Submit Search
Upload
Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
•
0 likes
•
24 views
IRJET Journal
Follow
https://www.irjet.net/archives/V4/i6/IRJET-V4I6422.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 2
Download now
Download to read offline
Recommended
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
IRJET Journal
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
IJERA Editor
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
IRJET Journal
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
IJERA Editor
Ijciet 08 04_220
Ijciet 08 04_220
IAEME Publication
Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysis
eSAT Publishing House
20320140507006 2-3
20320140507006 2-3
IAEME Publication
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET Journal
Recommended
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
IRJET Journal
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
IJERA Editor
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
IRJET Journal
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
Project Definition Rating Index with Feasibility Study in Infrastructure Proj...
IJERA Editor
Ijciet 08 04_220
Ijciet 08 04_220
IAEME Publication
Evaluate the effective resource management through pert analysis
Evaluate the effective resource management through pert analysis
eSAT Publishing House
20320140507006 2-3
20320140507006 2-3
IAEME Publication
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET- A Study on Factors Affecting Estimation of Construction Project
IRJET Journal
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
IJERA Editor
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
ijceronline
50120130405029
50120130405029
IAEME Publication
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET Journal
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
Thesis Proposal Presentation
Thesis Proposal Presentation
Turki Alshammary (CBAP, PMI-PBA, PMP)
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programming
Mazen Ghareb
Modeling Delay Percentage of Construction Projects in Egypt Using Statistical...
Modeling Delay Percentage of Construction Projects in Egypt Using Statistical...
IOSR Journals
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...
ijtsrd
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
IRJET Journal
Evaluation of Expression in Query Processing
Evaluation of Expression in Query Processing
Neel Shah
Application of Genetic Algorithm in Software Engineering: A Review
Application of Genetic Algorithm in Software Engineering: A Review
IRJESJOURNAL
Dj4201737746
Dj4201737746
IJERA Editor
IRJET - Optimum Utilization of Construction Resources: A Review
IRJET - Optimum Utilization of Construction Resources: A Review
IRJET Journal
ONE HIDDEN LAYER ANFIS MODEL FOR OOS DEVELOPMENT EFFORT ESTIMATION
ONE HIDDEN LAYER ANFIS MODEL FOR OOS DEVELOPMENT EFFORT ESTIMATION
International Journal of Technical Research & Application
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET Journal
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
IRJET Journal
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa Diagram
IJAEMSJORNAL
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
IRJET Journal
Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis
IOSR Journals
More Related Content
What's hot
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
IJERA Editor
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
ijceronline
50120130405029
50120130405029
IAEME Publication
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET Journal
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
Thesis Proposal Presentation
Thesis Proposal Presentation
Turki Alshammary (CBAP, PMI-PBA, PMP)
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET Journal
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programming
Mazen Ghareb
Modeling Delay Percentage of Construction Projects in Egypt Using Statistical...
Modeling Delay Percentage of Construction Projects in Egypt Using Statistical...
IOSR Journals
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...
ijtsrd
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
IRJET Journal
Evaluation of Expression in Query Processing
Evaluation of Expression in Query Processing
Neel Shah
Application of Genetic Algorithm in Software Engineering: A Review
Application of Genetic Algorithm in Software Engineering: A Review
IRJESJOURNAL
Dj4201737746
Dj4201737746
IJERA Editor
IRJET - Optimum Utilization of Construction Resources: A Review
IRJET - Optimum Utilization of Construction Resources: A Review
IRJET Journal
ONE HIDDEN LAYER ANFIS MODEL FOR OOS DEVELOPMENT EFFORT ESTIMATION
ONE HIDDEN LAYER ANFIS MODEL FOR OOS DEVELOPMENT EFFORT ESTIMATION
International Journal of Technical Research & Application
What's hot
(17)
Efficient Planning Scheduling and Delay Analysis of Residential Project
Efficient Planning Scheduling and Delay Analysis of Residential Project
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study
50120130405029
50120130405029
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Thesis Proposal Presentation
Thesis Proposal Presentation
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
IRJET- A Study on Factors Affecting Estimation of Construction Project : Conc...
Iceemas 119- state of art of metrics of aspect oriented programming
Iceemas 119- state of art of metrics of aspect oriented programming
Modeling Delay Percentage of Construction Projects in Egypt Using Statistical...
Modeling Delay Percentage of Construction Projects in Egypt Using Statistical...
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Investigating the Effectiveness of Construction Practices in Delayed Resident...
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Evaluation of Expression in Query Processing
Evaluation of Expression in Query Processing
Application of Genetic Algorithm in Software Engineering: A Review
Application of Genetic Algorithm in Software Engineering: A Review
Dj4201737746
Dj4201737746
IRJET - Optimum Utilization of Construction Resources: A Review
IRJET - Optimum Utilization of Construction Resources: A Review
ONE HIDDEN LAYER ANFIS MODEL FOR OOS DEVELOPMENT EFFORT ESTIMATION
ONE HIDDEN LAYER ANFIS MODEL FOR OOS DEVELOPMENT EFFORT ESTIMATION
Similar to Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET Journal
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
IRJET Journal
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa Diagram
IJAEMSJORNAL
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
IRJET Journal
Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis
IOSR Journals
B1303020508
B1303020508
IOSR Journals
IRJET- Review on Scheduling using Dependency Structure Matrix
IRJET- Review on Scheduling using Dependency Structure Matrix
IRJET Journal
Graph-based analysis of resource dependencies in project networks
Graph-based analysis of resource dependencies in project networks
Gurdal Ertek
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
IRJET Journal
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET Journal
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
IRJET Journal
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
IRJET Journal
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
IJERA Editor
Effective techniques in cost optimization of construction project an review
Effective techniques in cost optimization of construction project an review
eSAT Journals
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
IAEME Publication
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
IAEME Publication
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET Journal
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
IAEME Publication
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement c...
IAEME Publication
Similar to Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
(20)
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
Delay Analysis in EPC Projects using Ishikawa Diagram
Delay Analysis in EPC Projects using Ishikawa Diagram
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
Statistical Methods for Construction Delay Analysis
Statistical Methods for Construction Delay Analysis
B1303020508
B1303020508
IRJET- Review on Scheduling using Dependency Structure Matrix
IRJET- Review on Scheduling using Dependency Structure Matrix
Graph-based analysis of resource dependencies in project networks
Graph-based analysis of resource dependencies in project networks
A Review on Earned Value Management and Earned Schedule Method for Constructi...
A Review on Earned Value Management and Earned Schedule Method for Constructi...
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
Does a Hybrid Approach of Agile and Plan-Driven Methods Work Better for IT Sy...
Effective techniques in cost optimization of construction project an review
Effective techniques in cost optimization of construction project an review
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of engineering procurement c...
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Online crime reporting system project.pdf
Online crime reporting system project.pdf
Kamal Acharya
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Er.Sonali Nasikkar
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
Mathias Magdowski
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
josephjonse
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
MANASINANDKISHORDEOR
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
Sheetal Jain
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
RashidFaridChishti
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
AshishSingh1301
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdf
mahaffeycheryld
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
T.D. Shashikala
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
Mustafa Ahmed
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
Basics of Relay for Engineering Students
Basics of Relay for Engineering Students
kannan348865
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
NareenAsad
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
amrabdallah9
Raashid final report on Embedded Systems
Raashid final report on Embedded Systems
RaashidFaiyazSheikh
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
IJECEIAES
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
EMMANUELLEFRANCEHELI
Recently uploaded
(20)
Online crime reporting system project.pdf
Online crime reporting system project.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdf
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
Basics of Relay for Engineering Students
Basics of Relay for Engineering Students
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
Raashid final report on Embedded Systems
Raashid final report on Embedded Systems
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
Review Senstivity Analysis of Project Scheduling using Fuzzy Set Theory
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2166 REVIEW SENSTIVITY ANALYSIS OF PROJECT SCHEDULING USING FUZZY SET THEORY Batan Sharma1, Dr. Mukesh Pandey2 1PG scholar’s, Civil Engineering Department, ITM University, Gwalior 2HOD, Civil Engineering Department, ITM University, Gwalior -----------------------------------------------------------------------***---------------------------------------------------------------------- ABSTRACT: - This paper represents the practical applications of fuzzy set theory in the predicting delay in construction industry. The construction industry is one of the most important aspects of a civil engineering structure. The fuzzy set theory is an important part of construction industry. The fuzzy sets are the sets which are introduced by Lotfi a Zadeh and Dieter Khana in 1965. There are many construction problems in a construction industry which effects on the construction in different wages, like delay in construction, construction cost, material used on side etc. due to these problems, we caused delay in construction. there are many methods which estimation the delay duration of activity in a construction industry. The fuzzy set theory is one of them. This method helps us to minimize the product of sum of the membership association for a certain frequency of occurrence and corresponding frequency of occurrence. The CPM (critical path method) and PERT (Program Evaluation and Review Technique) are used in the activity delay. Fuzzy logic provides a simple way to solves a definite conclusion based upon vague, missing input information. The fuzzy logic is a form of value is deal with the reasoning i.e., approximate rather than fixed. Keywords: - CPM, PERT, Fuzzy logic, Delay, Construction problem. 1. INTRODUCTION The fuzzy set theory plays an important part in the construction industry, it has been studying over the last 50 years. The fuzzy logic set theory is introduced by the zadeh in his paper on Fuzzy set. the fuzzy logic set theory is now applied to problems in construction engineering, business, medical, related health sciences, and the natural sciences etc. In an effort to gain a better understanding of the use of fuzzy logic set theory in construction industry management research and to provide a use for future research, a literature review of fuzzy set theory in construction industry management has been conducted. In 1956, the critical path method (CPM) was implemented on a computer to schedule construction project. In 1957, a technique implements called the program evaluation review technique (PERT) has developed to integrate the coordinate contractor working on a single project. Recently a method called graphical evaluation and review techniques (GERT) was developed. It is the simplest method to say the dovetailed in the construction industry. It is useful when performance of all the operations is not necessary for the completion of projects. All the methods used in the fuzzy set theory has been totally divided into different two groups deterministic and probabilistic. When the information is used for a particular method and which is known during the analysis is called as deterministic, the critical path method and bar chart is define as the deterministic. In the probabilistic method every parameter is generally expressing in terms of mean, coefficient of variation, standard deviation etc. program evaluation and review technique, and graphical evaluation and review technique can be classified as a probabilistic method. However different probabilistic method is used with various degrees of complexity in construction engineering. Now day parameter is expressed in mathematical term, because classical probability theory fails to inaccurate the information. So these linguistic variables can be used in a mathematical form by fuzzy sets and system theory. The all problem related to weather and labor delay can be solved in paper using these concepts of fuzzy sets theory. 2. LITERATURE REVIEW The various literatures are studied to get an overview of the factors responsible for a construction delay in the construction industry and we studied the various uses of the fuzzy logic set theory in
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2167 various fields. This paper helps me to understands the fuzzy logic set theory. Pandey M.K, Dandotiya A, Trivedi M.K, Bhadoriya S.S, Ramasesh G.R. “Delay Computation Using Fuzzy Logic Approach” the author use the fuzzy logic set theory, which helps the author to find out the total delay duration on the construction site. Initially the research is based on the real project executed in Gwalior (mp), and find the delay duration due to shortage of materials and lack of operators. after that the author apply the fuzzy set theory on project with linguistic and membership values. The writer gets the nearly same value in his research. Bilal M. Ayyab and Achintya Haldar “The project scheduling using fuzzy set concepts” this paper analyzed the project scheduling method using fuzzy set which helps us to find out the delay duration in any completed project. In this paper author use the linguistic function along with membership function to find out the delay duration in any project. one of the important use of this technique is that it can be easily implemented in existing computer programs for project scheduling. Shruti singh, dr. M.K trivedi “APPLICATION OF FUZZY LOGIC IN DELAY ANALYSIS IN CONSTRUCTION” this paper represents the application of fuzzy logic in analysis of delays in construction industry using fuzzy toolbox of MATLAB program software. The author takes the different factor of delay labor related, project related, consultant related, contractor related, external factor, owner related, material related, environment related, design related, equipment related etc. a case study and an interview was done by a author in housing project in Gwalior ,to determine causes of delay with a help of questionnaire survey. The value of factor ranging from 1 to 100 as a probability of schedule delay (01 for very low and 100 for very high). M.H Sebt , H. Rajaei ,M.M P akseresht “A FUZZY MODELING APPROACH TO WEATHER DELAY ANALYSIS IN CONSTRUCTION PROJECT” the author use the same process which is used by the Bilal M. Ayyab and Achintya Haldar in his research paper but after that the author compare the different weather with the different activities. The time impact analysis for different delay analysis can be used. Adriana V. Ordonez Oliveros and Aminah Robinson Fayek “Fuzzy logic approach for Activity Delay Analysis and Schedule updating” the research aims to make a fuzzy logic model for modifying activity durations and the model integrates daily site reporting of activity progress and delays with a schedule updating and forecasting system for construction project monitoring and control. 3. CONCLUSION The critical review undertaken in this paper covers total effect of delay, and seen the different method of finding out the delay duration in different wages. The other authors used the different methods like RII, AHP etc, but in this paper we used the fuzzy logic set theory for determine the delay duration. 4. REFERENCES 1. Adriana V. Ordonez Oliveros and Aminah Robinson Fayek “Fuzzy logic approach for Activity delay analysis and schedule updating” (2005) pp.42-51. 2. Bilal M. Ayyub and Achintya Halder “project scheduling using fuzzy set concept” j. constr. Eng. manage., (1984), pp .110(02). 189-204. 3. H.N Ahuja. “Construction Performance Control by Network”, John Wiley & sons, inc , new York. (1976), pp.23-126. 4. J.J O Brein “Schedduling Handdook” Mc graw- hill book co. New York N.Y., (1969). 5. L. A Zadeh “Fuzzy sets” information and control, vol.8 (1965), pp. 338-353. 6. M.H.Sebt ,H.Rajaei, M.M Pakseresht “A Fuzzy modeling approach to weather delays analysis in construction projects” 7. Pandey M.K, Dandotiya A, Trivedi M.K, Bhadoriya S.S, Ramasesh G.R. “Delay Computation Using Fuzzy Logic Approach”. 8. Shurti Singh, Dr. M.K Trivedi “Application of fuzzy logic in delay analysis in construction”.
Download now