1. Robert Demanawa 20140225Page 1 of 4
Robert D. Demanawa
0435 Chico Street, Landing
Limay, Bataan, Philippines 2103
Mobile Phone: 09989872239 /09063805036 Email:demanaward@yahoo.com
Results-oriented Project Engineer/Turnaround Engineering with diversified international project
engineering experience in high-pressure, time and culture sensitive environments. Work with
various companies, recognized for uniqueness in developing construction processes that ensure
impeccable execution of maintenance projects in refineries and productions, including turnaround
and shutdown for large complex facilities. Actively support in building loyal team relationships,
organization and planning. Ensures change management is complementary to people and results.
Adept to communicate and write English, Filipino and Spanish (basic) languages.
Professional Qualifications
17 years of experience in oil and gas industry, construction, power, desalination, industrial
projects
Held positions as project, turnaround, pre-commissioning, mechanical and piping engineer
Degreed mechanical engineer
Prepare bid technical specifications, bid tabulations cost estimating work, detailed engineering
calculations
Extensive experience in project execution, turnaround pre-commissioning/turnover activities
Generated lift plan packages and AutoCAD 3D models for fabrication and construction reference
Create and up-date P&ID’s, Piping Isometrics and spool drawings,detail drawings for mechanical
equipment including general and assembly sections.
Career History
Transfield Services WorleyParsons — Philippines November 2011-Present
Project Engineer
Coordinate and ensure project performed by the construction contractors are completed in
accordance with the work package and specifications for Shell Philippines Exploration (SPEX)
offshore maintenance projects. Monitor the construction activities making sure proper execution
with emphasis on safety and quality and built responsibly in a timely manner and within budget.
Ensured efficient execution of project management with collaborative leadership with project
efficiency including resource management control and conflict resolution.
Managed several Maintenance Capital projects simultaneously with emphasize on safety,
quality and within schedule and budget.
Managed and optimized the planning and execution of more than 6 schedule driven
shutdowns meeting the absolute completion dates with success.
2. Robert Demanawa 20140225Page 2 of 4
Coordinated and managed all SPEX’s Operations/Maintenance programs ensuring
compliance with relevant engineering standards and quality in conjunction with Maintenance
Capital projects.
D.J. Roque Construction Company, Inc. — Philippines January2010 to October 2010
Field PipingEngineer
Managed the piping activities associated with the fabrication and installation for maintenance work
at Petron Bataan Refinery. Ensure the efficient project execution within time and optimum cost,
meeting quality and safety standards.
Optimized project and team performance, developed schedules and plans with detailed
scope and tasks for each job ensuring planned jobs and efficient plant production.
Developed loyal relationships with Operations/Maintenance team to successfully complete
assignments and ensured all areas are aligned to common goals.
Star Aruba Construction N.V. — Aruba D.W.I. January2001 to September2009
Project/Turnaround Engineer
Provide technical assistance to turnaround planning and material purchasing for the long lead
items. Interface with Operations, Process, Reliability and Inspection Group to clarify scopes for
turnaround.
Process technical and bid specifications for material purchasing.
Provide technical information to vendor during equipment design and fabrication.
Review design drawing and provide technical assistance to the designer and design
engineer. In addition, generate AutoCAD 3D Design for detailed planning reference in
mechanical and piping system and some structural installation and fabrication drawing of
existing installation.
Monitor the design phase of turnaround scope and assist in the planning process.
Assist operations area engineer in development and execution of the project.
Generate Authorization for Expenditure (AFE) for project funding.
Prepare Lift plan package for medium and heavy lift requirements
ABB Lummus Global Overseas Corp. — Aruba D.W.I. January2000 to April 2000
Initial Operation Inspector (Mechanical/Piping)
Second Decoker Plant Project with 23,000 bpd capacity for Coastal Aruba Refinery. Assist in
development of test packages into segments per operating system for project pre-commissioning phase.
Perform punchlist and checkout for equipment and piping systems of the plant.
Line check and witness hydrotesting activities.
Finalize all test documents for operation system turnover packages.
Establish isolation lock-out/tag-out (terminal points) between commissioning activities and
construction limits.
Assist in generating electronic documentation and modification of drawing for as-built.
Finalize all test documents for operation system turnover packages.
Establish isolation lock-out/tag-out (terminal points) between commissioning activities and
construction limits.
Assist in generating electronic documentation and modification of drawing for as-built.
Awarded several Safety Award
3. Robert Demanawa 20140225Page 3 of 4
J.A. Jones Construction Company — Aruba D.W.I. March 1999 to January2000
Field Engineer(Mechanical/Piping)
Offsite Field Engineer for Aruba Capacity Expansion (ACE) Project for the up-grading plant production.
Work on outside battery limit of major units and projects to minor units such as Light Feed to D2/D3
Crude Unit, Crude Unit #6 Debottleneck and Safety Flare Unit #3.
Perform site survey and coordinate construction activities.
Prepare material take-off list and request material for design modification.
Modify drawing for as-built package after line rerouting.
Identify test limits for hydrotesting and prepare package for testing and turnover documents.
Review drawings and field verify installation of equipment and piping systems.
Mohammad Al-Mojil Group — Saudi Arabia June 1997 to September1998
Mechanical/PipingEngineer
SAUDI ARAMCO Cross-country Pipeline Project by SNC-Lavalin Company Incorporated of Alberta,
Canada. Coordinate the day to day field engineering operations of a Saudi Aramco EPC project of
shipping and receiving facilities of 356 Km product pipelines and along main highway between Riyadh
and Al-Qassim worth more than 50MM US$.
Prepare cost estimate for change orders and additional work.
Review design and material specification for conformance to project specification.
Responsible for approval and requisition of materials for the project.
Monitor progress of work and anticipate changes to technical requirements.
Provide technical support to vendor in HVAC unit installation of Satellite Control Building.
Assist construction in pre-commissioning phase up to turnover of complete system.
Mohammad Al-Mojil Group — Saudi Arabia January1996 to May1997
Field PipingEngineer
Saline Water Conversion Company (SWCC) Expansion AK-III Project at Al-Khobar, KSA. Monitor the
field piping installation project in desalination area to produce additional 65,000 gal/day conversion salt
water to sweet water using waste heat from the power plant boiler.
Monitor and prepare material take-off for the material required.
Perform site survey and coordinate construction activities.
Provide assistance to construction for tie-in of 3000 mm diameter product line.
Responsible for approval and requisition of materials for the project.
Prepare cost estimate for change orders and additional work for billing report.
Litwin Lummus Crest Joint Venture-Aruba V.O.F. - Aruba April 1995 to August 1995
Initial Operation Engineer (Mechanical/Piping)
First Decoker PlantProject to produce additional23,000 bpd of finish product to Coastal Aruba Refinery.
Assist in development of test packages into segments per operating system for project pre-
commissioning activities.
Perform punchlist and checkout for equipment and piping systems of the plant.
Inspect equipment installation and component conformance with the design requirements.
Line check and witness hydrotesting activities.
Finalize all test documents for operation system turnover packages.
Establish isolation lock-out/tag-out (terminal points) between commissioning activities and
construction limits.
4. Robert Demanawa 20140225Page 4 of 4
Engineering and Equipment Inc. - Philippines November1994 to April 1995
Field Tracker/ Pipefitter
Philippine National Oil Company (PNOC) Sector II Project by Daelim Engineering Limited of South
Korea. Petron Bataan Refinery Phase 2 of capacity expansion project.
Inspect storage tank and pressure vessel piping system.
Monitor the installation of piping system at TCCU and GODU area.
Provide technical assistance to field installation and coordinate work progress with
proponent engineers.
Assist in development of test package for various line classifications.
Energy and Aviation Support Corp. - Philippines January1992 to September 1994
ProjectCoordinator/Mechanical Engineer
Bataan Thermal Power Plant Turbine Condenser System Project for Installation of Taprogge GmbH-
Germany Debris Filter and CondenserCleaning System for Turbine Condenser Unit No-1. The project
will improve the cooling efficiency of unit and eliminate shutdown for cleaning of tubes.
Lay-out and prepare equipment foundation
Coordinate daily progress report and material requirements.
Provide technical assistance to field installation.
Coordinate and assist with equipment representative during commissioning, start-up and
training of plant personnel.
Education and Technical Experience
MS Project 2007
Swagelok Tube Fitting Installation and Tube Bending Safety Seminar
High Definition Survey Training, Leica Geosystems
TBOSIET (OPITO)
2012
2012
2012
2012
Basic Occupational Safety and Health Training Course (Phil) 2011
Instrument and Calibration Techniques Course (TESDA Certification) 2011
Gas Welding Course 1994
Training in Theory, Operation, Maintenance and Repair of Taprogge Equipment 1992
Bachelor of Science in Mechanical Engineering, CSA-B, Philippines 1988
Microsoft Office 2010 including MS Word, MS Excel, MS Power Point, MS Visio
AutoCAD 2011 Adobe X Standard Business Draw 2009
Awards and Commendations
Several safety awards and commendations for construction projects in Aruba Refinery
Professional Associations
American Welding Society (Member) 1998
Licensed Mechanical Engineer, Philippine Regulation Commission 1991