I am a qualified Pipework Designer, with extensive experience in Offshore, Shipbuilding & other engineering industries.
My skills lie both in attention to detail and quality. I work well in a supervisory capacity or as a team member, but I am as equally
effective when working unsupervised and on my own initiative.
I believe that these skills, along with my experience, have helped me to successfully encompass roles of increased responsibility.
On several occasions, I have successfully adapted my skills and experience to the role of Piping Engineer.
I pride myself on being well organized, able to plan my workload, and work methodically through tasks to completion. I am
honest, conscientious and diligent in my attitude to work. I have always been able to foresee and react pro-actively, to situations
that may affect pre-determined targets.
I believe my skills in communication, coupled with my knowledge & experience are an invaluable combination when applied in a
high profile role on any project.
Employment History
Jan ‘14 – June ‘15 OGN, Wallsend
Position Piping Checker
Project ALDER (Conoco Phillips)
Activities & Responsibilities Checking of Pipework Fabrication Isometrics
Jun ‘13 – Jan ‘14 KHome International, Thornaby-on-Tees
Position Senior Piping Designer (PDMS)
Project Fredericia CO2 Terminal
Activities & Responsibilities PDMS 3D pipework design & checking of piping deliverables
Jun ‘11 – May ‘13 OGN, Wallsend
Position Senior Piping Designer (PDMS)
Project Forties Alpha Satellite Platform (FASP)
Activities & Responsibilities PDMS 3D pipework design
Feb ‘11 – Jun ’11 WGE, Telecoms House, Aberdeen
Position Senior Piping Designer (PDMS)
Project BP ANDREW
Activities & Responsibilities PDMS 3D pipework design
May ‘10 – Feb ’11 PETROFAC, Bridge View, Aberdeen
Position Senior Piping Designer
Project Various
Activities & Responsibilities Compiling, pipework estimates (construct & destruct) as part of bid process during invitation
to tender contract phase
Interrogation of 3D design model using Navisworks Simulate software.
PROFESSIONAL RESUME – Mr Ian Rowell May 2015
Page No 2 of 5
Delivery of completed design documentation within the budget and schedule in accordance
with the project plan
Checking of project deliverables. (Fab. Iso’s, Pipe Supports, etc.)
Mar ‘10 – Apr ’1 CONSAFE Engineering Services Ltd, East Tullos Ind. Est., Aberdeen
Position Piping Engineer
Project Agip KCO Technical Support Services – Kashagan Accomodation, Kazakhstan
Activities & Responsibilities Checking of piping related drawings (fabrication/installation isometrics, GA’s, etc.) in the
latter phase of the project, prior to construction issue
Development of various piping related schedules such as valve register(s), line list, special
items list, etc
Sept ‘08 – Feb ’10 Fabricom Offshore Services Limited, Longbenton, Newcastle-upon-Tyne
Position Lead Piping Designer
Project AUK North Over Fulmar (Talisman Energy)
Activities & Responsibilities Supervise and support a small team of piping designers, reporting to Piping Engineer
Interrogation of dimensional survey information in the form of point cloud data, via its
integration with PDMS, to develop a suitable layout of equipment and subsequent design of
pipe work to facilitate challenging project, process and safety specific requirements.
Modelling of pipework through to the issue of fabrication isometrics
Modelling of various equipment items
Checking of project documentation such as fabrication isometrics, material requisitions,
material take-offs, special item datasheets & technical bid evaluations of vendor quotations.
Close liaison with site based client representatives
Monitoring and reporting of progress regarding the development of PDMS model for piping
discipline
Sept ‘07 – Sept ‘08 AMEC Engineering Execution Centre, Wynyard, Stockton-On-Tees
Position Piping Engineer
Project VEBA Oil Operations (Libya)
Activities & Responsibilities Preparation of work scope documentation to support conceptual engineering phase of
upgrade to En Naga & Ghani production sites.
Distribution and monitoring of workload to a team of draughtsmen & supervision to meet
scheduled targets for issue of documentation.
Allocation of hours, close monitoring of hours expenditure & overall task progress, making the
most efficient use of available resources.
Liaison with engineering management team based in Old Street, London.
Feb '05 – Sept ’07 AMEC (Distributed Engineering), Wallsend, Tyne & Wear
Position Senior Piping Designer / Piping Engineer
Project Sigma3 (North Sea) - Upgrade Project(s)
Activities & Responsibilities Distribution and monitoring of workload to team of draughtsmen. Supervision of the team to
meet scheduled targets for issue of documentation (Isometrics, P&ID’s, Tie-In Schedule’s,
Survey reports, Scope of Work documents, MTO’s)
Allocation of hours, close monitoring of hours expenditure & overall task progress, making the
most efficient use of available resources.
Liaison with client engineering & management team based in Seafield House, Aberdeen as
well as close concurrent communications with other disciplines (Process, E&I, Structural,
Implementation, etc.)
Onshore support to offshore survey team(s).
PROFESSIONAL RESUME – Mr Ian Rowell May 2015
Page No 3 of 5
Preparation of work package information to support visual surveys, undertaken to establish
the degradation of the external condition of all piping, vessels & valves on SHELL platforms -
northern sector
Nov '04 - Jan '05 AMEC (Distributed Engineering), Wallsend, Tyne & Wear
Position Pipework Draughtsman
Project De Ruyter, Petro-Canada
Activities & Responsibilities Checking fabrication isometric MTO’s, to ensure compliance with piping specs & adherence
with fabrication best practices. Using PDMS to review modelled pipework.
Aug '02 - Sept '04 Sutton Engineering Ltd., Wallsend, Tyne and Wear
Position Section Leader - Pipework (CADDS 5)
Project Type 45 Destroyer - BAE Systems
Activities & Responsibilities Responsible for the supervision of a team of 17 pipework Draughtsmen, undertaken to
integrate all pipework systems in 6 design areas of the new class Type 45 Destroyer for the
MOD, BAE Systems being Prime Contract Office.
Ensuring a preliminary design was developed and matured into a practical and cost effective
solution, working closely with all relevant parties, including the client (MOD) and shipyard
production departments.
Liaison with a stage 1 design team to relay practical improvements and identify areas of
concern with preliminary model and diagrams. All aimed at improving the final product, whilst
meeting customer requirements.
Ensured compliance with PCO and naval design philosophies, through periodical design
reviews, within a tightly structured overall project plan.
Supervised and managed the production of all pipework fabrication and installation drawings.
Responsibility escalated to include the supervision of a further 11 draughtsmen, undertaking
the 2D drawings of compartment hotwork for release to production departments. Covering 6
design areas and 4 structural steelwork units.
Checking of all hotwork drawings prior to approval and release.
Resources scheduling to meet all project plan requirements and interim design demands.
Man-hour, performance and various other statistical and analytical reporting.
Feb '01 - Aug '02 Conmarque Engineering Ltd., Wallsend, Tyne and Wear
Position Section Leader - Pipework (TRIBON M1 version 4)
Project Anchor Handling & Towing Vessel UT Design 722L, Rolls Royce Machinery
(client Irving Shipbuilding, Halifax, Canada)
Activities & Responsibilities Responsibility for the routing and pipework layout of LP Hydraulic Oil system serving all Deck
Machinery, comprising 1 Working Drum c/w drive units, one Anchor Handling & Towing Drum
c/w drive units, two Secondary Winches & two Tugger winches.
Ensuring a preliminary design was developed and matured into a practical and cost effective
solution, liaising closely with all relevant shipyard production departments.
Complete material take off of all work content, for issue to production departments, in line
with the overall project build strategy.
Fabrication sketches and detailed installation drawings.
Jul '00 - Feb '01 Camell Laird Technical Services, Birkenhead, Merseyside
Position Senior Pipework Draughtsman, AutoCAD
Project Costa Classica - Cruise liner conversion/refit
Activities & Responsibilities Multi-discipline, composite arrangements of new deck sections of cruise liner.
Jul ''99 - Jul 2000 BAE Systems Marine, Barrow-in-Furness, Cumbria
Position Pipework Designer - CADDS 5X
Project Landing Platform Dock
PROFESSIONAL RESUME – Mr Ian Rowell May 2015
Page No 4 of 5
Activities / Responsibilities 3 dimensional, detailed design modelling of utilities and process pipework
Mar '98 - Jul '99 Harland & Wolff S.H.I., Belfast, Northern Ireland
Position Senior Pipework Designer - Tribon
Project Drill Ship, Deep Water (new design) - GLOBAL Marine
Activities & Responsibilities 3 dimensional detailed design modelling of utilities and process pipework (and the necessary
pipe supports) within main engine room.
Production of fabrication sketches and detailed installation drawings from modelled
information.
Complete material take off and palletisation of all work content, for issue to production
departments, in line with overall project build strategy.
Jan 97 - Mar 98 AMEC Process & Energy Ltd., Wallsend, Tyne & Wear
Position Module Engineer - Pipework
Project ETAP
Activities & Responsibilities Responsible for a team of Engineers, coordinating pre-test punch out of hydrostatic test
packs. Working within strictly defined priorities, to meet dedicated schedules associated with
Nitrogen leak testing, hot oil flushing, chemical cleaning and onshore commissioning.
Coordination and monitoring construction activities associated with pipework erection &
testing.
Field inspection and punch out of utilities and process pipework systems & pipe supports.
Definition and construction of work packages for the erection of all pipework, and subsequent
issue to construction personnel, in accordance with the overall module erection program.
Resolving engineering queries from outside fabricators and production departments
Sep 96 - Jan 97 Swan Hunter (Tyneside), Wallsend, Tyne & Wear
Position Pipework Designer - AutoCAD
Project Solitaire - Pipe laying vessel (Conversion)
Activities & Responsibilities Production of pipework fabrication isometrics and system GA's from client information and
extensive site surveys.
Jan 96 - Sep 96 Harland & Wolff S.H.I., Belfast, Northern Ireland
Position Pipework Designer - Tribon
Project Schiehalion (FPSO)
Activities & Responsibilities 3 dimensional detailed design modelling of utilities and process pipework (and the necessary
pipe supports) within machinery spaces.
Nov 94 - Dec 95 NASSCO, San Diego, California, USA
Position Senior Pipework Designer - CALMA
Project Sealift New Construction
Activities & Responsibilities 3 dimensional detailed design modelling of utilities and process pipework within machinery
spaces.
Production of composite installation drawings from modelled information.
My responsibilities were increased to incorporate the management of interference checking
of modelled information, for all disciplines within the entire machinery spaces. This involved
the establishment and initialization of collision control projects, close analysis of reported
conflicts and the delegation of subsequent re-modelling work to design team members. I was
directly responsible for establishing a complete departmental operating procedure for all
collision control projects.
Jul 93 - Apr 94 Courtaulds Engineering Limited
Position Pipework Designer - AutoCAD
Project Tank House Upgrade - Courtaulds Coatings, Felling, Tyne & Wear
Activities & Responsibilities Design of utilities and process pipework to supply new paint mixing vessels.
PROFESSIONAL RESUME – Mr Ian Rowell May 2015
Page No 5 of 5
Minor steelwork design of holding tank skids, pump seats & filtration equipment.
Various elements of site engineering.
Mar 91 - May 93 AMEC Offshore Ltd., Wallsend, Tyne & Wear
Position Pipework Design Draughtsman & Piping Engineer
Project Agip Tiffany, Saltire & BP Miller
Activities & Responsibilities Coordination and monitoring construction activities associated with pipework erection &
testing.
Field inspection and punch out of utilities and process pipework.
Resolving engineering queries from outside fabricators and production departments.
Hydrostatic testing supervision and analytical monitoring of progress.
Close liaison with an offsite sub-contractor to assist them in achieving overall project goals
with regard to pipework fabrications. This involved regular visits to the sub-contractor where I
assumed the role of client.
Production of detailed pipework fabrication isometrics from diagrams and design drawings.
Aug 82 - Mar 91 Swan Hunter Shipbuilders, Wallsend, Tyne & Wear
Position Pipework Design Draughtsman - CAD IBM 5080
Project Various
Activities & Responsibilities Production of pipework design arrangements, complying to both Lloyds rules and client
engineering specifications, in both machinery spaces and in hull & accommodation areas of
various designs of both naval and merchant vessels.
Production of composite installation drawings covering all disciplines.
Introduction to good drawing office and engineering practices
Qualifications and Training
PDMS, v11.6 (Pipework & Eqyp’t Modelling) 2008 AVEVA / AMEC, Wynyard, Teesside
PDMS, v11.5 (Starter course) 2004 AVEVA / Sutton Engineering Limited, Wallsend
CAD, 3D, TRIBON M2 2004 Sutton Engineering Limited, Wallsend, Tyne and Wear
CAD, 3D, TRIBON M1 v1.2 and v1.4 2001 Sutton Engineering Limited, Wallsend, Tyne and Wear
CAD, 3D, CADDS 5X 1999 BAE Systems Marine, Barrow-in-Furness, Cumbria
CAD, 3D, TRIBON (release 3.3) 1996 Harland & Wolff S.H.I., Belfast, Northern Ireland
CAD, 3D, CV Dim III Calma 1995 NASSCO, San Diego, California, USA
CAD, IBM 5080 1986 – 1991 Swan Hunter Shipbuilders, Wallsend, Tyne & Wear
AutoCAD (up to & including 2000) 1991 Onwards Various Clients
Apprenticeship, Pipework Designer 1982 – 1986 Swan Hunter Shipbuilders, Wallsend, Tyne & Wear
Skills, Qualities and Attributes
I possess a wealth of computer experience, coupled with invaluable practical engineering knowledge.
My adaptability, when encountering new technology, has been commended by every project with which I have been involved.
I am fully computer literate in Microsoft packages and various piping design software packages.
I enjoy challenge in the execution of my work, as I can draw on very effective communication & organisational skills and am very
capable of liaising with other disciplines and personnel at all levels.

Ian_Rowell_Resume_June_2015

  • 1.
    PROFESSIONAL RESUME –Mr Ian Rowell May 2015 Page No 1 of 5 11 Thornbury Close Boldon Colliery Tyne and Wear NE35 9LF 07973 762 517 (Mobile) 0191 537 4195 (Home) ianrowell65@gmail.com Date of birth - 3rd October 1965 Personal Profile I am a qualified Pipework Designer, with extensive experience in Offshore, Shipbuilding & other engineering industries. My skills lie both in attention to detail and quality. I work well in a supervisory capacity or as a team member, but I am as equally effective when working unsupervised and on my own initiative. I believe that these skills, along with my experience, have helped me to successfully encompass roles of increased responsibility. On several occasions, I have successfully adapted my skills and experience to the role of Piping Engineer. I pride myself on being well organized, able to plan my workload, and work methodically through tasks to completion. I am honest, conscientious and diligent in my attitude to work. I have always been able to foresee and react pro-actively, to situations that may affect pre-determined targets. I believe my skills in communication, coupled with my knowledge & experience are an invaluable combination when applied in a high profile role on any project. Employment History Jan ‘14 – June ‘15 OGN, Wallsend Position Piping Checker Project ALDER (Conoco Phillips) Activities & Responsibilities Checking of Pipework Fabrication Isometrics Jun ‘13 – Jan ‘14 KHome International, Thornaby-on-Tees Position Senior Piping Designer (PDMS) Project Fredericia CO2 Terminal Activities & Responsibilities PDMS 3D pipework design & checking of piping deliverables Jun ‘11 – May ‘13 OGN, Wallsend Position Senior Piping Designer (PDMS) Project Forties Alpha Satellite Platform (FASP) Activities & Responsibilities PDMS 3D pipework design Feb ‘11 – Jun ’11 WGE, Telecoms House, Aberdeen Position Senior Piping Designer (PDMS) Project BP ANDREW Activities & Responsibilities PDMS 3D pipework design May ‘10 – Feb ’11 PETROFAC, Bridge View, Aberdeen Position Senior Piping Designer Project Various Activities & Responsibilities Compiling, pipework estimates (construct & destruct) as part of bid process during invitation to tender contract phase Interrogation of 3D design model using Navisworks Simulate software.
  • 2.
    PROFESSIONAL RESUME –Mr Ian Rowell May 2015 Page No 2 of 5 Delivery of completed design documentation within the budget and schedule in accordance with the project plan Checking of project deliverables. (Fab. Iso’s, Pipe Supports, etc.) Mar ‘10 – Apr ’1 CONSAFE Engineering Services Ltd, East Tullos Ind. Est., Aberdeen Position Piping Engineer Project Agip KCO Technical Support Services – Kashagan Accomodation, Kazakhstan Activities & Responsibilities Checking of piping related drawings (fabrication/installation isometrics, GA’s, etc.) in the latter phase of the project, prior to construction issue Development of various piping related schedules such as valve register(s), line list, special items list, etc Sept ‘08 – Feb ’10 Fabricom Offshore Services Limited, Longbenton, Newcastle-upon-Tyne Position Lead Piping Designer Project AUK North Over Fulmar (Talisman Energy) Activities & Responsibilities Supervise and support a small team of piping designers, reporting to Piping Engineer Interrogation of dimensional survey information in the form of point cloud data, via its integration with PDMS, to develop a suitable layout of equipment and subsequent design of pipe work to facilitate challenging project, process and safety specific requirements. Modelling of pipework through to the issue of fabrication isometrics Modelling of various equipment items Checking of project documentation such as fabrication isometrics, material requisitions, material take-offs, special item datasheets & technical bid evaluations of vendor quotations. Close liaison with site based client representatives Monitoring and reporting of progress regarding the development of PDMS model for piping discipline Sept ‘07 – Sept ‘08 AMEC Engineering Execution Centre, Wynyard, Stockton-On-Tees Position Piping Engineer Project VEBA Oil Operations (Libya) Activities & Responsibilities Preparation of work scope documentation to support conceptual engineering phase of upgrade to En Naga & Ghani production sites. Distribution and monitoring of workload to a team of draughtsmen & supervision to meet scheduled targets for issue of documentation. Allocation of hours, close monitoring of hours expenditure & overall task progress, making the most efficient use of available resources. Liaison with engineering management team based in Old Street, London. Feb '05 – Sept ’07 AMEC (Distributed Engineering), Wallsend, Tyne & Wear Position Senior Piping Designer / Piping Engineer Project Sigma3 (North Sea) - Upgrade Project(s) Activities & Responsibilities Distribution and monitoring of workload to team of draughtsmen. Supervision of the team to meet scheduled targets for issue of documentation (Isometrics, P&ID’s, Tie-In Schedule’s, Survey reports, Scope of Work documents, MTO’s) Allocation of hours, close monitoring of hours expenditure & overall task progress, making the most efficient use of available resources. Liaison with client engineering & management team based in Seafield House, Aberdeen as well as close concurrent communications with other disciplines (Process, E&I, Structural, Implementation, etc.) Onshore support to offshore survey team(s).
  • 3.
    PROFESSIONAL RESUME –Mr Ian Rowell May 2015 Page No 3 of 5 Preparation of work package information to support visual surveys, undertaken to establish the degradation of the external condition of all piping, vessels & valves on SHELL platforms - northern sector Nov '04 - Jan '05 AMEC (Distributed Engineering), Wallsend, Tyne & Wear Position Pipework Draughtsman Project De Ruyter, Petro-Canada Activities & Responsibilities Checking fabrication isometric MTO’s, to ensure compliance with piping specs & adherence with fabrication best practices. Using PDMS to review modelled pipework. Aug '02 - Sept '04 Sutton Engineering Ltd., Wallsend, Tyne and Wear Position Section Leader - Pipework (CADDS 5) Project Type 45 Destroyer - BAE Systems Activities & Responsibilities Responsible for the supervision of a team of 17 pipework Draughtsmen, undertaken to integrate all pipework systems in 6 design areas of the new class Type 45 Destroyer for the MOD, BAE Systems being Prime Contract Office. Ensuring a preliminary design was developed and matured into a practical and cost effective solution, working closely with all relevant parties, including the client (MOD) and shipyard production departments. Liaison with a stage 1 design team to relay practical improvements and identify areas of concern with preliminary model and diagrams. All aimed at improving the final product, whilst meeting customer requirements. Ensured compliance with PCO and naval design philosophies, through periodical design reviews, within a tightly structured overall project plan. Supervised and managed the production of all pipework fabrication and installation drawings. Responsibility escalated to include the supervision of a further 11 draughtsmen, undertaking the 2D drawings of compartment hotwork for release to production departments. Covering 6 design areas and 4 structural steelwork units. Checking of all hotwork drawings prior to approval and release. Resources scheduling to meet all project plan requirements and interim design demands. Man-hour, performance and various other statistical and analytical reporting. Feb '01 - Aug '02 Conmarque Engineering Ltd., Wallsend, Tyne and Wear Position Section Leader - Pipework (TRIBON M1 version 4) Project Anchor Handling & Towing Vessel UT Design 722L, Rolls Royce Machinery (client Irving Shipbuilding, Halifax, Canada) Activities & Responsibilities Responsibility for the routing and pipework layout of LP Hydraulic Oil system serving all Deck Machinery, comprising 1 Working Drum c/w drive units, one Anchor Handling & Towing Drum c/w drive units, two Secondary Winches & two Tugger winches. Ensuring a preliminary design was developed and matured into a practical and cost effective solution, liaising closely with all relevant shipyard production departments. Complete material take off of all work content, for issue to production departments, in line with the overall project build strategy. Fabrication sketches and detailed installation drawings. Jul '00 - Feb '01 Camell Laird Technical Services, Birkenhead, Merseyside Position Senior Pipework Draughtsman, AutoCAD Project Costa Classica - Cruise liner conversion/refit Activities & Responsibilities Multi-discipline, composite arrangements of new deck sections of cruise liner. Jul ''99 - Jul 2000 BAE Systems Marine, Barrow-in-Furness, Cumbria Position Pipework Designer - CADDS 5X Project Landing Platform Dock
  • 4.
    PROFESSIONAL RESUME –Mr Ian Rowell May 2015 Page No 4 of 5 Activities / Responsibilities 3 dimensional, detailed design modelling of utilities and process pipework Mar '98 - Jul '99 Harland & Wolff S.H.I., Belfast, Northern Ireland Position Senior Pipework Designer - Tribon Project Drill Ship, Deep Water (new design) - GLOBAL Marine Activities & Responsibilities 3 dimensional detailed design modelling of utilities and process pipework (and the necessary pipe supports) within main engine room. Production of fabrication sketches and detailed installation drawings from modelled information. Complete material take off and palletisation of all work content, for issue to production departments, in line with overall project build strategy. Jan 97 - Mar 98 AMEC Process & Energy Ltd., Wallsend, Tyne & Wear Position Module Engineer - Pipework Project ETAP Activities & Responsibilities Responsible for a team of Engineers, coordinating pre-test punch out of hydrostatic test packs. Working within strictly defined priorities, to meet dedicated schedules associated with Nitrogen leak testing, hot oil flushing, chemical cleaning and onshore commissioning. Coordination and monitoring construction activities associated with pipework erection & testing. Field inspection and punch out of utilities and process pipework systems & pipe supports. Definition and construction of work packages for the erection of all pipework, and subsequent issue to construction personnel, in accordance with the overall module erection program. Resolving engineering queries from outside fabricators and production departments Sep 96 - Jan 97 Swan Hunter (Tyneside), Wallsend, Tyne & Wear Position Pipework Designer - AutoCAD Project Solitaire - Pipe laying vessel (Conversion) Activities & Responsibilities Production of pipework fabrication isometrics and system GA's from client information and extensive site surveys. Jan 96 - Sep 96 Harland & Wolff S.H.I., Belfast, Northern Ireland Position Pipework Designer - Tribon Project Schiehalion (FPSO) Activities & Responsibilities 3 dimensional detailed design modelling of utilities and process pipework (and the necessary pipe supports) within machinery spaces. Nov 94 - Dec 95 NASSCO, San Diego, California, USA Position Senior Pipework Designer - CALMA Project Sealift New Construction Activities & Responsibilities 3 dimensional detailed design modelling of utilities and process pipework within machinery spaces. Production of composite installation drawings from modelled information. My responsibilities were increased to incorporate the management of interference checking of modelled information, for all disciplines within the entire machinery spaces. This involved the establishment and initialization of collision control projects, close analysis of reported conflicts and the delegation of subsequent re-modelling work to design team members. I was directly responsible for establishing a complete departmental operating procedure for all collision control projects. Jul 93 - Apr 94 Courtaulds Engineering Limited Position Pipework Designer - AutoCAD Project Tank House Upgrade - Courtaulds Coatings, Felling, Tyne & Wear Activities & Responsibilities Design of utilities and process pipework to supply new paint mixing vessels.
  • 5.
    PROFESSIONAL RESUME –Mr Ian Rowell May 2015 Page No 5 of 5 Minor steelwork design of holding tank skids, pump seats & filtration equipment. Various elements of site engineering. Mar 91 - May 93 AMEC Offshore Ltd., Wallsend, Tyne & Wear Position Pipework Design Draughtsman & Piping Engineer Project Agip Tiffany, Saltire & BP Miller Activities & Responsibilities Coordination and monitoring construction activities associated with pipework erection & testing. Field inspection and punch out of utilities and process pipework. Resolving engineering queries from outside fabricators and production departments. Hydrostatic testing supervision and analytical monitoring of progress. Close liaison with an offsite sub-contractor to assist them in achieving overall project goals with regard to pipework fabrications. This involved regular visits to the sub-contractor where I assumed the role of client. Production of detailed pipework fabrication isometrics from diagrams and design drawings. Aug 82 - Mar 91 Swan Hunter Shipbuilders, Wallsend, Tyne & Wear Position Pipework Design Draughtsman - CAD IBM 5080 Project Various Activities & Responsibilities Production of pipework design arrangements, complying to both Lloyds rules and client engineering specifications, in both machinery spaces and in hull & accommodation areas of various designs of both naval and merchant vessels. Production of composite installation drawings covering all disciplines. Introduction to good drawing office and engineering practices Qualifications and Training PDMS, v11.6 (Pipework & Eqyp’t Modelling) 2008 AVEVA / AMEC, Wynyard, Teesside PDMS, v11.5 (Starter course) 2004 AVEVA / Sutton Engineering Limited, Wallsend CAD, 3D, TRIBON M2 2004 Sutton Engineering Limited, Wallsend, Tyne and Wear CAD, 3D, TRIBON M1 v1.2 and v1.4 2001 Sutton Engineering Limited, Wallsend, Tyne and Wear CAD, 3D, CADDS 5X 1999 BAE Systems Marine, Barrow-in-Furness, Cumbria CAD, 3D, TRIBON (release 3.3) 1996 Harland & Wolff S.H.I., Belfast, Northern Ireland CAD, 3D, CV Dim III Calma 1995 NASSCO, San Diego, California, USA CAD, IBM 5080 1986 – 1991 Swan Hunter Shipbuilders, Wallsend, Tyne & Wear AutoCAD (up to & including 2000) 1991 Onwards Various Clients Apprenticeship, Pipework Designer 1982 – 1986 Swan Hunter Shipbuilders, Wallsend, Tyne & Wear Skills, Qualities and Attributes I possess a wealth of computer experience, coupled with invaluable practical engineering knowledge. My adaptability, when encountering new technology, has been commended by every project with which I have been involved. I am fully computer literate in Microsoft packages and various piping design software packages. I enjoy challenge in the execution of my work, as I can draw on very effective communication & organisational skills and am very capable of liaising with other disciplines and personnel at all levels.