International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2773
A Study of Supply Chain Management in Civil Engineering
Milind Tapsi1, Dipali Patil, Patil Ashish3, Shaikh Tanveer Ajiz4, Sonawale Pranit5,
Shaikh Tanveer Shahnawaz6
1,2Professor Milind Tapsi, Dept of Civil Engineering, DRIEMS Neral, Maharashtra, India.
3,4,5,6Under Graduate, Dept. of Civil Engineering, DRIEMS Neral. Maharashtra, India.
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Supply Chain Management (SCM) is a concept
that has flourished in manufacturing, originating from
Just-In-Time production and logistics. Today, SCM
represents an autonomous managerial concept, although
still largely dominated by logistics. SCM endeavours to
observe the entire scope of the supply chain. This Project
is aimed to focus towards the adoption and
implementation of Microsoft Primavera in Construction
work. The theoretical findings are based on the literature
review of the existing papers.
In This Project MS Primavera is used to analyse the
effective time in which the internal plaster should be
ideally completed. The Internal Plastering of a Residential
Building (G+4) is taken for analysing. The time taken for
the plastering work on site is compared with the analytical
result of the software. The difference between the time
taken on site and result obtained shows the effective time
in which the plastering work should be completed. The
readings obtained from the site have been used for
calculation of effective time. Analysis of time use along the
process in order to get insight in the time build up. The
methodology used in the project includes the use of MS
Primavera Software for calculation. The basic objective of
the project is to study the use of Supply Chain
Management in Civil Engineering. The Scheduling of time
using Primavera to get greater efficiency and to enhance
flexibility. Optimizing value chain and improving customer
service is the key objective of the project. The Supply
Chain Performance is measured on Delivery, Quality, Time
and Cost.
Key Words: Management, Optimizing, Delivery,
Flexibility.
1. INTRODUCTION
1.1 General
Supply Chain is a system of organization, people, activities
information and resource involved in moving a product or
services from supplier to customer. Supply Chain activities
involves the transformation of natural resource, raw
material and components into a finished product that is
delivered to the end customer.
Supply Chain Management (SCM) is a well established
concept within the manufacturing industry although the
terminology has changed over the years (McCaffer and
Root, 2000 ). Ganeshan and Harrison (1995) defined
supply chain as a network of facilities and distribution
option that performs the function of procurement of
materials, transformation of materials into intermediate
and finished products, and the distribution of these
finished products to the customers. Supply chain exist
both service and manufacturing organisations, although
the complexity of the chain may vary greatly from industry
to industry and firm to firm. The effectiveness of Supply
Chain Management has been evaluated using MS
Primavera Software.
1.2 NECESSITY
The use of Construction Management in Civil Engineering
is growing rapidly. India being a developing country, the
construction process is taking place rapidly. The
completion of mega projects as per schedule is a key thing.
The scheduling of project helps in minimizing time as well
as maintaining quality. The materials required are already
been determined which also saves the wastage of material.
Fig. 1: Flow chart of supply chain
Supply Chain Strategies
Multiples Suppliers
Few Suppliers
Vertical Integration
Customer Service
Total Quality Management
Logistic Managment
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2774
1.4 OBJECTIVES
 To Study the use of Supply Chain Management in
Civil Engineering.
 To analyse Time Scheduling by using MS
Primavera.
 Greater Efficiency.
 Enhance Flexibility and Agility.
 By using Primavera for minimising economy.
 Improve Customer Services.
 Optimize Value Chain.
2. LITERATURE REVIEW
Supply Chain Management in Construction Scope,
Benefits and Barriers Volume 3 No. 1 June 2002 Syed
Mahmood Ahmed, Salman Azhar, Irtishad Ahmad in their
literature figured out the problems at operational level
and have described various factors like bank rates political
situations, material delivery, labour strikes, site accidents,
design changes etc which makes it difficult for a chain to
work efficiently.
Supply Chain Management is a great opportunity for the
construction industry to primarily reduce cost and time
and thus improve profitability. SCM principles seem to
have much strength to smoothen and integrate the
construction process. The supply chain in construction
could be divided into two major groups as material chain
and construction chain, which would help to separate the
procurement and management operations.
Supply Chain Management in Construction: Diagnosis
and Application issues. Alfredo Serpell and Boris Heredia
had their research project carried out with the general
objective of proposing a generic application methodology
of Supply Chain Management to the construction sector by
adapting the manufacturing SCM experience and
development to the particular characteristics of
construction. As part of this research a survey was carried
out to more than 50 companies that participate in the
construction sector. The purpose of this survey was to
obtain a diagnosis about the current situation of the
supply chain in the construction industry. The paper
presented the main results of the survey and highlights the
problems and restrictions that exist in the local
construction supply chains as well as their main causes.
Construction Supply Chains: A Proposal to develop a
new Conceptual Model Omer Baybars presented the
detailed method and procedure applying Supply Chain
Management to the construction enterprises. The study
was an attempt to prepare a framework with which a
Construction Supply Chain model can be developed. The
expected benefit of the proposed model is time and cost
savings.
Role of Supply Chain Management in Construction
Ruben Vrijhoef1 and Lauri Koskela addressed that the
actual practice in construction not only fails to address
issues of supply chain, but rather follows principles that
make supply chain performance worse. SCM can play
major roles in construction.
3. METHODOLOGY
3.1 Steps followed for the project using MS Primavera.
Fig. 2: Steps for supply chain
3.2 Select EPS
The EPS (Enterprise Project Structure) is a logical,
meaningful hierarchal, arrangement of all the projects in
an organization.
EPS are hierarchal nodes where a project can be created
and stored.
Project Name and
Responsible Manager
Select EPS
Activities
and
Details
Project
and WBS
Layout
Activities
and
Resource
Gantt
ChartReport
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2775
EPS is useful to summarize the projects under it so that the
summarized value can be seen.
In an EPS hierarchy, Root EPS is top level and child EPS is
low level.
3.3 Project Name and Responsible Manager
The project is given a name by which it can be identified
and also the project manager is assigned.
The Project Manager depends on the work that is to be
carried out.
Project Manager is responsible for all the work ON- Site
and OF- Site
The below image gives an example of the following.
Fig. 3: Project name
Fig. 4: Responsible manager
3.4 Layout
Layout is the division of the work.
Layout is the sequence of the work which is to be carried
out.
With the help of layout the responsible person for a
specific work can be determined.
The following shows the layout of the project.
Fig. 5: Layout
3.5 WBS (WORK BASED SYSTEM)
WBS is the key point of distribution and part of work.
For eg. In one floor four rooms are there in plan, so the
plastering work, brick work etc can be carried out which
can be grouped under WBS.
Fig. 6: WBS (Work Based System)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2776
3.6 Activities and Resource
Activities and Resource include all the activities and
resources which are to be used in the Project.
All the activities under WBS are under this Title.
The amount of resources which are required to complete
the project is also under the Title.
The following figure shows the activities and resources
TAB.
Fig. 7: Activities and resource
3.6.1 Gantt Cart
The basic use of Gantt Chart are to
 Add Relationships.
 Edit Relationships.
 Delete Relationships.
 The Scheduled activities are shown on the Gantt
Chart.
Fig. 8: Gantt chart activities
Fig. 9: Gantt chart activities and resources
4. CONCLUSION
Construction using Supply Chain Management is intended
to make savings by linking the supply chain more closely,
making manufacturers more responsive.
Due to its recurring character, the SCM Methodology
implies a continous improvement process of which the
scope can be enlarged over time, involving an increasing
number of areas of application.
Primavera solutions for Architecture, Engineering and
Construction firms enable them to successfully plan,
manage, control, and deliver projects. The result is
improved client service without sacrificing project
profitability.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2777
5. References
(1) SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION
SCOPE, BENEFITS AND BARRIERS.
Syed Mahmood Ahmed
Salman Azhar
Irtishad Ahmad
(2) SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION:
DIAGNOSIS AND APPLICATION ISSUES.
Alfredo Serpell
Boris Heredia
(3) ROLES OF SUPPLY CHAIN MANAGEMENT IN
CONSTRUCTION.
Ruben Vrijhoef and Lauri Koskela

More Related Content

What's hot

IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET Journal
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL JOSHI
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 
IRJET- Implementation based ERP Module for Construction Site Management
IRJET- Implementation based ERP Module for Construction Site ManagementIRJET- Implementation based ERP Module for Construction Site Management
IRJET- Implementation based ERP Module for Construction Site ManagementIRJET Journal
 
Academic Resources Architecture Framework Planning using ERP in Cloud Computing
Academic Resources Architecture Framework Planning using ERP in Cloud ComputingAcademic Resources Architecture Framework Planning using ERP in Cloud Computing
Academic Resources Architecture Framework Planning using ERP in Cloud ComputingIRJET Journal
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesIRJET Journal
 
Functional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF MethodsFunctional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF MethodsMandar Trivedi
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityIRJET Journal
 
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTIONEFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTIONIAEME Publication
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0Mandar Trivedi
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...IRJET Journal
 
IRJET- Course outcome Attainment Estimation System
IRJET-  	  Course outcome Attainment Estimation SystemIRJET-  	  Course outcome Attainment Estimation System
IRJET- Course outcome Attainment Estimation SystemIRJET Journal
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
IRJET- Literature Review on Manufacturing System Performance Improvement ...
IRJET-  	  Literature Review on Manufacturing System Performance Improvement ...IRJET-  	  Literature Review on Manufacturing System Performance Improvement ...
IRJET- Literature Review on Manufacturing System Performance Improvement ...IRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET Journal
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...IJECEIAES
 

What's hot (20)

IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
IRJET- Implementation based ERP Module for Construction Site Management
IRJET- Implementation based ERP Module for Construction Site ManagementIRJET- Implementation based ERP Module for Construction Site Management
IRJET- Implementation based ERP Module for Construction Site Management
 
Academic Resources Architecture Framework Planning using ERP in Cloud Computing
Academic Resources Architecture Framework Planning using ERP in Cloud ComputingAcademic Resources Architecture Framework Planning using ERP in Cloud Computing
Academic Resources Architecture Framework Planning using ERP in Cloud Computing
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction Companies
 
Functional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF MethodsFunctional and Information Modeling of Production Using IDEF Methods
Functional and Information Modeling of Production Using IDEF Methods
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & Sustainability
 
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTIONEFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
EFFICIENT COST MANAGEMENT OF MATERIALS IN CONVENTIONAL AND PRECAST CONSTRUCTION
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...
 
IRJET- Course outcome Attainment Estimation System
IRJET-  	  Course outcome Attainment Estimation SystemIRJET-  	  Course outcome Attainment Estimation System
IRJET- Course outcome Attainment Estimation System
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
IRJET- Literature Review on Manufacturing System Performance Improvement ...
IRJET-  	  Literature Review on Manufacturing System Performance Improvement ...IRJET-  	  Literature Review on Manufacturing System Performance Improvement ...
IRJET- Literature Review on Manufacturing System Performance Improvement ...
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...
 

Similar to IRJET- A Study of Supply Chain Management in Civil Engineering

Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...IRJET Journal
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewIRJET Journal
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...IRJET Journal
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...IRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET Journal
 
IRJET- Web based Project Management Systems for Small to Midsize Business...
IRJET-  	  Web based Project Management Systems for Small to Midsize Business...IRJET-  	  Web based Project Management Systems for Small to Midsize Business...
IRJET- Web based Project Management Systems for Small to Midsize Business...IRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...IRJET Journal
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET Journal
 
Issues of Embedded System Component Based Development in Mesh Networks
Issues of Embedded System  Component Based Development in Mesh NetworksIssues of Embedded System  Component Based Development in Mesh Networks
Issues of Embedded System Component Based Development in Mesh NetworksIRJET Journal
 
Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...IRJET Journal
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...IRJET Journal
 
IRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for TransportationIRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for TransportationIRJET Journal
 
An Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps AdoptionAn Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps AdoptionIRJET Journal
 
IRJET- Last Planner System
IRJET- Last Planner SystemIRJET- Last Planner System
IRJET- Last Planner SystemIRJET Journal
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork systemIRJET Journal
 

Similar to IRJET- A Study of Supply Chain Management in Civil Engineering (20)

Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
IRJET- Web based Project Management Systems for Small to Midsize Business...
IRJET-  	  Web based Project Management Systems for Small to Midsize Business...IRJET-  	  Web based Project Management Systems for Small to Midsize Business...
IRJET- Web based Project Management Systems for Small to Midsize Business...
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
Issues of Embedded System Component Based Development in Mesh Networks
Issues of Embedded System  Component Based Development in Mesh NetworksIssues of Embedded System  Component Based Development in Mesh Networks
Issues of Embedded System Component Based Development in Mesh Networks
 
Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...Introduction of Agile Project Management (APM) Methodology to a Railway and M...
Introduction of Agile Project Management (APM) Methodology to a Railway and M...
 
Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...Planning and Optimization of Resource Constrained Project Scheduling by using...
Planning and Optimization of Resource Constrained Project Scheduling by using...
 
IRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for TransportationIRJET- Truck Booking Project with Invoice Generator for Transportation
IRJET- Truck Booking Project with Invoice Generator for Transportation
 
An Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps AdoptionAn Approach of Improve Efficiencies through DevOps Adoption
An Approach of Improve Efficiencies through DevOps Adoption
 
IRJET- Last Planner System
IRJET- Last Planner SystemIRJET- Last Planner System
IRJET- Last Planner System
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Recently uploaded (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

IRJET- A Study of Supply Chain Management in Civil Engineering

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2773 A Study of Supply Chain Management in Civil Engineering Milind Tapsi1, Dipali Patil, Patil Ashish3, Shaikh Tanveer Ajiz4, Sonawale Pranit5, Shaikh Tanveer Shahnawaz6 1,2Professor Milind Tapsi, Dept of Civil Engineering, DRIEMS Neral, Maharashtra, India. 3,4,5,6Under Graduate, Dept. of Civil Engineering, DRIEMS Neral. Maharashtra, India. ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Supply Chain Management (SCM) is a concept that has flourished in manufacturing, originating from Just-In-Time production and logistics. Today, SCM represents an autonomous managerial concept, although still largely dominated by logistics. SCM endeavours to observe the entire scope of the supply chain. This Project is aimed to focus towards the adoption and implementation of Microsoft Primavera in Construction work. The theoretical findings are based on the literature review of the existing papers. In This Project MS Primavera is used to analyse the effective time in which the internal plaster should be ideally completed. The Internal Plastering of a Residential Building (G+4) is taken for analysing. The time taken for the plastering work on site is compared with the analytical result of the software. The difference between the time taken on site and result obtained shows the effective time in which the plastering work should be completed. The readings obtained from the site have been used for calculation of effective time. Analysis of time use along the process in order to get insight in the time build up. The methodology used in the project includes the use of MS Primavera Software for calculation. The basic objective of the project is to study the use of Supply Chain Management in Civil Engineering. The Scheduling of time using Primavera to get greater efficiency and to enhance flexibility. Optimizing value chain and improving customer service is the key objective of the project. The Supply Chain Performance is measured on Delivery, Quality, Time and Cost. Key Words: Management, Optimizing, Delivery, Flexibility. 1. INTRODUCTION 1.1 General Supply Chain is a system of organization, people, activities information and resource involved in moving a product or services from supplier to customer. Supply Chain activities involves the transformation of natural resource, raw material and components into a finished product that is delivered to the end customer. Supply Chain Management (SCM) is a well established concept within the manufacturing industry although the terminology has changed over the years (McCaffer and Root, 2000 ). Ganeshan and Harrison (1995) defined supply chain as a network of facilities and distribution option that performs the function of procurement of materials, transformation of materials into intermediate and finished products, and the distribution of these finished products to the customers. Supply chain exist both service and manufacturing organisations, although the complexity of the chain may vary greatly from industry to industry and firm to firm. The effectiveness of Supply Chain Management has been evaluated using MS Primavera Software. 1.2 NECESSITY The use of Construction Management in Civil Engineering is growing rapidly. India being a developing country, the construction process is taking place rapidly. The completion of mega projects as per schedule is a key thing. The scheduling of project helps in minimizing time as well as maintaining quality. The materials required are already been determined which also saves the wastage of material. Fig. 1: Flow chart of supply chain Supply Chain Strategies Multiples Suppliers Few Suppliers Vertical Integration Customer Service Total Quality Management Logistic Managment
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2774 1.4 OBJECTIVES  To Study the use of Supply Chain Management in Civil Engineering.  To analyse Time Scheduling by using MS Primavera.  Greater Efficiency.  Enhance Flexibility and Agility.  By using Primavera for minimising economy.  Improve Customer Services.  Optimize Value Chain. 2. LITERATURE REVIEW Supply Chain Management in Construction Scope, Benefits and Barriers Volume 3 No. 1 June 2002 Syed Mahmood Ahmed, Salman Azhar, Irtishad Ahmad in their literature figured out the problems at operational level and have described various factors like bank rates political situations, material delivery, labour strikes, site accidents, design changes etc which makes it difficult for a chain to work efficiently. Supply Chain Management is a great opportunity for the construction industry to primarily reduce cost and time and thus improve profitability. SCM principles seem to have much strength to smoothen and integrate the construction process. The supply chain in construction could be divided into two major groups as material chain and construction chain, which would help to separate the procurement and management operations. Supply Chain Management in Construction: Diagnosis and Application issues. Alfredo Serpell and Boris Heredia had their research project carried out with the general objective of proposing a generic application methodology of Supply Chain Management to the construction sector by adapting the manufacturing SCM experience and development to the particular characteristics of construction. As part of this research a survey was carried out to more than 50 companies that participate in the construction sector. The purpose of this survey was to obtain a diagnosis about the current situation of the supply chain in the construction industry. The paper presented the main results of the survey and highlights the problems and restrictions that exist in the local construction supply chains as well as their main causes. Construction Supply Chains: A Proposal to develop a new Conceptual Model Omer Baybars presented the detailed method and procedure applying Supply Chain Management to the construction enterprises. The study was an attempt to prepare a framework with which a Construction Supply Chain model can be developed. The expected benefit of the proposed model is time and cost savings. Role of Supply Chain Management in Construction Ruben Vrijhoef1 and Lauri Koskela addressed that the actual practice in construction not only fails to address issues of supply chain, but rather follows principles that make supply chain performance worse. SCM can play major roles in construction. 3. METHODOLOGY 3.1 Steps followed for the project using MS Primavera. Fig. 2: Steps for supply chain 3.2 Select EPS The EPS (Enterprise Project Structure) is a logical, meaningful hierarchal, arrangement of all the projects in an organization. EPS are hierarchal nodes where a project can be created and stored. Project Name and Responsible Manager Select EPS Activities and Details Project and WBS Layout Activities and Resource Gantt ChartReport
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2775 EPS is useful to summarize the projects under it so that the summarized value can be seen. In an EPS hierarchy, Root EPS is top level and child EPS is low level. 3.3 Project Name and Responsible Manager The project is given a name by which it can be identified and also the project manager is assigned. The Project Manager depends on the work that is to be carried out. Project Manager is responsible for all the work ON- Site and OF- Site The below image gives an example of the following. Fig. 3: Project name Fig. 4: Responsible manager 3.4 Layout Layout is the division of the work. Layout is the sequence of the work which is to be carried out. With the help of layout the responsible person for a specific work can be determined. The following shows the layout of the project. Fig. 5: Layout 3.5 WBS (WORK BASED SYSTEM) WBS is the key point of distribution and part of work. For eg. In one floor four rooms are there in plan, so the plastering work, brick work etc can be carried out which can be grouped under WBS. Fig. 6: WBS (Work Based System)
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2776 3.6 Activities and Resource Activities and Resource include all the activities and resources which are to be used in the Project. All the activities under WBS are under this Title. The amount of resources which are required to complete the project is also under the Title. The following figure shows the activities and resources TAB. Fig. 7: Activities and resource 3.6.1 Gantt Cart The basic use of Gantt Chart are to  Add Relationships.  Edit Relationships.  Delete Relationships.  The Scheduled activities are shown on the Gantt Chart. Fig. 8: Gantt chart activities Fig. 9: Gantt chart activities and resources 4. CONCLUSION Construction using Supply Chain Management is intended to make savings by linking the supply chain more closely, making manufacturers more responsive. Due to its recurring character, the SCM Methodology implies a continous improvement process of which the scope can be enlarged over time, involving an increasing number of areas of application. Primavera solutions for Architecture, Engineering and Construction firms enable them to successfully plan, manage, control, and deliver projects. The result is improved client service without sacrificing project profitability.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 2777 5. References (1) SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION SCOPE, BENEFITS AND BARRIERS. Syed Mahmood Ahmed Salman Azhar Irtishad Ahmad (2) SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION: DIAGNOSIS AND APPLICATION ISSUES. Alfredo Serpell Boris Heredia (3) ROLES OF SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION. Ruben Vrijhoef and Lauri Koskela