1. 1
CAREER OBJECTIVE:
To work in global competitive environment on the challenging assignment that shall yield the benefits
of the job satisfaction & steady-paced professional growth.
CAREER SUMMARY:
A Diploma Engineer with 23+ Years of Experience in Construction field covering Oil and Gas
Sector Projects ,Industrial Electrification, Power Plants, Petro Chemical plants, Refinery, LPG
Bottling Plant, ONGC Effluent treatment plant and Sugar Plant.
Performed with Prestigious Organizations in Toshiba Plant Systems & Services
Corporation,Japan(TPSC),SPIC SMO,Spic Jel Engineering and Construction Limited with good
appreciation from the clients KREBS France,DEWA,Larsen and Toubro OGSP Division,ITC,Bovis
Lend Lease,Flour Daniel,Hyundai Engineering and Construction Company and Samsung
Engineering and Construction Company.
Over 8+ years of experience in Onshore & Offshore Oil and Gas Project in electrical equipment
installation and construction activities including co-ordination with client, consultant, suppliers and
sub-contractors in Tanzania (Songas), Tunisia (British Gas) ,Syria (Petro Canada & Hayan
Petroleum Co), Algeria (Groupment Berkine/Sonatrach Anadarko Association) , UAE
(ZADCO) & India( Cairn Energy).
Over 14 years of extensive experience in various electrical fields like Powerplant,
Petrochemical Plants,Refinery,LPG Bottling Plant, Sugar Plant,in Production,Equipment
installation,Commissioning and complete electrical installation activity including co-ordination
with client, consultant, suppliers and sub-contractors in Jordan,UAE,India
Extensive exposure to IEEE,NEMA Standards and EIL,Technip Standards.
Been leading the Construction team from the position of Superintendant (6 years), Site
Incharge(2years),Site Engineer(4 years),Site Supervisor (9 years) with high degree of focus
on co-ordination of Engineering, Procurement and Site activities
SKILLS:
Key technical skills
Dedication and Excellence in Construction field of work in order to deliver my best performance and
commitment to which ever organization and having ability to work as a team as well as independently.
Area of expertise
Oil and Gas, Petrochemical, Refinery, Power Plant, Sugar Plant and Industrial Projects.
Certifications
- Competence Certificate for Elec-ATEX Installation Level -2E,Conception,Realisation and Maintenance
valid up to 2015.
- Basic H2S OPITO Approved certificate valid up to 2015.
- Travel Safety by boat OPITIO Approved certificate valid up to 2017.
- ZADCO Offshore Safety certificate valid up to 2015.
2. 2
Software proficiency
MS WINDOWS
CAREER HISTORY:
Petrofac International Ltd (08/10/2007-Till date)
Project 1
Current Designation -Electrical Superintendent Construction (18/10/2013- to till date)
Name – Upper Zakum UZ750,Island Surface Facilities Project
Project Value – 3700 MMUS$
Client – Zakum Development Company
Country - UAE
Key elements of the Projects
Lump Sum Turnkey (LSTK) Engineering, Procurement, Construction and Commissioning (EPCC) works for
Installation of the Island Surface Facilities for the Production Build-up (PBU) Phase that will achieve target oil
production of 750,000 BOPD. The project includes implementation of modularization strategy to maximize the
scope of work performed in fabrication yards and minimize the work on the islands.
The work is spread over on the four artificial islands which are approximately 80 Kms in the sea from
Abudhabi. Project comprises of the following major facilities.
Well heads
Gas lift Manifolds
Gas Injection Manifolds
Water Injection Manifolds
Responsibility and achievements
Review Temporary facilities drawing/documents submitted by Sub-contractor.
Preparing Method statements/Risk assessment for the Permenant job installation activity.
Review construction related drawings/Documents check submitted By IDC.
Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client in Previous Project.
Lessons learnt/problems found in earlier project.
Proper review/planning of work sequence of construction activites to be start up in Central Island with
respect to SPMT movements.
Complete installation of accommodation facilities in island.
Planning sequence of electrical installation activity
Project 2
Designation - Electrical Superintendent Construction (23/01/2011 to 02/09/2013)
Name – Elmerk Field,Central Processing Facilities (CPF)
Project Value - 2216 MMUS$
Client – Groupment Berkine/Sonatrach Anadarko Association
Country - Algeria
Key elements of the Projects
Central Processing Facility in Berkine region,Processing Hydrocarbons initially from Block 208,seperated by
the Sonatrach/Anardorko Association,& from the unitised EMK Field located on a portion of both Block 208 &
the Sonatrach/Conaco Philips operated Block 405A Capacities are as follows
2 X 65,000 BPD (each) Oil/Condensate Trains
3. 3
1X 600 MMSCFD NGL Train
Water Injection -155,000BPD
Gas Injection - 500 MMSCFD
Export (Nominal Peak)
Oil 90,000BPD : Condensate-42,000BPD : LPG -65,000BPD
Process Systems
Inlet Facilities - 3 Nos Slug Catchers
Oil Separation, Desalting, Stabilization & Condensate Recovery 2 Trains of 65,000 BPD
Associated Gas Compression Facilities: 2 Trains of Motor Driven Compression
Booster Gas Compression Facilities: 3 Trains of Motor Driven Compression
Gas Dehydration Facilities : 2 Trains of Motor Driven Compression
NGL Recovery & Fractionation Facilities: 1 Train of 600 MMSCFD NGL Unit of High Propane Recovery
(Cryogenic Turbo Expander) & Fractionation
Residue Gas Compression Facilities : 2 Trains of Gas Turbine Driven Compression
Injection Gas Compression Facilities: 3 Trains of Gas Turbine Driven Compression
Oil Storage and Export Facilities
Oil/Condensate Re-run Facilities
LPG Storage and Export Facilities
Utility System:
Water Treatment Facilities, Fuel Gas Facilities, Hot Oil Systems, Flare and Releif Facilities
(7Flares),Instrument Air,Nitrogen Generation and Distribution Facilities, Oily Water Treatment Facilities,
Control and Safe guarding systems.
Responsibility and achievements
Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely inline with project schedule.
Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
Ensure that all construction activities were carried out in line with project specification and client
requirement.
4. 4
Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of PETROPCS Check sheets.
Project 3
Designation-Electrical Superintendent Construction (13/02/2010 to 18/12/2010)
Name – Jihar Gas Plant Project
Project Value - 450 MMUS$
Client – Hayan Petroleum Company (HPC)
Country – Syria
Key elements of the Projects
Engineering,Procurement,Construction,Pre-Commissioning,Commissioning,Start up of Gas Processing
Facilities Involving Mainly the
Gas Treatment Plant at 150MMSCFD
LPG Recovery System
LPG Storage& Loading Facility
Gas Treatment Plant at 150MMSCFD
Satellite Gathering Station
Well Sites & Flow Lines
Utilities & Offsites Facilities
Transport Pipelines and living quarter etc.
Responsibility and achievements
Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely in line with project schedule.
Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
Ensure that all construction activities were carried out in line with project specification and client
requirement.
Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
5. 5
Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of PETROPCS Check sheets.
Project 4
Designation -Electrical Superintendant Construction (02/05/2009 to12/01/2010)
Name – Ebla Gas Project Surface Facilities
Project Value - 620 MMUS$
Client – Petro –Canada Palmyra B.V
Country - Syria
Key elements of the Projects
Engineering, Procurement, Construction Commissioning and Start-Up of Gas Treatment Plant Producing 80
MMSCFD of Sales Gas, Gathering Station and Flow-lines and Pipelines Connecting well sites and Gas
Gathering Stations with Gas Treatment Plant
The Gas Treatment Plant will consist of
Gas dehydration unit, Gas Separation using Turbo-expander/low temperature separator process, LPG
Recovery Unit, LPG Storage facilities and Loading Facilities, Sales Gas Compression and transportation
facilities, Condensate Stabilization and Storage, Associated Offsites & Utilities
Responsibility and achievements
Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely in line with project schedule.
Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
Ensure that all construction activities were carried out in line with project specification and client
requirement.
Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of PETROPCS Check sheets.
6. 6
Project 5
Designation -Electrical Supervisor, Construction (08/10/2007 to 28/03/2009)
Name – Hasdrubal Gas Plant Contract
Project Value - 460 MMUS$
Client – British Gas Tunisia Limited and Enterprise Tunisienne D”activities Petrolieres (ETAP)
Country – Tunisia
Key elements of the Projects
EPC, The Project Scope Covers Feed Gas Containing 90PPM H2S and 3.8% CO2 and Mercury,120MMSCFD
Wet Gas Processing with Production of 15,000 BPD of Stabilised Condensate and Oil with 2,000 BPD of
Produced Water. 4,300 BPD of LPG (Propane/Butane) using Proprietary turbo expander technology
(ORTLOFF)
Gas Separation
Mercury Removal
Amine Gas Sweetening
Molsieve Gas Dehyration
Gas Dew Pointing using Turbo-expander
Produced water treatment and disposal
Gas Export Compression
Condensate Stabilisation
Condensate storage and export systems
Recycle Gas compression
Flare systems & Hot oil systems
Power Generation/Distribution and all associated tie-ins with the existing plant
Responsibility and achievements
Proper Planning of required resources for timely completion of all construction work as lay down in the
scope of work.
Proactively peruse all construction related drawings/documents quality and material requirements and
initiate procurement action at an early stage.
Organizing workforce based on skill levels and ensured that the electrical construction activities
qualitatively and quantitavely in line with project schedule.
Maintain continuous construction work front availability through preparation and review of three week
look ahead schedules, engineering deliverables and material delivery schedule.
Coordinate with Client for any electrical activity/concerns that need to be addressed and also give an
update on the development of work schedule.
Continuously interact with the QC &HSE Teams to enhance the status of Construction Quality and
also HSE for the timely closures of corrective actions and non-conformance raised and the Quality of
work.
Lessons learnt/problems found in earlier project has been taken care well in advance for timely
completion.
Expedite material delivery in co-ordination with Sharjah Procurement and ensured that all materials
were available for the sub-contractor to proceed with the allocated work.
Co-ordinate with Engineering team to provide inputs on issues/concerns as and they get raised by
Client.
Ensure that all construction activities were carried out in line with project specification and client
requirement.
7. 7
Co-ordinate with respective vendors for the installation checks and in future with successful
commissioning of UPS, Switchgears, Transformers, etc.
Proper review/planning of MILESTONE for timely handover of systems/Sub-systems to commissioning
teams including clearing of WINPCS Check sheets.
Previous company No 1- (Toshiba Plant Systems & Services Corporation, Japan (TPSC)
Designation – Electrical Engineer - Construction (20/01/2005 – 21/05/2007)
Project 1
Name – Jebel Ali Power & Desalination Station “ L”Phase-1 750MW Combined Cycle Power Plant
Project Value -816MNUS$
Client – Dubai Electricity and Water Authority.
Country –UAE
Key elements of the Projects
Engineering, procurement and construction of capacity of 750 MW power generation plant including
supply and installation of gas turbines, heat recovery steam generators, auxiliary boilers, back
pressure steam turbines and carrying out associated works.
The project will add 860 megawatts of power and 70 million imperial gallons a day of desalination
capacity, and is divided into four stages, with the first concentrated on the power generation station
using gas turbines. The second stage includes a seawater desalination station. The third includes a
400 kV transformer station, and the final phase will result in a 400 kV overhead transmission and
connection lines to connect the L station to the Dubai electricity grid.
Responsibility and achievements
Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
Adherence to Construction schedule
Ensuring good discipline of Construction labour as well as local Contractors
Planning work in liaison with the Planning Engineer.
Co-ordination with Consultant to get material approval & vendor approval.
Monitoring stage by stage work schedule
Work follow up with Sub-contractors.
Installation Of HV/LV Transformers
Assisting in assemblingof400KV Step up Transformer, Oil filling, Oil filtration and its associated works
Installation of Switchgears 11kv MV and LV Boards.
Installation of Battery Chargers and Distribution Boards.
Installation of DCS and Marshalling Panels.
Installation of Busducts (IPB AND MV)
Installation of Battery system installation and commissioning 110v and 24v
Installation of EOT Cranes and Hoist and its associated cabling etc.
Raceway and Cable Embedded Conduit Installation
Co-ordination with Consultant and Owner Etc.
Installation of Lighting and Power distribution board and complete plant lighting system
Installation of complete plant earthing systems
Preparing and submitting of As Built Diagrams and Material Reconciliation and Handing over the
Project Materials
8. 8
Previous company name No.2 - Central Electricals International Limited
Designation – Electrical Site-Incharge (15/10/2003 – 14/10/2004)
Project 1
Name- Songo Songo Gas development and Power generation Project –Onshore and Offshore
Client – Larsen and Toubro OGSP Division.
Country - Tanzania
Key elements of the Projects
Songo Songo Gas Development and Power Generation Project for Songas Limited , Tanzania ,
comprising of 2 x 35 MMSCFD Gas Processing Plant, 3 shallow water wellhead platform, 25 km sub-
sea pipeline and 210 cross-country pipeline to power plant near Dar-e-Salaam.
Responsibility and achievements
Co-Ordination with regular site Erection activities in all area and preparation of schedules.
Co-ordination with Consultant to get material approval & vendor approval.
Procurement of materials as per site requirement.
Inspection of materials with Client & Consultant
Monitoring stage by stage work schedule
Maintaining of Project materials stores
Maintaining receipt, issue, balance and storage status documents.
Co-ordination with Site Engineers
Deployment of adequate Construction equipment and tools
Planning work in liaison with the Planning Engineer.
Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
Contract administration, Invoicing and Payment follow up with Clients
Attending Client Meetings and Preparing and Submitting of Reports Weekly, Daily and Monthly as well
as Quality Reports
Complete supervision of Installation and Commissioning of Switchgears, Transformers.
Installation of Diesel and Gas Generators
Laying and Termination of Power and control Cables
Complete Plant Earthing, Lighting and Paging Systems
Preparing and submitting of As Built Diagrams and Material Reconciliation and Handing over the
Project Materials
Previous company name No 3 – Spic Jel Engineering and Construction Limited – (December 1994-
November2003)
Project 1
Designation -Electrical Engineer- Construction (September 2002-November2003)
Name : Fabrication Shop, Main office
Country - India
Key elements of the Projects
Complete HT Supply conversion installation and maintenance of Transformers, Switchgears and
Fabrication shop equipment’s, EOT Cranes.
Responsibility and achievements
Installation and Operation maintenance of Transformers
9. 9
Installation and Operation maintenance of Power and Welding Generators
Maintenance of EOT Cranes
Maintenance of Electrical fabrication equipment’s like grinder, Welding machines Etc.
Periodic maintenance of all equipment’s and records.
Deployment of adequate Construction equipment and tools
Conduct annual inspection with CEIG.
Project 2
Designation -Electrical Engineer- Construction (July 2001-August2002)
Name – Arooran Sugar Plant Relocation Project
Client – Thiru Arooran Sugars Limited
Country – India
Key elements of the Projects
Complete dismantling and relocation of 2500 TCD Capacity sugar mill from Kollumangudi to A. Chittur,
Virudhachalam Taluk, Cuddalore District, including 18.6 MW cogeneration power plant. Testing and
commissioning complete.
Responsibility and achievements
Preparation of Old Layout of Panels and termination Details Cable Trenches routing, Lighting
Layout, Etc.
Planning of fore schedule with Management and Erection team.
Co-ordination with Consultant to get material approval & vendor approval.
Preparation of Technical Evaluation of materials.
Attending Technical & Commercial meeting with vendors.
Co-ordination with Design Division to get the material as per design requirement.
Procurement of materials as per site requirement.
Inspection of materials with Client & Consultant
Complete Dismantling of 110KV Switchyard and accessories
Complete Dismantling of Transformers and Busducts etc.
Complete dismantling of all HT and LT Panels, light fittings, cables
Complete Packing of all Panels and all accessories and shifting
Reinstallation the same in new plant Vridhachalam
Invoicing and Payment follow up with Clients.
Commissioning of all Switchgears, Motors, Transformers, including power receiving from TNEB
Project 3
Designation - Electrical Engineer, Construction (April2001 to June 2001)
Name – IOCL Barauni Refinery Expansion Project
Client – Samsung Engineering Company Limited, Korea
Country - INDIA
Key elements of the Projects
Complete electrical installation and commissioning works of transformers, HT/LT Switchgears, MCCs,
Structural cable tray installation, cabling and termination, lighting and earthing systems
Responsibility and achievements
Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
By conducting Tools box Talk, Induction Training Etc.
10. 10
Installation of LV Transformers
Installation of Switchgears 11kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
Installation of Bus ducts and its supporting structures
Installation of Battery system installation 110v and 24 v DC
Cable laying and termination works.
Lighting and earthing system installation works.
Commissioning of Panels, Transformers and Plant distribution Boards etc.
Prepare work schedule and Target for implementation of work progress, Coordination with Consultant
and Owner Etc.
Project 3
Designation-Electrical Engineer, Construction (December1999 to March2001)
Name – ITC Primary Manufacturing Plant Project
Client – Bovis Lend Lease
Country – India
Key elements of the Projects
Fabrication and Erection of Underground tank and Above Ground tanks and associated steam and condensate
piping, Installation of 1MW Diesel Generators 4 No’s along with Stack
Responsibility and achievements
Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
By conducting Tools box Talk, Induction Training Etc.
Co-ordination with Client & Consultant.
Procurement of material as per site requirement.
Inspection of materials with Client & Consultant
Monitoring stage by stage work schedule
Maintenance of all construction equipment’s like cranes, generators, welding machines etc.
Project 4
Designation -Electrical Supervisor Construction (June 1998 to November 1999)
Name – 4X50 MW DIESEL BASED GMR VASAVI POWER PROJECT
Client – Hyundai Heavy Industries Company
Country - India
Key elements of the Projects
The world’s largest diesel engine driven electric power plant possessing a nominal capacity of 200MW
with four units low speed diesel (HDEC) engines, each driving a 50 MW generator. Each engine is 70,000
horsepower. This power plant is equipped with a sewage treatment system having a capacity og 7,200
ton/day for environment purposes. This power is designed to provide trouble free parallel operations with
the existing 110KV Grid facilities to the TNEB (Tamilnadu Electricity Board) System. It supplies the main
source of electrical power to the area of Chennai under Hyundai’s Operation and Maintenance (O&M)
Services.
11. 11
Responsibility and achievements
Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
Adherence to Construction schedule
Ensuring good discipline of Construction labor as well as local Contractors
Allocation of Construction Staff and workforce
Deployment of adequate Construction equipment and tools
Planning work in liaison with the Planning Engineer.
Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
Invoicing and Payment follow up with Clients.
Installation of LV Transformers
Installation of Switchgears 11kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
Installation of Bus ducts and its supporting structures
Installation of Battery system installation 110v and 24 v DC
Paging and Public Addressing system & Telephone system
Commissioning of Panels, Transformers and Plant distribution Boards etc.
Commissioning of all equipment’s including power receiving from TNEB and Plant lighting system
Project 5
Designation -Electrical Supervisor, Construction (July 1997 to APRIL 1998)
Name – NYLON 6.6 PLANT PROJECT
Client – M/s. DuPont Fibres Ltd., Gummidipoondi.
Country – India
Key elements of the Projects
Fabrication and Erection Piping and Structural works, Equipments and Associated Piping and Installation of
Electrical Panels, cabling, cable tray supports, termination, lighting and earthing complete includes testing and
commissioning
Responsibility and achievements
Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
Adherence to Construction schedule
Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
Invoicing and Payment follow up with Clients.
Implementing ISO procedures at Site.
Installation of Distribution Transformer
Installation of Switchgears 6.6kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
Installation of Bus ducts
Installation of Battery system installation 110v and 24 v DC
Paging and Public Addressing system & Telephone system
Commissioning of Panels, Transformers and Plant distribution Boards etc.
Complete Cable Laying of Both Power and Control cable and its Termination
Coordination with Consultant and Owner Etc.
12. 12
Project 6
Designation-Electrical Supervisor- Construction (June 1996 to June1997)
Name –SA/PA INDO JORDAN PLANT PROJECT
Project Value -170 Million US$
Client – M/s Krebs, France / M/s. SPIC SMO, Chennai.
Country – Jordan
Key elements of the Projects
The project complex consists of a 224,000 MT/Year Phosphoric Acid Plant, a 660,000 MT/Year dedicated
Sulphuric Acid Plant and associated Utilities & Offsite facilities at Eshidiya and an acid storage facility (4
tanks of 5,000 m3 capacity each) at Aqaba, Jordan.
Responsibility and achievements
Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
Adherence to Construction schedule
Preparing cost estimates and extra works with the assistance of the Planning Engineer and other
Engineers.
Contract administration, Invoicing and Payment follow up with Clients.
Implementing ISO procedures at Site.
Installation of Distribution Transformer
Installation of Switchgears 6.6kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
Installation of Bus ducts
Installation of Battery system installation 110v and 24 v DC
Installation of Paging and Public Addressing system & Telephone system
Commissioning of Panels, Transformers and Plant distribution Boards etc.
Complete Cable Laying of Both Power and Control cable and its Termination
Coordination with consultant and owner Etc.
Project 7
Designation -Electrical Supervisor- Construction (March 1996 to June 1996)
Name – SPIC TUTICORIN UREA AMMONIA EXPANSION PROJECT
Client – SPIC Limited
Country - India
Key elements of the Projects
Fabrication and Erection Piping and Structural works, Equipment’s and Associated Piping and Installation of
Electrical Panels, cabling, cable tray supports, termination, lighting and earthing complete includes testing and
commissioning
Responsibility and achievements
Enforcement of all Statutory, Company and Owner’s rules and regulations, with special attention to
safety.
Adherence to Construction schedule
Ensuring good discipline of Construction labor as well as local Contractors
Installation of Distribution Transformer
Removal and reinstallation of Distribution Transformer
Installation of Switchgears 6.6kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
13. 13
Installation of Bus ducts
Dismantling of old cables and retermintation the same in new panel
Complete Cable Reglanding and Retermination of Both Power and Control Cables
Invoicing and Payment follow up with Clients.
Implementing ISO procedures at Site.
Co-ordination with Client & Consultant
Commissioning of switchgears and LV Boards
Installation of Battery system installation 110v and 24 v DC
Commissioning of Panels, Transformers and Plant distribution Boards etc
Project 8
Designation -Electrical Supervisor, Construction (June 1995 to Febraury 1996)
Name – SPIC LPG PROJECT ,CHENNAI
Client – M/s. SPIC Petroleum Division
Country – India
Key elements of the Projects
Fabrication and Erection of tanks,LPG Bullets,Equipments and Associated Piping and Installation of
Electrical Panels,cabling,cable tray supports,termination,lighting and earthing complete includes
testing and commissiong
Responsibility and achievements
Overall Incharge for electrical installation and commissioning of
Installation of Distribution Transformer
Installation of Switchgears 6.6kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
Commissioning of switchgears and LV Boards
Commissioning of Panels, Transformers and Plant distribution Boards etc
Complete Cable Laying of Both Power and Control cable and its Termination
Coordination with consultant and owner Etc
Project 9
Designation-Electrical Supervisor- Construction (December 1994 to April 1995)
Name – SPIC LPG PROJECT ,MADURAI
Client – M/s. SPIC Petroleum Division ,Chennai.
Country – India
Key elements of the Projects
Fabrication and Erection of tanks,LPG Bullets,Equipments and Associated Piping and Installation of Electrical
Panels,cabling,cable tray supports,termination,lighting and earthing complete includes testing and
commissiong
Responsibility and achievements
Installation of Distribution Transformer
Installation of Switchgears 6.6kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
14. 14
Commissioning of switchgears and LV Boards
Commissioning of Panels, Transformers and Plant distribution Boards etc
Complete Cable Laying of Both Power and Control cable and its Termination
Invoicing and Payment follow up with Clients.
Implementing ISO procedures at Site.
Co-ordination with Client & Consultant
Previous company name No4 – SPIC-SMO (January 1994-November 1994)
Designation-Electrical Supervisor- Construction
Project 1-
Name –Effluent Treatment Project
Client – ONGC
Country INDIA
Key elements of the Projects
Ele Engineering,Procurement,Construction ,commissioning and startup of EFFLUENT TREATMENT PLANT
Responsibility and achievements
Overall Incharge for electrical installation and commissioning of
Installation of Distribution Transformer
Installation of Switchgears 11kvM.V and L.V Boards
Installation of Battery Chargers and Distribution Panels
Commissioning of switchgears and LV Boards
Commissioning of Panels, Transformers and Plant distribution Boards etc
Complete Cable Laying of Both Power and Control cable and its Termination
Cable Tray and Cable Embedded Conduit Installation
Prepares work schedule and Target for implementation of work progress
Invoicing and Payment follow up with Clients
Coordination with consultant and owner Etc
Previous company name No5 – SPIC-Science Foundation (May 1991-January 1994)
Designation-Electrical Technician
Project 1-
Name – Conversion of LT to HT Supply and Maintenance
Client – SPIC
Country INDIA
Key elements of the Projects
Complete change of Low tension electrical system to high tension supply including detail engineering,
installation, testing and commissioning of transformers,switchgears,11kvswitchyard,DG Sets
Responsibility and achievements
Installation of Distribution Transformer
Installation of Switchgears 11KV and L.V Boards
Installation of Battery Chargers and Distribution Panels
Commissioning of switchgears and LV Boards
Commissioning of Panels, Transformers and Plant distribution Boards etc
Complete Cable Laying of Both Power and Control cable and its Termination
Prepares work schedule and Target for implementation of work progress
15. 15
Invoicing and Payment follow up with Clients
Routine Electrical Maintenance of all electrical equipments
Qualification:-
Diploma in Electrical & Electronics Engg
Year of Passing: April 1991
PERSONAL TRAITS:
Positive attitude.
Ability to mould oneself according to the needs of the organization.
Good communication and interpersonal skills.
Always striving to work hard to achieve objectives.