SlideShare a Scribd company logo
1 of 7
PIPING SUPERVISOR
Name : AHMAD DODO
Phone Number : 0812 6616 1033
E-mail : ahmad_dodo@yahoo.com
WORK CONDITIONS
• Can work with less supervision and under pressure
OTHER SKILLS AND COMPETENCIES
• A dynamic leader of his work force
• Able to motivate others, with good communication and
Inter personal skills.
• A creative thinker and very good organizer
• Good command of English reading, writing and speaking
EDUCATIONAL QUALIFICATIONS
• Senior High School
SUMMARY OF SKILLS
• 18 years experience supervisory level with emphasis on piping
• Considerable years, of experience in oil & gas pipeline project
• Hands on exposure to petroleum & petrochemical construction project
• In-depth knowledge & experience in refinery, power plant & petrochemical project
• Strength of technical know-how in piping & structural erection
• Ample exposure to heavy Equipments, storage tank and related activities
• Strong Knowledge in International codes & standards
• Able to monitor and lead a group & assignments entrusted.
• Skills in handling of office communications activities independently
• Ensure all necessary plant and piping equipment is maintained in a current Operable and calibrated
condition, and work crews are properly supplied With tools, equipment and materials.
WORKING DETAIL COMPANY
1. M/S. WASCO ENGINEERING INDONESIA
• Post Held : Piping Supervisor
• Client : Modec MV 27
• Project : Petro Bras FPSO Cidade de caraguatatuba
• Period : 23 December 2015 – 22 July 2015
• Place of Project : Hyundai Project Area
DUTIES AND RESPONSIBILITIES
• Piping Supervisor Responsible for the supervision of fabrication and Installation of carbon
steel and stainless steel pipes, the work included Installation of mechanical equipments
fabrication and installation Of connection carbon steel and stainless steel pipe work installation
of Chemical dosing equipment and pipe work, installation of pump stations, Pressure testing.
• Receiving the approved drawing for fabrication
• Preparing the fabrication / installation schedule according to priority
• Preparing the spool peck for traceability
• Allocating the tack according to the ability of foreman
• Preparing the materials request according to the requirement spool
• Inspect the pipes and piping materials as per specification
• Visual inspection and receiving the materials from store
• Guiding the sub – ordinate and workers regarding proper use of tools and tackles
• Resolving field problems and liaison client under supervision of mech engg and process dept
• Adherence to construction safety and special safety requirement for working at plant
• Allocation of jobs among various working group
• During the fabrication activities visual inspection of pipes and all fittings, edge preparation fit
up of the pipe, welding quality of the pipe and D.P.T
• Co – ordination with concerned person, during fabrication & erection
• Planning & supervision of piping fabrication & erection
• Checking the daily report
• Reporting the senior engineer and construction manager regarding whole day production
monitoring the front availability
2. M/S. ECOGREEN OLEO CHEMICAL
• Post Held : Piping Supervisor
• Client : Ecogreen Oleo Chemical
• Project : EOB3
• Period : 01 October 2014 – 22 December 2014
• Place of Project : Ecogreen Oleo Chemical Batam
DUTIES AND RESPONSIBILITIES
• Coordination of Tank construction works.
• Work Permit Management for Safe working
• Inspection of the work to adhere to strict Quality Maintenance
• Overseeing of Safety Management system at the work place
• Handling of complete Documentation work & Record Keeping
• Assists the Const : Manager in the supervising and monitoring of work execution at site.
• Responsible of Contractors supply material as per Construction documents.
• Review / approve the project schedule and mobilization plant.
• Review Method statements, rigging plan, facilitate TRAS
• Liaise with operations, safety, QA / QC for smooth functioning of SD jobs
• Foresee constructability difficulties and prepare a solution
• Participate in daily review meeting and report progress / areas of concern.
• Verifies the adequacy of equipment to perform work safety. Supervise and coordinate the
activities of construction contractors.
• Ensure that contractor comply with all aspects of the worksite HSE plan and policy; site
regulations, permit to work and client requirements. Ensure by leadership and guidance, that
contracted works meets all practical, commercial, requirements of productivity, quality and
contract target completions.
• Maintain daily supervisory surveillance checks and records ensuring that contractors
management and supervision are providing safe working conditions and permitting procedures,
all required competent personal protective equipment, adequate supervision and manpower,
with reliable, well maintained equipment to execute the contracted works as per contract
schedule and targets. Ensure by leadership and guidance, that contracted works meet all
practical, commercial, requirements of productivity, quality and contract target completions.
• Verifies competence of construction contractor’s personnel.
• Assures completion of the pre-commissioning works and participates with the commissioning
and start up activities.
• Routinely study, check and review all contractors scope as detailed in drawings, specifications
and instructions, ensuring contractors proper interpretation and compliance with the lasted
AFC drawings and specifications.
• Ensure proper change control by issuing field instructions for all changes, reviewing technical
queries to ensure responses are appropriate and practical, and reviewing advanced revision
notices prior to issue to contractors to ensure correct use of construction resources.
• Ensure contractors dimensional control methods for checking that the works are properly set
out. Supervise specialist surveying contractors where necessary.
• Ensure supervisors carryout the witness, inspection and surveillance checks in accordance with
the quality plant and the requirements of the quality control manager.
3. M/S MUARO PRIMA UTAMA
• Post Held : Piping Supervisor
• Client : Ecogreen Oleo Chemical
• Project : EOB3
• Period : 02 June 2014 – 25 September 2014
• Place of Project : Ecogreen Oleo Chemical Batam
DUTIES AND RESPONSIBILITIES
• Receiving the approved drawing Fabrication
• Preparing the fabrication scheduling according to priority
• Preparing the spool pack for traceability
• Allocating the task according to the ability of foreman
• Preparing the material request according to the requirement of spool
• Inspect the pipes and piping materials as per specification
• Visual inspection and receiving the materials from store
4. M/S VME PROCESS
• Post Held : Piping Supervisor
• Client : Modec
• Project : Mitsubishi Main Compressor MV 24
• Period : 01 February 2013 – 31 August 2013
• Place of Project : PT. ULTRACO BATU AMPAR BATAM
DUTIES AND RESPONSIBILITIES
• Receiving the approved drawing Fabrication
• Preparing the fabrication scheduling according to priority
• Preparing the spool pack for traceability
• Allocating the task according to the ability of foreman
• Preparing the material request according to the requirement of spool
• Inspect the pipe and piping materials as per specification
• Visual inspection and receiving the materials from store
5. M/S DWI CAHAYA SEJATI
• Post Held : Piping Supervisor
• Client : Rotary Engineering
• Project : VAM 4 Plants / CCD
• Period : 12 April 2012 – 10 December 2012
• Place of Project : Workshop Rotary Engineering Batam
DUTIES AND RESPONSIBILITIES
• Planning or work and Scheduling
• Receiving the approved drawing Fabrication
• Supervision of piping pre fabrication
• Preparing the material request according to the requirement of spool
• Work permit management for safe working
6. M/S AMPERA JAYA BERSAMA
• Post Held : Piping Supervisor
• Client : Aramco
• Project : Miscellanedus Cladding
• Period : 07 December 2011 – 20 February 2012
• Place of Project : Workshop Cladtek Baru Ampar ( Batam )
DUTIES AND RESPONSIBILITIES
• Supervision of piping pre fabrication
• Planning or work and Scheduling
• Controlling and monitoring of resources, manpower, equipments
• Checking for quality control
• Work permit management for safe working
• Inspect the pipe and piping materials as per specification
7. M/S WELL BUILT ENGINEERING INDONESIA
• Post Held : Piping Supervisor
• Client : VME Process
• Project : FPSO Module Joko Tole, Terang Sirasun Batur Field
• Period : 21 April 2011 – 18 September 2011
• Place of Project : PT. ULTRACO BATU AMPAR
DUTIES AND RESPONSIBILITIES
• Planning or work and Scheduling
• Receiving the approved drawing Fabrication
• Preparing the spool pack for Trace ability
• Monitoring of erection of piping and related structural work
• Checking the daily progress report
8. M/S VIKING ENGINEERING INDONESIA
• Post Held : Piping Supervisor
• Client : Primer Oil, Prosafe, Batamec
• Project : Gajah Baru, Prosafe Project, Shipyard
• Period : 05 May 2008 – 30 September 2010
• Place of Project : Workshop Viking Engineering
: Sekupang Logistic, Batamec Area
DUTIES AND RESPONSIBILITIES
• Planning and Supervision of piping fabrication & Erection
• Receiving the approved drawing Fabrication & Erection
• Adherence to construction Safety and special safety requirement for working plant
• Reporting the senior engineer and construction manager
• Regarding whole day production monitoring the pront availability.
9. M/S VIKING ENGINEERING
• Post Held : Foreman Piping
• Client : Prosafe
• Project : Prosafe
• Period : 14 January 2008 – 09 May 2008
• Place of Project : Workshop Viking Engineering ( Batam )
DUTIES AND RESPONSIBILITIES
• Receiving the approved drawing Fabrication
• Preparing the fabrication schedule according to priority
• Preparing the spool fitting / material
• Permit management work
• Reporting daily report to supervisor
10 . M/S SMOE INDONESIA
• Post Held : Supervisor
• Client : Conoco Philips
• Project : Krisi Project
• Period : 22 October 2006 – 01 March 2007
• Place of Project : Yard SMOE ( Batam )
DUTIES AND RESPONSIBILITIES
• Piping supervisor – responsibility for the supervision of fabrication and installation of carbon
steel and stainless steel pipe.
• Receiving the approved drawing for Fabrication
• Preparing the material request according to the requirement of spool
• Inspect the pipe and piping materials as per specification
• Visual inspection and receiving materials.
11. M/S BUDI DAYA MANDIRI
• Post Held : Piping Foreman
• Client : IKPT
• Project : Jaringan Pipa Plant area SP Merbau
• Period : 01 April 2006 – 30 June 2006
• Place of Project : SP Merbau ( Sumsel )
DUTIES AND RESPONSIBILITIES
• Receiving the approved drawing Fabrication & Erection
• Preparing the spool pack
• Preparing the fabrication schedule according to priority
• Permit of work
• Reporting the supervisor
12. M/S SWADAYA GRAHA
• Post Held : Piping Foreman
• Client : JGC
• Project : TPPI ( Petro Chemical )
• Period : 21 April 2005 – 25 August 2005
• Place of Project : Tuban East Java
DUTIES AND RESPONSIBILITIES
• Receiving the approved drawing Fabrication & Erection
• Preparing the spool pack
• Preparing the fabrication schedule according to priority
• Supervision of piping fabrication & Erection
• Reporting the supervisor
13. M/S JATI HARUM
• Post Held : General Foreman
• Client : Pupuk Kujang
• Project : Kujang I B
• Period : 07 December 2004 – 15 April 2005
• Place of Project : Cikampek
14. M/S CATIR NIKKI CONSTRUCTION
• Post Held : Piping Foreman
• Client : JGC
• Project : TPPI ( Petro Chemical Indonesia )
• Period : 29 August 2005 – 6 Feb 2006
• Place of Project : Tuban East Java
DUTIES AND RESPONSIBILITIES
• Receiving the approved drawing fabrication & erection
• Preparing the spool pack
• Preparing the fabrication schedule according to priority
• Supervision of Piping Fabrication & Erection
• Reporting the Supervisor
DECLARATION :
I hereby declare that all the information furnished by me is true to best of my know ledge and belief.
Your Faithfully,
AHMAD DODO

More Related Content

What's hot

Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Haider
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_VEERAKAMU C
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad Samir
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 

What's hot (20)

Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Rizwan Piping Supervisor
Rizwan Piping SupervisorRizwan Piping Supervisor
Rizwan Piping Supervisor
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
resume piping
resume pipingresume piping
resume piping
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 

Viewers also liked

Bill Quimby Resume
Bill Quimby ResumeBill Quimby Resume
Bill Quimby ResumeBill Quimby
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisorshaikh haroon
 
Construction supervisor
Construction supervisorConstruction supervisor
Construction supervisorSHAMSHER ALAM
 
Piping supervisor perfomance appraisal 2
Piping supervisor perfomance appraisal 2Piping supervisor perfomance appraisal 2
Piping supervisor perfomance appraisal 2tonychoper6504
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGramon carcido
 
sameer-parab_resume
sameer-parab_resumesameer-parab_resume
sameer-parab_resumeSAMEER PARAB
 
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressedRESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressedAli alnasser
 
Resume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. OctavianoResume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. OctavianoAlzen Octavio
 
Fatima gamal mansour CV
Fatima gamal mansour CVFatima gamal mansour CV
Fatima gamal mansour CVfatima gamal
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineerIram shahzad khan
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Boytoy Domer
 
Electricidad99electronica
Electricidad99electronicaElectricidad99electronica
Electricidad99electronicaDavid Leon
 

Viewers also liked (15)

Bill Quimby Resume
Bill Quimby ResumeBill Quimby Resume
Bill Quimby Resume
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Construction supervisor
Construction supervisorConstruction supervisor
Construction supervisor
 
Piping supervisor perfomance appraisal 2
Piping supervisor perfomance appraisal 2Piping supervisor perfomance appraisal 2
Piping supervisor perfomance appraisal 2
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 
sameer-parab_resume
sameer-parab_resumesameer-parab_resume
sameer-parab_resume
 
AMM_Resume_160620
AMM_Resume_160620AMM_Resume_160620
AMM_Resume_160620
 
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressedRESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
RESUME OF ALI AL-NASSER, PMT HSE SUPERVISOR.compressed
 
Resume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. OctavianoResume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. Octaviano
 
Fatima gamal mansour CV
Fatima gamal mansour CVFatima gamal mansour CV
Fatima gamal mansour CV
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
Electricidad99electronica
Electricidad99electronicaElectricidad99electronica
Electricidad99electronica
 

Similar to CV Dodo NEW (20)

Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06
 
Amir QC
Amir QCAmir QC
Amir QC
 
arun megarme
arun megarmearun megarme
arun megarme
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Resume
ResumeResume
Resume
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Naim CV
Naim CVNaim CV
Naim CV
 
Ng Eng Beng CV
Ng Eng Beng CVNg Eng Beng CV
Ng Eng Beng CV
 
ROGELIO DE GUZMAN Piping welding Inspector
ROGELIO DE GUZMAN  Piping  welding InspectorROGELIO DE GUZMAN  Piping  welding Inspector
ROGELIO DE GUZMAN Piping welding Inspector
 
Caleb T Bentsen Resume
Caleb T Bentsen ResumeCaleb T Bentsen Resume
Caleb T Bentsen Resume
 
Nivin Joseph- resume
Nivin Joseph- resumeNivin Joseph- resume
Nivin Joseph- resume
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
 
CV
CVCV
CV
 
newCHris Resume
newCHris ResumenewCHris Resume
newCHris Resume
 

CV Dodo NEW

  • 1. PIPING SUPERVISOR Name : AHMAD DODO Phone Number : 0812 6616 1033 E-mail : ahmad_dodo@yahoo.com WORK CONDITIONS • Can work with less supervision and under pressure OTHER SKILLS AND COMPETENCIES • A dynamic leader of his work force • Able to motivate others, with good communication and Inter personal skills. • A creative thinker and very good organizer • Good command of English reading, writing and speaking EDUCATIONAL QUALIFICATIONS • Senior High School SUMMARY OF SKILLS • 18 years experience supervisory level with emphasis on piping • Considerable years, of experience in oil & gas pipeline project • Hands on exposure to petroleum & petrochemical construction project • In-depth knowledge & experience in refinery, power plant & petrochemical project • Strength of technical know-how in piping & structural erection • Ample exposure to heavy Equipments, storage tank and related activities • Strong Knowledge in International codes & standards • Able to monitor and lead a group & assignments entrusted. • Skills in handling of office communications activities independently • Ensure all necessary plant and piping equipment is maintained in a current Operable and calibrated condition, and work crews are properly supplied With tools, equipment and materials. WORKING DETAIL COMPANY 1. M/S. WASCO ENGINEERING INDONESIA • Post Held : Piping Supervisor • Client : Modec MV 27 • Project : Petro Bras FPSO Cidade de caraguatatuba • Period : 23 December 2015 – 22 July 2015 • Place of Project : Hyundai Project Area DUTIES AND RESPONSIBILITIES • Piping Supervisor Responsible for the supervision of fabrication and Installation of carbon steel and stainless steel pipes, the work included Installation of mechanical equipments
  • 2. fabrication and installation Of connection carbon steel and stainless steel pipe work installation of Chemical dosing equipment and pipe work, installation of pump stations, Pressure testing. • Receiving the approved drawing for fabrication • Preparing the fabrication / installation schedule according to priority • Preparing the spool peck for traceability • Allocating the tack according to the ability of foreman • Preparing the materials request according to the requirement spool • Inspect the pipes and piping materials as per specification • Visual inspection and receiving the materials from store • Guiding the sub – ordinate and workers regarding proper use of tools and tackles • Resolving field problems and liaison client under supervision of mech engg and process dept • Adherence to construction safety and special safety requirement for working at plant • Allocation of jobs among various working group • During the fabrication activities visual inspection of pipes and all fittings, edge preparation fit up of the pipe, welding quality of the pipe and D.P.T • Co – ordination with concerned person, during fabrication & erection • Planning & supervision of piping fabrication & erection • Checking the daily report • Reporting the senior engineer and construction manager regarding whole day production monitoring the front availability 2. M/S. ECOGREEN OLEO CHEMICAL • Post Held : Piping Supervisor • Client : Ecogreen Oleo Chemical • Project : EOB3 • Period : 01 October 2014 – 22 December 2014 • Place of Project : Ecogreen Oleo Chemical Batam DUTIES AND RESPONSIBILITIES • Coordination of Tank construction works. • Work Permit Management for Safe working • Inspection of the work to adhere to strict Quality Maintenance • Overseeing of Safety Management system at the work place • Handling of complete Documentation work & Record Keeping • Assists the Const : Manager in the supervising and monitoring of work execution at site. • Responsible of Contractors supply material as per Construction documents. • Review / approve the project schedule and mobilization plant. • Review Method statements, rigging plan, facilitate TRAS • Liaise with operations, safety, QA / QC for smooth functioning of SD jobs • Foresee constructability difficulties and prepare a solution • Participate in daily review meeting and report progress / areas of concern. • Verifies the adequacy of equipment to perform work safety. Supervise and coordinate the activities of construction contractors. • Ensure that contractor comply with all aspects of the worksite HSE plan and policy; site regulations, permit to work and client requirements. Ensure by leadership and guidance, that
  • 3. contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions. • Maintain daily supervisory surveillance checks and records ensuring that contractors management and supervision are providing safe working conditions and permitting procedures, all required competent personal protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets. Ensure by leadership and guidance, that contracted works meet all practical, commercial, requirements of productivity, quality and contract target completions. • Verifies competence of construction contractor’s personnel. • Assures completion of the pre-commissioning works and participates with the commissioning and start up activities. • Routinely study, check and review all contractors scope as detailed in drawings, specifications and instructions, ensuring contractors proper interpretation and compliance with the lasted AFC drawings and specifications. • Ensure proper change control by issuing field instructions for all changes, reviewing technical queries to ensure responses are appropriate and practical, and reviewing advanced revision notices prior to issue to contractors to ensure correct use of construction resources. • Ensure contractors dimensional control methods for checking that the works are properly set out. Supervise specialist surveying contractors where necessary. • Ensure supervisors carryout the witness, inspection and surveillance checks in accordance with the quality plant and the requirements of the quality control manager. 3. M/S MUARO PRIMA UTAMA • Post Held : Piping Supervisor • Client : Ecogreen Oleo Chemical • Project : EOB3 • Period : 02 June 2014 – 25 September 2014 • Place of Project : Ecogreen Oleo Chemical Batam DUTIES AND RESPONSIBILITIES • Receiving the approved drawing Fabrication • Preparing the fabrication scheduling according to priority • Preparing the spool pack for traceability • Allocating the task according to the ability of foreman • Preparing the material request according to the requirement of spool • Inspect the pipes and piping materials as per specification • Visual inspection and receiving the materials from store 4. M/S VME PROCESS • Post Held : Piping Supervisor • Client : Modec • Project : Mitsubishi Main Compressor MV 24 • Period : 01 February 2013 – 31 August 2013 • Place of Project : PT. ULTRACO BATU AMPAR BATAM DUTIES AND RESPONSIBILITIES
  • 4. • Receiving the approved drawing Fabrication • Preparing the fabrication scheduling according to priority • Preparing the spool pack for traceability • Allocating the task according to the ability of foreman • Preparing the material request according to the requirement of spool • Inspect the pipe and piping materials as per specification • Visual inspection and receiving the materials from store 5. M/S DWI CAHAYA SEJATI • Post Held : Piping Supervisor • Client : Rotary Engineering • Project : VAM 4 Plants / CCD • Period : 12 April 2012 – 10 December 2012 • Place of Project : Workshop Rotary Engineering Batam DUTIES AND RESPONSIBILITIES • Planning or work and Scheduling • Receiving the approved drawing Fabrication • Supervision of piping pre fabrication • Preparing the material request according to the requirement of spool • Work permit management for safe working 6. M/S AMPERA JAYA BERSAMA • Post Held : Piping Supervisor • Client : Aramco • Project : Miscellanedus Cladding • Period : 07 December 2011 – 20 February 2012 • Place of Project : Workshop Cladtek Baru Ampar ( Batam ) DUTIES AND RESPONSIBILITIES • Supervision of piping pre fabrication • Planning or work and Scheduling • Controlling and monitoring of resources, manpower, equipments • Checking for quality control • Work permit management for safe working • Inspect the pipe and piping materials as per specification 7. M/S WELL BUILT ENGINEERING INDONESIA • Post Held : Piping Supervisor • Client : VME Process • Project : FPSO Module Joko Tole, Terang Sirasun Batur Field • Period : 21 April 2011 – 18 September 2011 • Place of Project : PT. ULTRACO BATU AMPAR
  • 5. DUTIES AND RESPONSIBILITIES • Planning or work and Scheduling • Receiving the approved drawing Fabrication • Preparing the spool pack for Trace ability • Monitoring of erection of piping and related structural work • Checking the daily progress report 8. M/S VIKING ENGINEERING INDONESIA • Post Held : Piping Supervisor • Client : Primer Oil, Prosafe, Batamec • Project : Gajah Baru, Prosafe Project, Shipyard • Period : 05 May 2008 – 30 September 2010 • Place of Project : Workshop Viking Engineering : Sekupang Logistic, Batamec Area DUTIES AND RESPONSIBILITIES • Planning and Supervision of piping fabrication & Erection • Receiving the approved drawing Fabrication & Erection • Adherence to construction Safety and special safety requirement for working plant • Reporting the senior engineer and construction manager • Regarding whole day production monitoring the pront availability. 9. M/S VIKING ENGINEERING • Post Held : Foreman Piping • Client : Prosafe • Project : Prosafe • Period : 14 January 2008 – 09 May 2008 • Place of Project : Workshop Viking Engineering ( Batam ) DUTIES AND RESPONSIBILITIES • Receiving the approved drawing Fabrication • Preparing the fabrication schedule according to priority • Preparing the spool fitting / material • Permit management work • Reporting daily report to supervisor 10 . M/S SMOE INDONESIA • Post Held : Supervisor • Client : Conoco Philips • Project : Krisi Project • Period : 22 October 2006 – 01 March 2007
  • 6. • Place of Project : Yard SMOE ( Batam ) DUTIES AND RESPONSIBILITIES • Piping supervisor – responsibility for the supervision of fabrication and installation of carbon steel and stainless steel pipe. • Receiving the approved drawing for Fabrication • Preparing the material request according to the requirement of spool • Inspect the pipe and piping materials as per specification • Visual inspection and receiving materials. 11. M/S BUDI DAYA MANDIRI • Post Held : Piping Foreman • Client : IKPT • Project : Jaringan Pipa Plant area SP Merbau • Period : 01 April 2006 – 30 June 2006 • Place of Project : SP Merbau ( Sumsel ) DUTIES AND RESPONSIBILITIES • Receiving the approved drawing Fabrication & Erection • Preparing the spool pack • Preparing the fabrication schedule according to priority • Permit of work • Reporting the supervisor 12. M/S SWADAYA GRAHA • Post Held : Piping Foreman • Client : JGC • Project : TPPI ( Petro Chemical ) • Period : 21 April 2005 – 25 August 2005 • Place of Project : Tuban East Java DUTIES AND RESPONSIBILITIES • Receiving the approved drawing Fabrication & Erection • Preparing the spool pack • Preparing the fabrication schedule according to priority • Supervision of piping fabrication & Erection • Reporting the supervisor 13. M/S JATI HARUM • Post Held : General Foreman • Client : Pupuk Kujang • Project : Kujang I B
  • 7. • Period : 07 December 2004 – 15 April 2005 • Place of Project : Cikampek 14. M/S CATIR NIKKI CONSTRUCTION • Post Held : Piping Foreman • Client : JGC • Project : TPPI ( Petro Chemical Indonesia ) • Period : 29 August 2005 – 6 Feb 2006 • Place of Project : Tuban East Java DUTIES AND RESPONSIBILITIES • Receiving the approved drawing fabrication & erection • Preparing the spool pack • Preparing the fabrication schedule according to priority • Supervision of Piping Fabrication & Erection • Reporting the Supervisor DECLARATION : I hereby declare that all the information furnished by me is true to best of my know ledge and belief. Your Faithfully, AHMAD DODO