, Volume: 4 Issue: 6, ISSN: 2321-8169,page 445 – 446,2016 7 Pradip D. Nimbalkar, S. S. Valunjkar, Amarsinh B. Landage “A Review of Automated Monitoring System in Construction of Road Project, Proc. of the 32nd CIB W78 Conference 2015, 27th-29th 2015, Eindhoven, The Netherlands,2015 8 Narimah Kasim, “Intelligent Materials Tracking System for Construction Projects Management, International Journal of Engineering Research Volume No.5, ISSN:2319-6890(online),2347- 5013,Issue Special 1 pp : 197-199 8 & 9 Jan 2016 9 Marianna Kopsida, oannis Brilakis , Patricio Antonio Vela “A Review of Automated Construction Progress Monitoring and Inspection Methods, Copyright ©2015
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 3427 Published by ITB Journal Publisher, ISSN: 2337- 5779,The 2nd International Conference on Sustainable Infrastructure & Built Environment (SIBE), 19-20 November 2013, Bandung, Indonesia. 10 Akinci, B., Patton, M., and Ergen, E. (2002). “Utilizing radio frequency identification on precast concrete components – supplier’s perspective.” Proceedings of 19th ISARC, Washington, DC, 381-386. 11 Aziz, Z., Anumba, C., Ruikar, D., Carrillo, P. And Bouchlaghem, D. ‘‘Intelligent wireless web services for construction—a review of the enabling technologies’’, Autom. Constr., 15(2), pp. 113–123 (2006) 12 Caron, F., Navabzadeh Razavi, S., Song, J., Vanheeghe, P., Duflos, E., Caldas, C.H., Haas, C.T. (2006). “Models for locating RFID nodes.” Joint International Conference on Computing and Decision Making in Civil and Building Engineering (ICCCBE), Montreal, Canada. 13 Caldas, C.H., Torrent, D.J. and Haas, C.T. ‘‘Using global positioning system to improve materials-processing on industrial projects’’, J. Constr. Eng. Manage., ASCE, 132(7), pp. 741–749 (2006). 14 Construction Industry Institute (CII). (1988). “Project materials management primer.” Publication 7-2, November 1988 15 Javad Majrouhi Sardroud, “Influence of RFID technology on automated management of construction materials and components”, Scientia Iranica, Open Access funded by Sharif University of Technology, 30 April 2012, pages 381-392. 16 Narimah Kasim, Aryani Ahmad Latiffi, Mohamad Syazli Fathi , “RFID Technology for Materials Management in Construction Projects – A Review”, international Journal of Construction Engineering and Management, Dated 2nd September 2013, Pages 7-12 17 Narimah Kasim, Rozlin Zaina, Alina Shamsuddin, Naadira Che Kamarudin, “Implementation of RFID Technology for Real-Time Materials Tracking Process in Construction Projects”, 2012 IEEE Colloquium on Humanities, Science & Engineering Research (CHUSER 2012), December 3-4, 2012, Kota Kinabalu, Sabah, Malaysia, Pages 472-476 18 Kasim, N. B. (2008). Improving Materials Management on Construction Projects. Loughborough University: phd Thesis. Kasim, N. B. (2010). Towards a Framework for ICT-Enabled Materials Management in Complex Projects. Journal of Techno-Social. 19 Saee, G., Brown, A., Knight, M. And Winchester, M. ‘‘Delivery of pedestrian real-time location and routing information to mobile architectural guide’’, Autom. Constr., 19(4), pp. 502–517 (2010). 20 Song, J. (2005). Tracking the Location of Materials on Construction Projects. University of Texas: phd Thesis. 21 Song, J., Haas, C. T., & Caldas, C. H. (2006). Tracking the Location of Materials on Construction Job Sites. Journal of Construction Engineering and Management,132(9), pp. 911-918. 22 T. Phani Madhavi , Steve Varghese Mathew, Roy Sasidharan, “Material Management in Construction – A Case Study”, IJRET: International Journal of Research in Engineering and Technology,November- 2013, pages-401 to 403. 23 Patel, K. V. & Vyas, C. M. (2011). Construction Materials Management on Project Sites. National Conference on Recent Trends in Engineering & Technology, Gujarat. 24 Http://www.corerfid.com/ 25 Https://www.atlasrfidstore.com/ 26 Http://www.technovelgy.com/ct/technology- article.asp [1] Http://www.impinj.com/resources/about-rfid/