1. Working Experience
Commissioning Manager (2014- 2015)at Falcon Energy Group Singapore
 as owner representative in CJ50 Gusto MSC-120 Jackup (4 units)at Shanhaiguan Shipyard, China
 Assist project manager to plan the commissioning activities and prepare the schedule to meet the
delivery date
 Coordinate with shipyard and vendors to resolve the technical issues found on site
 Provide expert technical advices to shipyard project team on construction and commissioning
activities.
 Work closely with site surveyorto ensure the rig is constructed according to the contracted class rules
and regulations
 Work with engineering and shipyard to prepare commissioning procedures
 Review the piping, electrical and HVAC engineering design drawing,
 Assist shipyard to prepare completion of Mechanical Completion Dossiers.
 Plan and lead the major operation such as full jacking trial, preload jacking, preload holding and
derrick load test.
 Lead the multi-disciplines commissioning engineers to coordinate with shipyard personnels to attend
the test and commissioning inspection on the rig for all the systemincluding Drilling System, Mud
System and Marine System such as Ballast and Bilge system, Seawater cooling system, Fresh Water
cooling system, Power Management system, Lighting and distribution System, Vessel Management
System, PAGA/PABX system, Fire and Gas System, Potable Water System, Sewage Treatment
System, Remote Control Valve System and Compressed Air System.
 assist and witness mechanical, electrical and piping construction inspection prior to commissioning
and pre-commissioning activities
Assistant Project Manager / Commissioning Manager (2013- 2014)at Jurong Shipyard Pte. Ltd. Singapore
 Involved in Noble Jackup JU3000N#2 (Noble Mick O’Brien), JU3000N#3 (Noble Houston Colbert)
and JU3000N#5 (Noble Tom Prosser), Helix Q7000 Well Intervention Unit
 Assist to project manager to plan the commissioning activities and prepare the schedule to meet the
delivery date
 Coordinate with owner and vendorto achieve the commissioning schedule as plan
 Work with engineering and vendorto prepare commissioning procedures
 Oversee the piping, electrical and HVAC construction problems and coordinate to push for
completion of MCD dossiers.
 Plan and lead the major operation such as full jacking trial, preload jacking, preload holding and
derrick load test.
 Take lead in managing project testing and commissioning activities which require higher level of
technical sophistication.
 Lead the multi-disciplines commissioning engineers to coordinate with client and class representatives
to perform the test and commissioning inspection on the rig for all the systemincluding Drilling
System, Mud System and Marine Systemsuch as Ballast and Bilge system,Seawater cooling system,
Fresh Water cooling system, Power Management system, Lighting and distribution System, Vessel
Management System, PAGA/PABX system, Fire and Gas System, Potable Water System, Sewage
Treatment System, Remote Control Valve System and Compressed Air System
 Chair daily commissioning meeting with engineers and client representatives to review daily
commissioning activities and resolve conflicts between client and vendors.
 Attend weekly project meeting to report commissioning progress to client project manager.
 Report to top management project commissioning progress to reassure them no delay in delivery
schedule.
 Utilised shipyard EPCC management software to track and record commissioning progress and punch
list register.
 Ensure my commissioning team members to monitor and manage punch list generated during
construction and commissioning.
 Assist to project manager to trace down additional job enhancement in variation orders.
 Assist to project manager to prepare and execute the recovery plan with production teams when there
is requirement.
 Lead commissioning team members to prepare final handoverdocumentation after completion of all
commissioning activities.
 Manage and negotiate construction subcontractors effectively in daily construction and
commissioning meeting.
Project Engineer (2011-2012)at Jurong Shipyard Pte. Ltd. Singapore
 Involved in Noble Jackup JU3000N#1 Noble Regina Allen piping construction
 Read and understand piping technical drawings.
 assist to monitor the piping installation jobs
 help to rectify the piping material shortage problem
 monitoring for piping construction progress and set production target
 Work togetherwith all parties including owner, engineering and production to rectify piping
installation and testing issues.
 Assist to project manager to coordinate the piping contractors to work on recovery plan when the
progress was behind schedule.
 Organise construction meeting to communicate project schedule, planning and requirement with
construction team.
 Ensure all the production documents such as welding procedure specification, dimension reports and
material certifications are properly documented.
Project Engineer / Commissioning Engineer (2007-2012)at Jurong Shipyard Pte. Ltd. Singapore
 Involved in Submersible Rig -West Sirius (Seadrill 8), Petrorig 1 (Ocean Courage), Petrorig III ,
Atwood Osprey, Atwood Condor
 Carried out the commissioning activities on marine equipment such as anchorwinches, lifeboat,
rescue craft, life raft, pneumatic water tight doors, starting air system,fuel oil supply and return
system, Main Diesel Generator C280 3600 modal, Ballast, Bilge, Drill Water and Deck Drainage,
 Commission of drilling equipment such as Drill Floor Manipulator Arm, Riser Chute, Riser Handling
Crane, Mouse hole, Rotary Table, Active Heave Compensator, Tubular Feeding Machine and
Hydraulic Auto Roughneck
 Commission of Mud Systemsuch as High Pressure Mud System, Low Pressure mud charging, Brine
System, Mud Return and Treatment (Shale Shaker, Desilter and Desander) and Mud Drainage.
 Working closely with vendorand owner to troubleshoot the problems during commissioning.
 Work togetherwith owner to produce commissioning procedures
 Work togetherwith construction teamto rectify and resolve the punch list raised during inspection
and commissioning.
 prepare the final handover document after completion of all commissioning activities.
Design Engineer (2006-2007): at Insiphil Manufacturing Pte. Ltd, Malaysia
 Develop new product.
 Design mechanical part, mainly metal stamping parts.
 Meet with metal stamping supplier for technical support.
 Follow up with supplier for project support.
 monitor the parts assembly progress and troubleshoot the assembly conflict occurred
2. Education
Bachelor of Engineering (Honours) Mechanical with Second Class Honours (Upper Division) (CGPA 3.39/4.00)
Multimedia University, Malaysia
2003-2007
3. Skills
Languages
 Spoken: English, Malay, Mandarin, Chinese dialect.
 Written: English, Malay, and Mandarin.
Technical / Computer Skills
 Microsoft Word, Microsoft Excel, Microsoft Power Point, Microsoft Access,C Programming, Catia,
Autocad,Solidwork 2006, Mathlab, Microprocessorprogramming (8051), EPCC inhouse software,
Microsoft Project.
Leadership Skills
 Result orientedable to work independently,self-motivated, multi-lingual (Malay, English, Mandarin,
Cantonese and some local dialects), initiative, dynamic, able to work overtime, willing to travel
4. Certifications& Achievements
1. Safety Instruction Course for Shiprepair Manager
2. Fundamental of Offshore and Ship Systems
3. Risk Management Course (accredited by Ministry of Manpower Singapore)
4. Project Management for Executives
5. Offshore Facilities for Oil and Gas Production

More Related Content

What's hot

CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)Joedon Cunanan
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resumeiminneedofu
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd ResumeNathan Mudd
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae limFilemon Lim
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdfCary Dela Cruz
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015Ricky Dasal
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 

What's hot (20)

Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Topside
TopsideTopside
Topside
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resume
 
CV 2016
CV 2016CV 2016
CV 2016
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 
2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf2015 Resume Cary B. Dela Cruz.pdf
2015 Resume Cary B. Dela Cruz.pdf
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 

Viewers also liked

Proyecto investigacion
Proyecto investigacionProyecto investigacion
Proyecto investigacionJuank Suarez
 
Bowling Together Fnchs Presentation
Bowling Together Fnchs PresentationBowling Together Fnchs Presentation
Bowling Together Fnchs Presentationjasonharpe
 
lukilabs_infographic
lukilabs_infographiclukilabs_infographic
lukilabs_infographicFatma Ghailan
 
Impactos del Cambio Climático en especies y ecosistemas
Impactos del Cambio Climático en especies y ecosistemasImpactos del Cambio Climático en especies y ecosistemas
Impactos del Cambio Climático en especies y ecosistemasJC Riveros
 
APS Blocking Dogs
APS Blocking DogsAPS Blocking Dogs
APS Blocking DogsJune Patton
 
สถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1page
สถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1pageสถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1page
สถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1pagePrachoom Rangkasikorn
 
LE EMOZIONI DEI VOLONTARI D'AMBULANZA
LE EMOZIONI DEI VOLONTARI D'AMBULANZALE EMOZIONI DEI VOLONTARI D'AMBULANZA
LE EMOZIONI DEI VOLONTARI D'AMBULANZAElisabetta Bassani
 
Serfor: Bosques productivos para la vida
Serfor: Bosques productivos para la vida Serfor: Bosques productivos para la vida
Serfor: Bosques productivos para la vida Serfor Perú
 
La sindrome da deficit dell’attenzione e iperattivita’- ADHD
La sindrome da deficit dell’attenzione e iperattivita’- ADHDLa sindrome da deficit dell’attenzione e iperattivita’- ADHD
La sindrome da deficit dell’attenzione e iperattivita’- ADHDEmanuel Mian
 
Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...
Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...
Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...State of Mind
 
Dipendenze da Internet e Hikikomori - Dott. Salvatore Morabito
Dipendenze da Internet e Hikikomori - Dott. Salvatore MorabitoDipendenze da Internet e Hikikomori - Dott. Salvatore Morabito
Dipendenze da Internet e Hikikomori - Dott. Salvatore MorabitoSalvatore Morabito
 
Català setena lectura
Català setena lecturaCatalà setena lectura
Català setena lecturajmsoses
 

Viewers also liked (15)

Proyecto investigacion
Proyecto investigacionProyecto investigacion
Proyecto investigacion
 
Bowling Together Fnchs Presentation
Bowling Together Fnchs PresentationBowling Together Fnchs Presentation
Bowling Together Fnchs Presentation
 
lukilabs_infographic
lukilabs_infographiclukilabs_infographic
lukilabs_infographic
 
The 10 Worst Vacation Moments and How You Can Help
The 10 Worst Vacation Moments and How You Can HelpThe 10 Worst Vacation Moments and How You Can Help
The 10 Worst Vacation Moments and How You Can Help
 
Core values 1
Core values 1Core values 1
Core values 1
 
Impactos del Cambio Climático en especies y ecosistemas
Impactos del Cambio Climático en especies y ecosistemasImpactos del Cambio Climático en especies y ecosistemas
Impactos del Cambio Climático en especies y ecosistemas
 
APS Blocking Dogs
APS Blocking DogsAPS Blocking Dogs
APS Blocking Dogs
 
สถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1page
สถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1pageสถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1page
สถานภาพและบทบาท+478+dltvsocp5+54soc p05 f21-1page
 
LE EMOZIONI DEI VOLONTARI D'AMBULANZA
LE EMOZIONI DEI VOLONTARI D'AMBULANZALE EMOZIONI DEI VOLONTARI D'AMBULANZA
LE EMOZIONI DEI VOLONTARI D'AMBULANZA
 
Serfor: Bosques productivos para la vida
Serfor: Bosques productivos para la vida Serfor: Bosques productivos para la vida
Serfor: Bosques productivos para la vida
 
Dipendenza affettiva
Dipendenza affettivaDipendenza affettiva
Dipendenza affettiva
 
La sindrome da deficit dell’attenzione e iperattivita’- ADHD
La sindrome da deficit dell’attenzione e iperattivita’- ADHDLa sindrome da deficit dell’attenzione e iperattivita’- ADHD
La sindrome da deficit dell’attenzione e iperattivita’- ADHD
 
Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...
Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...
Metacognitive beliefs and Desire Thinking as Predictors of Craving and Alcoho...
 
Dipendenze da Internet e Hikikomori - Dott. Salvatore Morabito
Dipendenze da Internet e Hikikomori - Dott. Salvatore MorabitoDipendenze da Internet e Hikikomori - Dott. Salvatore Morabito
Dipendenze da Internet e Hikikomori - Dott. Salvatore Morabito
 
Català setena lectura
Català setena lecturaCatalà setena lectura
Català setena lectura
 

Similar to Resume

shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie Casinillo
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1Lim Soo
 
MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1RAMON AVELLANA
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1Lim Soo
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 

Similar to Resume (20)

Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
MURUGU SUNDARAN - CV
MURUGU SUNDARAN - CVMURUGU SUNDARAN - CV
MURUGU SUNDARAN - CV
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
Rudyard Ejercito - Resume
Rudyard Ejercito - ResumeRudyard Ejercito - Resume
Rudyard Ejercito - Resume
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1
 
MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1MY CV-RAMON AVELLANA - QSTec1
MY CV-RAMON AVELLANA - QSTec1
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Noel Mago
Noel MagoNoel Mago
Noel Mago
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 

Resume

  • 1. RESUME Name : Jackie Ting Ding Gin Date of Birth : 8th July 1982 Address : Block 678B #09-319,Jurong West Street 64, 642678 Singapore Contact No. : +6593831543 E-mail : m_jac1982@yahoo.com Nationality : Singaporean 1. Working Experience Commissioning Manager (2014- 2015)at Falcon Energy Group Singapore  as owner representative in CJ50 Gusto MSC-120 Jackup (4 units)at Shanhaiguan Shipyard, China  Assist project manager to plan the commissioning activities and prepare the schedule to meet the delivery date  Coordinate with shipyard and vendors to resolve the technical issues found on site  Provide expert technical advices to shipyard project team on construction and commissioning activities.  Work closely with site surveyorto ensure the rig is constructed according to the contracted class rules and regulations  Work with engineering and shipyard to prepare commissioning procedures  Review the piping, electrical and HVAC engineering design drawing,  Assist shipyard to prepare completion of Mechanical Completion Dossiers.  Plan and lead the major operation such as full jacking trial, preload jacking, preload holding and derrick load test.  Lead the multi-disciplines commissioning engineers to coordinate with shipyard personnels to attend the test and commissioning inspection on the rig for all the systemincluding Drilling System, Mud System and Marine System such as Ballast and Bilge system, Seawater cooling system, Fresh Water cooling system, Power Management system, Lighting and distribution System, Vessel Management System, PAGA/PABX system, Fire and Gas System, Potable Water System, Sewage Treatment System, Remote Control Valve System and Compressed Air System.  assist and witness mechanical, electrical and piping construction inspection prior to commissioning and pre-commissioning activities
  • 2. Assistant Project Manager / Commissioning Manager (2013- 2014)at Jurong Shipyard Pte. Ltd. Singapore  Involved in Noble Jackup JU3000N#2 (Noble Mick O’Brien), JU3000N#3 (Noble Houston Colbert) and JU3000N#5 (Noble Tom Prosser), Helix Q7000 Well Intervention Unit  Assist to project manager to plan the commissioning activities and prepare the schedule to meet the delivery date  Coordinate with owner and vendorto achieve the commissioning schedule as plan  Work with engineering and vendorto prepare commissioning procedures  Oversee the piping, electrical and HVAC construction problems and coordinate to push for completion of MCD dossiers.  Plan and lead the major operation such as full jacking trial, preload jacking, preload holding and derrick load test.  Take lead in managing project testing and commissioning activities which require higher level of technical sophistication.  Lead the multi-disciplines commissioning engineers to coordinate with client and class representatives to perform the test and commissioning inspection on the rig for all the systemincluding Drilling System, Mud System and Marine Systemsuch as Ballast and Bilge system,Seawater cooling system, Fresh Water cooling system, Power Management system, Lighting and distribution System, Vessel Management System, PAGA/PABX system, Fire and Gas System, Potable Water System, Sewage Treatment System, Remote Control Valve System and Compressed Air System  Chair daily commissioning meeting with engineers and client representatives to review daily commissioning activities and resolve conflicts between client and vendors.  Attend weekly project meeting to report commissioning progress to client project manager.  Report to top management project commissioning progress to reassure them no delay in delivery schedule.  Utilised shipyard EPCC management software to track and record commissioning progress and punch list register.  Ensure my commissioning team members to monitor and manage punch list generated during construction and commissioning.  Assist to project manager to trace down additional job enhancement in variation orders.  Assist to project manager to prepare and execute the recovery plan with production teams when there is requirement.  Lead commissioning team members to prepare final handoverdocumentation after completion of all commissioning activities.  Manage and negotiate construction subcontractors effectively in daily construction and commissioning meeting. Project Engineer (2011-2012)at Jurong Shipyard Pte. Ltd. Singapore  Involved in Noble Jackup JU3000N#1 Noble Regina Allen piping construction  Read and understand piping technical drawings.  assist to monitor the piping installation jobs
  • 3.  help to rectify the piping material shortage problem  monitoring for piping construction progress and set production target  Work togetherwith all parties including owner, engineering and production to rectify piping installation and testing issues.  Assist to project manager to coordinate the piping contractors to work on recovery plan when the progress was behind schedule.  Organise construction meeting to communicate project schedule, planning and requirement with construction team.  Ensure all the production documents such as welding procedure specification, dimension reports and material certifications are properly documented. Project Engineer / Commissioning Engineer (2007-2012)at Jurong Shipyard Pte. Ltd. Singapore  Involved in Submersible Rig -West Sirius (Seadrill 8), Petrorig 1 (Ocean Courage), Petrorig III , Atwood Osprey, Atwood Condor  Carried out the commissioning activities on marine equipment such as anchorwinches, lifeboat, rescue craft, life raft, pneumatic water tight doors, starting air system,fuel oil supply and return system, Main Diesel Generator C280 3600 modal, Ballast, Bilge, Drill Water and Deck Drainage,  Commission of drilling equipment such as Drill Floor Manipulator Arm, Riser Chute, Riser Handling Crane, Mouse hole, Rotary Table, Active Heave Compensator, Tubular Feeding Machine and Hydraulic Auto Roughneck  Commission of Mud Systemsuch as High Pressure Mud System, Low Pressure mud charging, Brine System, Mud Return and Treatment (Shale Shaker, Desilter and Desander) and Mud Drainage.  Working closely with vendorand owner to troubleshoot the problems during commissioning.  Work togetherwith owner to produce commissioning procedures  Work togetherwith construction teamto rectify and resolve the punch list raised during inspection and commissioning.  prepare the final handover document after completion of all commissioning activities. Design Engineer (2006-2007): at Insiphil Manufacturing Pte. Ltd, Malaysia  Develop new product.  Design mechanical part, mainly metal stamping parts.  Meet with metal stamping supplier for technical support.  Follow up with supplier for project support.  monitor the parts assembly progress and troubleshoot the assembly conflict occurred
  • 4. 2. Education Bachelor of Engineering (Honours) Mechanical with Second Class Honours (Upper Division) (CGPA 3.39/4.00) Multimedia University, Malaysia 2003-2007 3. Skills Languages  Spoken: English, Malay, Mandarin, Chinese dialect.  Written: English, Malay, and Mandarin. Technical / Computer Skills  Microsoft Word, Microsoft Excel, Microsoft Power Point, Microsoft Access,C Programming, Catia, Autocad,Solidwork 2006, Mathlab, Microprocessorprogramming (8051), EPCC inhouse software, Microsoft Project. Leadership Skills  Result orientedable to work independently,self-motivated, multi-lingual (Malay, English, Mandarin, Cantonese and some local dialects), initiative, dynamic, able to work overtime, willing to travel 4. Certifications& Achievements 1. Safety Instruction Course for Shiprepair Manager 2. Fundamental of Offshore and Ship Systems 3. Risk Management Course (accredited by Ministry of Manpower Singapore) 4. Project Management for Executives 5. Offshore Facilities for Oil and Gas Production