IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 320
APPLICATION OF ICT BENEFITS FOR BUILDING PROJECT
MANAGEMENT USING ISM MODEL
S.V.S.N.D.L.Prasanna1
, T. Raja Ramanna2
1
Assistant Professor, Civil Engineering Department, University College of Engineering, Osmania University, Hyderabad- 07
2
M.E scholar, Civil Engineering Department, University College of Engineering, Osmania University, Hyderabad- 07
Abstract
Construction is the second largest industrial activity is the Indian economy, employing over 31 million people. The construction
projects require effective collaboration and coordination among the diverse project participants, that which exhibits a unique set
of characteristics such as fragmentation, multidisciplinary, development, substantial financial commitment, varying complexities,
long time spans, and a large number of geographically separated stakeholders involved at all the stages of the projects.
Construction projects are managed by designated Project Managers, Architects or Contracts on behalf of the client or by the
clients themselves depending on the contract and the project type. Project managers are required to integrate the efforts of all the
stakeholders for required coordination for successful project management. Information Communication Technology (ICT) has
influenced project management practices by the way of introducing and implementing newly developed management tools and the
latest technology. Interpretive Structural Modeling(ISM) is a systematic application of graph theory in such a way that
theoretical, conceptual and computational leverage is exploited by efficiently constructs a directed graph, or network
representation, of the complex patters of relationship among the elements. In the present study an attempt is made to identify the
strategic benefits, their level and interdependency for the project team organization using ICT and to develop ISM model for all
the categories of benefits. For the present study MICMAC analysis is used to analyze the drive power and dependence power
factors and by which 14 independent / Driven / Linkage benefits were obtained out of 31 benefits.
Key Words: Construction, Project Managers, Collaboration, Benefits.
--------------------------------------------------------------------***----------------------------------------------------------------------
1. INTRODUCTION
Construction projects require effective collaboration and
coordination among the diverse project participants and can
be done effectively by means of communication between all
the project participants. This type of co-ordination and
effective communication is crucial in order to achieve
quality standards and to reduce the cost of production
effectively. Construction projects are managed by
designated officials like Project Managers, Architects or
Contractors on part of the Client or by the Clients
themselves depending upon the contract and the project
type. Such good and responsive communication is important
to monitor and control projects‟ activities according to the
specific plans and thereby to achieve required project goals.
Hence, the efficiency of the project manager lies in the way
he communicates, evaluates and explains the feedback to the
rest of the project team during each stage of the project life-
cycle and determines how efficiently a project‟s goals will
be achieved.
Communication or data handling often takes about 75% to
90% of project managers‟ time in the construction industry.
ICT is required not only to free up project managers for
more decision making tasks but also to deliver the required
levels of „consistency and reliability‟ of information in the
construction supply chains because use of incorrect or
incomplete data can compromise the scheduled completion
of a project and lead to wastage of resources Multi
enterprise scenario of construction projects requires
collaborative use of ICT by all the project team
organizations for managing a project that is to be planned
before the start of the project.
In the present day, ICT is being adopted for construction
project management, but, till date, a perfect and sustainable
methodology has not been developed and presented for the
construction industry to examine the potential contributions
of information management strategies in efforts to reduce
overall project schedule and cost. This inability to quantify
process improvements and uncertainty of benefits from
process and cultural changes has become one of the primary
barriers for effective implementation of ICT in construction
project management. As a result of this the benefits of ICT
adoption are primarily perception based and not quantifiable
that specifically defines the extent of ICT adoption by the
construction industry. Certain benefits are said to drive other
benefits and certain benefits out of the driven ones are
dependent on some other benefits. Construction
professionals need to understand this aspect of driving
power and dependence relationship between the benefits to
plan strategic adoption of ICT for building project
management.
Interpretive Structural Modeling (ISM) falls into the soft
operations research (OR) family of approaches. Soft OR
methods can be used to augment traditional quantitative
methods that do not exactly replace traditional tools and
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 321
techniques. ISM is a tool that which highly helps all
different groups of people in structuring their collective
knowledge. ISM is a systematic application of graph theory
in which theoretical, conceptual, and computational leverage
is exploited to efficiently construct a directed graph, or
network representation having a complex pattern with
contextual relationship among a set of elements. It also
helps to identify the structure within a system of related
elements and also may represent the information either by a
digraph (directed graph) or by a matrix, ultimately resulting
in a “directed graphic representation of a particular
relationship among all pairs of elements in a set to aid in
structuring a complex issue area”.
1.1 Objectives of the Study
1. Identifying the strategic benefits for the project team
organization and developing ISM model for all
categories of benefits.
2. Identifying the level of benefits and interdependency
for evaluating the most independent and driving
benefits for the total project.
2. METHODOLOGY
Construction projects are of two categories, namely
building construction projects and Engineering or
Infrastructure projects for which the basic need is to study
ICT adoption for both the categories of projects separately,
where characteristics of supply chain issues, management
procedures and contract conditions are different for both the
categories of projects. In this study, variables are the
perceived benefits of ICT adoption for building project
management identified 31 important perceived benefits
from literature and after discussion with the experts from
the industry and academics. Considering the past
experience, ISM technique has been used to analyze the
relation between various benefits and to understand the
dependence and driving power of each benefit with respect
to other benefits. This way of analyzing each project, shall
help the managers to decide, whether they are planning and
proceeding with systematic ICT adoption procedure for
achieving certain benefits to know the other driving benefits
that should be achieved prior to the first and also the
dependent benefits that would be achieved by default. It
requires examination of all relationships between the
benefits of ICT adoption rather than considering these
benefits in isolation.
2.1 Benefits of Information Communication
Technology in Construction Project
Benefits of ICT adoption for managing building projects
and improving overall organizational efficiency have been
discussed in the literature. Some of the identified benefits
are: richer information to aid decision making, project
information obtained quicker, improved communication,
closer relationships, improved information flow, and greater
management control (Hendrickson and Au, 1989; Root and
Thorpe, 2001; Love et al., 2004).
Table 1: Perceived benefits of ICT adoption for building
project management
Benefits related to measures of project success
1 Projects completion as per the estimated time
2 Project completion as per the estimated budget
3 project completion as per the specifications
4 Life cycle concept becomes a competitive factors
5 Projects information obtained in real time
6 Richer information made available to managers
7 Less time spent in query and approval process
8 Effective change management
9 Reduced risk of errors and rework on projects
10 Effective concurrent construction management
11
A complete log of all communications maintained
for tracking purposes
12 Effective material procurement and management
13 Effective contract management
14
"One-Source" documentation archive maintained
for clients
15 Client satisfaction
16
Reduced administrative costs of document handling
and distribution to multiple parties
17
Project managers spend more time on managerial
works
Benefits related to effective team management
18
Effective collaboration and co-ordination between
project team members
19
Effective communication management between
project team members
20 Greater management control
21 Effective joint decision making
22 Motivation of the work force
Benefits related to effective use of technology
23
Increased information portability in the ICT
environment
24
Reduced hard copy storage of documents /
drawings
25 Flow of accurate information
26 Ease of retrieval of information
27
Improved capability of the system to cross
reference to other correspondence
28 Multi locational availability of information
Benefits related to increase organizational efficiency
29 Increase in overall organizational efficiency
30
Better information assessment and management
with in the organization
31
Useful information compiled and disseminated to
other projects
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 322
2.2 Interpretive structural Modeling
ISM is an interactive learning process technique in which a
set of different directly and indirectly related elements are
structured into a comprehensive systematic model. The
model so formed portrays the structure of a complex issue
or problem in a carefully designed pattern implying
graphics as well as words. This model is a well-established
methodology for identifying relationships among detailed
stuff, which define a problem. For any complex problem
under consideration, different number of factors may be
related to problem. However, the direct and indirect
relationships between these factors describe the situation
more accurately than the individual factor taken into
isolation. Therefore, ISM develops insights into collective
understandings of these relationships. The following are the
steps involved in Interpretive Structural Modeling
Step 1: Identify the elements which are relevant to the
problem. This could be done by a survey or group problem
solving technique. The benefits which we presented in
Table 1 are considered in this step.
Step 2: Establish a contextual relationship between elements
with respect to which pairs of elements would be examined.
Step 3: Structural Self-Interaction Matrix (SSIM)
 V for the relation from factor i to factor j (i.e.,
factor i will influence factor j)
 A for the relation from factor j to factor i (i.e.,
factor i will be influenced by
factor j)
 X for both direction relations (i.e., factors i and j
will influence each other)
 O for no relation between the factors (i.e., barriers
i and j are unrelated).
 X for both direction relations (i.e., factors i and j
will influence each other)
 O for no relation between the factors (i.e., barriers
i and j are unrelated).
Step 4: Reachability Matrix
The next step in ISM approach is to develop an initial
reachability matrix from SSIM. For this, SSIM is converted
into the initial reachability matrix by substituting the four
symbols (i.e., V, A, X or O) of SSIM by 1s or 0s in the
initial reachability matrix. The rules for this substitution are
as follows:
 If the (i, j) entry in the SSIM is V, then the (i, j)
entry in the reachability matrix becomes 1 and the
(j, i) entry becomes 0.
 If the (i, j) entry in the SSIM is A, then the (i, j)
entry in the matrix becomes 0 and the (j, i) entry
becomes 1.
 If the (i, j) entry in the SSIM is X, then the (i, j)
entry in the matrix becomes 1 and the (j, i) entry
also becomes 1.
 If the (i, j) entry in the SSIM is O, then the (i, j)
entry in the matrix becomes 0 and the (j, i) entry
also becomes 0.
Step 5: Level partitions
The reachability set for a particular variable consists of the
variable itself and the variables it drives. The antecedent set
shown in Table 2 consists of the variable itself and the
variables on which it depends. Subsequently, the
intersection of these sets is derived for all the benefits. The
variable(s) for which the reachability and the intersection
sets are the same as in the top-level of ISM hierarchy, as
they would not help achieve any other variable above their
own level. After the identification of the top-level variables,
these are discarded from the other remaining variables (Ravi
and Shankar, 2005). Then the same process is repeated to
find out the factors in the next level. This process is
continued until the level of each factor is found. These
levels shown in Table 3 help in building the diagraph and
the ISM model.
Table 2 Reachability and Antecedent Set.
Benefits Reachability set Antecedent set
1 1,2,15,20
1,5-13,15-21,23-
28,30,31
2 2,15,20 1,2,4-9,11-13,16-31
3 3,15,20
3,5,6,8,9,11,13,16-
21,23-28,30
4 2,4,15
4,6,7,16,17,19,21,
23-26,28,30
5
1,2,3,5,6,7,8,9,10,
12,13,15,16,18,19,
20,25,28,30,31
5,16-21,24,26,27
6
1,2,3,4,6,8,9,10,12,
13,15,16,18,19,20,28,30
5-7,16,17,21,
23-27,28,31
7
1,2,4,6,7,8,9,10,12,
13,15,16,18,20,28,30
5,7,11,16,17,19,21,
23-26,28
8
1,2,3,8,9,10,12,13,
15,16,18,20,30
5-8,11,16-19,21,23-
28,30
9 1,2,3,9,10,13,15,20
5-9,11,16-19,21,23-
28,30
10 1,10,13,15,20
5-12,16-19,21,23-
28,30
11
1,2,3,7,8,9,10,11,12,13,
14,15,16,18,19,20,
23,25,28,30,31
11,17,21,26
12 1,2,10,12,13,15,20
5-8,11,12,16-19,
23-28,30
13 1,2,3,13,15,20
5-13,16-21,23-
25,27-30
14 14,15,31 11,14,21
15 1,15,20 1-21,23-30
16 1-10,12,13,15-20,29,30
5-
8,11,16,17,19,21,23-
28
17
1-13,15-20,22,23,25,26,
28-31
16,17,21,24,26
18
1,2,3,5,6,7,9,10,8,12,
13,15,18,19,20
5-8,11,16-19,21,23,
25-28,30
19
1-5,7-10,12,13,15,16,
18-20,
5,6,11,16-19,21,23-
28
20 1,2,3,5,13,15,20,
1-3,5-13,15-20,
23-28,30
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 323
21 1-19,21,23,25,27-31 21
22 2,22,29 17,22,26
23
1-4,6-10,12,13,15,16,
18-20,23,28,29,30
11,17,21,23
24
1-10,12,13,15,16,17,19,
20,24,25,28,30,31
24
25
1-4,6-10,12,13,15,16,
18-20,25,28,30
5,11,17,21,24-27
26
1-12,15-20,22,25-
28,30,31
17,26
27
1,2,3,5,6,8,9,10,
12,13,15,16,18,19,20,
25,27,28,30,31
21,26,27
28
1-4,8-10,12,13,15,16,
18-20,28-31
5-8,11,17,21,23-28
29 2,13,15,29 16,17,21-23,28,29
30
1-4,8-10,12,13,15,18,
20,30
5-8,11,16,17,21,23-
28,30
31 1,2,6,31
5,11,14,17,21,24,26-
28,31
Step 6: Conical Matrix
A conical matrix is developed by clustering benefits at the
levels achieved, across rows and columns in the final
reachability matrix. The final reachability matrix is in
conical form. Most zero (0) variables are in the upper
diagonal half of the matrix and most unitary (1) variables
are in the lower half. The ISM Model shall be framed.
Table 3 Level of Benefits
Level Benefits Types
1
1
Projects completion as per
the estimated time
Projects Related
15 Client satisfaction Projects Related
2
2
Project completion as per
estimated time
Projects Related
3
Project completion as per
specifications
Projects Related
3
5
Project information
obtained in real time
Projects realted
19
Effective communication
management between
project team members
Team management
related
4
8
Effective change
management
Projects related
17
Projects managers spend
more time on managerial
works
Project related
26
Ease to retrieval of
information
Technology related
30
Better information
assessment and
management within the
organization
Organization related
5
4
Life cycle concept
becomes a competitive
factor
Project related
13
Effective contract
management
Project related
20
Greater management
control
Team management
related
6
10
Effective concurrent
construction management
Project related
29
Increase in overall
organizational efficiency
Organization related
7 9
Reduced risk of errors and
rework on projects
Project related
12
Effective material
procurement and
management
Project related
22
Motivation of the work
force
Team management
related
8 16
Reduced administrative
costs of document
handling and distribution
to multiple parties
Project related
18
Effective collaboration and
co-ordination between
project team members
Team management
related
9
6
Richer information made
available to managers
Project related
7
Less time spent in query
and approval process
Project related
31
Useful information
compiled and disseminated
to other projects
Organization related
10
14
“one-source”
documentation archive
maintained for clients
Project related
23
Increased information
portability in the ICT
environment
Technology related
25
Flow of accurate
information
Technology related
11 11
All communications
maintained for tracking
purpose
Project related
24
Hard copy storage of
documents
Technology related
27
Improved capability of the
system
Technology related
12 21
Effective joint decision
making
Team management
related
13 28
Multi location availability
of data
Technology related
2.3 MICMAC Analysis
The purpose of MICMAC analysis is to analyze the drive
power and dependence power of factors. MICMAC
principle is based on multiplication properties of matrices.
It is done to identify the key factors that drive the system in
various categories. Based on their drive power and
dependence power, the factors, have been classified into
four categories i.e. autonomous factors (Weak drive power
and weak dependent power), linkage factors (Strong drive
power as well as strong dependent power), dependent (weak
drive power but strong dependence power) and independent
(strong drive power but weak dependence power) factors.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 324
The fig. shows the details about the nature of benefits which
tells us about the driven or dependent or independent
benefits.
Fig 1: MICMAC Analysis.
3. RESULTS
The developed ISM model presents a hierarchical
framework to evaluate the ICT benefits those shall be
adopted for building project management.
The results can be summarized as follows.
1. The Structural Self Interaction Matrix shows the
relation between the 31 benefits.
2. From Reachability matrix the no. of driven power,
dependence power for each benefit is obtained and
reachability set, antecedent set for each benefit is found.
3. From the 13 Iterations level of each benefit is obtained
and shown below.
4. From the MICMAC analysis we got 14 Independent /
Driven / Linkage benefits
(5,6,7,11,16,17,19,21,23,24,25,26,27,28) out of 31
benefits. These 14 benefits reflect on the qualitative and
quantitative completion of project.
Iteration Level Benefits
1 1 1,15
2 2 2.3
3 3 5,149
4 4 8,17,26,30
5 5 4,13,20
6 6 10,29
7 7 9,12,22
8 8 16,18
9 9 6,7,31
10 10 14,23,25
11 11 11,24,27
12 12 21
13 13 28
4. DISCUSSIONS
The Developed ISM model shows that the project related
benefits are primarily at the top of hierarchy, team
management related benefits are primarily in the middle and
technology and organization related benefits are primarily at
the bottom of hierarchy. The result indicates the Positive
Net Value as driving nature of the benefits and negative Net
Value as the dependent nature of the benefits and 0 indicates
equal driving and dependent nature of the benefits.
5. REFERENCES
1. Ahuja., Vanita and Yang., Jay and Shankar., Ravi.
(2006). “Web Based Communication for Construction
Project Management.” World Conference on
Accelerating Excellence in the Built Environment.
2. Chunwei Chen. (2012). “The Application of
Interpretive Structural Modeling Method to Develop
Verity Design Solution of Case Host Preference-Based
Products: A Case Study of Razor.” Journal of
Theoretical and Applied Informatiion Technology, 35
(1).
3. Janes, F.R. (1988). “Interpretive Structural Modeling
(ISM) a methodology for structuring complex issues.”
Trans Inst MC, 10 (3).
4. Joseph Sarkis., Mohd. Asif Hasan., Ravi Shankar.
(2007). “Evaluating Environmentally Conscious
Manufacturing Barriers with Interpretive Structural
Modeling.”
5. Joshi., Y., Satendre, P., Saurabh, S.C. (2012).
“Knowledge Sharing in Organizations: Modeling the
Barriers, an Interpretive Structural Modeling
Approach.” International Journal of Engineering and
Innovative Technology (IJEIT), 2 (3).
6. Ming-Lang Tseng., and Yuan Hsu Lin. (2011).
“Modeling a hierarchical structure of municipal solid
waste management using interpretive structural
modeling." WSEAS Transactions on Environment and
Development, 7 (11).
7. Neena Sohani., and Nagendra Sohani. (2012).
“Developing Interpretive Structural Model for Quality
Framework in Higher Education: Indian Context.”
Journal of Engineering, Science and Management
Education, 5 (2).
8. Rajesh, A., Nikhil Dev., and Vivek Sharma. (2013).
“Interpretive Structural Modeling (ISM) approach: An
Overview.” Research Journal of Management Sciences,
2 (2), 3-8.
9. Shahabadkar, P., Hebbal, S.S., and Prashant, S. (2012).
“Development of Interpretive Structural Modeling
Methodology in Supply Chain Management an
Overview.” International Journal of Industrial
Engineering & Production Research, 23 (3), 195-205.
10. Singh, M.D., and Kant, R. (2008). “Knowledge
management barriers: An interpretive structural
modeling approach.” International Journal of
Management Science and Engineering Management, 3
(2), 141-150.
11. Sreejith, B. (2012). “A Hierarchical Framework of
Barriers to Green Supply Chain Management in the
Construction Sector.” Journal of Sustainable
Development, 5 (10).
12. Sudarshan Kumar., and Ravi Kant. (2013). “Supplier
Selection Process Enablers: An Interpretive Structural
Modeling Approach.” International Journal of
Mechanical and Industrial Engineering, 3 (1).

More Related Content

What's hot

Construction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information ModelingConstruction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information ModelingIJERA Editor
 
An Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology ProjectsAn Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology ProjectsIOSR Journals
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...IRJET Journal
 
Rethinking Interface Management
Rethinking Interface ManagementRethinking Interface Management
Rethinking Interface ManagementBob Prieto
 
Propagating Engineering Changes To Manufacturing Process Planning Does Plm M...
Propagating Engineering Changes To Manufacturing Process Planning  Does Plm M...Propagating Engineering Changes To Manufacturing Process Planning  Does Plm M...
Propagating Engineering Changes To Manufacturing Process Planning Does Plm M...Mohamed Ali El Hani
 
The sustainable management of remote construction projects
The sustainable management of remote construction projectsThe sustainable management of remote construction projects
The sustainable management of remote construction projectsBhzad Sidawi
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost managementSara Kharono
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' Alan Martin Redmond, PhD
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه m.saboor nesar
 
micE Model for Defining Enterprise Mobile Strategy
micE Model for Defining Enterprise Mobile StrategymicE Model for Defining Enterprise Mobile Strategy
micE Model for Defining Enterprise Mobile Strategyidescitation
 
Exploring the adoption of building information
Exploring the adoption of building informationExploring the adoption of building information
Exploring the adoption of building informationeSAT Publishing House
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementIRJET Journal
 
Implementation of-building-information-modeling-in-turkish-government-sector-...
Implementation of-building-information-modeling-in-turkish-government-sector-...Implementation of-building-information-modeling-in-turkish-government-sector-...
Implementation of-building-information-modeling-in-turkish-government-sector-...Mohammad Lemar ZALMAİ
 
The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...
The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...
The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...Mandar Trivedi
 
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveAdvantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveMichael Cook
 
Risk analysis of infrastructure projects under public private partnerships
Risk analysis of infrastructure projects under public private partnershipsRisk analysis of infrastructure projects under public private partnerships
Risk analysis of infrastructure projects under public private partnershipsIAEME Publication
 

What's hot (19)

Construction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information ModelingConstruction Cost Prediction by Using Building Information Modeling
Construction Cost Prediction by Using Building Information Modeling
 
An Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology ProjectsAn Investigation of Critical Failure Factors In Information Technology Projects
An Investigation of Critical Failure Factors In Information Technology Projects
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...
 
Rethinking Interface Management
Rethinking Interface ManagementRethinking Interface Management
Rethinking Interface Management
 
Propagating Engineering Changes To Manufacturing Process Planning Does Plm M...
Propagating Engineering Changes To Manufacturing Process Planning  Does Plm M...Propagating Engineering Changes To Manufacturing Process Planning  Does Plm M...
Propagating Engineering Changes To Manufacturing Process Planning Does Plm M...
 
The sustainable management of remote construction projects
The sustainable management of remote construction projectsThe sustainable management of remote construction projects
The sustainable management of remote construction projects
 
Ijmet 10 02_009
Ijmet 10 02_009Ijmet 10 02_009
Ijmet 10 02_009
 
Ch07
Ch07Ch07
Ch07
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost management
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه
 
micE Model for Defining Enterprise Mobile Strategy
micE Model for Defining Enterprise Mobile StrategymicE Model for Defining Enterprise Mobile Strategy
micE Model for Defining Enterprise Mobile Strategy
 
Exploring the adoption of building information
Exploring the adoption of building informationExploring the adoption of building information
Exploring the adoption of building information
 
A Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project Management
 
Implementation of-building-information-modeling-in-turkish-government-sector-...
Implementation of-building-information-modeling-in-turkish-government-sector-...Implementation of-building-information-modeling-in-turkish-government-sector-...
Implementation of-building-information-modeling-in-turkish-government-sector-...
 
The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...
The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...
The development of_the_lifecycle_function_model_by_idef0_for_construction_pro...
 
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's PerspectiveAdvantages and Challenges of Using BIM: a Cost Consultant's Perspective
Advantages and Challenges of Using BIM: a Cost Consultant's Perspective
 
SOLOMON_QS-1[1]
SOLOMON_QS-1[1]SOLOMON_QS-1[1]
SOLOMON_QS-1[1]
 
Risk analysis of infrastructure projects under public private partnerships
Risk analysis of infrastructure projects under public private partnershipsRisk analysis of infrastructure projects under public private partnerships
Risk analysis of infrastructure projects under public private partnerships
 

Viewers also liked

Application of technology acceptance model to wi fi user at economics and bus...
Application of technology acceptance model to wi fi user at economics and bus...Application of technology acceptance model to wi fi user at economics and bus...
Application of technology acceptance model to wi fi user at economics and bus...Alexander Decker
 
Managing Information Systems
Managing Information SystemsManaging Information Systems
Managing Information SystemsAsanka Abeykoon
 
Interpretive Structural Modeling
Interpretive Structural ModelingInterpretive Structural Modeling
Interpretive Structural ModelingRaj Kabade
 
Robotics in future warfare 09 finkelstein
Robotics in future warfare 09 finkelsteinRobotics in future warfare 09 finkelstein
Robotics in future warfare 09 finkelsteinKaye Beach
 
Interpretive structural modeling
Interpretive structural modelingInterpretive structural modeling
Interpretive structural modelingUjjwal 'Shanu'
 
management information system
management information systemmanagement information system
management information systemKumudini Alwis
 
Measurement of iodine availability and stability of
Measurement of iodine availability and stability ofMeasurement of iodine availability and stability of
Measurement of iodine availability and stability ofeSAT Publishing House
 
Real time implementation of object tracking through
Real time implementation of object tracking throughReal time implementation of object tracking through
Real time implementation of object tracking througheSAT Publishing House
 
Electronic system for testing tensile strength of foundry sand
Electronic system for testing tensile strength of foundry sandElectronic system for testing tensile strength of foundry sand
Electronic system for testing tensile strength of foundry sandeSAT Publishing House
 
A simple and effective scheme to find malicious node in wireless sensor network
A simple and effective scheme to find malicious node in wireless sensor networkA simple and effective scheme to find malicious node in wireless sensor network
A simple and effective scheme to find malicious node in wireless sensor networkeSAT Publishing House
 
Comparison of symmetrical and asymmetrical cascaded
Comparison of symmetrical and asymmetrical cascadedComparison of symmetrical and asymmetrical cascaded
Comparison of symmetrical and asymmetrical cascadedeSAT Publishing House
 
Review and calculation of activity co efficient of tea
Review and calculation of activity co efficient of teaReview and calculation of activity co efficient of tea
Review and calculation of activity co efficient of teaeSAT Publishing House
 
Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...
Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...
Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...eSAT Publishing House
 
Sequences classification based on group technology
Sequences classification based on group technologySequences classification based on group technology
Sequences classification based on group technologyeSAT Publishing House
 
Automatic detection and severity analysis of brain
Automatic detection and severity analysis of brainAutomatic detection and severity analysis of brain
Automatic detection and severity analysis of braineSAT Publishing House
 
Holographic optical elements for beautification
Holographic optical elements for beautificationHolographic optical elements for beautification
Holographic optical elements for beautificationeSAT Publishing House
 
Learning analytics to quantize and improve the skills development and attainm...
Learning analytics to quantize and improve the skills development and attainm...Learning analytics to quantize and improve the skills development and attainm...
Learning analytics to quantize and improve the skills development and attainm...eSAT Publishing House
 
Investigation of stresses in the thin rimmed spur
Investigation of stresses in the thin rimmed spurInvestigation of stresses in the thin rimmed spur
Investigation of stresses in the thin rimmed spureSAT Publishing House
 

Viewers also liked (20)

Application of technology acceptance model to wi fi user at economics and bus...
Application of technology acceptance model to wi fi user at economics and bus...Application of technology acceptance model to wi fi user at economics and bus...
Application of technology acceptance model to wi fi user at economics and bus...
 
Managing Information Systems
Managing Information SystemsManaging Information Systems
Managing Information Systems
 
1st FYP prsentation
1st FYP prsentation1st FYP prsentation
1st FYP prsentation
 
Interpretive Structural Modeling
Interpretive Structural ModelingInterpretive Structural Modeling
Interpretive Structural Modeling
 
Ism ppt
Ism pptIsm ppt
Ism ppt
 
Robotics in future warfare 09 finkelstein
Robotics in future warfare 09 finkelsteinRobotics in future warfare 09 finkelstein
Robotics in future warfare 09 finkelstein
 
Interpretive structural modeling
Interpretive structural modelingInterpretive structural modeling
Interpretive structural modeling
 
management information system
management information systemmanagement information system
management information system
 
Measurement of iodine availability and stability of
Measurement of iodine availability and stability ofMeasurement of iodine availability and stability of
Measurement of iodine availability and stability of
 
Real time implementation of object tracking through
Real time implementation of object tracking throughReal time implementation of object tracking through
Real time implementation of object tracking through
 
Electronic system for testing tensile strength of foundry sand
Electronic system for testing tensile strength of foundry sandElectronic system for testing tensile strength of foundry sand
Electronic system for testing tensile strength of foundry sand
 
A simple and effective scheme to find malicious node in wireless sensor network
A simple and effective scheme to find malicious node in wireless sensor networkA simple and effective scheme to find malicious node in wireless sensor network
A simple and effective scheme to find malicious node in wireless sensor network
 
Comparison of symmetrical and asymmetrical cascaded
Comparison of symmetrical and asymmetrical cascadedComparison of symmetrical and asymmetrical cascaded
Comparison of symmetrical and asymmetrical cascaded
 
Review and calculation of activity co efficient of tea
Review and calculation of activity co efficient of teaReview and calculation of activity co efficient of tea
Review and calculation of activity co efficient of tea
 
Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...
Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...
Status of noise in yeshwanthpur circle (bangalore north) based on on site dat...
 
Sequences classification based on group technology
Sequences classification based on group technologySequences classification based on group technology
Sequences classification based on group technology
 
Automatic detection and severity analysis of brain
Automatic detection and severity analysis of brainAutomatic detection and severity analysis of brain
Automatic detection and severity analysis of brain
 
Holographic optical elements for beautification
Holographic optical elements for beautificationHolographic optical elements for beautification
Holographic optical elements for beautification
 
Learning analytics to quantize and improve the skills development and attainm...
Learning analytics to quantize and improve the skills development and attainm...Learning analytics to quantize and improve the skills development and attainm...
Learning analytics to quantize and improve the skills development and attainm...
 
Investigation of stresses in the thin rimmed spur
Investigation of stresses in the thin rimmed spurInvestigation of stresses in the thin rimmed spur
Investigation of stresses in the thin rimmed spur
 

Similar to Application of ict benefits for building project management using ism model

IRJET- Interface Management and its Effect on Project Complexity in Constr...
IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...
IRJET- Interface Management and its Effect on Project Complexity in Constr...IRJET Journal
 
IRJET-The Benefits of Information and Communication Technology Adoption in Co...
IRJET-The Benefits of Information and Communication Technology Adoption in Co...IRJET-The Benefits of Information and Communication Technology Adoption in Co...
IRJET-The Benefits of Information and Communication Technology Adoption in Co...IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...IRJET Journal
 
Net impact implementation application development life-cycle management in ba...
Net impact implementation application development life-cycle management in ba...Net impact implementation application development life-cycle management in ba...
Net impact implementation application development life-cycle management in ba...CSITiaesprime
 
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET Journal
 
A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...eSAT Journals
 
Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...
Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...
Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...Eswar Publications
 
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET-  	  Development of a Neural Network based Model for Construction Proje...IRJET-  	  Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...IRJET Journal
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...IRJET Journal
 
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...IJSRED
 
The editors bookshelf
The editors bookshelfThe editors bookshelf
The editors bookshelfGlen Alleman
 
The potential use of Web-based project management systems to manage construct...
The potential use of Web-based project management systems to manage construct...The potential use of Web-based project management systems to manage construct...
The potential use of Web-based project management systems to manage construct...Bhzad Sidawi
 
The impact of usability in information technology projects
The impact of usability in information technology projectsThe impact of usability in information technology projects
The impact of usability in information technology projectsCSITiaesprime
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based projecteSAT Journals
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET Journal
 
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...IRJET Journal
 

Similar to Application of ict benefits for building project management using ism model (20)

IRJET- Interface Management and its Effect on Project Complexity in Constr...
IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...IRJET- 	  Interface Management and its Effect on Project Complexity in Constr...
IRJET- Interface Management and its Effect on Project Complexity in Constr...
 
IRJET-The Benefits of Information and Communication Technology Adoption in Co...
IRJET-The Benefits of Information and Communication Technology Adoption in Co...IRJET-The Benefits of Information and Communication Technology Adoption in Co...
IRJET-The Benefits of Information and Communication Technology Adoption in Co...
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
 
Net impact implementation application development life-cycle management in ba...
Net impact implementation application development life-cycle management in ba...Net impact implementation application development life-cycle management in ba...
Net impact implementation application development life-cycle management in ba...
 
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...IRJET- Study of Innovative Technologies for Effective Construction and Manage...
IRJET- Study of Innovative Technologies for Effective Construction and Manage...
 
A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...A study of the constraints affecting the proper utilization of computer appli...
A study of the constraints affecting the proper utilization of computer appli...
 
Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...
Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...
Evaluation of Factors Affecting the Adoption of Smart Buildings Using the Tec...
 
IRJET- Development of a Neural Network based Model for Construction Proje...
IRJET-  	  Development of a Neural Network based Model for Construction Proje...IRJET-  	  Development of a Neural Network based Model for Construction Proje...
IRJET- Development of a Neural Network based Model for Construction Proje...
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
Construction Site Monitoring and Predictive Analysis Using Artificial Neural ...
 
The editors bookshelf
The editors bookshelfThe editors bookshelf
The editors bookshelf
 
The potential use of Web-based project management systems to manage construct...
The potential use of Web-based project management systems to manage construct...The potential use of Web-based project management systems to manage construct...
The potential use of Web-based project management systems to manage construct...
 
The impact of usability in information technology projects
The impact of usability in information technology projectsThe impact of usability in information technology projects
The impact of usability in information technology projects
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
ch01.ppt
ch01.pptch01.ppt
ch01.ppt
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Application of ict benefits for building project management using ism model

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 320 APPLICATION OF ICT BENEFITS FOR BUILDING PROJECT MANAGEMENT USING ISM MODEL S.V.S.N.D.L.Prasanna1 , T. Raja Ramanna2 1 Assistant Professor, Civil Engineering Department, University College of Engineering, Osmania University, Hyderabad- 07 2 M.E scholar, Civil Engineering Department, University College of Engineering, Osmania University, Hyderabad- 07 Abstract Construction is the second largest industrial activity is the Indian economy, employing over 31 million people. The construction projects require effective collaboration and coordination among the diverse project participants, that which exhibits a unique set of characteristics such as fragmentation, multidisciplinary, development, substantial financial commitment, varying complexities, long time spans, and a large number of geographically separated stakeholders involved at all the stages of the projects. Construction projects are managed by designated Project Managers, Architects or Contracts on behalf of the client or by the clients themselves depending on the contract and the project type. Project managers are required to integrate the efforts of all the stakeholders for required coordination for successful project management. Information Communication Technology (ICT) has influenced project management practices by the way of introducing and implementing newly developed management tools and the latest technology. Interpretive Structural Modeling(ISM) is a systematic application of graph theory in such a way that theoretical, conceptual and computational leverage is exploited by efficiently constructs a directed graph, or network representation, of the complex patters of relationship among the elements. In the present study an attempt is made to identify the strategic benefits, their level and interdependency for the project team organization using ICT and to develop ISM model for all the categories of benefits. For the present study MICMAC analysis is used to analyze the drive power and dependence power factors and by which 14 independent / Driven / Linkage benefits were obtained out of 31 benefits. Key Words: Construction, Project Managers, Collaboration, Benefits. --------------------------------------------------------------------***---------------------------------------------------------------------- 1. INTRODUCTION Construction projects require effective collaboration and coordination among the diverse project participants and can be done effectively by means of communication between all the project participants. This type of co-ordination and effective communication is crucial in order to achieve quality standards and to reduce the cost of production effectively. Construction projects are managed by designated officials like Project Managers, Architects or Contractors on part of the Client or by the Clients themselves depending upon the contract and the project type. Such good and responsive communication is important to monitor and control projects‟ activities according to the specific plans and thereby to achieve required project goals. Hence, the efficiency of the project manager lies in the way he communicates, evaluates and explains the feedback to the rest of the project team during each stage of the project life- cycle and determines how efficiently a project‟s goals will be achieved. Communication or data handling often takes about 75% to 90% of project managers‟ time in the construction industry. ICT is required not only to free up project managers for more decision making tasks but also to deliver the required levels of „consistency and reliability‟ of information in the construction supply chains because use of incorrect or incomplete data can compromise the scheduled completion of a project and lead to wastage of resources Multi enterprise scenario of construction projects requires collaborative use of ICT by all the project team organizations for managing a project that is to be planned before the start of the project. In the present day, ICT is being adopted for construction project management, but, till date, a perfect and sustainable methodology has not been developed and presented for the construction industry to examine the potential contributions of information management strategies in efforts to reduce overall project schedule and cost. This inability to quantify process improvements and uncertainty of benefits from process and cultural changes has become one of the primary barriers for effective implementation of ICT in construction project management. As a result of this the benefits of ICT adoption are primarily perception based and not quantifiable that specifically defines the extent of ICT adoption by the construction industry. Certain benefits are said to drive other benefits and certain benefits out of the driven ones are dependent on some other benefits. Construction professionals need to understand this aspect of driving power and dependence relationship between the benefits to plan strategic adoption of ICT for building project management. Interpretive Structural Modeling (ISM) falls into the soft operations research (OR) family of approaches. Soft OR methods can be used to augment traditional quantitative methods that do not exactly replace traditional tools and
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 321 techniques. ISM is a tool that which highly helps all different groups of people in structuring their collective knowledge. ISM is a systematic application of graph theory in which theoretical, conceptual, and computational leverage is exploited to efficiently construct a directed graph, or network representation having a complex pattern with contextual relationship among a set of elements. It also helps to identify the structure within a system of related elements and also may represent the information either by a digraph (directed graph) or by a matrix, ultimately resulting in a “directed graphic representation of a particular relationship among all pairs of elements in a set to aid in structuring a complex issue area”. 1.1 Objectives of the Study 1. Identifying the strategic benefits for the project team organization and developing ISM model for all categories of benefits. 2. Identifying the level of benefits and interdependency for evaluating the most independent and driving benefits for the total project. 2. METHODOLOGY Construction projects are of two categories, namely building construction projects and Engineering or Infrastructure projects for which the basic need is to study ICT adoption for both the categories of projects separately, where characteristics of supply chain issues, management procedures and contract conditions are different for both the categories of projects. In this study, variables are the perceived benefits of ICT adoption for building project management identified 31 important perceived benefits from literature and after discussion with the experts from the industry and academics. Considering the past experience, ISM technique has been used to analyze the relation between various benefits and to understand the dependence and driving power of each benefit with respect to other benefits. This way of analyzing each project, shall help the managers to decide, whether they are planning and proceeding with systematic ICT adoption procedure for achieving certain benefits to know the other driving benefits that should be achieved prior to the first and also the dependent benefits that would be achieved by default. It requires examination of all relationships between the benefits of ICT adoption rather than considering these benefits in isolation. 2.1 Benefits of Information Communication Technology in Construction Project Benefits of ICT adoption for managing building projects and improving overall organizational efficiency have been discussed in the literature. Some of the identified benefits are: richer information to aid decision making, project information obtained quicker, improved communication, closer relationships, improved information flow, and greater management control (Hendrickson and Au, 1989; Root and Thorpe, 2001; Love et al., 2004). Table 1: Perceived benefits of ICT adoption for building project management Benefits related to measures of project success 1 Projects completion as per the estimated time 2 Project completion as per the estimated budget 3 project completion as per the specifications 4 Life cycle concept becomes a competitive factors 5 Projects information obtained in real time 6 Richer information made available to managers 7 Less time spent in query and approval process 8 Effective change management 9 Reduced risk of errors and rework on projects 10 Effective concurrent construction management 11 A complete log of all communications maintained for tracking purposes 12 Effective material procurement and management 13 Effective contract management 14 "One-Source" documentation archive maintained for clients 15 Client satisfaction 16 Reduced administrative costs of document handling and distribution to multiple parties 17 Project managers spend more time on managerial works Benefits related to effective team management 18 Effective collaboration and co-ordination between project team members 19 Effective communication management between project team members 20 Greater management control 21 Effective joint decision making 22 Motivation of the work force Benefits related to effective use of technology 23 Increased information portability in the ICT environment 24 Reduced hard copy storage of documents / drawings 25 Flow of accurate information 26 Ease of retrieval of information 27 Improved capability of the system to cross reference to other correspondence 28 Multi locational availability of information Benefits related to increase organizational efficiency 29 Increase in overall organizational efficiency 30 Better information assessment and management with in the organization 31 Useful information compiled and disseminated to other projects
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 322 2.2 Interpretive structural Modeling ISM is an interactive learning process technique in which a set of different directly and indirectly related elements are structured into a comprehensive systematic model. The model so formed portrays the structure of a complex issue or problem in a carefully designed pattern implying graphics as well as words. This model is a well-established methodology for identifying relationships among detailed stuff, which define a problem. For any complex problem under consideration, different number of factors may be related to problem. However, the direct and indirect relationships between these factors describe the situation more accurately than the individual factor taken into isolation. Therefore, ISM develops insights into collective understandings of these relationships. The following are the steps involved in Interpretive Structural Modeling Step 1: Identify the elements which are relevant to the problem. This could be done by a survey or group problem solving technique. The benefits which we presented in Table 1 are considered in this step. Step 2: Establish a contextual relationship between elements with respect to which pairs of elements would be examined. Step 3: Structural Self-Interaction Matrix (SSIM)  V for the relation from factor i to factor j (i.e., factor i will influence factor j)  A for the relation from factor j to factor i (i.e., factor i will be influenced by factor j)  X for both direction relations (i.e., factors i and j will influence each other)  O for no relation between the factors (i.e., barriers i and j are unrelated).  X for both direction relations (i.e., factors i and j will influence each other)  O for no relation between the factors (i.e., barriers i and j are unrelated). Step 4: Reachability Matrix The next step in ISM approach is to develop an initial reachability matrix from SSIM. For this, SSIM is converted into the initial reachability matrix by substituting the four symbols (i.e., V, A, X or O) of SSIM by 1s or 0s in the initial reachability matrix. The rules for this substitution are as follows:  If the (i, j) entry in the SSIM is V, then the (i, j) entry in the reachability matrix becomes 1 and the (j, i) entry becomes 0.  If the (i, j) entry in the SSIM is A, then the (i, j) entry in the matrix becomes 0 and the (j, i) entry becomes 1.  If the (i, j) entry in the SSIM is X, then the (i, j) entry in the matrix becomes 1 and the (j, i) entry also becomes 1.  If the (i, j) entry in the SSIM is O, then the (i, j) entry in the matrix becomes 0 and the (j, i) entry also becomes 0. Step 5: Level partitions The reachability set for a particular variable consists of the variable itself and the variables it drives. The antecedent set shown in Table 2 consists of the variable itself and the variables on which it depends. Subsequently, the intersection of these sets is derived for all the benefits. The variable(s) for which the reachability and the intersection sets are the same as in the top-level of ISM hierarchy, as they would not help achieve any other variable above their own level. After the identification of the top-level variables, these are discarded from the other remaining variables (Ravi and Shankar, 2005). Then the same process is repeated to find out the factors in the next level. This process is continued until the level of each factor is found. These levels shown in Table 3 help in building the diagraph and the ISM model. Table 2 Reachability and Antecedent Set. Benefits Reachability set Antecedent set 1 1,2,15,20 1,5-13,15-21,23- 28,30,31 2 2,15,20 1,2,4-9,11-13,16-31 3 3,15,20 3,5,6,8,9,11,13,16- 21,23-28,30 4 2,4,15 4,6,7,16,17,19,21, 23-26,28,30 5 1,2,3,5,6,7,8,9,10, 12,13,15,16,18,19, 20,25,28,30,31 5,16-21,24,26,27 6 1,2,3,4,6,8,9,10,12, 13,15,16,18,19,20,28,30 5-7,16,17,21, 23-27,28,31 7 1,2,4,6,7,8,9,10,12, 13,15,16,18,20,28,30 5,7,11,16,17,19,21, 23-26,28 8 1,2,3,8,9,10,12,13, 15,16,18,20,30 5-8,11,16-19,21,23- 28,30 9 1,2,3,9,10,13,15,20 5-9,11,16-19,21,23- 28,30 10 1,10,13,15,20 5-12,16-19,21,23- 28,30 11 1,2,3,7,8,9,10,11,12,13, 14,15,16,18,19,20, 23,25,28,30,31 11,17,21,26 12 1,2,10,12,13,15,20 5-8,11,12,16-19, 23-28,30 13 1,2,3,13,15,20 5-13,16-21,23- 25,27-30 14 14,15,31 11,14,21 15 1,15,20 1-21,23-30 16 1-10,12,13,15-20,29,30 5- 8,11,16,17,19,21,23- 28 17 1-13,15-20,22,23,25,26, 28-31 16,17,21,24,26 18 1,2,3,5,6,7,9,10,8,12, 13,15,18,19,20 5-8,11,16-19,21,23, 25-28,30 19 1-5,7-10,12,13,15,16, 18-20, 5,6,11,16-19,21,23- 28 20 1,2,3,5,13,15,20, 1-3,5-13,15-20, 23-28,30
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 323 21 1-19,21,23,25,27-31 21 22 2,22,29 17,22,26 23 1-4,6-10,12,13,15,16, 18-20,23,28,29,30 11,17,21,23 24 1-10,12,13,15,16,17,19, 20,24,25,28,30,31 24 25 1-4,6-10,12,13,15,16, 18-20,25,28,30 5,11,17,21,24-27 26 1-12,15-20,22,25- 28,30,31 17,26 27 1,2,3,5,6,8,9,10, 12,13,15,16,18,19,20, 25,27,28,30,31 21,26,27 28 1-4,8-10,12,13,15,16, 18-20,28-31 5-8,11,17,21,23-28 29 2,13,15,29 16,17,21-23,28,29 30 1-4,8-10,12,13,15,18, 20,30 5-8,11,16,17,21,23- 28,30 31 1,2,6,31 5,11,14,17,21,24,26- 28,31 Step 6: Conical Matrix A conical matrix is developed by clustering benefits at the levels achieved, across rows and columns in the final reachability matrix. The final reachability matrix is in conical form. Most zero (0) variables are in the upper diagonal half of the matrix and most unitary (1) variables are in the lower half. The ISM Model shall be framed. Table 3 Level of Benefits Level Benefits Types 1 1 Projects completion as per the estimated time Projects Related 15 Client satisfaction Projects Related 2 2 Project completion as per estimated time Projects Related 3 Project completion as per specifications Projects Related 3 5 Project information obtained in real time Projects realted 19 Effective communication management between project team members Team management related 4 8 Effective change management Projects related 17 Projects managers spend more time on managerial works Project related 26 Ease to retrieval of information Technology related 30 Better information assessment and management within the organization Organization related 5 4 Life cycle concept becomes a competitive factor Project related 13 Effective contract management Project related 20 Greater management control Team management related 6 10 Effective concurrent construction management Project related 29 Increase in overall organizational efficiency Organization related 7 9 Reduced risk of errors and rework on projects Project related 12 Effective material procurement and management Project related 22 Motivation of the work force Team management related 8 16 Reduced administrative costs of document handling and distribution to multiple parties Project related 18 Effective collaboration and co-ordination between project team members Team management related 9 6 Richer information made available to managers Project related 7 Less time spent in query and approval process Project related 31 Useful information compiled and disseminated to other projects Organization related 10 14 “one-source” documentation archive maintained for clients Project related 23 Increased information portability in the ICT environment Technology related 25 Flow of accurate information Technology related 11 11 All communications maintained for tracking purpose Project related 24 Hard copy storage of documents Technology related 27 Improved capability of the system Technology related 12 21 Effective joint decision making Team management related 13 28 Multi location availability of data Technology related 2.3 MICMAC Analysis The purpose of MICMAC analysis is to analyze the drive power and dependence power of factors. MICMAC principle is based on multiplication properties of matrices. It is done to identify the key factors that drive the system in various categories. Based on their drive power and dependence power, the factors, have been classified into four categories i.e. autonomous factors (Weak drive power and weak dependent power), linkage factors (Strong drive power as well as strong dependent power), dependent (weak drive power but strong dependence power) and independent (strong drive power but weak dependence power) factors.
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Special Issue: 06 | May-2014 | RRDCE - 2014, Available @ http://www.ijret.org 324 The fig. shows the details about the nature of benefits which tells us about the driven or dependent or independent benefits. Fig 1: MICMAC Analysis. 3. RESULTS The developed ISM model presents a hierarchical framework to evaluate the ICT benefits those shall be adopted for building project management. The results can be summarized as follows. 1. The Structural Self Interaction Matrix shows the relation between the 31 benefits. 2. From Reachability matrix the no. of driven power, dependence power for each benefit is obtained and reachability set, antecedent set for each benefit is found. 3. From the 13 Iterations level of each benefit is obtained and shown below. 4. From the MICMAC analysis we got 14 Independent / Driven / Linkage benefits (5,6,7,11,16,17,19,21,23,24,25,26,27,28) out of 31 benefits. These 14 benefits reflect on the qualitative and quantitative completion of project. Iteration Level Benefits 1 1 1,15 2 2 2.3 3 3 5,149 4 4 8,17,26,30 5 5 4,13,20 6 6 10,29 7 7 9,12,22 8 8 16,18 9 9 6,7,31 10 10 14,23,25 11 11 11,24,27 12 12 21 13 13 28 4. DISCUSSIONS The Developed ISM model shows that the project related benefits are primarily at the top of hierarchy, team management related benefits are primarily in the middle and technology and organization related benefits are primarily at the bottom of hierarchy. The result indicates the Positive Net Value as driving nature of the benefits and negative Net Value as the dependent nature of the benefits and 0 indicates equal driving and dependent nature of the benefits. 5. REFERENCES 1. Ahuja., Vanita and Yang., Jay and Shankar., Ravi. (2006). “Web Based Communication for Construction Project Management.” World Conference on Accelerating Excellence in the Built Environment. 2. Chunwei Chen. (2012). “The Application of Interpretive Structural Modeling Method to Develop Verity Design Solution of Case Host Preference-Based Products: A Case Study of Razor.” Journal of Theoretical and Applied Informatiion Technology, 35 (1). 3. Janes, F.R. (1988). “Interpretive Structural Modeling (ISM) a methodology for structuring complex issues.” Trans Inst MC, 10 (3). 4. Joseph Sarkis., Mohd. Asif Hasan., Ravi Shankar. (2007). “Evaluating Environmentally Conscious Manufacturing Barriers with Interpretive Structural Modeling.” 5. Joshi., Y., Satendre, P., Saurabh, S.C. (2012). “Knowledge Sharing in Organizations: Modeling the Barriers, an Interpretive Structural Modeling Approach.” International Journal of Engineering and Innovative Technology (IJEIT), 2 (3). 6. Ming-Lang Tseng., and Yuan Hsu Lin. (2011). “Modeling a hierarchical structure of municipal solid waste management using interpretive structural modeling." WSEAS Transactions on Environment and Development, 7 (11). 7. Neena Sohani., and Nagendra Sohani. (2012). “Developing Interpretive Structural Model for Quality Framework in Higher Education: Indian Context.” Journal of Engineering, Science and Management Education, 5 (2). 8. Rajesh, A., Nikhil Dev., and Vivek Sharma. (2013). “Interpretive Structural Modeling (ISM) approach: An Overview.” Research Journal of Management Sciences, 2 (2), 3-8. 9. Shahabadkar, P., Hebbal, S.S., and Prashant, S. (2012). “Development of Interpretive Structural Modeling Methodology in Supply Chain Management an Overview.” International Journal of Industrial Engineering & Production Research, 23 (3), 195-205. 10. Singh, M.D., and Kant, R. (2008). “Knowledge management barriers: An interpretive structural modeling approach.” International Journal of Management Science and Engineering Management, 3 (2), 141-150. 11. Sreejith, B. (2012). “A Hierarchical Framework of Barriers to Green Supply Chain Management in the Construction Sector.” Journal of Sustainable Development, 5 (10). 12. Sudarshan Kumar., and Ravi Kant. (2013). “Supplier Selection Process Enablers: An Interpretive Structural Modeling Approach.” International Journal of Mechanical and Industrial Engineering, 3 (1).