SlideShare a Scribd company logo
1 of 15
Download to read offline
1
CAREER OBJECTIVE:
To work in global competitive environment on the challenging assignment that shall yield the benefits
of the job satisfaction & steady-paced professional growth.
CAREER SUMMARY:
 A Diploma Engineer with 23+ Years of Experience in Construction field covering Oil and Gas
Sector Projects ,Industrial Electrification, Power Plants, Petro Chemical plants, Refinery, LPG
Bottling Plant, ONGC Effluent treatment plant and Sugar Plant.
 Performed with Prestigious Organizations in Toshiba Plant Systems & Services
Corporation,Japan(TPSC),SPIC SMO,Spic Jel Engineering and Construction Limited with good
appreciation from the clients KREBS France,DEWA,Larsen and Toubro OGSP Division,ITC,Bovis
Lend Lease,Flour Daniel,Hyundai Engineering and Construction Company and Samsung
Engineering and Construction Company.
 Over 8+ years of experience in Onshore & Offshore Oil and Gas Project in electrical equipment
installation and construction activities including co-ordination with client, consultant, suppliers and
sub-contractors in Tanzania (Songas), Tunisia (British Gas) ,Syria (Petro Canada & Hayan
Petroleum Co), Algeria (Groupment Berkine/Sonatrach Anadarko Association) , UAE
(ZADCO) & India( Cairn Energy).
 Over 14 years of extensive experience in various electrical fields like Powerplant,
Petrochemical Plants,Refinery,LPG Bottling Plant, Sugar Plant,in Production,Equipment
installation,Commissioning and complete electrical installation activity including co-ordination
with client, consultant, suppliers and sub-contractors in Jordan,UAE,India
 Extensive exposure to IEEE,NEMA Standards and EIL,Technip Standards.
 Been leading the Construction team from the position of Superintendant (6 years), Site
Incharge(2years),Site Engineer(4 years),Site Supervisor (9 years) with high degree of focus
on co-ordination of Engineering, Procurement and Site activities
SKILLS:
Key technical skills
Dedication and Excellence in Construction field of work in order to deliver my best performance and
commitment to which ever organization and having ability to work as a team as well as independently.
Area of expertise
Oil and Gas, Petrochemical, Refinery, Power Plant, Sugar Plant and Industrial Projects.
Certifications
- Competence Certificate for Elec-ATEX Installation Level -2E,Conception,Realisation and Maintenance
valid up to 2015.
- Basic H2S OPITO Approved certificate valid up to 2015.
- Travel Safety by boat OPITIO Approved certificate valid up to 2017.
- ZADCO Offshore Safety certificate valid up to 2015.
2
Software proficiency
MS WINDOWS
CAREER HISTORY:
Petrofac International Ltd (08/10/2007-Till date)
Project 1
Current Designation -Electrical Superintendent Construction (18/10/2013- to till date)
Name – Upper Zakum UZ750,Island Surface Facilities Project
Project Value – 3700 MMUS$
Client – Zakum Development Company
Country - UAE
 Key elements of the Projects
Lump Sum Turnkey (LSTK) Engineering, Procurement, Construction and Commissioning (EPCC) works for
Installation of the Island Surface Facilities for the Production Build-up (PBU) Phase that will achieve target oil
production of 750,000 BOPD. The project includes implementation of modularization strategy to maximize the
scope of work performed in fabrication yards and minimize the work on the islands.
The work is spread over on the four artificial islands which are approximately 80 Kms in the sea from
Abudhabi. Project comprises of the following major facilities.
Well heads
Gas lift Manifolds
Gas Injection Manifolds
Water Injection Manifolds
 Responsibility and achievements
 Review Temporary facilities drawing/documents submitted by Sub-contractor.
 Preparing Method statements/Risk assessment for the Permenant job installation activity.
 Review construction related drawings/Documents check submitted By IDC.
 Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client in Previous Project.
 Lessons learnt/problems found in earlier project.
 Proper review/planning of work sequence of construction activites to be start up in Central Island with
respect to SPMT movements.
 Complete installation of accommodation facilities in island.
 Planning sequence of electrical installation activity
Project 2
Designation - Electrical Superintendent Construction (23/01/2011 to 02/09/2013)
Name – Elmerk Field,Central Processing Facilities (CPF)
Project Value - 2216 MMUS$
Client – Groupment Berkine/Sonatrach Anadarko Association
Country - Algeria
 Key elements of the Projects
Central Processing Facility in Berkine region,Processing Hydrocarbons initially from Block 208,seperated by
the Sonatrach/Anardorko Association,& from the unitised EMK Field located on a portion of both Block 208 &
the Sonatrach/Conaco Philips operated Block 405A Capacities are as follows
2 X 65,000 BPD (each) Oil/Condensate Trains
3
1X 600 MMSCFD NGL Train
Water Injection -155,000BPD
Gas Injection - 500 MMSCFD
Export (Nominal Peak)
Oil 90,000BPD : Condensate-42,000BPD : LPG -65,000BPD
Process Systems
Inlet Facilities - 3 Nos Slug Catchers
Oil Separation, Desalting, Stabilization & Condensate Recovery 2 Trains of 65,000 BPD
Associated Gas Compression Facilities: 2 Trains of Motor Driven Compression
Booster Gas Compression Facilities: 3 Trains of Motor Driven Compression
Gas Dehydration Facilities : 2 Trains of Motor Driven Compression
NGL Recovery & Fractionation Facilities: 1 Train of 600 MMSCFD NGL Unit of High Propane Recovery
(Cryogenic Turbo Expander) & Fractionation
Residue Gas Compression Facilities : 2 Trains of Gas Turbine Driven Compression
Injection Gas Compression Facilities: 3 Trains of Gas Turbine Driven Compression
Oil Storage and Export Facilities
Oil/Condensate Re-run Facilities
LPG Storage and Export Facilities
Utility System:
Water Treatment Facilities, Fuel Gas Facilities, Hot Oil Systems, Flare and Releif Facilities
(7Flares),Instrument Air,Nitrogen Generation and Distribution Facilities, Oily Water Treatment Facilities,
Control and Safe guarding systems.
 Responsibility and achievements
 Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
 Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
 Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
 Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely inline with project schedule.
 Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
 Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
 Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
 Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
 Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
 Ensure that all construction activities were carried out in line with project specification and client
requirement.
4
 Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
 Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of PETROPCS Check sheets.
Project 3
Designation-Electrical Superintendent Construction (13/02/2010 to 18/12/2010)
Name – Jihar Gas Plant Project
Project Value - 450 MMUS$
Client – Hayan Petroleum Company (HPC)
Country – Syria
 Key elements of the Projects
Engineering,Procurement,Construction,Pre-Commissioning,Commissioning,Start up of Gas Processing
Facilities Involving Mainly the
Gas Treatment Plant at 150MMSCFD
LPG Recovery System
LPG Storage& Loading Facility
Gas Treatment Plant at 150MMSCFD
Satellite Gathering Station
Well Sites & Flow Lines
Utilities & Offsites Facilities
Transport Pipelines and living quarter etc.
 Responsibility and achievements
 Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
 Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
 Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
 Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely in line with project schedule.
 Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
 Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
 Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
 Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
 Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
 Ensure that all construction activities were carried out in line with project specification and client
requirement.
 Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
5
 Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of PETROPCS Check sheets.
Project 4
Designation -Electrical Superintendant Construction (02/05/2009 to12/01/2010)
Name – Ebla Gas Project Surface Facilities
Project Value - 620 MMUS$
Client – Petro –Canada Palmyra B.V
Country - Syria
 Key elements of the Projects
Engineering, Procurement, Construction Commissioning and Start-Up of Gas Treatment Plant Producing 80
MMSCFD of Sales Gas, Gathering Station and Flow-lines and Pipelines Connecting well sites and Gas
Gathering Stations with Gas Treatment Plant
The Gas Treatment Plant will consist of
Gas dehydration unit, Gas Separation using Turbo-expander/low temperature separator process, LPG
Recovery Unit, LPG Storage facilities and Loading Facilities, Sales Gas Compression and transportation
facilities, Condensate Stabilization and Storage, Associated Offsites & Utilities
 Responsibility and achievements
 Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
 Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
 Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
 Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely in line with project schedule.
 Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
 Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
 Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
 Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
 Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
 Ensure that all construction activities were carried out in line with project specification and client
requirement.
 Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
 Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of PETROPCS Check sheets.
6
Project 5
Designation -Electrical Supervisor, Construction (08/10/2007 to 28/03/2009)
Name – Hasdrubal Gas Plant Contract
Project Value - 460 MMUS$
Client – British Gas Tunisia Limited and Enterprise Tunisienne D”activities Petrolieres (ETAP)
Country – Tunisia
 Key elements of the Projects
EPC, The Project Scope Covers Feed Gas Containing 90PPM H2S and 3.8% CO2 and Mercury,120MMSCFD
Wet Gas Processing with Production of 15,000 BPD of Stabilised Condensate and Oil with 2,000 BPD of
Produced Water. 4,300 BPD of LPG (Propane/Butane) using Proprietary turbo expander technology
(ORTLOFF)
Gas Separation
Mercury Removal
Amine Gas Sweetening
Molsieve Gas Dehyration
Gas Dew Pointing using Turbo-expander
Produced water treatment and disposal
Gas Export Compression
Condensate Stabilisation
Condensate storage and export systems
Recycle Gas compression
Flare systems & Hot oil systems
Power Generation/Distribution and all associated tie-ins with the existing plant
 Responsibility and achievements
 Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
 Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
 Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely in line with project schedule.
 Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
 Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
 Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
 Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
 Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
 Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
 Ensure that all construction activities were carried out in line with project specification and client
requirement.
7
 Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
 Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of WINPCS Check sheets.
Previous company No 1- (Toshiba Plant Systems & Services Corporation, Japan (TPSC)
Designation – Electrical Engineer - Construction (20/01/2005 – 21/05/2007)
Project 1
Name – Jebel Ali Power & Desalination Station “ L”Phase-1 750MW Combined Cycle Power Plant
Project Value -816MNUS$
Client – Dubai Electricity and Water Authority.
Country –UAE
 Key elements of the Projects
 Engineering, procurement and construction of capacity of 750 MW power generation plant including
supply and installation of gas turbines, heat recovery steam generators, auxiliary boilers, back
pressure steam turbines and carrying out associated works.
 The project will add 860 megawatts of power and 70 million imperial gallons a day of desalination
capacity, and is divided into four stages, with the first concentrated on the power generation station
using gas turbines. The second stage includes a seawater desalination station. The third includes a
400 kV transformer station, and the final phase will result in a 400 kV overhead transmission and
connection lines to connect the L station to the Dubai electricity grid.
 Responsibility and achievements
 Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
 Adherence to Construction schedule
 Ensuring good discipline of Construction labour as well as local Contractors
 Planning work in liaison with the Planning Engineer.
 Co-ordination with Consultant to get material approval & vendor approval.
 Monitoring stage by stage work schedule
 Work follow up with Sub-contractors.
 Installation Of HV/LV Transformers
 Assisting in assemblingof400KV Step up Transformer, Oil filling, Oil filtration and its associated works
 Installation of Switchgears 11kv MV and LV Boards.
 Installation of Battery Chargers and Distribution Boards.
 Installation of DCS and Marshalling Panels.
 Installation of Busducts (IPB AND MV)
 Installation of Battery system installation and commissioning 110v and 24v
 Installation of EOT Cranes and Hoist and its associated cabling etc.
 Raceway and Cable Embedded Conduit Installation
 Co-ordination with Consultant and Owner Etc.
 Installation of Lighting and Power distribution board and complete plant lighting system
 Installation of complete plant earthing systems
 Preparing and submitting of As Built Diagrams and Material Reconciliation and Handing over the
Project Materials
8
Previous company name No.2 - Central Electricals International Limited
Designation – Electrical Site-Incharge (15/10/2003 – 14/10/2004)
Project 1
Name- Songo Songo Gas development and Power generation Project –Onshore and Offshore
Client – Larsen and Toubro OGSP Division.
Country - Tanzania
 Key elements of the Projects
 Songo Songo Gas Development and Power Generation Project for Songas Limited , Tanzania ,
comprising of 2 x 35 MMSCFD Gas Processing Plant, 3 shallow water wellhead platform, 25 km sub-
sea pipeline and 210 cross-country pipeline to power plant near Dar-e-Salaam.
 Responsibility and achievements
 Co-Ordination with regular site Erection activities in all area and preparation of schedules.
 Co-ordination with Consultant to get material approval & vendor approval.
 Procurement of materials as per site requirement.
 Inspection of materials with Client & Consultant
 Monitoring stage by stage work schedule
 Maintaining of Project materials stores
 Maintaining receipt, issue, balance and storage status documents.
 Co-ordination with Site Engineers
 Deployment of adequate Construction equipment and tools
 Planning work in liaison with the Planning Engineer.
 Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
 Contract administration, Invoicing and Payment follow up with Clients
 Attending Client Meetings and Preparing and Submitting of Reports Weekly, Daily and Monthly as well
as Quality Reports
 Complete supervision of Installation and Commissioning of Switchgears, Transformers.
 Installation of Diesel and Gas Generators
 Laying and Termination of Power and control Cables
 Complete Plant Earthing, Lighting and Paging Systems
 Preparing and submitting of As Built Diagrams and Material Reconciliation and Handing over the
Project Materials
Previous company name No 3 – Spic Jel Engineering and Construction Limited – (December 1994-
November2003)
Project 1
Designation -Electrical Engineer- Construction (September 2002-November2003)
Name : Fabrication Shop, Main office
Country - India
 Key elements of the Projects
 Complete HT Supply conversion installation and maintenance of Transformers, Switchgears and
Fabrication shop equipment’s, EOT Cranes.
 Responsibility and achievements
 Installation and Operation maintenance of Transformers
9
 Installation and Operation maintenance of Power and Welding Generators
 Maintenance of EOT Cranes
 Maintenance of Electrical fabrication equipment’s like grinder, Welding machines Etc.
 Periodic maintenance of all equipment’s and records.
 Deployment of adequate Construction equipment and tools
 Conduct annual inspection with CEIG.
Project 2
Designation -Electrical Engineer- Construction (July 2001-August2002)
Name – Arooran Sugar Plant Relocation Project
Client – Thiru Arooran Sugars Limited
Country – India
 Key elements of the Projects
 Complete dismantling and relocation of 2500 TCD Capacity sugar mill from Kollumangudi to A. Chittur,
Virudhachalam Taluk, Cuddalore District, including 18.6 MW cogeneration power plant. Testing and
commissioning complete.
 Responsibility and achievements
 Preparation of Old Layout of Panels and termination Details Cable Trenches routing, Lighting
Layout, Etc.
 Planning of fore schedule with Management and Erection team.
 Co-ordination with Consultant to get material approval & vendor approval.
 Preparation of Technical Evaluation of materials.
 Attending Technical & Commercial meeting with vendors.
 Co-ordination with Design Division to get the material as per design requirement.
 Procurement of materials as per site requirement.
 Inspection of materials with Client & Consultant
 Complete Dismantling of 110KV Switchyard and accessories
 Complete Dismantling of Transformers and Busducts etc.
 Complete dismantling of all HT and LT Panels, light fittings, cables
 Complete Packing of all Panels and all accessories and shifting
 Reinstallation the same in new plant Vridhachalam
 Invoicing and Payment follow up with Clients.
 Commissioning of all Switchgears, Motors, Transformers, including power receiving from TNEB
Project 3
Designation - Electrical Engineer, Construction (April2001 to June 2001)
Name – IOCL Barauni Refinery Expansion Project
Client – Samsung Engineering Company Limited, Korea
Country - INDIA
 Key elements of the Projects
Complete electrical installation and commissioning works of transformers, HT/LT Switchgears, MCCs,
Structural cable tray installation, cabling and termination, lighting and earthing systems
 Responsibility and achievements
 Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
 By conducting Tools box Talk, Induction Training Etc.
10
 Installation of LV Transformers
 Installation of Switchgears 11kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
 Installation of Bus ducts and its supporting structures
 Installation of Battery system installation 110v and 24 v DC
 Cable laying and termination works.
 Lighting and earthing system installation works.
 Commissioning of Panels, Transformers and Plant distribution Boards etc.
 Prepare work schedule and Target for implementation of work progress, Coordination with Consultant
and Owner Etc.
Project 3
Designation-Electrical Engineer, Construction (December1999 to March2001)
Name – ITC Primary Manufacturing Plant Project
Client – Bovis Lend Lease
Country – India
 Key elements of the Projects
Fabrication and Erection of Underground tank and Above Ground tanks and associated steam and condensate
piping, Installation of 1MW Diesel Generators 4 No’s along with Stack
 Responsibility and achievements
 Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
 By conducting Tools box Talk, Induction Training Etc.
 Co-ordination with Client & Consultant.
 Procurement of material as per site requirement.
 Inspection of materials with Client & Consultant
 Monitoring stage by stage work schedule
 Maintenance of all construction equipment’s like cranes, generators, welding machines etc.
Project 4
Designation -Electrical Supervisor Construction (June 1998 to November 1999)
Name – 4X50 MW DIESEL BASED GMR VASAVI POWER PROJECT
Client – Hyundai Heavy Industries Company
Country - India
 Key elements of the Projects
 The world’s largest diesel engine driven electric power plant possessing a nominal capacity of 200MW
with four units low speed diesel (HDEC) engines, each driving a 50 MW generator. Each engine is 70,000
horsepower. This power plant is equipped with a sewage treatment system having a capacity og 7,200
ton/day for environment purposes. This power is designed to provide trouble free parallel operations with
the existing 110KV Grid facilities to the TNEB (Tamilnadu Electricity Board) System. It supplies the main
source of electrical power to the area of Chennai under Hyundai’s Operation and Maintenance (O&M)
Services.
11
 Responsibility and achievements
 Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
 Adherence to Construction schedule
 Ensuring good discipline of Construction labor as well as local Contractors
 Allocation of Construction Staff and workforce
 Deployment of adequate Construction equipment and tools
 Planning work in liaison with the Planning Engineer.
 Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
 Invoicing and Payment follow up with Clients.
 Installation of LV Transformers
 Installation of Switchgears 11kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
 Installation of Bus ducts and its supporting structures
 Installation of Battery system installation 110v and 24 v DC
 Paging and Public Addressing system & Telephone system
 Commissioning of Panels, Transformers and Plant distribution Boards etc.
 Commissioning of all equipment’s including power receiving from TNEB and Plant lighting system
Project 5
Designation -Electrical Supervisor, Construction (July 1997 to APRIL 1998)
Name – NYLON 6.6 PLANT PROJECT
Client – M/s. DuPont Fibres Ltd., Gummidipoondi.
Country – India
 Key elements of the Projects
Fabrication and Erection Piping and Structural works, Equipments and Associated Piping and Installation of
Electrical Panels, cabling, cable tray supports, termination, lighting and earthing complete includes testing and
commissioning
 Responsibility and achievements
 Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
 Adherence to Construction schedule
 Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
 Invoicing and Payment follow up with Clients.
 Implementing ISO procedures at Site.
 Installation of Distribution Transformer
 Installation of Switchgears 6.6kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
 Installation of Bus ducts
 Installation of Battery system installation 110v and 24 v DC
 Paging and Public Addressing system & Telephone system
 Commissioning of Panels, Transformers and Plant distribution Boards etc.
 Complete Cable Laying of Both Power and Control cable and its Termination
 Coordination with Consultant and Owner Etc.
12
Project 6
Designation-Electrical Supervisor- Construction (June 1996 to June1997)
Name –SA/PA INDO JORDAN PLANT PROJECT
Project Value -170 Million US$
Client – M/s Krebs, France / M/s. SPIC SMO, Chennai.
Country – Jordan
 Key elements of the Projects
 The project complex consists of a 224,000 MT/Year Phosphoric Acid Plant, a 660,000 MT/Year dedicated
Sulphuric Acid Plant and associated Utilities & Offsite facilities at Eshidiya and an acid storage facility (4
tanks of 5,000 m3 capacity each) at Aqaba, Jordan.
 Responsibility and achievements
 Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
 Adherence to Construction schedule
 Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
 Contract administration, Invoicing and Payment follow up with Clients.
 Implementing ISO procedures at Site.
 Installation of Distribution Transformer
 Installation of Switchgears 6.6kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
 Installation of Bus ducts
 Installation of Battery system installation 110v and 24 v DC
 Installation of Paging and Public Addressing system & Telephone system
 Commissioning of Panels, Transformers and Plant distribution Boards etc.
 Complete Cable Laying of Both Power and Control cable and its Termination
 Coordination with consultant and owner Etc.
Project 7
Designation -Electrical Supervisor- Construction (March 1996 to June 1996)
Name – SPIC TUTICORIN UREA AMMONIA EXPANSION PROJECT
Client – SPIC Limited
Country - India
 Key elements of the Projects
Fabrication and Erection Piping and Structural works, Equipment’s and Associated Piping and Installation of
Electrical Panels, cabling, cable tray supports, termination, lighting and earthing complete includes testing and
commissioning
 Responsibility and achievements
 Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
 Adherence to Construction schedule
 Ensuring good discipline of Construction labor as well as local Contractors
 Installation of Distribution Transformer
 Removal and reinstallation of Distribution Transformer
 Installation of Switchgears 6.6kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
13
 Installation of Bus ducts
 Dismantling of old cables and retermintation the same in new panel
 Complete Cable Reglanding and Retermination of Both Power and Control Cables
 Invoicing and Payment follow up with Clients.
 Implementing ISO procedures at Site.
 Co-ordination with Client & Consultant
 Commissioning of switchgears and LV Boards
 Installation of Battery system installation 110v and 24 v DC
 Commissioning of Panels, Transformers and Plant distribution Boards etc
Project 8
Designation -Electrical Supervisor, Construction (June 1995 to Febraury 1996)
Name – SPIC LPG PROJECT ,CHENNAI
Client – M/s. SPIC Petroleum Division
Country – India
 Key elements of the Projects
 Fabrication and Erection of tanks,LPG Bullets,Equipments and Associated Piping and Installation of
Electrical Panels,cabling,cable tray supports,termination,lighting and earthing complete includes
testing and commissiong
Responsibility and achievements
Overall Incharge for electrical installation and commissioning of
 Installation of Distribution Transformer
 Installation of Switchgears 6.6kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
 Commissioning of switchgears and LV Boards
 Commissioning of Panels, Transformers and Plant distribution Boards etc
 Complete Cable Laying of Both Power and Control cable and its Termination
 Coordination with consultant and owner Etc
Project 9
Designation-Electrical Supervisor- Construction (December 1994 to April 1995)
Name – SPIC LPG PROJECT ,MADURAI
Client – M/s. SPIC Petroleum Division ,Chennai.
Country – India
 Key elements of the Projects
Fabrication and Erection of tanks,LPG Bullets,Equipments and Associated Piping and Installation of Electrical
Panels,cabling,cable tray supports,termination,lighting and earthing complete includes testing and
commissiong
 Responsibility and achievements
 Installation of Distribution Transformer
 Installation of Switchgears 6.6kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
14
 Commissioning of switchgears and LV Boards
 Commissioning of Panels, Transformers and Plant distribution Boards etc
 Complete Cable Laying of Both Power and Control cable and its Termination
 Invoicing and Payment follow up with Clients.
 Implementing ISO procedures at Site.
 Co-ordination with Client & Consultant
Previous company name No4 – SPIC-SMO (January 1994-November 1994)
Designation-Electrical Supervisor- Construction
Project 1-
Name –Effluent Treatment Project
Client – ONGC
Country INDIA
 Key elements of the Projects
Ele Engineering,Procurement,Construction ,commissioning and startup of EFFLUENT TREATMENT PLANT
 Responsibility and achievements
Overall Incharge for electrical installation and commissioning of
 Installation of Distribution Transformer
 Installation of Switchgears 11kvM.V and L.V Boards
 Installation of Battery Chargers and Distribution Panels
 Commissioning of switchgears and LV Boards
 Commissioning of Panels, Transformers and Plant distribution Boards etc
 Complete Cable Laying of Both Power and Control cable and its Termination
 Cable Tray and Cable Embedded Conduit Installation
 Prepares work schedule and Target for implementation of work progress
 Invoicing and Payment follow up with Clients
 Coordination with consultant and owner Etc
Previous company name No5 – SPIC-Science Foundation (May 1991-January 1994)
Designation-Electrical Technician
Project 1-
Name – Conversion of LT to HT Supply and Maintenance
Client – SPIC
Country INDIA
 Key elements of the Projects
 Complete change of Low tension electrical system to high tension supply including detail engineering,
installation, testing and commissioning of transformers,switchgears,11kvswitchyard,DG Sets
 Responsibility and achievements
 Installation of Distribution Transformer
 Installation of Switchgears 11KV and L.V Boards
 Installation of Battery Chargers and Distribution Panels
 Commissioning of switchgears and LV Boards
 Commissioning of Panels, Transformers and Plant distribution Boards etc
 Complete Cable Laying of Both Power and Control cable and its Termination
 Prepares work schedule and Target for implementation of work progress
15
 Invoicing and Payment follow up with Clients
 Routine Electrical Maintenance of all electrical equipments
Qualification:-
Diploma in Electrical & Electronics Engg
Year of Passing: April 1991
PERSONAL TRAITS:
 Positive attitude.
 Ability to mould oneself according to the needs of the organization.
 Good communication and interpersonal skills.
 Always striving to work hard to achieve objectives.

More Related Content

What's hot

61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 2014112961T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129James Zhang (Chi, Zhang)
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15jim matthews
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015SANJAY SHARAN
 

What's hot (20)

61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 2014112961T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Current resume
Current resumeCurrent resume
Current resume
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
bio data 1
bio data 1bio data 1
bio data 1
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
 
CV-PM
CV-PMCV-PM
CV-PM
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 

Viewers also liked

Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVJALAL ALASFAR
 
PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014Amir Y. Simon
 
RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. JordanSteve Jordan
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)Amer Abbas
 
Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan Gilmer
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resumeMohammed Dawood
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in JordanLXLLLP
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansalDrMani Kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cvrejith raman
 

Viewers also liked (19)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Eng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CVEng.Jalal AlAsfar CV
Eng.Jalal AlAsfar CV
 
Samra
SamraSamra
Samra
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014
 
RESUME - James S. Jordan
RESUME - James S. JordanRESUME - James S. Jordan
RESUME - James S. Jordan
 
EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 
Hatem aldawi CV
Hatem  aldawi CVHatem  aldawi CV
Hatem aldawi CV
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
Jordan CV
Jordan CVJordan CV
Jordan CV
 
Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15Corey Jordan Resume 6-15-15
Corey Jordan Resume 6-15-15
 
Jordan_Gilmer_Resume
Jordan_Gilmer_ResumeJordan_Gilmer_Resume
Jordan_Gilmer_Resume
 
Assign 1
Assign 1Assign 1
Assign 1
 
Mohammed h. dawood resume
Mohammed h. dawood resumeMohammed h. dawood resume
Mohammed h. dawood resume
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Oil Regulation in Jordan
Oil Regulation in JordanOil Regulation in Jordan
Oil Regulation in Jordan
 
osama cv
osama cvosama cv
osama cv
 
Globalization by Dr. mani kansal
Globalization by Dr. mani kansalGlobalization by Dr. mani kansal
Globalization by Dr. mani kansal
 
Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 

Similar to V.GUHAN-CV 01 link

Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)Umar Akbar
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkatesh Rajendran
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updatedMOHAMED ILYAS
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeriaRCREEE
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016ehsan nazeer
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016ehsan nazeer
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFAAhmedAttia136
 

Similar to V.GUHAN-CV 01 link (20)

Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
CV Asif Rashid
CV Asif Rashid CV Asif Rashid
CV Asif Rashid
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Resume (Umar AKbar)
Resume (Umar AKbar)Resume (Umar AKbar)
Resume (Umar AKbar)
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
MNC-14
MNC-14MNC-14
MNC-14
 
cv Rashid Tagelsir updated . -2016
cv Rashid Tagelsir   updated . -2016cv Rashid Tagelsir   updated . -2016
cv Rashid Tagelsir updated . -2016
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeria
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 

V.GUHAN-CV 01 link

  • 1. 1 CAREER OBJECTIVE: To work in global competitive environment on the challenging assignment that shall yield the benefits of the job satisfaction & steady-paced professional growth. CAREER SUMMARY:  A Diploma Engineer with 23+ Years of Experience in Construction field covering Oil and Gas Sector Projects ,Industrial Electrification, Power Plants, Petro Chemical plants, Refinery, LPG Bottling Plant, ONGC Effluent treatment plant and Sugar Plant.  Performed with Prestigious Organizations in Toshiba Plant Systems & Services Corporation,Japan(TPSC),SPIC SMO,Spic Jel Engineering and Construction Limited with good appreciation from the clients KREBS France,DEWA,Larsen and Toubro OGSP Division,ITC,Bovis Lend Lease,Flour Daniel,Hyundai Engineering and Construction Company and Samsung Engineering and Construction Company.  Over 8+ years of experience in Onshore & Offshore Oil and Gas Project in electrical equipment installation and construction activities including co-ordination with client, consultant, suppliers and sub-contractors in Tanzania (Songas), Tunisia (British Gas) ,Syria (Petro Canada & Hayan Petroleum Co), Algeria (Groupment Berkine/Sonatrach Anadarko Association) , UAE (ZADCO) & India( Cairn Energy).  Over 14 years of extensive experience in various electrical fields like Powerplant, Petrochemical Plants,Refinery,LPG Bottling Plant, Sugar Plant,in Production,Equipment installation,Commissioning and complete electrical installation activity including co-ordination with client, consultant, suppliers and sub-contractors in Jordan,UAE,India  Extensive exposure to IEEE,NEMA Standards and EIL,Technip Standards.  Been leading the Construction team from the position of Superintendant (6 years), Site Incharge(2years),Site Engineer(4 years),Site Supervisor (9 years) with high degree of focus on co-ordination of Engineering, Procurement and Site activities SKILLS: Key technical skills Dedication and Excellence in Construction field of work in order to deliver my best performance and commitment to which ever organization and having ability to work as a team as well as independently. Area of expertise Oil and Gas, Petrochemical, Refinery, Power Plant, Sugar Plant and Industrial Projects. Certifications - Competence Certificate for Elec-ATEX Installation Level -2E,Conception,Realisation and Maintenance valid up to 2015. - Basic H2S OPITO Approved certificate valid up to 2015. - Travel Safety by boat OPITIO Approved certificate valid up to 2017. - ZADCO Offshore Safety certificate valid up to 2015.
  • 2. 2 Software proficiency MS WINDOWS CAREER HISTORY: Petrofac International Ltd (08/10/2007-Till date) Project 1 Current Designation -Electrical Superintendent Construction (18/10/2013- to till date) Name – Upper Zakum UZ750,Island Surface Facilities Project Project Value – 3700 MMUS$ Client – Zakum Development Company Country - UAE  Key elements of the Projects Lump Sum Turnkey (LSTK) Engineering, Procurement, Construction and Commissioning (EPCC) works for Installation of the Island Surface Facilities for the Production Build-up (PBU) Phase that will achieve target oil production of 750,000 BOPD. The project includes implementation of modularization strategy to maximize the scope of work performed in fabrication yards and minimize the work on the islands. The work is spread over on the four artificial islands which are approximately 80 Kms in the sea from Abudhabi. Project comprises of the following major facilities. Well heads Gas lift Manifolds Gas Injection Manifolds Water Injection Manifolds  Responsibility and achievements  Review Temporary facilities drawing/documents submitted by Sub-contractor.  Preparing Method statements/Risk assessment for the Permenant job installation activity.  Review construction related drawings/Documents check submitted By IDC.  Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by Client in Previous Project.  Lessons learnt/problems found in earlier project.  Proper review/planning of work sequence of construction activites to be start up in Central Island with respect to SPMT movements.  Complete installation of accommodation facilities in island.  Planning sequence of electrical installation activity Project 2 Designation - Electrical Superintendent Construction (23/01/2011 to 02/09/2013) Name – Elmerk Field,Central Processing Facilities (CPF) Project Value - 2216 MMUS$ Client – Groupment Berkine/Sonatrach Anadarko Association Country - Algeria  Key elements of the Projects Central Processing Facility in Berkine region,Processing Hydrocarbons initially from Block 208,seperated by the Sonatrach/Anardorko Association,& from the unitised EMK Field located on a portion of both Block 208 & the Sonatrach/Conaco Philips operated Block 405A Capacities are as follows 2 X 65,000 BPD (each) Oil/Condensate Trains
  • 3. 3 1X 600 MMSCFD NGL Train Water Injection -155,000BPD Gas Injection - 500 MMSCFD Export (Nominal Peak) Oil 90,000BPD : Condensate-42,000BPD : LPG -65,000BPD Process Systems Inlet Facilities - 3 Nos Slug Catchers Oil Separation, Desalting, Stabilization & Condensate Recovery 2 Trains of 65,000 BPD Associated Gas Compression Facilities: 2 Trains of Motor Driven Compression Booster Gas Compression Facilities: 3 Trains of Motor Driven Compression Gas Dehydration Facilities : 2 Trains of Motor Driven Compression NGL Recovery & Fractionation Facilities: 1 Train of 600 MMSCFD NGL Unit of High Propane Recovery (Cryogenic Turbo Expander) & Fractionation Residue Gas Compression Facilities : 2 Trains of Gas Turbine Driven Compression Injection Gas Compression Facilities: 3 Trains of Gas Turbine Driven Compression Oil Storage and Export Facilities Oil/Condensate Re-run Facilities LPG Storage and Export Facilities Utility System: Water Treatment Facilities, Fuel Gas Facilities, Hot Oil Systems, Flare and Releif Facilities (7Flares),Instrument Air,Nitrogen Generation and Distribution Facilities, Oily Water Treatment Facilities, Control and Safe guarding systems.  Responsibility and achievements  Lessons learnt/problems found in earlier project has been taken care well in advance for timely completion.  Proper Planning of required resources for timely completion of all construction work as lay down in the scope of work.  Proactively peruse all construction related drawings/documents quality and material requirements and initiate procurement action at an early stage.  Organizing workforce based on skill levels and ensured that the electrical construction activities qualitatively and quantitavely inline with project schedule.  Maintain continuous construction work front availability through preparation and review of three week look ahead schedules, engineering deliverables and material delivery schedule.  Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an update on the development of work schedule.  Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of work.  Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials were available for the sub-contractor to proceed with the allocated work.  Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by Client.  Ensure that all construction activities were carried out in line with project specification and client requirement.
  • 4. 4  Co-ordinate with respective vendors for the installation checks and in future with successful commissioning of UPS, Switchgears, Transformers, etc.  Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning teams including clearing of PETROPCS Check sheets. Project 3 Designation-Electrical Superintendent Construction (13/02/2010 to 18/12/2010) Name – Jihar Gas Plant Project Project Value - 450 MMUS$ Client – Hayan Petroleum Company (HPC) Country – Syria  Key elements of the Projects Engineering,Procurement,Construction,Pre-Commissioning,Commissioning,Start up of Gas Processing Facilities Involving Mainly the Gas Treatment Plant at 150MMSCFD LPG Recovery System LPG Storage& Loading Facility Gas Treatment Plant at 150MMSCFD Satellite Gathering Station Well Sites & Flow Lines Utilities & Offsites Facilities Transport Pipelines and living quarter etc.  Responsibility and achievements  Lessons learnt/problems found in earlier project has been taken care well in advance for timely completion.  Proper Planning of required resources for timely completion of all construction work as lay down in the scope of work.  Proactively peruse all construction related drawings/documents quality and material requirements and initiate procurement action at an early stage.  Organizing workforce based on skill levels and ensured that the electrical construction activities qualitatively and quantitavely in line with project schedule.  Maintain continuous construction work front availability through preparation and review of three week look ahead schedules, engineering deliverables and material delivery schedule.  Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an update on the development of work schedule.  Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of work.  Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials were available for the sub-contractor to proceed with the allocated work.  Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by Client.  Ensure that all construction activities were carried out in line with project specification and client requirement.  Co-ordinate with respective vendors for the installation checks and in future with successful commissioning of UPS, Switchgears, Transformers, etc.
  • 5. 5  Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning teams including clearing of PETROPCS Check sheets. Project 4 Designation -Electrical Superintendant Construction (02/05/2009 to12/01/2010) Name – Ebla Gas Project Surface Facilities Project Value - 620 MMUS$ Client – Petro –Canada Palmyra B.V Country - Syria  Key elements of the Projects Engineering, Procurement, Construction Commissioning and Start-Up of Gas Treatment Plant Producing 80 MMSCFD of Sales Gas, Gathering Station and Flow-lines and Pipelines Connecting well sites and Gas Gathering Stations with Gas Treatment Plant The Gas Treatment Plant will consist of Gas dehydration unit, Gas Separation using Turbo-expander/low temperature separator process, LPG Recovery Unit, LPG Storage facilities and Loading Facilities, Sales Gas Compression and transportation facilities, Condensate Stabilization and Storage, Associated Offsites & Utilities  Responsibility and achievements  Lessons learnt/problems found in earlier project has been taken care well in advance for timely completion.  Proper Planning of required resources for timely completion of all construction work as lay down in the scope of work.  Proactively peruse all construction related drawings/documents quality and material requirements and initiate procurement action at an early stage.  Organizing workforce based on skill levels and ensured that the electrical construction activities qualitatively and quantitavely in line with project schedule.  Maintain continuous construction work front availability through preparation and review of three week look ahead schedules, engineering deliverables and material delivery schedule.  Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an update on the development of work schedule.  Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of work.  Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials were available for the sub-contractor to proceed with the allocated work.  Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by Client.  Ensure that all construction activities were carried out in line with project specification and client requirement.  Co-ordinate with respective vendors for the installation checks and in future with successful commissioning of UPS, Switchgears, Transformers, etc.  Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning teams including clearing of PETROPCS Check sheets.
  • 6. 6 Project 5 Designation -Electrical Supervisor, Construction (08/10/2007 to 28/03/2009) Name – Hasdrubal Gas Plant Contract Project Value - 460 MMUS$ Client – British Gas Tunisia Limited and Enterprise Tunisienne D”activities Petrolieres (ETAP) Country – Tunisia  Key elements of the Projects EPC, The Project Scope Covers Feed Gas Containing 90PPM H2S and 3.8% CO2 and Mercury,120MMSCFD Wet Gas Processing with Production of 15,000 BPD of Stabilised Condensate and Oil with 2,000 BPD of Produced Water. 4,300 BPD of LPG (Propane/Butane) using Proprietary turbo expander technology (ORTLOFF) Gas Separation Mercury Removal Amine Gas Sweetening Molsieve Gas Dehyration Gas Dew Pointing using Turbo-expander Produced water treatment and disposal Gas Export Compression Condensate Stabilisation Condensate storage and export systems Recycle Gas compression Flare systems & Hot oil systems Power Generation/Distribution and all associated tie-ins with the existing plant  Responsibility and achievements  Proper Planning of required resources for timely completion of all construction work as lay down in the scope of work.  Proactively peruse all construction related drawings/documents quality and material requirements and initiate procurement action at an early stage.  Organizing workforce based on skill levels and ensured that the electrical construction activities qualitatively and quantitavely in line with project schedule.  Maintain continuous construction work front availability through preparation and review of three week look ahead schedules, engineering deliverables and material delivery schedule.  Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an update on the development of work schedule.  Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of work.  Lessons learnt/problems found in earlier project has been taken care well in advance for timely completion.  Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials were available for the sub-contractor to proceed with the allocated work.  Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by Client.  Ensure that all construction activities were carried out in line with project specification and client requirement.
  • 7. 7  Co-ordinate with respective vendors for the installation checks and in future with successful commissioning of UPS, Switchgears, Transformers, etc.  Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning teams including clearing of WINPCS Check sheets. Previous company No 1- (Toshiba Plant Systems & Services Corporation, Japan (TPSC) Designation – Electrical Engineer - Construction (20/01/2005 – 21/05/2007) Project 1 Name – Jebel Ali Power & Desalination Station “ L”Phase-1 750MW Combined Cycle Power Plant Project Value -816MNUS$ Client – Dubai Electricity and Water Authority. Country –UAE  Key elements of the Projects  Engineering, procurement and construction of capacity of 750 MW power generation plant including supply and installation of gas turbines, heat recovery steam generators, auxiliary boilers, back pressure steam turbines and carrying out associated works.  The project will add 860 megawatts of power and 70 million imperial gallons a day of desalination capacity, and is divided into four stages, with the first concentrated on the power generation station using gas turbines. The second stage includes a seawater desalination station. The third includes a 400 kV transformer station, and the final phase will result in a 400 kV overhead transmission and connection lines to connect the L station to the Dubai electricity grid.  Responsibility and achievements  Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to safety.  Adherence to Construction schedule  Ensuring good discipline of Construction labour as well as local Contractors  Planning work in liaison with the Planning Engineer.  Co-ordination with Consultant to get material approval & vendor approval.  Monitoring stage by stage work schedule  Work follow up with Sub-contractors.  Installation Of HV/LV Transformers  Assisting in assemblingof400KV Step up Transformer, Oil filling, Oil filtration and its associated works  Installation of Switchgears 11kv MV and LV Boards.  Installation of Battery Chargers and Distribution Boards.  Installation of DCS and Marshalling Panels.  Installation of Busducts (IPB AND MV)  Installation of Battery system installation and commissioning 110v and 24v  Installation of EOT Cranes and Hoist and its associated cabling etc.  Raceway and Cable Embedded Conduit Installation  Co-ordination with Consultant and Owner Etc.  Installation of Lighting and Power distribution board and complete plant lighting system  Installation of complete plant earthing systems  Preparing and submitting of As Built Diagrams and Material Reconciliation and Handing over the Project Materials
  • 8. 8 Previous company name No.2 - Central Electricals International Limited Designation – Electrical Site-Incharge (15/10/2003 – 14/10/2004) Project 1 Name- Songo Songo Gas development and Power generation Project –Onshore and Offshore Client – Larsen and Toubro OGSP Division. Country - Tanzania  Key elements of the Projects  Songo Songo Gas Development and Power Generation Project for Songas Limited , Tanzania , comprising of 2 x 35 MMSCFD Gas Processing Plant, 3 shallow water wellhead platform, 25 km sub- sea pipeline and 210 cross-country pipeline to power plant near Dar-e-Salaam.  Responsibility and achievements  Co-Ordination with regular site Erection activities in all area and preparation of schedules.  Co-ordination with Consultant to get material approval & vendor approval.  Procurement of materials as per site requirement.  Inspection of materials with Client & Consultant  Monitoring stage by stage work schedule  Maintaining of Project materials stores  Maintaining receipt, issue, balance and storage status documents.  Co-ordination with Site Engineers  Deployment of adequate Construction equipment and tools  Planning work in liaison with the Planning Engineer.  Preparing cost estimates and extra works with the assistance of the Planning Engineer and other Engineers.  Contract administration, Invoicing and Payment follow up with Clients  Attending Client Meetings and Preparing and Submitting of Reports Weekly, Daily and Monthly as well as Quality Reports  Complete supervision of Installation and Commissioning of Switchgears, Transformers.  Installation of Diesel and Gas Generators  Laying and Termination of Power and control Cables  Complete Plant Earthing, Lighting and Paging Systems  Preparing and submitting of As Built Diagrams and Material Reconciliation and Handing over the Project Materials Previous company name No 3 – Spic Jel Engineering and Construction Limited – (December 1994- November2003) Project 1 Designation -Electrical Engineer- Construction (September 2002-November2003) Name : Fabrication Shop, Main office Country - India  Key elements of the Projects  Complete HT Supply conversion installation and maintenance of Transformers, Switchgears and Fabrication shop equipment’s, EOT Cranes.  Responsibility and achievements  Installation and Operation maintenance of Transformers
  • 9. 9  Installation and Operation maintenance of Power and Welding Generators  Maintenance of EOT Cranes  Maintenance of Electrical fabrication equipment’s like grinder, Welding machines Etc.  Periodic maintenance of all equipment’s and records.  Deployment of adequate Construction equipment and tools  Conduct annual inspection with CEIG. Project 2 Designation -Electrical Engineer- Construction (July 2001-August2002) Name – Arooran Sugar Plant Relocation Project Client – Thiru Arooran Sugars Limited Country – India  Key elements of the Projects  Complete dismantling and relocation of 2500 TCD Capacity sugar mill from Kollumangudi to A. Chittur, Virudhachalam Taluk, Cuddalore District, including 18.6 MW cogeneration power plant. Testing and commissioning complete.  Responsibility and achievements  Preparation of Old Layout of Panels and termination Details Cable Trenches routing, Lighting Layout, Etc.  Planning of fore schedule with Management and Erection team.  Co-ordination with Consultant to get material approval & vendor approval.  Preparation of Technical Evaluation of materials.  Attending Technical & Commercial meeting with vendors.  Co-ordination with Design Division to get the material as per design requirement.  Procurement of materials as per site requirement.  Inspection of materials with Client & Consultant  Complete Dismantling of 110KV Switchyard and accessories  Complete Dismantling of Transformers and Busducts etc.  Complete dismantling of all HT and LT Panels, light fittings, cables  Complete Packing of all Panels and all accessories and shifting  Reinstallation the same in new plant Vridhachalam  Invoicing and Payment follow up with Clients.  Commissioning of all Switchgears, Motors, Transformers, including power receiving from TNEB Project 3 Designation - Electrical Engineer, Construction (April2001 to June 2001) Name – IOCL Barauni Refinery Expansion Project Client – Samsung Engineering Company Limited, Korea Country - INDIA  Key elements of the Projects Complete electrical installation and commissioning works of transformers, HT/LT Switchgears, MCCs, Structural cable tray installation, cabling and termination, lighting and earthing systems  Responsibility and achievements  Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to safety.  By conducting Tools box Talk, Induction Training Etc.
  • 10. 10  Installation of LV Transformers  Installation of Switchgears 11kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels  Installation of Bus ducts and its supporting structures  Installation of Battery system installation 110v and 24 v DC  Cable laying and termination works.  Lighting and earthing system installation works.  Commissioning of Panels, Transformers and Plant distribution Boards etc.  Prepare work schedule and Target for implementation of work progress, Coordination with Consultant and Owner Etc. Project 3 Designation-Electrical Engineer, Construction (December1999 to March2001) Name – ITC Primary Manufacturing Plant Project Client – Bovis Lend Lease Country – India  Key elements of the Projects Fabrication and Erection of Underground tank and Above Ground tanks and associated steam and condensate piping, Installation of 1MW Diesel Generators 4 No’s along with Stack  Responsibility and achievements  Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to safety.  By conducting Tools box Talk, Induction Training Etc.  Co-ordination with Client & Consultant.  Procurement of material as per site requirement.  Inspection of materials with Client & Consultant  Monitoring stage by stage work schedule  Maintenance of all construction equipment’s like cranes, generators, welding machines etc. Project 4 Designation -Electrical Supervisor Construction (June 1998 to November 1999) Name – 4X50 MW DIESEL BASED GMR VASAVI POWER PROJECT Client – Hyundai Heavy Industries Company Country - India  Key elements of the Projects  The world’s largest diesel engine driven electric power plant possessing a nominal capacity of 200MW with four units low speed diesel (HDEC) engines, each driving a 50 MW generator. Each engine is 70,000 horsepower. This power plant is equipped with a sewage treatment system having a capacity og 7,200 ton/day for environment purposes. This power is designed to provide trouble free parallel operations with the existing 110KV Grid facilities to the TNEB (Tamilnadu Electricity Board) System. It supplies the main source of electrical power to the area of Chennai under Hyundai’s Operation and Maintenance (O&M) Services.
  • 11. 11  Responsibility and achievements  Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to safety.  Adherence to Construction schedule  Ensuring good discipline of Construction labor as well as local Contractors  Allocation of Construction Staff and workforce  Deployment of adequate Construction equipment and tools  Planning work in liaison with the Planning Engineer.  Preparing cost estimates and extra works with the assistance of the Planning Engineer and other Engineers.  Invoicing and Payment follow up with Clients.  Installation of LV Transformers  Installation of Switchgears 11kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels  Installation of Bus ducts and its supporting structures  Installation of Battery system installation 110v and 24 v DC  Paging and Public Addressing system & Telephone system  Commissioning of Panels, Transformers and Plant distribution Boards etc.  Commissioning of all equipment’s including power receiving from TNEB and Plant lighting system Project 5 Designation -Electrical Supervisor, Construction (July 1997 to APRIL 1998) Name – NYLON 6.6 PLANT PROJECT Client – M/s. DuPont Fibres Ltd., Gummidipoondi. Country – India  Key elements of the Projects Fabrication and Erection Piping and Structural works, Equipments and Associated Piping and Installation of Electrical Panels, cabling, cable tray supports, termination, lighting and earthing complete includes testing and commissioning  Responsibility and achievements  Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to safety.  Adherence to Construction schedule  Preparing cost estimates and extra works with the assistance of the Planning Engineer and other Engineers.  Invoicing and Payment follow up with Clients.  Implementing ISO procedures at Site.  Installation of Distribution Transformer  Installation of Switchgears 6.6kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels  Installation of Bus ducts  Installation of Battery system installation 110v and 24 v DC  Paging and Public Addressing system & Telephone system  Commissioning of Panels, Transformers and Plant distribution Boards etc.  Complete Cable Laying of Both Power and Control cable and its Termination  Coordination with Consultant and Owner Etc.
  • 12. 12 Project 6 Designation-Electrical Supervisor- Construction (June 1996 to June1997) Name –SA/PA INDO JORDAN PLANT PROJECT Project Value -170 Million US$ Client – M/s Krebs, France / M/s. SPIC SMO, Chennai. Country – Jordan  Key elements of the Projects  The project complex consists of a 224,000 MT/Year Phosphoric Acid Plant, a 660,000 MT/Year dedicated Sulphuric Acid Plant and associated Utilities & Offsite facilities at Eshidiya and an acid storage facility (4 tanks of 5,000 m3 capacity each) at Aqaba, Jordan.  Responsibility and achievements  Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to safety.  Adherence to Construction schedule  Preparing cost estimates and extra works with the assistance of the Planning Engineer and other Engineers.  Contract administration, Invoicing and Payment follow up with Clients.  Implementing ISO procedures at Site.  Installation of Distribution Transformer  Installation of Switchgears 6.6kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels  Installation of Bus ducts  Installation of Battery system installation 110v and 24 v DC  Installation of Paging and Public Addressing system & Telephone system  Commissioning of Panels, Transformers and Plant distribution Boards etc.  Complete Cable Laying of Both Power and Control cable and its Termination  Coordination with consultant and owner Etc. Project 7 Designation -Electrical Supervisor- Construction (March 1996 to June 1996) Name – SPIC TUTICORIN UREA AMMONIA EXPANSION PROJECT Client – SPIC Limited Country - India  Key elements of the Projects Fabrication and Erection Piping and Structural works, Equipment’s and Associated Piping and Installation of Electrical Panels, cabling, cable tray supports, termination, lighting and earthing complete includes testing and commissioning  Responsibility and achievements  Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to safety.  Adherence to Construction schedule  Ensuring good discipline of Construction labor as well as local Contractors  Installation of Distribution Transformer  Removal and reinstallation of Distribution Transformer  Installation of Switchgears 6.6kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels
  • 13. 13  Installation of Bus ducts  Dismantling of old cables and retermintation the same in new panel  Complete Cable Reglanding and Retermination of Both Power and Control Cables  Invoicing and Payment follow up with Clients.  Implementing ISO procedures at Site.  Co-ordination with Client & Consultant  Commissioning of switchgears and LV Boards  Installation of Battery system installation 110v and 24 v DC  Commissioning of Panels, Transformers and Plant distribution Boards etc Project 8 Designation -Electrical Supervisor, Construction (June 1995 to Febraury 1996) Name – SPIC LPG PROJECT ,CHENNAI Client – M/s. SPIC Petroleum Division Country – India  Key elements of the Projects  Fabrication and Erection of tanks,LPG Bullets,Equipments and Associated Piping and Installation of Electrical Panels,cabling,cable tray supports,termination,lighting and earthing complete includes testing and commissiong Responsibility and achievements Overall Incharge for electrical installation and commissioning of  Installation of Distribution Transformer  Installation of Switchgears 6.6kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels  Commissioning of switchgears and LV Boards  Commissioning of Panels, Transformers and Plant distribution Boards etc  Complete Cable Laying of Both Power and Control cable and its Termination  Coordination with consultant and owner Etc Project 9 Designation-Electrical Supervisor- Construction (December 1994 to April 1995) Name – SPIC LPG PROJECT ,MADURAI Client – M/s. SPIC Petroleum Division ,Chennai. Country – India  Key elements of the Projects Fabrication and Erection of tanks,LPG Bullets,Equipments and Associated Piping and Installation of Electrical Panels,cabling,cable tray supports,termination,lighting and earthing complete includes testing and commissiong  Responsibility and achievements  Installation of Distribution Transformer  Installation of Switchgears 6.6kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels
  • 14. 14  Commissioning of switchgears and LV Boards  Commissioning of Panels, Transformers and Plant distribution Boards etc  Complete Cable Laying of Both Power and Control cable and its Termination  Invoicing and Payment follow up with Clients.  Implementing ISO procedures at Site.  Co-ordination with Client & Consultant Previous company name No4 – SPIC-SMO (January 1994-November 1994) Designation-Electrical Supervisor- Construction Project 1- Name –Effluent Treatment Project Client – ONGC Country INDIA  Key elements of the Projects Ele Engineering,Procurement,Construction ,commissioning and startup of EFFLUENT TREATMENT PLANT  Responsibility and achievements Overall Incharge for electrical installation and commissioning of  Installation of Distribution Transformer  Installation of Switchgears 11kvM.V and L.V Boards  Installation of Battery Chargers and Distribution Panels  Commissioning of switchgears and LV Boards  Commissioning of Panels, Transformers and Plant distribution Boards etc  Complete Cable Laying of Both Power and Control cable and its Termination  Cable Tray and Cable Embedded Conduit Installation  Prepares work schedule and Target for implementation of work progress  Invoicing and Payment follow up with Clients  Coordination with consultant and owner Etc Previous company name No5 – SPIC-Science Foundation (May 1991-January 1994) Designation-Electrical Technician Project 1- Name – Conversion of LT to HT Supply and Maintenance Client – SPIC Country INDIA  Key elements of the Projects  Complete change of Low tension electrical system to high tension supply including detail engineering, installation, testing and commissioning of transformers,switchgears,11kvswitchyard,DG Sets  Responsibility and achievements  Installation of Distribution Transformer  Installation of Switchgears 11KV and L.V Boards  Installation of Battery Chargers and Distribution Panels  Commissioning of switchgears and LV Boards  Commissioning of Panels, Transformers and Plant distribution Boards etc  Complete Cable Laying of Both Power and Control cable and its Termination  Prepares work schedule and Target for implementation of work progress
  • 15. 15  Invoicing and Payment follow up with Clients  Routine Electrical Maintenance of all electrical equipments Qualification:- Diploma in Electrical & Electronics Engg Year of Passing: April 1991 PERSONAL TRAITS:  Positive attitude.  Ability to mould oneself according to the needs of the organization.  Good communication and interpersonal skills.  Always striving to work hard to achieve objectives.