SlideShare a Scribd company logo
1 of 4
Robert Demanawa 20140225Page 1 of 4
Robert D. Demanawa
0435 Chico Street, Landing
Limay, Bataan, Philippines 2103
Mobile Phone: 09989872239 /09063805036 Email:demanaward@yahoo.com
Results-oriented Project Engineer/Turnaround Engineering with diversified international project
engineering experience in high-pressure, time and culture sensitive environments. Work with
various companies, recognized for uniqueness in developing construction processes that ensure
impeccable execution of maintenance projects in refineries and productions, including turnaround
and shutdown for large complex facilities. Actively support in building loyal team relationships,
organization and planning. Ensures change management is complementary to people and results.
Adept to communicate and write English, Filipino and Spanish (basic) languages.
Professional Qualifications
 17 years of experience in oil and gas industry, construction, power, desalination, industrial
projects
 Held positions as project, turnaround, pre-commissioning, mechanical and piping engineer
 Degreed mechanical engineer
 Prepare bid technical specifications, bid tabulations cost estimating work, detailed engineering
calculations
 Extensive experience in project execution, turnaround pre-commissioning/turnover activities
 Generated lift plan packages and AutoCAD 3D models for fabrication and construction reference
 Create and up-date P&ID’s, Piping Isometrics and spool drawings,detail drawings for mechanical
equipment including general and assembly sections.
Career History
Transfield Services WorleyParsons — Philippines November 2011-Present
Project Engineer
Coordinate and ensure project performed by the construction contractors are completed in
accordance with the work package and specifications for Shell Philippines Exploration (SPEX)
offshore maintenance projects. Monitor the construction activities making sure proper execution
with emphasis on safety and quality and built responsibly in a timely manner and within budget.
 Ensured efficient execution of project management with collaborative leadership with project
efficiency including resource management control and conflict resolution.
 Managed several Maintenance Capital projects simultaneously with emphasize on safety,
quality and within schedule and budget.
 Managed and optimized the planning and execution of more than 6 schedule driven
shutdowns meeting the absolute completion dates with success.
Robert Demanawa 20140225Page 2 of 4
 Coordinated and managed all SPEX’s Operations/Maintenance programs ensuring
compliance with relevant engineering standards and quality in conjunction with Maintenance
Capital projects.
D.J. Roque Construction Company, Inc. — Philippines January2010 to October 2010
Field PipingEngineer
Managed the piping activities associated with the fabrication and installation for maintenance work
at Petron Bataan Refinery. Ensure the efficient project execution within time and optimum cost,
meeting quality and safety standards.
 Optimized project and team performance, developed schedules and plans with detailed
scope and tasks for each job ensuring planned jobs and efficient plant production.
 Developed loyal relationships with Operations/Maintenance team to successfully complete
assignments and ensured all areas are aligned to common goals.
Star Aruba Construction N.V. — Aruba D.W.I. January2001 to September2009
Project/Turnaround Engineer
Provide technical assistance to turnaround planning and material purchasing for the long lead
items. Interface with Operations, Process, Reliability and Inspection Group to clarify scopes for
turnaround.
 Process technical and bid specifications for material purchasing.
 Provide technical information to vendor during equipment design and fabrication.
 Review design drawing and provide technical assistance to the designer and design
engineer. In addition, generate AutoCAD 3D Design for detailed planning reference in
mechanical and piping system and some structural installation and fabrication drawing of
existing installation.
 Monitor the design phase of turnaround scope and assist in the planning process.
 Assist operations area engineer in development and execution of the project.
 Generate Authorization for Expenditure (AFE) for project funding.
 Prepare Lift plan package for medium and heavy lift requirements
ABB Lummus Global Overseas Corp. — Aruba D.W.I. January2000 to April 2000
Initial Operation Inspector (Mechanical/Piping)
Second Decoker Plant Project with 23,000 bpd capacity for Coastal Aruba Refinery. Assist in
development of test packages into segments per operating system for project pre-commissioning phase.
 Perform punchlist and checkout for equipment and piping systems of the plant.
 Line check and witness hydrotesting activities.
 Finalize all test documents for operation system turnover packages.
 Establish isolation lock-out/tag-out (terminal points) between commissioning activities and
construction limits.
 Assist in generating electronic documentation and modification of drawing for as-built.
 Finalize all test documents for operation system turnover packages.
 Establish isolation lock-out/tag-out (terminal points) between commissioning activities and
construction limits.
 Assist in generating electronic documentation and modification of drawing for as-built.
 Awarded several Safety Award
Robert Demanawa 20140225Page 3 of 4
J.A. Jones Construction Company — Aruba D.W.I. March 1999 to January2000
Field Engineer(Mechanical/Piping)
Offsite Field Engineer for Aruba Capacity Expansion (ACE) Project for the up-grading plant production.
Work on outside battery limit of major units and projects to minor units such as Light Feed to D2/D3
Crude Unit, Crude Unit #6 Debottleneck and Safety Flare Unit #3.
 Perform site survey and coordinate construction activities.
 Prepare material take-off list and request material for design modification.
 Modify drawing for as-built package after line rerouting.
 Identify test limits for hydrotesting and prepare package for testing and turnover documents.
 Review drawings and field verify installation of equipment and piping systems.
Mohammad Al-Mojil Group — Saudi Arabia June 1997 to September1998
Mechanical/PipingEngineer
SAUDI ARAMCO Cross-country Pipeline Project by SNC-Lavalin Company Incorporated of Alberta,
Canada. Coordinate the day to day field engineering operations of a Saudi Aramco EPC project of
shipping and receiving facilities of 356 Km product pipelines and along main highway between Riyadh
and Al-Qassim worth more than 50MM US$.
 Prepare cost estimate for change orders and additional work.
 Review design and material specification for conformance to project specification.
 Responsible for approval and requisition of materials for the project.
 Monitor progress of work and anticipate changes to technical requirements.
 Provide technical support to vendor in HVAC unit installation of Satellite Control Building.
 Assist construction in pre-commissioning phase up to turnover of complete system.
Mohammad Al-Mojil Group — Saudi Arabia January1996 to May1997
Field PipingEngineer
Saline Water Conversion Company (SWCC) Expansion AK-III Project at Al-Khobar, KSA. Monitor the
field piping installation project in desalination area to produce additional 65,000 gal/day conversion salt
water to sweet water using waste heat from the power plant boiler.
 Monitor and prepare material take-off for the material required.
 Perform site survey and coordinate construction activities.
 Provide assistance to construction for tie-in of 3000 mm diameter product line.
 Responsible for approval and requisition of materials for the project.
 Prepare cost estimate for change orders and additional work for billing report.
Litwin Lummus Crest Joint Venture-Aruba V.O.F. - Aruba April 1995 to August 1995
Initial Operation Engineer (Mechanical/Piping)
First Decoker PlantProject to produce additional23,000 bpd of finish product to Coastal Aruba Refinery.
Assist in development of test packages into segments per operating system for project pre-
commissioning activities.
 Perform punchlist and checkout for equipment and piping systems of the plant.
 Inspect equipment installation and component conformance with the design requirements.
 Line check and witness hydrotesting activities.
 Finalize all test documents for operation system turnover packages.
 Establish isolation lock-out/tag-out (terminal points) between commissioning activities and
construction limits.
Robert Demanawa 20140225Page 4 of 4
Engineering and Equipment Inc. - Philippines November1994 to April 1995
Field Tracker/ Pipefitter
Philippine National Oil Company (PNOC) Sector II Project by Daelim Engineering Limited of South
Korea. Petron Bataan Refinery Phase 2 of capacity expansion project.
 Inspect storage tank and pressure vessel piping system.
 Monitor the installation of piping system at TCCU and GODU area.
 Provide technical assistance to field installation and coordinate work progress with
proponent engineers.
 Assist in development of test package for various line classifications.
Energy and Aviation Support Corp. - Philippines January1992 to September 1994
ProjectCoordinator/Mechanical Engineer
Bataan Thermal Power Plant Turbine Condenser System Project for Installation of Taprogge GmbH-
Germany Debris Filter and CondenserCleaning System for Turbine Condenser Unit No-1. The project
will improve the cooling efficiency of unit and eliminate shutdown for cleaning of tubes.
 Lay-out and prepare equipment foundation
 Coordinate daily progress report and material requirements.
 Provide technical assistance to field installation.
 Coordinate and assist with equipment representative during commissioning, start-up and
training of plant personnel.
Education and Technical Experience
MS Project 2007
Swagelok Tube Fitting Installation and Tube Bending Safety Seminar
High Definition Survey Training, Leica Geosystems
TBOSIET (OPITO)
2012
2012
2012
2012
Basic Occupational Safety and Health Training Course (Phil) 2011
Instrument and Calibration Techniques Course (TESDA Certification) 2011
Gas Welding Course 1994
Training in Theory, Operation, Maintenance and Repair of Taprogge Equipment 1992
Bachelor of Science in Mechanical Engineering, CSA-B, Philippines 1988
Microsoft Office 2010 including MS Word, MS Excel, MS Power Point, MS Visio
AutoCAD 2011 Adobe X Standard Business Draw 2009
Awards and Commendations
Several safety awards and commendations for construction projects in Aruba Refinery
Professional Associations
American Welding Society (Member) 1998
Licensed Mechanical Engineer, Philippine Regulation Commission 1991

More Related Content

What's hot

Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302Rhod Mayers
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016Mujahid Ali Akhtar
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6Mujahid Ali Akhtar
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResumeRyan Moyer PE
 

What's hot (20)

CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Resume of ECP
Resume of ECPResume of ECP
Resume of ECP
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
Emmanuel C-CV2
Emmanuel C-CV2Emmanuel C-CV2
Emmanuel C-CV2
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResume
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 

Viewers also liked

Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017Kim Kadletz
 
(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea water(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea waterAlsayed Yakoot
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014Billy Robb
 
Ram Kumar2015
Ram Kumar2015Ram Kumar2015
Ram Kumar2015ram kumar
 
RESUME - DAVID SILVA (1) (1)
RESUME -  DAVID SILVA (1) (1)RESUME -  DAVID SILVA (1) (1)
RESUME - DAVID SILVA (1) (1)David Silva Polo
 
Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copydarren williams
 
Recruitment Department Kp Is
Recruitment Department Kp IsRecruitment Department Kp Is
Recruitment Department Kp Ishsalem
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRYodhia Antariksa
 

Viewers also liked (16)

Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea water(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea water
 
MY CV
MY CVMY CV
MY CV
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
 
cv 2016
cv 2016cv 2016
cv 2016
 
Ram Kumar2015
Ram Kumar2015Ram Kumar2015
Ram Kumar2015
 
AURANG ZEB MALIK
AURANG ZEB MALIKAURANG ZEB MALIK
AURANG ZEB MALIK
 
RAN BIJAY
RAN BIJAYRAN BIJAY
RAN BIJAY
 
RESUME - DAVID SILVA (1) (1)
RESUME -  DAVID SILVA (1) (1)RESUME -  DAVID SILVA (1) (1)
RESUME - DAVID SILVA (1) (1)
 
Sachin updated CV
Sachin updated CVSachin updated CV
Sachin updated CV
 
Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copy
 
cv adi(1new)
cv adi(1new)cv adi(1new)
cv adi(1new)
 
Sreekumar_Resume
Sreekumar_ResumeSreekumar_Resume
Sreekumar_Resume
 
Recruitment Department Kp Is
Recruitment Department Kp IsRecruitment Department Kp Is
Recruitment Department Kp Is
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HR
 

Similar to Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)

Similar to Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC) (20)

FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
CV
CVCV
CV
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Resume
Resume Resume
Resume
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Sameer CV-DC
Sameer CV-DCSameer CV-DC
Sameer CV-DC
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
cv 2016
cv 2016cv 2016
cv 2016
 

Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)

  • 1. Robert Demanawa 20140225Page 1 of 4 Robert D. Demanawa 0435 Chico Street, Landing Limay, Bataan, Philippines 2103 Mobile Phone: 09989872239 /09063805036 Email:demanaward@yahoo.com Results-oriented Project Engineer/Turnaround Engineering with diversified international project engineering experience in high-pressure, time and culture sensitive environments. Work with various companies, recognized for uniqueness in developing construction processes that ensure impeccable execution of maintenance projects in refineries and productions, including turnaround and shutdown for large complex facilities. Actively support in building loyal team relationships, organization and planning. Ensures change management is complementary to people and results. Adept to communicate and write English, Filipino and Spanish (basic) languages. Professional Qualifications  17 years of experience in oil and gas industry, construction, power, desalination, industrial projects  Held positions as project, turnaround, pre-commissioning, mechanical and piping engineer  Degreed mechanical engineer  Prepare bid technical specifications, bid tabulations cost estimating work, detailed engineering calculations  Extensive experience in project execution, turnaround pre-commissioning/turnover activities  Generated lift plan packages and AutoCAD 3D models for fabrication and construction reference  Create and up-date P&ID’s, Piping Isometrics and spool drawings,detail drawings for mechanical equipment including general and assembly sections. Career History Transfield Services WorleyParsons — Philippines November 2011-Present Project Engineer Coordinate and ensure project performed by the construction contractors are completed in accordance with the work package and specifications for Shell Philippines Exploration (SPEX) offshore maintenance projects. Monitor the construction activities making sure proper execution with emphasis on safety and quality and built responsibly in a timely manner and within budget.  Ensured efficient execution of project management with collaborative leadership with project efficiency including resource management control and conflict resolution.  Managed several Maintenance Capital projects simultaneously with emphasize on safety, quality and within schedule and budget.  Managed and optimized the planning and execution of more than 6 schedule driven shutdowns meeting the absolute completion dates with success.
  • 2. Robert Demanawa 20140225Page 2 of 4  Coordinated and managed all SPEX’s Operations/Maintenance programs ensuring compliance with relevant engineering standards and quality in conjunction with Maintenance Capital projects. D.J. Roque Construction Company, Inc. — Philippines January2010 to October 2010 Field PipingEngineer Managed the piping activities associated with the fabrication and installation for maintenance work at Petron Bataan Refinery. Ensure the efficient project execution within time and optimum cost, meeting quality and safety standards.  Optimized project and team performance, developed schedules and plans with detailed scope and tasks for each job ensuring planned jobs and efficient plant production.  Developed loyal relationships with Operations/Maintenance team to successfully complete assignments and ensured all areas are aligned to common goals. Star Aruba Construction N.V. — Aruba D.W.I. January2001 to September2009 Project/Turnaround Engineer Provide technical assistance to turnaround planning and material purchasing for the long lead items. Interface with Operations, Process, Reliability and Inspection Group to clarify scopes for turnaround.  Process technical and bid specifications for material purchasing.  Provide technical information to vendor during equipment design and fabrication.  Review design drawing and provide technical assistance to the designer and design engineer. In addition, generate AutoCAD 3D Design for detailed planning reference in mechanical and piping system and some structural installation and fabrication drawing of existing installation.  Monitor the design phase of turnaround scope and assist in the planning process.  Assist operations area engineer in development and execution of the project.  Generate Authorization for Expenditure (AFE) for project funding.  Prepare Lift plan package for medium and heavy lift requirements ABB Lummus Global Overseas Corp. — Aruba D.W.I. January2000 to April 2000 Initial Operation Inspector (Mechanical/Piping) Second Decoker Plant Project with 23,000 bpd capacity for Coastal Aruba Refinery. Assist in development of test packages into segments per operating system for project pre-commissioning phase.  Perform punchlist and checkout for equipment and piping systems of the plant.  Line check and witness hydrotesting activities.  Finalize all test documents for operation system turnover packages.  Establish isolation lock-out/tag-out (terminal points) between commissioning activities and construction limits.  Assist in generating electronic documentation and modification of drawing for as-built.  Finalize all test documents for operation system turnover packages.  Establish isolation lock-out/tag-out (terminal points) between commissioning activities and construction limits.  Assist in generating electronic documentation and modification of drawing for as-built.  Awarded several Safety Award
  • 3. Robert Demanawa 20140225Page 3 of 4 J.A. Jones Construction Company — Aruba D.W.I. March 1999 to January2000 Field Engineer(Mechanical/Piping) Offsite Field Engineer for Aruba Capacity Expansion (ACE) Project for the up-grading plant production. Work on outside battery limit of major units and projects to minor units such as Light Feed to D2/D3 Crude Unit, Crude Unit #6 Debottleneck and Safety Flare Unit #3.  Perform site survey and coordinate construction activities.  Prepare material take-off list and request material for design modification.  Modify drawing for as-built package after line rerouting.  Identify test limits for hydrotesting and prepare package for testing and turnover documents.  Review drawings and field verify installation of equipment and piping systems. Mohammad Al-Mojil Group — Saudi Arabia June 1997 to September1998 Mechanical/PipingEngineer SAUDI ARAMCO Cross-country Pipeline Project by SNC-Lavalin Company Incorporated of Alberta, Canada. Coordinate the day to day field engineering operations of a Saudi Aramco EPC project of shipping and receiving facilities of 356 Km product pipelines and along main highway between Riyadh and Al-Qassim worth more than 50MM US$.  Prepare cost estimate for change orders and additional work.  Review design and material specification for conformance to project specification.  Responsible for approval and requisition of materials for the project.  Monitor progress of work and anticipate changes to technical requirements.  Provide technical support to vendor in HVAC unit installation of Satellite Control Building.  Assist construction in pre-commissioning phase up to turnover of complete system. Mohammad Al-Mojil Group — Saudi Arabia January1996 to May1997 Field PipingEngineer Saline Water Conversion Company (SWCC) Expansion AK-III Project at Al-Khobar, KSA. Monitor the field piping installation project in desalination area to produce additional 65,000 gal/day conversion salt water to sweet water using waste heat from the power plant boiler.  Monitor and prepare material take-off for the material required.  Perform site survey and coordinate construction activities.  Provide assistance to construction for tie-in of 3000 mm diameter product line.  Responsible for approval and requisition of materials for the project.  Prepare cost estimate for change orders and additional work for billing report. Litwin Lummus Crest Joint Venture-Aruba V.O.F. - Aruba April 1995 to August 1995 Initial Operation Engineer (Mechanical/Piping) First Decoker PlantProject to produce additional23,000 bpd of finish product to Coastal Aruba Refinery. Assist in development of test packages into segments per operating system for project pre- commissioning activities.  Perform punchlist and checkout for equipment and piping systems of the plant.  Inspect equipment installation and component conformance with the design requirements.  Line check and witness hydrotesting activities.  Finalize all test documents for operation system turnover packages.  Establish isolation lock-out/tag-out (terminal points) between commissioning activities and construction limits.
  • 4. Robert Demanawa 20140225Page 4 of 4 Engineering and Equipment Inc. - Philippines November1994 to April 1995 Field Tracker/ Pipefitter Philippine National Oil Company (PNOC) Sector II Project by Daelim Engineering Limited of South Korea. Petron Bataan Refinery Phase 2 of capacity expansion project.  Inspect storage tank and pressure vessel piping system.  Monitor the installation of piping system at TCCU and GODU area.  Provide technical assistance to field installation and coordinate work progress with proponent engineers.  Assist in development of test package for various line classifications. Energy and Aviation Support Corp. - Philippines January1992 to September 1994 ProjectCoordinator/Mechanical Engineer Bataan Thermal Power Plant Turbine Condenser System Project for Installation of Taprogge GmbH- Germany Debris Filter and CondenserCleaning System for Turbine Condenser Unit No-1. The project will improve the cooling efficiency of unit and eliminate shutdown for cleaning of tubes.  Lay-out and prepare equipment foundation  Coordinate daily progress report and material requirements.  Provide technical assistance to field installation.  Coordinate and assist with equipment representative during commissioning, start-up and training of plant personnel. Education and Technical Experience MS Project 2007 Swagelok Tube Fitting Installation and Tube Bending Safety Seminar High Definition Survey Training, Leica Geosystems TBOSIET (OPITO) 2012 2012 2012 2012 Basic Occupational Safety and Health Training Course (Phil) 2011 Instrument and Calibration Techniques Course (TESDA Certification) 2011 Gas Welding Course 1994 Training in Theory, Operation, Maintenance and Repair of Taprogge Equipment 1992 Bachelor of Science in Mechanical Engineering, CSA-B, Philippines 1988 Microsoft Office 2010 including MS Word, MS Excel, MS Power Point, MS Visio AutoCAD 2011 Adobe X Standard Business Draw 2009 Awards and Commendations Several safety awards and commendations for construction projects in Aruba Refinery Professional Associations American Welding Society (Member) 1998 Licensed Mechanical Engineer, Philippine Regulation Commission 1991