Nailesh PATEL
405, Soham, Vasant Hsg. Complex, Mahavir Nagar, Kandivali (West), Mumbai – 400067.
+91 98209 63048 (P) +91 86001 43224 (S) – nailesh_2003@yahoo.com
Profile
Engineering professional with significant construction and project management experience gained from
major high technology projects in oil and gas industry with overall EPC experience of 25 plus years in
multi discipline.
Summary
 Experienced in areas of fabrication - piping and structural and installation of fixed platforms such as
FPSO, TLWP, wellhead, and production platforms.
 Over 9 years of service with J Ray McDermott with the position of Piping Production Engineer.
Familiar with PDMS review station and PIMS operation.
 Knowledge with international design codes, standards such as B31.3, ASME, NACE procedures, and
engineering practices.
 Knowledgeable and experienced in using MSOffice software (Word, Excel & Outlook). Well familiar
with interpreting and understanding of schedules generated from Primavera and reports from
Microsoft Access.
 Highly experience in Project management, Estimation, Proposal, Subcontracting, Commissioning and
Turn Around works.
Qualification
Bachelor of Engineering (Production), Jawaharlal Nehru Engineering College, Aurangabad, Maharashtra.
Professional Experience
Petroleum Consulting Engineers Pvt Ltd.
Piping Field Engineer August 2013 to January 2016
Jamnagar, India
Project summary
Piping Field Engineer, on deputation to Reliance Industries limited for LDPE and LLDPE project at their
J3 Jamnagar site.
Responsibilities:
 Planning and organizing all aspect of piping engineering activities.
 Keep the lead engineer apprised of various activities and concerns.
 Preparation of construction isometrics from design Isos form installation point of view and smooth
monitoring of spools status.
 Maintain close coordination with procurement department for timely delivery of piping materials (Pipes
and pipe fittings) for piping spools fabrication. Piping inline items like valves, strainers, Control valves
etc. for installation purpose.
 Working closely with warehouse department for proper preservation of pipes, fittings, valves and other
items in the lay down area. Proper segregation of stainless steel, duplex and other material from carbon
steel material.
 Maintain close coordination with other engineering disciplines like Structural and Mechanical,
for release of work front for installation of piping spools and other inline items. Working closely with
Planning and QC department as required.
 Participate in internal, client and third party audit on engineering deliverables and vendor document.
 Participate in the preparation of detail piping engineering scope and estimates for proposal.
 Become fully familiar with the scope of work. Monitor scope change and raised change notification.
 Check design center deliverable list, deliverables and philosophies to ensure compliance with the
specification and functional integrity.
 Review and assist in approval of vendor data/drawings.
 Check the final vendor data manuals to ensure that all the requested data has been received and approved.
 Attend project review meeting, vendor meetings, engineering meetings and off shore site survey as
required.
 Providing necessary design inputs to other disciplines to enable them in proceeding with their
deliverables.
 Identify any change in the scope of work due to client comments and changes in existing project scope
and inform team leader.
 Creating awareness and enforcing the Safety measures to provide a safe working environment at work
site.
FloaTEC (Contracted through Brunel, Singapore)
Piping Field Engineer May 2012 to April 2013
Singapore, Brazil.
Project summary
Piping and mechanical commissioning engineer with experience of TLWP process platform commissioning.
P-61 Papa Terra project in Brazil for Petrobras. Project was to build topside and Hull for oil drilling and
production lines connected to FPSO. Total project duration was 4 years. Piping scope was of close to 400
lines which include process lines and utility lines. All the lines were further broken down in about 4800
spools. Hydro testing of all the pipe work was completed in 325 test packs. N2-He leak testing of
hydrocarbon and critical lines was done in 22 test packs. Total manpower involvement was 100 people
including sub-contractor and vendor personal. Diesel lines connected to generators and stainless steel were
chemically cleaned by third party vendors. 3 Ea. 18” final production process lines were connected to P-63
FPSO for further processing and off-loading.
Responsibilities:
 Development of detail and micro schedule Pre-commissioning/commissioning activities in conjunction
with project Pre com/comm coordinator.
 Identification of the resources like personal, equipment, materials, spares and consumables necessary to
carry out the tasks.
 Identification and coordination of vendor assistance during commissioning and hiring of specialized test
equipments.
 Identification and coordination of subcontractor needed to perform specialized activities like pigging,
N2-He leak testing, chemical cleaning, torquing/tensioning and hydraulic system flushing.
 Preparation of various procedure like functional test procedure, chemical cleaning, N2-He leak testing.
 Preparation of equipment that require preservation.
 Clearing and managing the discipline punch list.
 Coordination of discipline pre-commissioning/commissioning activities in yard and off shore.
 Issuing progress report and managing interface with subcontractor with regards to discipline pre-
commissioning/commissioning activities.
 Providing guidance to junior engineers.
P.T.McDermott
Piping Field Engineer September 2010 to March 2011
Batam, Indonesia
Project Summary
Piping completion engineer for Topside of Chevron Platong gas II project, Thailand. Total platform weight
was 17,000 tons. Pipe scope was of about 1100 lines, which includes process and utilities line. Pipe work
was made up of materials like Carbon Steel, Stainless Steel, Duplex, Super duplex, LTCS etc. All the piping
systems were hydro tested in 725 test packs. It took approximately 1,000,000 Man-Hours to complete all
the piping activities.
Responsibilities:
 Review of test packs based on sub system priorities.
 Lead a group of line walker responsible for mechanical completion. Organize line walker based on the
priority test packs.
 Coordinate with production team to clear all “A” punch lists prior to hydro testing. Reinstatement of
pipe work as per the test packs.
 Coordinate with production team to clear all “B” punch lists prior to commissioning. Ensure that all
scheduled test packs must be deliver in time.
 Liaise with production team and subcontractor to solve day to day issues. Coordinate and assist
production for the preparation of leak testing activities including flange management prior to leak
testing.
P.T.McDermott
Piping Field Engineer December 2008 to September 2010
Batam, Indonesia
Project Summary
Piping field Engineer for FPSO modules fabrication of Peregrino Maersk project, Brazil. Total modules
weight was about 6,500 metric tons. Pipe scope was of approximately 700 lines, which includes process and
utilities line. Pipe work was made up of all sort of material like carbon steel, stainless steel, Duplex, Super
duplex, LTCS etc. All the piping systems were hydro tested in about 450 test packs. It took about 650,000
Man-Hours to complete all the piping. All the modules were assembled in Keppel yard in Singapore
Responsibilities:
 Assist in planning and organizing all aspect of piping engineering activities.
 Keep the lead engineer apprised of various activities and concerns.
 Preparation of construction isometrics from design Isos form installation point of view and smooth
monitoring of spools status.
 Maintain close coordination with procurement department for timely delivery of piping materials (Pipes
and pipe fittings) for piping spools fabrication. Piping inline items like valves, strainers, Control valves
etc. for installation purpose.
 Working closely with warehouse department for proper preservation of pipes, fittings, valves and other
items in the lay down area. Proper segregation of stainless steel, duplex and other P5, P9, P11material
from carbon steel material.
 Maintain close coordination with other engineering disciplines like Structural and Mechanical,
For release of work front for installation of piping spools and other inline items. Working closely with
Planning and QC department as required.
 Participate in internal, client and third party audit on engineering deliverables and vendor document.
 Participate in the preparation of detail piping engineering scope and estimates for proposal.
 Become fully familiar with the scope of work. Monitor scope change and raised change notification.
 Check design center deliverable list, deliverables and philosophies to ensure compliance with the
specification and functional integrity.
 Review and assist in approval of vendor data/drawings.
 Check the final vendor data manuals to ensure that all the requested data has been received and approved.
 Attend project review meeting, vendor meetings, engineering meetings and off shore site survey as
required.
 Identify any change in the scope of work due to client comments and changes in existing project scope
and inform team leader.
 Creating awareness and enforcing the Safety measures to provide a safe working environment at work
site.
 Ensuring adherence to company procedures and guidelines.
McDermott Caspian Contractor
PIPING/STRUCTURAL ENGINEER November 2007 to December 2008
Baku, Azerbaijan
Project Summary
Involved in preparation of structural and piping estimation, bidding and proposal for topside and jacket,
living quarters, utility deck, flare boom and flare jacket for Karachaganak field development project.
Calculated total MTO for structural and piping scope of work. Estimated approximate man hour required
for the job based on SBUM. Raised bid clarifications and maintained log for it. Prepared and assisted in
yard facility information presentation. Total estimated value of the project was more than 15b USD.
McDermott Caspian Contractor
STRUCTURAL FIELD ENGINEER October 2005 to November 2007
Baku, Azerbaijan
Project Summary
Structural Engineer experienced in construction of Topside platforms for AIOC, Chirag gas development
area in Azerbaijan. Total wt of the topside was about 14,000 tonnes. Structural scope was of about1,
500,000 man-hrs. These include all the man-hrs require from material procurement, warehousing,
preparation of detail construction drawing for each member of primary and secondary structure, pre-
fabrication of structural member, assembly of small modules in the workshop, integration of all the modules
in the site and installation of tertiary structural items like stairs, ladders, handrail, gratings, pipe supports
and other misc. work to final handover to client.
Responsibilities:
 Construction project engineering, Office and field project management and Supervision. Directing and
controlling the fabrication and installation of Topside platforms.
 Performing, Checking / reviewing and ensuring technical accuracy and quality of Structural discipline
deliverables such as Shop drawings, specifications, purchase requisitions and etc. during the phases of
the project.
 Responsible for planning, organizing and delegation of work to discipline engineers and drafting
department.
 Review and approval of all vendor documents and drawings.
 Responsible for material procurement scope and material control for the projects.
 Representing Contractor in co-ordination with Discipline Heads/Project Team for monitoring of
Company Standards and quality.
 Responsible for technical meetings with Clients, PMT, Operations, Yard etc. and maintaining cordial
relationship with all parties involved in the projects.
 Close interaction with Operation to resolve installation issues during installation phase.
 To review any design work carried out by third parties (vendors), and to participate in, Reliability
Studies, Safety and Facilities Technical audits.
 To prepare engineering, construction and material estimation, schedule and resource planning.
 To maintain the weekly productive, monitor for the extra scope of work of the project for billing the
client and week reporting to the top level management.
McDermott Caspian Contractor
Piping Field Engineer October 2003 to October 2005
Baku, Azerbaijan
Project Summary
Piping production Engineer experienced in construction of Topside platforms for AIOC, Chirag gas
development area in Azerbaijan. Total platform weight was about 14,000 tonnes. Pipe scope was of about
1000 lines, which includes process and utilities line. Pipe work was made up of all sort of material like
carbon steel, stainless steel, Duplex, Super duplex, LTCS etc. All the piping systems were hydro tested in
about 600 test packs. It took about 900,000 Man-Hrs to complete all the piping activities. .
Responsibilities similar to that of FPSO project (December 2008 to September 2010).
AYTB
Maintenance Engineer May 2000 to October 2003
Jubail, Kingdom of Saudi Arabia
Project Summary
Maintenance engineer of Furnace and Hot area of KOP (Sabic and Exxon JV), petrochemical complex in
Al-Jubail in Kingdom of Saudi Arabia. Periodic maintenance of 07 Ea. Gas fired furnace (Supplied by ABB
Lummus) and exchangers for decoking. In charge for Furnace and hot area for 2 months Turn Around job.
Responsibilities:
 Preparation of job packages for maintenance of furnace, heat exchangers, Quench tower, columns and
boilers which includes preparation of drawing for equipment isolation, Manpower, Machinery and Tools &
Tackles required.
 To prepare Special procedures and task risk assessment.
 To organize scaffolding for equipment Isolation, Insulation removal or Installation.
 Planning and arrangement for the safety gears like gas testers, respirators, SCBA, Fire Extinguisher and
Safety harness.
 Review of QC Plans and Hold points required during different stage of execution.
 Preparation of (sketches & fabrication) of Manifolds, Air blower, Holders and Arrangement of hoses.
Arrangement of permanent material like Exchanger Gaskets, valve Internals, Gland packing, Trays, Bubble
caps, Clamps, demisters and other fasteners etc. required for job completion.
 Review the Bar-chart and to give comments or suggestion for any additional requirement / supports.
 During turn around attend the daily meetings, close monitoring of jobs and preparation of daily progress
report.
 Close coordination with different department / vendor like valve shop, hydro jetting crew, QC, Operation,
Engineering, Safety, warehouse and other third parties.
 Creating Awareness and enforcing the safety measures to provide a safe working environment at work site.
 Finally close out of all the job packages.
 Follow company safety plans and procedure.
Previous Companies & Positions Include:
Toyo Engineers India ltd (Client_ Haldia Petrochemicals Ltd)
Piping Field Engineer December 1997 to April 2000
2005
Haldia, India
Consolidated Construction Company (Client_ Equate Petrochemical Company)
Piping Field Engineer May 1996 to September 1997
Shuaiba, Kuwait
Consolidated Construction Company (Client_ OGD Phase-1 ADNOC)
Piping Field Engineer March 1994 to February 1996
Hubshan, Abu Dhabi_ UAE
Consolidated Construction Company (Client_ LNG-3 ADGAS)
Piping Field Engineer February 1993 to February 1994
Das Island, Abu Dhabi_ UAE
Essar Projects ltd (Client_ Essar Steel Ltd)
Piping Field Engineer July 1988 to January 1993
Surat, India
PERSONAL DETAILS:
Date of birth : 25-11-1965
Passport no : Z1754703 valid through Oct 2017
BOSIET : Valid up to Nov 2016

More Related Content

What's hot

En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineerandi dipayadnya
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 
1 re sume 2016 anders engstroem piping & layout
1   re sume 2016 anders engstroem piping & layout1   re sume 2016 anders engstroem piping & layout
1 re sume 2016 anders engstroem piping & layoutAnders Engstroem
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi
 
Varun Resume
Varun Resume Varun Resume
Varun Resume varun k
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 

What's hot (20)

RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
1 re sume 2016 anders engstroem piping & layout
1   re sume 2016 anders engstroem piping & layout1   re sume 2016 anders engstroem piping & layout
1 re sume 2016 anders engstroem piping & layout
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Varun Resume
Varun Resume Varun Resume
Varun Resume
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Antony cv - 2
Antony cv - 2Antony cv - 2
Antony cv - 2
 
Resume NMN 5b _3_
Resume NMN 5b _3_Resume NMN 5b _3_
Resume NMN 5b _3_
 

Viewers also liked

Basic Income in the United States by Sarang Ahuja
Basic Income in the United States by Sarang AhujaBasic Income in the United States by Sarang Ahuja
Basic Income in the United States by Sarang AhujaSarang Ahuja
 
Effective_presentation.ppt
Effective_presentation.pptEffective_presentation.ppt
Effective_presentation.pptplutoone TestTwo
 
Tipografía plano general.pptx margarita copia
Tipografía  plano general.pptx margarita   copiaTipografía  plano general.pptx margarita   copia
Tipografía plano general.pptx margarita copiaMargarita Negria
 
How Companies Can Regain Momentum
How Companies Can Regain MomentumHow Companies Can Regain Momentum
How Companies Can Regain MomentumRudy Trebels
 
La tecnología en la sociedad contemporanea
La tecnología en la sociedad contemporaneaLa tecnología en la sociedad contemporanea
La tecnología en la sociedad contemporaneaCarsu Glez
 
Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016
Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016
Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016Jason Condon
 

Viewers also liked (7)

Basic Income in the United States by Sarang Ahuja
Basic Income in the United States by Sarang AhujaBasic Income in the United States by Sarang Ahuja
Basic Income in the United States by Sarang Ahuja
 
Effective_presentation.ppt
Effective_presentation.pptEffective_presentation.ppt
Effective_presentation.ppt
 
Tipografía plano general.pptx margarita copia
Tipografía  plano general.pptx margarita   copiaTipografía  plano general.pptx margarita   copia
Tipografía plano general.pptx margarita copia
 
How Companies Can Regain Momentum
How Companies Can Regain MomentumHow Companies Can Regain Momentum
How Companies Can Regain Momentum
 
hello plutoone
hello plutoonehello plutoone
hello plutoone
 
La tecnología en la sociedad contemporanea
La tecnología en la sociedad contemporaneaLa tecnología en la sociedad contemporanea
La tecnología en la sociedad contemporanea
 
Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016
Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016
Workbook: Church Planter Training Intensive, Minneapolis MN, March 9-14, 2016
 

Similar to Nailesh Patel CV

Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnesto Costorio
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014ALBERT AUDU
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resumeAbhinav Rawat
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)deepesh s
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Pintu Darji
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie Casinillo
 

Similar to Nailesh Patel CV (20)

Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Noel Mago
Noel MagoNoel Mago
Noel Mago
 
Resume
Resume Resume
Resume
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
CV
CVCV
CV
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Rudyard Ejercito - Resume
Rudyard Ejercito - ResumeRudyard Ejercito - Resume
Rudyard Ejercito - Resume
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
 

Nailesh Patel CV

  • 1. Nailesh PATEL 405, Soham, Vasant Hsg. Complex, Mahavir Nagar, Kandivali (West), Mumbai – 400067. +91 98209 63048 (P) +91 86001 43224 (S) – nailesh_2003@yahoo.com Profile Engineering professional with significant construction and project management experience gained from major high technology projects in oil and gas industry with overall EPC experience of 25 plus years in multi discipline. Summary  Experienced in areas of fabrication - piping and structural and installation of fixed platforms such as FPSO, TLWP, wellhead, and production platforms.  Over 9 years of service with J Ray McDermott with the position of Piping Production Engineer. Familiar with PDMS review station and PIMS operation.  Knowledge with international design codes, standards such as B31.3, ASME, NACE procedures, and engineering practices.  Knowledgeable and experienced in using MSOffice software (Word, Excel & Outlook). Well familiar with interpreting and understanding of schedules generated from Primavera and reports from Microsoft Access.  Highly experience in Project management, Estimation, Proposal, Subcontracting, Commissioning and Turn Around works. Qualification Bachelor of Engineering (Production), Jawaharlal Nehru Engineering College, Aurangabad, Maharashtra. Professional Experience Petroleum Consulting Engineers Pvt Ltd. Piping Field Engineer August 2013 to January 2016 Jamnagar, India Project summary Piping Field Engineer, on deputation to Reliance Industries limited for LDPE and LLDPE project at their J3 Jamnagar site. Responsibilities:  Planning and organizing all aspect of piping engineering activities.  Keep the lead engineer apprised of various activities and concerns.  Preparation of construction isometrics from design Isos form installation point of view and smooth monitoring of spools status.  Maintain close coordination with procurement department for timely delivery of piping materials (Pipes and pipe fittings) for piping spools fabrication. Piping inline items like valves, strainers, Control valves etc. for installation purpose.  Working closely with warehouse department for proper preservation of pipes, fittings, valves and other items in the lay down area. Proper segregation of stainless steel, duplex and other material from carbon steel material.  Maintain close coordination with other engineering disciplines like Structural and Mechanical, for release of work front for installation of piping spools and other inline items. Working closely with Planning and QC department as required.  Participate in internal, client and third party audit on engineering deliverables and vendor document.  Participate in the preparation of detail piping engineering scope and estimates for proposal.  Become fully familiar with the scope of work. Monitor scope change and raised change notification.  Check design center deliverable list, deliverables and philosophies to ensure compliance with the specification and functional integrity.  Review and assist in approval of vendor data/drawings.  Check the final vendor data manuals to ensure that all the requested data has been received and approved.
  • 2.  Attend project review meeting, vendor meetings, engineering meetings and off shore site survey as required.  Providing necessary design inputs to other disciplines to enable them in proceeding with their deliverables.  Identify any change in the scope of work due to client comments and changes in existing project scope and inform team leader.  Creating awareness and enforcing the Safety measures to provide a safe working environment at work site. FloaTEC (Contracted through Brunel, Singapore) Piping Field Engineer May 2012 to April 2013 Singapore, Brazil. Project summary Piping and mechanical commissioning engineer with experience of TLWP process platform commissioning. P-61 Papa Terra project in Brazil for Petrobras. Project was to build topside and Hull for oil drilling and production lines connected to FPSO. Total project duration was 4 years. Piping scope was of close to 400 lines which include process lines and utility lines. All the lines were further broken down in about 4800 spools. Hydro testing of all the pipe work was completed in 325 test packs. N2-He leak testing of hydrocarbon and critical lines was done in 22 test packs. Total manpower involvement was 100 people including sub-contractor and vendor personal. Diesel lines connected to generators and stainless steel were chemically cleaned by third party vendors. 3 Ea. 18” final production process lines were connected to P-63 FPSO for further processing and off-loading. Responsibilities:  Development of detail and micro schedule Pre-commissioning/commissioning activities in conjunction with project Pre com/comm coordinator.  Identification of the resources like personal, equipment, materials, spares and consumables necessary to carry out the tasks.  Identification and coordination of vendor assistance during commissioning and hiring of specialized test equipments.  Identification and coordination of subcontractor needed to perform specialized activities like pigging, N2-He leak testing, chemical cleaning, torquing/tensioning and hydraulic system flushing.  Preparation of various procedure like functional test procedure, chemical cleaning, N2-He leak testing.  Preparation of equipment that require preservation.  Clearing and managing the discipline punch list.  Coordination of discipline pre-commissioning/commissioning activities in yard and off shore.  Issuing progress report and managing interface with subcontractor with regards to discipline pre- commissioning/commissioning activities.  Providing guidance to junior engineers. P.T.McDermott Piping Field Engineer September 2010 to March 2011 Batam, Indonesia Project Summary Piping completion engineer for Topside of Chevron Platong gas II project, Thailand. Total platform weight was 17,000 tons. Pipe scope was of about 1100 lines, which includes process and utilities line. Pipe work was made up of materials like Carbon Steel, Stainless Steel, Duplex, Super duplex, LTCS etc. All the piping systems were hydro tested in 725 test packs. It took approximately 1,000,000 Man-Hours to complete all the piping activities. Responsibilities:  Review of test packs based on sub system priorities.  Lead a group of line walker responsible for mechanical completion. Organize line walker based on the priority test packs.  Coordinate with production team to clear all “A” punch lists prior to hydro testing. Reinstatement of pipe work as per the test packs.
  • 3.  Coordinate with production team to clear all “B” punch lists prior to commissioning. Ensure that all scheduled test packs must be deliver in time.  Liaise with production team and subcontractor to solve day to day issues. Coordinate and assist production for the preparation of leak testing activities including flange management prior to leak testing. P.T.McDermott Piping Field Engineer December 2008 to September 2010 Batam, Indonesia Project Summary Piping field Engineer for FPSO modules fabrication of Peregrino Maersk project, Brazil. Total modules weight was about 6,500 metric tons. Pipe scope was of approximately 700 lines, which includes process and utilities line. Pipe work was made up of all sort of material like carbon steel, stainless steel, Duplex, Super duplex, LTCS etc. All the piping systems were hydro tested in about 450 test packs. It took about 650,000 Man-Hours to complete all the piping. All the modules were assembled in Keppel yard in Singapore Responsibilities:  Assist in planning and organizing all aspect of piping engineering activities.  Keep the lead engineer apprised of various activities and concerns.  Preparation of construction isometrics from design Isos form installation point of view and smooth monitoring of spools status.  Maintain close coordination with procurement department for timely delivery of piping materials (Pipes and pipe fittings) for piping spools fabrication. Piping inline items like valves, strainers, Control valves etc. for installation purpose.  Working closely with warehouse department for proper preservation of pipes, fittings, valves and other items in the lay down area. Proper segregation of stainless steel, duplex and other P5, P9, P11material from carbon steel material.  Maintain close coordination with other engineering disciplines like Structural and Mechanical, For release of work front for installation of piping spools and other inline items. Working closely with Planning and QC department as required.  Participate in internal, client and third party audit on engineering deliverables and vendor document.  Participate in the preparation of detail piping engineering scope and estimates for proposal.  Become fully familiar with the scope of work. Monitor scope change and raised change notification.  Check design center deliverable list, deliverables and philosophies to ensure compliance with the specification and functional integrity.  Review and assist in approval of vendor data/drawings.  Check the final vendor data manuals to ensure that all the requested data has been received and approved.  Attend project review meeting, vendor meetings, engineering meetings and off shore site survey as required.  Identify any change in the scope of work due to client comments and changes in existing project scope and inform team leader.  Creating awareness and enforcing the Safety measures to provide a safe working environment at work site.  Ensuring adherence to company procedures and guidelines. McDermott Caspian Contractor PIPING/STRUCTURAL ENGINEER November 2007 to December 2008 Baku, Azerbaijan Project Summary Involved in preparation of structural and piping estimation, bidding and proposal for topside and jacket, living quarters, utility deck, flare boom and flare jacket for Karachaganak field development project. Calculated total MTO for structural and piping scope of work. Estimated approximate man hour required for the job based on SBUM. Raised bid clarifications and maintained log for it. Prepared and assisted in yard facility information presentation. Total estimated value of the project was more than 15b USD.
  • 4. McDermott Caspian Contractor STRUCTURAL FIELD ENGINEER October 2005 to November 2007 Baku, Azerbaijan Project Summary Structural Engineer experienced in construction of Topside platforms for AIOC, Chirag gas development area in Azerbaijan. Total wt of the topside was about 14,000 tonnes. Structural scope was of about1, 500,000 man-hrs. These include all the man-hrs require from material procurement, warehousing, preparation of detail construction drawing for each member of primary and secondary structure, pre- fabrication of structural member, assembly of small modules in the workshop, integration of all the modules in the site and installation of tertiary structural items like stairs, ladders, handrail, gratings, pipe supports and other misc. work to final handover to client. Responsibilities:  Construction project engineering, Office and field project management and Supervision. Directing and controlling the fabrication and installation of Topside platforms.  Performing, Checking / reviewing and ensuring technical accuracy and quality of Structural discipline deliverables such as Shop drawings, specifications, purchase requisitions and etc. during the phases of the project.  Responsible for planning, organizing and delegation of work to discipline engineers and drafting department.  Review and approval of all vendor documents and drawings.  Responsible for material procurement scope and material control for the projects.  Representing Contractor in co-ordination with Discipline Heads/Project Team for monitoring of Company Standards and quality.  Responsible for technical meetings with Clients, PMT, Operations, Yard etc. and maintaining cordial relationship with all parties involved in the projects.  Close interaction with Operation to resolve installation issues during installation phase.  To review any design work carried out by third parties (vendors), and to participate in, Reliability Studies, Safety and Facilities Technical audits.  To prepare engineering, construction and material estimation, schedule and resource planning.  To maintain the weekly productive, monitor for the extra scope of work of the project for billing the client and week reporting to the top level management. McDermott Caspian Contractor Piping Field Engineer October 2003 to October 2005 Baku, Azerbaijan Project Summary Piping production Engineer experienced in construction of Topside platforms for AIOC, Chirag gas development area in Azerbaijan. Total platform weight was about 14,000 tonnes. Pipe scope was of about 1000 lines, which includes process and utilities line. Pipe work was made up of all sort of material like carbon steel, stainless steel, Duplex, Super duplex, LTCS etc. All the piping systems were hydro tested in about 600 test packs. It took about 900,000 Man-Hrs to complete all the piping activities. . Responsibilities similar to that of FPSO project (December 2008 to September 2010). AYTB Maintenance Engineer May 2000 to October 2003 Jubail, Kingdom of Saudi Arabia Project Summary Maintenance engineer of Furnace and Hot area of KOP (Sabic and Exxon JV), petrochemical complex in Al-Jubail in Kingdom of Saudi Arabia. Periodic maintenance of 07 Ea. Gas fired furnace (Supplied by ABB Lummus) and exchangers for decoking. In charge for Furnace and hot area for 2 months Turn Around job.
  • 5. Responsibilities:  Preparation of job packages for maintenance of furnace, heat exchangers, Quench tower, columns and boilers which includes preparation of drawing for equipment isolation, Manpower, Machinery and Tools & Tackles required.  To prepare Special procedures and task risk assessment.  To organize scaffolding for equipment Isolation, Insulation removal or Installation.  Planning and arrangement for the safety gears like gas testers, respirators, SCBA, Fire Extinguisher and Safety harness.  Review of QC Plans and Hold points required during different stage of execution.  Preparation of (sketches & fabrication) of Manifolds, Air blower, Holders and Arrangement of hoses. Arrangement of permanent material like Exchanger Gaskets, valve Internals, Gland packing, Trays, Bubble caps, Clamps, demisters and other fasteners etc. required for job completion.  Review the Bar-chart and to give comments or suggestion for any additional requirement / supports.  During turn around attend the daily meetings, close monitoring of jobs and preparation of daily progress report.  Close coordination with different department / vendor like valve shop, hydro jetting crew, QC, Operation, Engineering, Safety, warehouse and other third parties.  Creating Awareness and enforcing the safety measures to provide a safe working environment at work site.  Finally close out of all the job packages.  Follow company safety plans and procedure. Previous Companies & Positions Include: Toyo Engineers India ltd (Client_ Haldia Petrochemicals Ltd) Piping Field Engineer December 1997 to April 2000 2005 Haldia, India Consolidated Construction Company (Client_ Equate Petrochemical Company) Piping Field Engineer May 1996 to September 1997 Shuaiba, Kuwait Consolidated Construction Company (Client_ OGD Phase-1 ADNOC) Piping Field Engineer March 1994 to February 1996 Hubshan, Abu Dhabi_ UAE Consolidated Construction Company (Client_ LNG-3 ADGAS) Piping Field Engineer February 1993 to February 1994 Das Island, Abu Dhabi_ UAE Essar Projects ltd (Client_ Essar Steel Ltd) Piping Field Engineer July 1988 to January 1993 Surat, India PERSONAL DETAILS: Date of birth : 25-11-1965 Passport no : Z1754703 valid through Oct 2017 BOSIET : Valid up to Nov 2016