1. Page 1 of 6
No.46 Jalan Gunung Nuang U11/17
Bukit Bandaraya Shah Alam, 40000
Shah Alam, Selangor, Malaysia
+6012-777 1841
+6018-282 0800
ghufran@gomresources.com
ghufranyusuf@gmail.com
I am a dedicated Professional Engineer over 10 years experience in oil & gas industries
specialization in pipeline. My areas of expertise include project management in pipeline
installation. Key strengths involve the ability to solve complex technical issuses, learn in very
rapid manner and take responsibilities in performing all duties. I am result oriented individual
with a dedication to contribute and achieve every project milestone and goal on time.
DATE OF BIRTH : 27TH
NOVEMBER 1979
NATIONALITY : MALAYSIAN
POSITION : SENIOR PROJECT ENGINEER
Master's Degree in Advance Manufacturing Processes (Machining)
The University of Birmingham, United Kingdom
Graduation Date (Dec 2003)
BEng (Hons) Mechanical Engineering
Staffordshire University, Stafford, United Kingdom
Graduation Date (Jul 2002)
Jan 13 to present GOM Resources Sdn Bhd formally known Global Offshore Malaysia
Senior Project Engineer (PMT FOR PAN MALAYSIA CONTRACT)
Monitor implementation and adequacy of the construction/ installation procedures
established for the project activities undertaken are conducted in accordance with
COMPANY’s specification and Procedures.
Maintains project schedule by monitoring project progress and coordinating
activities.
Controls project plan by reviewing design, specifications, and plan and schedule
changes.
MOHD GHUFRAN YUSUF
PERSONAL DETAILS
ACADEMIC QUALIFICATIONS
WORKING EXPERIENCE
SENIOR PROJECT ENGINEER
2. CV: MOHD GHUFRAN BIN YUSUF
Page 2 of 6
Provide technical advice and instruction/ interpretation rules/procedures/standards
to the Project Manager and PMT
Preparing project cost and budget, monitoring the cost during project execution.
Managing subcontracting work scope and contract and developing ITB inclusive Pre
and Post Installation Work i.e Survey, Span Correction and
Precommisioning.Responsible for the management of technical, logistical and
interface issues for all projects under execution by the CONTRACTOR.
Provide support to the Project Management Team for the installation of the pipeline,
subsea structures, flexible risers and Project mooring components.
Interface for PMT and CLIENT on the day to day project update.
Work experiences
Senior Project Engineer for Integrated Transportation and Installation of Offshore
Facilities (Package B) 2014-2016
a. 28” Beach Pull EVA- NMB (2013)
b. 28” x 280KM EVA-NMB from TGAS to Muda Platform (2014-2015)
c. Lead Precommissioning for 28”280KM EVA-NMB Integrated Precommissioning
(Pigging, Hydrotest, Dewatering and Vaccum) from TGAS to Muda Platform
(2014-2015)
Construction Manager (present) for Integrated Transportation and Installation of
Offshore Facilities (Package A) 2013.
a. Installation of DAMAR Structure Project for EPMI (Tender)
b. Precommissioning (Dewatering/N2) and Inteligent Pig 24” KNPG-B/SOGT
(140km) and 18” PL KNJT-C/KNPG-B (2km)
c. 28”x 700m Shore Approach for EVA-NMB from TGAS to Muda Platform
d. Tukau 8” x 1km Pipelay
e. Riser Guard Installation SKO (9 nos)-ongoing project.
March 10 to Dec 13 GLOBAL OFFSHORE MALAYSIA (Assignee from GLOBAL
INDUSTRIES ASIA PACIFIC, SINGAPORE)
Senior Project Engineer
Senior Project Engineer for Integrated Transportation and Installation of Offshore
Facilities (Package A) 2010-2012.
a. 24” Gas/Condensate line from KBB to SOGT x 123km
b. 14” Oil line from KBB to SOGTx 123km
c. 2km x 8” and 2km x 10” Malikai pipelines from KBB (partial lay)
3. CV: MOHD GHUFRAN BIN YUSUF
Page 3 of 6
d. Post Installation Works (Post Lay, Free Span Correction and Integrated
Precommissioning for 24” PL KBB/SOGT, 14” PL KBB/SOGT, 8” and 10” PL
Malikai, 24” KNPG-B/SOGT and 18” PL KNJT-C/KNPG-B
e. North Malay Basin Development Project 16” Gas Export Pipeline Lawit/PLEM
Project Engineer for 14” and 24” Export Pipeline Shore Approach Installation up to the
beach Valve for Kebabangan Northen Hub Development Project with concurrent Project
for 24” Kinabalu NAG Pipeline Shore Approach Installation and Mid point Tie in for
Petronas Carigali. (Lead of Tender Committee (technical and Commercial) and
executed Shore Approach projects (3 nos Pipelines) at SOGT Sabah 2011.
Project Engineer for Integrated Transportation & Installation of Offshore Facilities
(Package A) for Petronas Carigali 2011.
Pipelines Installation together with pipeline ends riser installation and
Precommissioning for:
a. 12” x 1.3km Sectional replacement P/L from PULAI-A to TAPIS-A
b. 18” x 1.83km P/L from KNJT-A to KNPG-B
c. 24” x 139.22km P/L from KNPG-B to SOGT
d. 24” x 4.8km P/L from KASS-A to KAKG-A
Install 4 risers as following:
a. 18” Riser @ KNJT-C (P/L KNJT-C to KNPG-B)
b. 18” Riser @ KNPG-B (P/L KNJT-C to KNPG-B)
c. 24” Riser @ KNPG-B (P/L KNPG-B to SOGT)
d. 24” Riser @ KAKG-A (P/L KASS-A to KAKG-A)
July 08 to March 10 GLOBAL INDUSTRIES ASIA PACIFIC, SINGAPORE
Project engineer
Work experiences
Project engineer for D35 skids & D30 WHSF topside transportation & installation
works - PCPP Project 2009.
Assist In Technical Tender for South Mahakam Development Project
(Precommissioning and Beach Pull Scope of Work).
Project Engineer for Chevron Thailand (2009 installation Campaign Installation of
Platform and Pipelines). 11 nos Platforms and Pipelines varies 6”, 10” 16” and 20” Spool
Installation and Precommissioning.
Precommisioning Engineer for Berri and Qatif Project for Saudi Aramco at Jubail, Saudi
Arabia. Assisting the Gel technology for flooding and hydrotesting 30” Pipeline 20 KM
and 16 Laterals (16” and 12” x 2km average length).
4. CV: MOHD GHUFRAN BIN YUSUF
Page 4 of 6
Assist In Technical Tender for Gorgon Project Shallow Water Pipelay 30”,8” and 6”
Pipelines for Chevron Australia Pty Ltd.
Project Engineer (Precommissionig) for Transportasi Gas Indonesia (Pipeline Repair KP
110- KP 133- Kuala Tungkal-Panaran, 23km 28” Pipeline).
June 2007 to June 08 Petronas Carigali Sdn Bhd SARAWAK, MALAYSIA (SKO)
(Secondee From Pbjv Group Sdn Bhd)
Pipeline Engineer (Maintenance Department)
Report to Head of Pipeline / Head of Maintenance Department.
Prepare the pipeline integrity, inspection and maintenance plan and administer the
execution within the available resources to achieve most cost effective pipeline
availability and reliability.
Implement all pipeline integrity, inspection, maintenance and modification works within
WP&B and meeting corporate standards and operational requirement in cost effective
and save manner.
Prepare and execute the development and implementation of pipeline integrity,
inspection and maintenance outsourcing plan to support the planned activities in
compliance to PETRONAS Group Tender and Contract guideline.
Compile and verify all inspection records and findings so as to meet PCSB pipeline
integrity guidelines, philosophies and industries best practices.
Administer the implementation of Carigali Pipeline Integrity Management System,
CPIMS and ensure that the system able to provide timely and updated overall online
pipeline integrity status.
Implement the identified latest technology, opportunities, innovative concept to
continuously improve and enhance pipeline integrity management and effectiveness.
Consolidate all HSE requirements related to the pipeline integrity, inspection and
maintenance execution and participate in the preparation of those required
documentation.
Compile all pipeline engineering drawings, documentation and materials which are
required in daily operation, assessment, modification and emergency pipeline repair.
Work experiences
Pipelines Replacement Programs for Sarawak (PCSB) PMT (4 nos Pipeline
replacement Projects).
5. CV: MOHD GHUFRAN BIN YUSUF
Page 5 of 6
Pig Trap (launcher/receiver at Platforms) Project for 31 nos involving Design and
Installation.
Asset Engineer for 3 Crude Oil/Gas Terminal (MCOT/BCOT/MLNG) for incoming and
Export Line offshore/onshore.
Riser Maintenance Campaign for all SKO platform.
Undertaking emergency leak repair onshore/offshore pipelines (18” WLP-A/MCOT leak,
10” TEP-A/TEP-B leak, 12” BNDP-A/BEP-A underwater repair, BNDP-I Riser leak
repair).
Planning/ implementation for vessel movement for the Works relate to Pipeline
maintenances (ROV, Diving spread, Barge, AHT, anchor pattern).
Assist for Intelligent pigging and auxiliary pumping for Pipeline integrity, operation
pigging, hydrotesting, deoiling, dewatering and decommissioning of Pipelines.
Aug 05 to May 07 PBJV GROUP JV SDN BHD
Project Engineer
Report to Project Manager and General Manager.
Fully responsible on Site project including Meeting, Procedure approval, Site technical
Query, Preparation ( fabrication, maintenance equipment and procurement), Project Site
Execution and As Built Report for Project Completion.
Prepare Tender Project (Technical Procedure).
Representative at Sabah and Sarawak, Malaysia for operation Engineer for
Rejuvenation and Abandonment Pipeline.
Field /Engineering/Operation Engineer for Installation Pipeline (OIC).
Work experiences
Installation Pipeline for 18” x 34km from MCOT to WLP-A Platform and 10” from
WLP-A to WLP-C Platform (Petronas Carigali Sdn. Bhd) for Shore approach, subsea
pipeline Installation and Riser Installation, Repair Underwater Pipeline
Deoiling/Flushing, Pigging, Cleaning,Hydrotesting.
Deoiling/Flushing Of 10" x 0.67km Pipeline From BODP-C To BOP-A Platform
(Subsea Leak Pipeline) Petronas Carigali Sdn. Bhd for Deoiling/Flushing, Pigging,
Cleaning,Hydrotesting, Installation of New spool Riser for subsea leak pipeline.
De-Commissioning Of 10" x 2km From WLP-A To WLDP-C and 6” x 0.67km WLP-A
to WLJT-4 Pipeline (Petronas Carigali Sdn. Bhd) for Pigging, Cleaning, Deoiling.
Pre-Commissioning Of 28” X 42.7 KM E8DR-A to E11P-B Pipeline E11/E8 and
28” X 0.8 KM E11V-B to E11P-B Pipeline Sarawak Shell Berhad for Pigging,
Cleaning, Hydrotesting, Bulk Dewatering, and Nitrogen Packing.
6. CV: MOHD GHUFRAN BIN YUSUF
Page 6 of 6
Pre-Commissioning Of 16" x 35km Pipeline From Mcot To Bap-AA Petronas Carigali
Sdn. Bhd for Pigging, Cleaning, Hydrotesting, Bulk Dewatering
Baram Subsea Cable Installation (Petronas Carigali Sdn. Bhd) for Transportation and
installation of 3.8/6.6 kV insulated power and optical fiber composite subsea cable
from Badp-A to Bakp-B and from Bajt-H to Bakp-B.
Construction of 16" BAP-AA To MCOT Shore Apparoch Pipeline (petronas Carigali
Sdn Bhd for Shore approach, subsea pipeline Installation and continue to
Commisioning the pipeline.
West Lutong to MCOT 12” Pipeline Reverse Flushing on Stuck Pig (Petronas Carigali
Sdn. Bhd) for Flushing, Deoiling, Pigging of 16” x 31 km pipeline WLP-A to MCOT.
Baram Field Crude Evacuation (Petronas Carigali Sdn. Bhd) for Deoiling Pigging,
Leak Testing and preservation of 8" x 3 km ( 6 pipelines ) and 10" x 3 km ( 3
pipelines) in Baram Interfield Pipeline.
Nov 04 to Jul 05 Protank Technologies Sdn Bhd
Procurement Engineer
Vendor list
Generate data sheet and MTO.
RFQ/ITB- sourcing, technical clarification and commercial package
Delivery arrangement – site acceptance and inspection test plan
Reporting to Procurement Manager and Head of Engineering Material Services.
Project procurement Planning- (Prefabrication/Steel Plate Delivery Program for New
Tank 5, T33/T34 BSP as Project/Process Holder).
Report to Project Manager/ Project Director of New Tank 5, T33/T34 Brunei Shell
Petroleum.