1. DELFIM JOSE MOREIRA
9 Fulmar Close , Penarth , Vale Of Glamorgan CF64 5FE
Home: 02922210747 - Cell: 07787142670 - delfim.moreira82@gmail.com
SUMMARY
I have 28 years of experience in Piping Industries: Power Energy, Chemical ,Steel Factory
&Ship Building/Repair. Hardworking, reliable and self- confident individual, who has
good communication and interpersonal skills, works efficiently on his own initiative and
is a supportive team player. I am well organised, I have a exemplary timekeeping record,
capable of adapting to any changing environments and is trustworthy and honest.
Results- driven and focused Engineering Technician who prioritises safety, cost-effective
solutions and exceeding customer expectations,equipped with a strong a ention to detail
and ability to recognise potential issues before they start.
SKILLS
Team player
Design Codes & Standards knowledge
Excellent analytical and methodical
skills
Exposure to engineering development
High-level oral and written
communication skills
Ability to travel
WORK HISTORY
01/2015 to 10/2015Piping Supervisor
03/2014 to 01/2015Piping Supervisor
Tema Engineering Services Ltd – Newport
Jan-Sep 2015 Work shop in Cardiff (Tema Engineering Services Ltd) Piping
Supervisor ,Ensure accomplishment of team goals through effective
design,development and implementation of any engineering changes.
Mar 2014-Jan 2015 In Newport ,Wales: for Tema Engineering at Eastman Chemical
Plant Corporation Rd, Newport NP19 4XF Cheque and find the right place for the
pipe spools in all the plant ,find and organize the right drawings in different areas
and zones in the all plant ,positioned and organize the right teams to install the pipe
work, pipefi ers ,welders ,etc .A ention to the detail and able to do the necessary
modifications and pressure tests, communicate the progress and reports to the site
manager.
Completed project by effectively applying engineering, technical and maintenance
procedures.
Followed up on manufacturing and field reports and resolved outstanding problems.
Maintained design standards for facilities and equipment.
Provided engineering support including training to field operations and
manufacturing.
05/2013 to 01/2014Piping and Mechanical Supervisor
Bio-Mass Usk, Monmouthshire Biomass Plant in Usk, South Wales Usk
Monmouthshire NP15 1HT From Boccard Alliance for Success and Dordtech
Engineering B.V All the pipe work installation all most in stainless steel1" to 24"
general plans drawings interpretation and take measures in place and make drawings
to fabricate and assembly all the pipe work in place .Make sure the connections are
level ,square and free of stress ,also have dialogs whit the client to some
modifications and changes to make in the pipe work ,supports and mechanical
installation.
All the pipe spools installation all most stainless steel 1" to 24" and mechanical
work a.
2. 01/2013 to 05/2013Piping Construction Supervisor
RWE Power Station at Hamm /Germany one of the world's most modern hard
coal-fired ,£ 2 billion cost Construction complies with detailed Engineering
Schedule and Safety Practices ,Check and report to the Superintendent the Progress
of the work performed by the Contractor ,participate in technical reviews and
prepared all required documentation, Supervision of pipe installation to ensure the
performance and project schedule: piping connection between boiler and
turbine(finalize installation successful.
07/2012 to 12/2012Piping Supervisor
01/2012 to 06/2012Piping Supervisor
Exxon MobilExxon Mobil – ScotlandScotland
Exxon Mobil: Chemical Ethylene Plant in Five ,Scotland.
Talk and explain the risks assessments and health & safety to the workers before start
the jobs over see all the piping construction activities in site, responsible of all
piping procedures and progress daily reports to the site manager.
Jul-Dec 2012 Piping Supervisor : Eneos (Old BP)Refinery in Grangemouth
(Doosan-Babcock)-Intec-velosi
Responsibilities on all pipe work,take the permits for the control room,risk
assessments in place and health&safety,make sure site workers understand the better
way to do the job,take 5,organise paper work and the safety packs and keep them up
to date.Give Toolbox talk.
Jan-Sep2011 Piping Supervisor : Esso Refinery in Fawley, Southampton Duties
involved making sure site workers were given instructions on a daily basis ,permits
responsible.
Supervision of pipe installation to ensure the performance and project schedule.
Conferred with scientific, engineering and technical personnel to resolve design,
research and testing problems.
01/2011 to 10/2011 Piping Supervisor
MII Engineering Ltd
Tata, Port Talbot, cold mill Responsible for piping Fabrication and installation
(Water cooling system)of the blast furnace, Prepare Hydro testing Responsible of
Reinstatement Responsibilities involved making sure site workers were given
instructions on daily basis ,organiser safety toolbox meetings on a weekly basis
,permits to sign and check before start jobs ,health and safety first.
02/2010 to 12/2010Piping Supervisor
MII Engineering Ltd – Belvedere
Energy from waste / Belvedere Incinerator Water Steam Cycle Pipework, General pipe
work.
Supervising piping construction activities, responsible of pipe procedures and
progress daily reports, overseeing welders and pipefi ers ,a ention to detail and make
sure the use of right materials ,fill all correct documentation.
Responsibilities involved making sure all the site workers understand the daily task
required, the right procedures are in place and correct tools in use(risk assessments)
and also make sure the health and safety policies are follow.
Every week make a toolbox meetings about health and safety to make sure all the
workers can understand be er health and safety basis and priorities.
Make the time sheets for 34 workers: welders, pipefi ers and pla ers.
02/2009 to 01/2010Piping Supervisor
Fabricon – Rotterdam.NL
Shell Rotterdam .Refinery Shell+Pernis in Rotterdam ,piping Supervisor Fabricon
Group Suez Supervising of piping construction to ensuring the construction
complies with detailed engineering schedule and safety practices,check and report to
3. the construction manager the progress of work performance,participate in technical
reviews and prepared all required documentation,coordinate punching.
Evaluated construction design information such as detail and assembly drawings,
design calculations, system layouts and sketches or specifications.
Maintained design standards for facilities and equipment.
08/2007 to 01/2009Pipe Supervisor
Kepeel Verolme Ship YardKepeel Verolme Ship Yard Ro erdamRo erdam Work
involved : read drawings [iso] and general plans ,organize daily work(Audacia
Project).
Routine and priorities ,check the assembly of pipes spools and preparing drawings to
be welded.
given instructions on a daily basis to pla ers ,welders and pipe fi ers Fabrication and
installation pipe lines and supports in safely and quality work the priorities ,check
the materials and works places , give weekly tool boxes meetings , experience to
remember and talk about safety and quality in the work.
Implemented schematics, diagrams and wri en and verbal descriptions to effectively
solve engineering project issues.
Followed up on manufacturing and field reports and resolved outstanding problems.
06/2006 to 05/2007 BIS Bilfinger BIS Bilfinger BIS Bilfinger BIS Bilfinger
Gellen.NLGellen.NLGellen.NLGellen.NL D.S.M.
in Geleen Holland, The New Chemelot Petrochimie Fabricon, GTI Pipe Supervisor
[workshop] Receive drawings in the office, from the site manager, then give to the
workers making sure that the health and safety procedures.
are followed and ensuring that the job is carried out in the correct way.
Ensure that the welders and fi ers understand on a daily basis the jobs to be
completed.
Collaborated with engineers at the new product introduction phase to develop and
verify design changes.
Followed verbal instructions and hand sketches to adapt and modify tooling.
01/2005 to 03/2006Piping SupervisorPiping Supervisor
BorealisBorealis StenungsungStenungsung
Petrochemical (Titanium pipe spools) Responsibilities involved make sure that all
site workers were given instructions on a daily basis ,given safety tool box meetings
on a weekly basis to all workers and make sure the safety and ppe are respected
.Connect to site manager in daily basis to make sure the production , quality and
safety go on in order and satisfaction to the client.
Responsibility to communicate to my boss the needs from the client.
Completed project by effectively applying engineering, technical and maintenance
procedures.
07/1999 to 09/2004Piping Supervisor
Fabricon – Antwerp
Gti ,Fabricon Antwerp.Be Belgium,Antuerpen-Hoboken-Workshop,Piping
Supervisor-Gti.
Fabricon ,Group Suez Responsibilities involved make sure that all site workers were
given instructions on a daily basis, report to site manager every day.
Improved product quality by customising tools and eliminating variability.
Followed up on manufacturing and field reports and resolved outstanding
problems.Developed standard operation procedures and quality or safety standards
for assembly and weld the pipe spools
Evaluated construction design information such as detail and assembly drawings,
design calculations, system layouts and sketches or specifications.
07/1997 to 12/1999Pipe Foreman
4. Kremsmuller – Terneusen
Dow-Chemical (Terneuzen) Kremsmuller Gmbh,Sofina Gmbh Responsibilities on all
pipework ,Take the Permits for the control room, make sure site workers , understand
the way to do the job, ,organise safety packs and paper work ,give toolbox meetings
when needed.
Completed projects by effectively applying engineering, technical and maintenance
procedures.
Maintained design standards for facilities and equipment.
PERSONAL INFORMATION
I have a passion for fishing, I also enjoy going for bicycle rides.
REFERENCES
References References Available Upon Request
LANGUAGES
English ,France, Italian, Spanish and Portuguese(native)
ADDITIONAL INFORMATION
VCA Personal Safety Logbook NL. Safety Passport
TUV SUD Akademie SCC-Document 018 D. Certificate
Additional information CSCS ACE Card Level 3
CCNSG Safety Passport
SMSTS Certificate
NVQ 3 Level 3 Diploma in Installing Engineering Construction Plant and Systems
- Pipeffiting