SlideShare a Scribd company logo
1 of 9
Resume
Position:Mechanical Supervisor
Mr. Leonardo P. David
Address: 828 Jaime St. Sampaloc, Manila, Philippines
Contact No. +6327495894 (Philippines)
Contact No +639202810642 (Philippines)
Contact No +639155947514 (Philippines)
E-mail:leopinedadavid@yahoo.com
Company name: M+W GROUP Philippines
Company Address: Corporate Building, 6th Floor
Ortigas, Pasig City
Position: Mechanical Engineer/Tank Superintendent
Inclusive Dates: August 27, 2015 to Present
Company Profile: Construct Industrial Plant
Duties and Responsibilities:
 Ensuring that both the health and safety project plans are implemented
 Being on site to oversee all the construction process
 Ensuring that the budget is followed in terms of purchases and wages
 Organizing the workers and ensuring that they are performing as required
 Recording the total costs for materials bought and payments for work done
 General inspection of the workers and their performance and safety
 Ensuring that the stipulated safety rules and regulations are met
 Liaises with government inspectors on the standard requirements of the site
in terms of licenses and safety
 Follows the project construction process to ensure that it is completed in time
 Supervises the subcontractors and ensures that they are punctual and that
they deliver
 Ensure that quality is preserved in the construction process and that the
budget is maintained
 Writing project progress records in liaison with the foreman
 Assist Contractor (Mechatrend) for the erection of 2 Diesel storage Tank,
 Review Project contract document and monitor construction activities to
ensure compliance of Specification.
 Monitor and inspects the installation and testing of all mechanical
equipment, piping and control systemto include, but not limited to,
underground utilities fire protection and above ground such process, Process
cooling water (PCW), Process Hot Water (PHW), Compress Dry Air System
 Monitor insulation and jacketing, to ensure specified protective cover.
 Verifies equipment setting, alignment, balancing commissioning operations.
 Monitor contractor daily activities compliance with shop drawing and
specification.
 Assist commissioning department to commission every process systemneed
by the client.
 Handled also CDA equipment such 7 unit of compressor ZR 480 and 500
which such 480 volts power supply and 680 (Atlas Copco compressor)
 Handled Civil works such foundation of the equipment.
 Handled also mechanical pump for the bulk diesel Tank.
Company name: SPIE/SNC LAVALIN
Company Address: Al-Khobar, KSA
Position: Tank Superintendent/Mechanical Engineer
Inclusive Dates: February 23, 2014 to May 6, 2015
Company Profile: Commissioning & Start up
The YASREF Refinery Project involves the construction and operation of a 400,000
barrel per stream day (BPSD).Located in the Yanbu Industrial City on the west
coast of Saudi Arabia along the RedSea. The refinery will process 100 percent
Arabian Heavy Crude and will produce gasoline, high quality diesel, and liquefied
petroleum gases (LPG) as well as byproduct Sulfur and petroleum coke for export.
The refinery will include process units for the separation and conversion of the feed
crude into finished products, utility and offsite systems to support the refinery
operation, and associatedfeed, intermediate and product storage facilities.
Duties and Responsibilities:
 Ensuring that both the health and safety project plans are implemented
 Being on site to oversee all the construction process
 Ensuring that the budget is followed in terms of purchases and wages
 Organizing the workers and ensuring that they are performing as required
 Recording the total costs for materials bought and payments for work done
 General inspection of the workers and their performance and safety
 Ensuring that the stipulated safety rules and regulations are met
 Liaises with government inspectors on the standard requirements of the site
in terms of licenses and safety
 Follows the project construction process to ensure that it is completed in time
 Supervises the subcontractors and ensures that they are punctual and that
they deliver
 Ensure that quality is preserved in the construction process and that the
budget is maintained
 Writing project progress records in liaison with the foreman
 Assist Contractor (CBI & Yanbu steel) for the erection of oil storage Tank,
Water Tank and utilities of the tank such piping and Pumps.
 Verify documentation of the contractor base on the API 650.
Company name: SAIPEM, Spa. Eni.
Company Address: Shuwaik, Kuwait
Position: Mechanical Engineer/Tank superintendent
Inclusive Dates: June 16, 2011 to December 15, 2013
Company Profile: Pipe Line & BoosterStation (EPC Contractor)
Duties and Responsibilities:
 Carry out the project specification. Be familiar with the requisition
requirements and equipment/material specifications. Be fully familiar with
the verification and inspection release processes and ensure their
compliance. Attend Pre-production kick-off meetings with
Supplier/Subcontractor. . Assist in the undertaking of both internal and
external audit activities as requested. Participate (as necessary) in
management visits/audits to Suppliers and Sub-contractors. Report
promptly to the Project Manager all matters related to Project Management
System performance. Ensure that all necessary Project records are
identified and retained in accordance with company, client and regulatory
requirements. Provide input and support the subcontractor/supplier
evaluation processes and monitor subcontractor/supplier performance.
Provide performance data as requested for reporting purposes.
 Ensuring that both the health and safety project plans are implemented
 Being on site to oversee all the construction process
 Ensuring that the budget is followed in terms of purchases and wages
 Organizing the workers and ensuring that they are performing as required
 Recording the total costs for materials bought and payments for work done
 General inspection of the workers and their performance and safety
 Ensuring that the stipulated safety rules and regulations are met
 Liaises with government inspectors on the standard requirements of the site
in terms of licenses and safety
 Follows the project construction process to ensure that it is completed in
time
 Supervises the subcontractors and ensures that they are punctual and that
they deliver
 Ensure that quality is preserved in the construction process and that the
budget is maintained
 Writing project progress records in liaison with the foreman
 Coordination to the client construction issues
 Monitoring of daily activity of the contractor for the erection of equipment
such pumps , vessel and storage tank
 Tracking of everyday activity of sub- contractor
 Reviewing of project requirement
 Assist sub-contractor to follow the specification in the project
 Conduct joint walkthrough with the client representative
 Preparation of surveillance report
 Preparation of site query if there is some change in the drawing
 Preparation of weekly report to submitted to the Project Manager
 Attend weekly construction meeting
Company Name: Hyundai-Baesuk
Company Address: Khursaniyah Industrial City K.S.A
Position: Mechanical Engineer
Inclusive Dates: June 19, 2010 to March 09, 2011
Department: Construction Department
Company Profile: Karan Gas Field Development Plant
(Karan Gas Facilities Project)
Duties and Responsibilities:
 Completion the FPI Training course.
 Study the U/G Utility Piping Installation Procedure
 Check Isometric drawing and compare to the plot plan
 Monitoring daily activity if they are followed the standard or work
procedure
 Preparation of site query if there is some changes or routing of the line
 Report also all safety aspect
 Assist contractor to follow specification and procedure
 Preparation of daily report
Company Name: Shaw Stone & Webster Arabia
Company Ltd. (SSWACL)
Company Address: Jubail Industrial City K.S.A
Position: Construction Supervisor/Mechanical Engineer
Inclusive Dates: May 2, 2007 to January 31, 2010
Department: Pipeline Department
Company Profile: Company Involved in Construction of Ethylene Plant
(Shark 3rd Expansion Project)
Duties and Responsibilities:
 Review Project contract document and monitor construction activities to
ensure compliance of Specification.
 Confirm Documentation of the contractor in accordance of ASME and
AWS and API 650
 Provides general instruction of all contractor and subcontractor work to
ensure safe and workmanlike operation.
 Verifies equipment setting, alignment, balancing commissioning
operations.
 Monitoring contractor daily activities compliance with specification
 Monitoring for construction of storage tank by sub- contractor if
compliance of API 650
Company Name: Qatar Kentz
Company Address: State of Qatar
Position: Mechanical Engineer
Inclusive Dates: June 8, 2005 to March 10, 2007
Department: Piping /Mechanical
Company Profile: Qatar Kentz involved in the construction of power
Plant and camp facilities
Duties and Responsibilities:
 Review project contract documents and monitors construction activities
to ensure compliance of specification.
 Monitored all contractor and subcontractor work to ensure safe and
workmanlike operations.
 Verifies equipment setting, alignment, balancing, and commissioning
operations.
 Monitors contractors' compliance with specification
Project to be completed :
 Qatar Gas Camp Facilities / Substations
 Oryx LNG Project
 Fluor Camp Facilities and GTL Project
Company Name: ABV Rock Group KB
Company Address: Madinah and Yanbu, Saudi Arabia
Position: Construction Supervisor
Inclusive Dates: August 31, 2003 to April 1, 2004
Department: Construction
Immediate Supervisor: Mr. Roland Wilson
Company Profile: ABV Rock involve in the construction of Fuel
Storage Plant facilities, Tunneling and Pipeline
installation with Shipping Pump Stations and
Receiving Stations.
Duties and Responsibilities:
 Received and understand all specifications and procedures work
instruction.
 Receivedinstruction from superintendent.
 Monitoring of daily activities undertaken by sub-contractor.
 Ensure timely probation of relevant timely reports.
 Immediate report unsafe or not satisfactory completion of the activities.
 Monitoring of 14”Ø pipeline from Yanbu refinery to Madihan receiving
station/ 160 KM pipeline.
Company Name: ABV Rock Group KB
Company Address: Medinah and Yanbu, Saudi Arabia
Position: Field Engineer
Inclusive Dates: October 1, 2001 to August 31, 2003
Department: Construction (Pipeline Works)
Immediate Supervisor: Mr. Andrew Blow
Company Profile: ABV Rock involve in the construction of Fuel
Storage Plant facilities, Tunneling and Pipeline
installation with Shipping Pump Stations and
Receiving Stations.
Duties and Responsibilities:
 Received and understand all specifications and procedures work
instruction.
 Receivedinstruction from superintendent
 Monitoring of daily activities undertaken by sub-contractor.
 Ensure timely probation of relevant timely reports.
 Immediate report unsafe or not satisfactory completion of the activities.
 Monitoring of 14”Ø pipeline from Yanbu refinery to Madinah receiving
station/ 160 KM pipeline.
Company Name: ABV Rock Group KB
Company Address: Jeddah, Saudi Arabia
Position: Field Engineer
Inclusive Dates: June 8, 1997 to October 1, 2001
Department: Pipeline Works
Immediate Supervisor: Mr. Roland Wilson
Company Profile: ABV Rock involve in the construction of Fuel
Storage Plant facilities, Tunneling and Pipeline
installation with Shipping Pump Stations and
Receiving Stations.
Duties and Responsibilities:
 Received and understand all specifications and procedures work
instruction.
 Receivedinstruction from superintendent
 Perform inspection of daily activities undertaken by sub-contractor.
 Ensure timely probation of relevant timely reports.
 Immediate report unsafe or not satisfactory completion of the activities.
 Monitoring of 12”Ø twin line, pipeline from Jeddah refinery to North
Jeddah Bulk Plant and to Storage Plant, 95 KM pipeline.
Company Name: Jembas Assistencia Tecnica Limitada
Company Address: 88 Luanda, P.O. Box. 10013, Republic of Angola
Position: Distribution Network Engineer
Inclusive Dates: Sept. 4, 1995 to Jan. 26, 1996
Department: Pipeline
Immediate Supervisor: Mr. Ettiene Brechie
Company Profile: The Company involve in the installation of
Submersible pump and water pipeline and
power generation.
Duties and Responsibilities:
 Installation of submersible pumps and bore hole or wellhead.
 Rehabilitation of submersible pumps and bore hole or wellhead.
 Manpower estimation and materials.
 Preparation of monthly reports.
 Preparation of material take-off
Company Name: Riyadh water works and Sewerage System
Company Address: P.O. Box. 29253, Riyadh 11457 K.S.A.
Position: Network Supervisor
Inclusive Dates: June 1993 to May 1995
Department: Leak Detection
Company Profile: The Company is involved in the maintenance of
Pipeline of riyadh area and leak detection of
distribution Line.
Duties and Responsibilities:
 Maintenance of water pipeline Primary and Secondary Line.
 Inspection of water network line.
 Preparation of monthly report.
Company Name: Petrola Hellas Refinery
Company Address: Athens, Greece
Position: Maintenance Engineer
Inclusive Dates: Nov. 1992 to April 1993
Department: Maintenance Dept.
Company Profile: The Company involved in the maintenance of
refinery.
Duties and Responsibilities:
 Punch list item to be repaired.
 Work implementation and supervision.
 Inspection of every job package.
 Report preparation.
Company Name: Ministry of Electricity and Water
Company Address: State of Kuwait
Position: Mechanical Engineer
Department: Emergency Section, Sulaibikhat Area
Duration: October 1991 to October 1992
Company Profile: The Company is involved in the construction of
water line and maintenance.
Duties and Responsibilities:
 Maintenance of water pipeline.
 Rehabilitation of primary line and distribution line.
 Mapping of every line.
 Monitoring of sub-contractor
Company Name: Metropolitan Water Works and Sewerage
System
Company Address: Philippines
Position: Senior Engineer
Department: Water Main Valves and hydrant
Duration: July 1984 to October 1991
Duties and Responsibilities:
 Pipe laying and mapping
 Leak Detection
 Maintenance of Primary line
 Preparation of tools and equipment
 Scheduling of works or daily activity
 Supervision of works
 Preparation of monthly reports
Education:
Collegiate: National University 1985
Manila Philippines
B.S. Mechanical Engineering
Board Rating : 75.4% Passed
Leo Doc (CV)A(Mechanical Supervisor)

More Related Content

What's hot

Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMohammed Akbar
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP SupervisorArun Arun
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.AZHAR QAZI
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvacElvis Joy
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisornitin mokal
 

What's hot (20)

Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
mechanical technician (1)
mechanical technician (1)mechanical technician (1)
mechanical technician (1)
 
Balaji CV - 2015
Balaji CV - 2015Balaji CV - 2015
Balaji CV - 2015
 
MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
resume piping
resume pipingresume piping
resume piping
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisor
 

Viewers also liked

MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007REHAN MUMTAZ
 
Resume MANOJ SHARMA
Resume MANOJ SHARMAResume MANOJ SHARMA
Resume MANOJ SHARMAmanoj sharma
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copyyoussef youssef
 
Top 5 site supervisor cover letter samples
Top 5 site supervisor cover letter samplesTop 5 site supervisor cover letter samples
Top 5 site supervisor cover letter samplesgerisfori
 
Materi pelatihan smm.supervisor
Materi pelatihan smm.supervisorMateri pelatihan smm.supervisor
Materi pelatihan smm.supervisorroellys
 
GJIS' IB MYP Personal Project Sample
GJIS' IB MYP Personal Project SampleGJIS' IB MYP Personal Project Sample
GJIS' IB MYP Personal Project SamplePakLiam
 
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERAZHAR QAZI
 
CV Yoli Andra - HSE Officer-Coordinator
CV Yoli Andra - HSE Officer-CoordinatorCV Yoli Andra - HSE Officer-Coordinator
CV Yoli Andra - HSE Officer-CoordinatorAndra kotolimpa
 

Viewers also liked (14)

MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 
C.V
C.VC.V
C.V
 
Resume MANOJ SHARMA
Resume MANOJ SHARMAResume MANOJ SHARMA
Resume MANOJ SHARMA
 
Resume Imran
Resume ImranResume Imran
Resume Imran
 
SITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - CopySITE MECHANICAL SUPERVISOR - Copy
SITE MECHANICAL SUPERVISOR - Copy
 
cv جديد
cv جديدcv جديد
cv جديد
 
Top 5 site supervisor cover letter samples
Top 5 site supervisor cover letter samplesTop 5 site supervisor cover letter samples
Top 5 site supervisor cover letter samples
 
Materi pelatihan smm.supervisor
Materi pelatihan smm.supervisorMateri pelatihan smm.supervisor
Materi pelatihan smm.supervisor
 
GJIS' IB MYP Personal Project Sample
GJIS' IB MYP Personal Project SampleGJIS' IB MYP Personal Project Sample
GJIS' IB MYP Personal Project Sample
 
Mark Kingsmill CV
Mark Kingsmill CVMark Kingsmill CV
Mark Kingsmill CV
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV
 
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGERCV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
CV---MECHANICAL ENGINEER / EPC-PROPOSALS MANAGER
 
CV Yoli Andra - HSE Officer-Coordinator
CV Yoli Andra - HSE Officer-CoordinatorCV Yoli Andra - HSE Officer-Coordinator
CV Yoli Andra - HSE Officer-Coordinator
 

Similar to Leo Doc (CV)A(Mechanical Supervisor)

Similar to Leo Doc (CV)A(Mechanical Supervisor) (20)

NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
Instrumentation Inspector
Instrumentation InspectorInstrumentation Inspector
Instrumentation Inspector
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
cv_piping engineer updated
cv_piping engineer updatedcv_piping engineer updated
cv_piping engineer updated
 
hatata cv 2015
hatata cv 2015hatata cv 2015
hatata cv 2015
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
LOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAINLOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAIN
 
Resume
ResumeResume
Resume
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
EL-SAYES_CV
EL-SAYES_CV EL-SAYES_CV
EL-SAYES_CV
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
Instrument Engineer
Instrument EngineerInstrument Engineer
Instrument Engineer
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 

Leo Doc (CV)A(Mechanical Supervisor)

  • 1. Resume Position:Mechanical Supervisor Mr. Leonardo P. David Address: 828 Jaime St. Sampaloc, Manila, Philippines Contact No. +6327495894 (Philippines) Contact No +639202810642 (Philippines) Contact No +639155947514 (Philippines) E-mail:leopinedadavid@yahoo.com Company name: M+W GROUP Philippines Company Address: Corporate Building, 6th Floor Ortigas, Pasig City Position: Mechanical Engineer/Tank Superintendent Inclusive Dates: August 27, 2015 to Present Company Profile: Construct Industrial Plant Duties and Responsibilities:  Ensuring that both the health and safety project plans are implemented  Being on site to oversee all the construction process  Ensuring that the budget is followed in terms of purchases and wages  Organizing the workers and ensuring that they are performing as required  Recording the total costs for materials bought and payments for work done  General inspection of the workers and their performance and safety  Ensuring that the stipulated safety rules and regulations are met  Liaises with government inspectors on the standard requirements of the site in terms of licenses and safety  Follows the project construction process to ensure that it is completed in time  Supervises the subcontractors and ensures that they are punctual and that they deliver  Ensure that quality is preserved in the construction process and that the budget is maintained  Writing project progress records in liaison with the foreman  Assist Contractor (Mechatrend) for the erection of 2 Diesel storage Tank,  Review Project contract document and monitor construction activities to ensure compliance of Specification.  Monitor and inspects the installation and testing of all mechanical equipment, piping and control systemto include, but not limited to, underground utilities fire protection and above ground such process, Process cooling water (PCW), Process Hot Water (PHW), Compress Dry Air System  Monitor insulation and jacketing, to ensure specified protective cover.  Verifies equipment setting, alignment, balancing commissioning operations.
  • 2.  Monitor contractor daily activities compliance with shop drawing and specification.  Assist commissioning department to commission every process systemneed by the client.  Handled also CDA equipment such 7 unit of compressor ZR 480 and 500 which such 480 volts power supply and 680 (Atlas Copco compressor)  Handled Civil works such foundation of the equipment.  Handled also mechanical pump for the bulk diesel Tank. Company name: SPIE/SNC LAVALIN Company Address: Al-Khobar, KSA Position: Tank Superintendent/Mechanical Engineer Inclusive Dates: February 23, 2014 to May 6, 2015 Company Profile: Commissioning & Start up The YASREF Refinery Project involves the construction and operation of a 400,000 barrel per stream day (BPSD).Located in the Yanbu Industrial City on the west coast of Saudi Arabia along the RedSea. The refinery will process 100 percent Arabian Heavy Crude and will produce gasoline, high quality diesel, and liquefied petroleum gases (LPG) as well as byproduct Sulfur and petroleum coke for export. The refinery will include process units for the separation and conversion of the feed crude into finished products, utility and offsite systems to support the refinery operation, and associatedfeed, intermediate and product storage facilities. Duties and Responsibilities:  Ensuring that both the health and safety project plans are implemented  Being on site to oversee all the construction process  Ensuring that the budget is followed in terms of purchases and wages  Organizing the workers and ensuring that they are performing as required  Recording the total costs for materials bought and payments for work done  General inspection of the workers and their performance and safety  Ensuring that the stipulated safety rules and regulations are met  Liaises with government inspectors on the standard requirements of the site in terms of licenses and safety  Follows the project construction process to ensure that it is completed in time  Supervises the subcontractors and ensures that they are punctual and that they deliver  Ensure that quality is preserved in the construction process and that the budget is maintained  Writing project progress records in liaison with the foreman  Assist Contractor (CBI & Yanbu steel) for the erection of oil storage Tank, Water Tank and utilities of the tank such piping and Pumps.  Verify documentation of the contractor base on the API 650. Company name: SAIPEM, Spa. Eni.
  • 3. Company Address: Shuwaik, Kuwait Position: Mechanical Engineer/Tank superintendent Inclusive Dates: June 16, 2011 to December 15, 2013 Company Profile: Pipe Line & BoosterStation (EPC Contractor) Duties and Responsibilities:  Carry out the project specification. Be familiar with the requisition requirements and equipment/material specifications. Be fully familiar with the verification and inspection release processes and ensure their compliance. Attend Pre-production kick-off meetings with Supplier/Subcontractor. . Assist in the undertaking of both internal and external audit activities as requested. Participate (as necessary) in management visits/audits to Suppliers and Sub-contractors. Report promptly to the Project Manager all matters related to Project Management System performance. Ensure that all necessary Project records are identified and retained in accordance with company, client and regulatory requirements. Provide input and support the subcontractor/supplier evaluation processes and monitor subcontractor/supplier performance. Provide performance data as requested for reporting purposes.  Ensuring that both the health and safety project plans are implemented  Being on site to oversee all the construction process  Ensuring that the budget is followed in terms of purchases and wages  Organizing the workers and ensuring that they are performing as required  Recording the total costs for materials bought and payments for work done  General inspection of the workers and their performance and safety  Ensuring that the stipulated safety rules and regulations are met  Liaises with government inspectors on the standard requirements of the site in terms of licenses and safety  Follows the project construction process to ensure that it is completed in time  Supervises the subcontractors and ensures that they are punctual and that they deliver  Ensure that quality is preserved in the construction process and that the budget is maintained  Writing project progress records in liaison with the foreman  Coordination to the client construction issues  Monitoring of daily activity of the contractor for the erection of equipment such pumps , vessel and storage tank  Tracking of everyday activity of sub- contractor  Reviewing of project requirement  Assist sub-contractor to follow the specification in the project  Conduct joint walkthrough with the client representative  Preparation of surveillance report  Preparation of site query if there is some change in the drawing
  • 4.  Preparation of weekly report to submitted to the Project Manager  Attend weekly construction meeting Company Name: Hyundai-Baesuk Company Address: Khursaniyah Industrial City K.S.A Position: Mechanical Engineer Inclusive Dates: June 19, 2010 to March 09, 2011 Department: Construction Department Company Profile: Karan Gas Field Development Plant (Karan Gas Facilities Project) Duties and Responsibilities:  Completion the FPI Training course.  Study the U/G Utility Piping Installation Procedure  Check Isometric drawing and compare to the plot plan  Monitoring daily activity if they are followed the standard or work procedure  Preparation of site query if there is some changes or routing of the line  Report also all safety aspect  Assist contractor to follow specification and procedure  Preparation of daily report Company Name: Shaw Stone & Webster Arabia Company Ltd. (SSWACL) Company Address: Jubail Industrial City K.S.A Position: Construction Supervisor/Mechanical Engineer Inclusive Dates: May 2, 2007 to January 31, 2010 Department: Pipeline Department Company Profile: Company Involved in Construction of Ethylene Plant (Shark 3rd Expansion Project) Duties and Responsibilities:  Review Project contract document and monitor construction activities to ensure compliance of Specification.  Confirm Documentation of the contractor in accordance of ASME and AWS and API 650  Provides general instruction of all contractor and subcontractor work to ensure safe and workmanlike operation.  Verifies equipment setting, alignment, balancing commissioning operations.  Monitoring contractor daily activities compliance with specification  Monitoring for construction of storage tank by sub- contractor if compliance of API 650
  • 5. Company Name: Qatar Kentz Company Address: State of Qatar Position: Mechanical Engineer Inclusive Dates: June 8, 2005 to March 10, 2007 Department: Piping /Mechanical Company Profile: Qatar Kentz involved in the construction of power Plant and camp facilities Duties and Responsibilities:  Review project contract documents and monitors construction activities to ensure compliance of specification.  Monitored all contractor and subcontractor work to ensure safe and workmanlike operations.  Verifies equipment setting, alignment, balancing, and commissioning operations.  Monitors contractors' compliance with specification Project to be completed :  Qatar Gas Camp Facilities / Substations  Oryx LNG Project  Fluor Camp Facilities and GTL Project Company Name: ABV Rock Group KB Company Address: Madinah and Yanbu, Saudi Arabia Position: Construction Supervisor Inclusive Dates: August 31, 2003 to April 1, 2004 Department: Construction Immediate Supervisor: Mr. Roland Wilson Company Profile: ABV Rock involve in the construction of Fuel Storage Plant facilities, Tunneling and Pipeline installation with Shipping Pump Stations and Receiving Stations. Duties and Responsibilities:  Received and understand all specifications and procedures work instruction.  Receivedinstruction from superintendent.  Monitoring of daily activities undertaken by sub-contractor.  Ensure timely probation of relevant timely reports.  Immediate report unsafe or not satisfactory completion of the activities.  Monitoring of 14”Ø pipeline from Yanbu refinery to Madihan receiving station/ 160 KM pipeline.
  • 6. Company Name: ABV Rock Group KB Company Address: Medinah and Yanbu, Saudi Arabia Position: Field Engineer Inclusive Dates: October 1, 2001 to August 31, 2003 Department: Construction (Pipeline Works) Immediate Supervisor: Mr. Andrew Blow Company Profile: ABV Rock involve in the construction of Fuel Storage Plant facilities, Tunneling and Pipeline installation with Shipping Pump Stations and Receiving Stations. Duties and Responsibilities:  Received and understand all specifications and procedures work instruction.  Receivedinstruction from superintendent  Monitoring of daily activities undertaken by sub-contractor.  Ensure timely probation of relevant timely reports.  Immediate report unsafe or not satisfactory completion of the activities.  Monitoring of 14”Ø pipeline from Yanbu refinery to Madinah receiving station/ 160 KM pipeline. Company Name: ABV Rock Group KB Company Address: Jeddah, Saudi Arabia Position: Field Engineer Inclusive Dates: June 8, 1997 to October 1, 2001 Department: Pipeline Works Immediate Supervisor: Mr. Roland Wilson Company Profile: ABV Rock involve in the construction of Fuel Storage Plant facilities, Tunneling and Pipeline installation with Shipping Pump Stations and Receiving Stations. Duties and Responsibilities:  Received and understand all specifications and procedures work instruction.  Receivedinstruction from superintendent  Perform inspection of daily activities undertaken by sub-contractor.  Ensure timely probation of relevant timely reports.  Immediate report unsafe or not satisfactory completion of the activities.  Monitoring of 12”Ø twin line, pipeline from Jeddah refinery to North Jeddah Bulk Plant and to Storage Plant, 95 KM pipeline. Company Name: Jembas Assistencia Tecnica Limitada Company Address: 88 Luanda, P.O. Box. 10013, Republic of Angola Position: Distribution Network Engineer Inclusive Dates: Sept. 4, 1995 to Jan. 26, 1996
  • 7. Department: Pipeline Immediate Supervisor: Mr. Ettiene Brechie Company Profile: The Company involve in the installation of Submersible pump and water pipeline and power generation. Duties and Responsibilities:  Installation of submersible pumps and bore hole or wellhead.  Rehabilitation of submersible pumps and bore hole or wellhead.  Manpower estimation and materials.  Preparation of monthly reports.  Preparation of material take-off Company Name: Riyadh water works and Sewerage System Company Address: P.O. Box. 29253, Riyadh 11457 K.S.A. Position: Network Supervisor Inclusive Dates: June 1993 to May 1995 Department: Leak Detection Company Profile: The Company is involved in the maintenance of Pipeline of riyadh area and leak detection of distribution Line. Duties and Responsibilities:  Maintenance of water pipeline Primary and Secondary Line.  Inspection of water network line.  Preparation of monthly report. Company Name: Petrola Hellas Refinery Company Address: Athens, Greece Position: Maintenance Engineer Inclusive Dates: Nov. 1992 to April 1993 Department: Maintenance Dept. Company Profile: The Company involved in the maintenance of refinery. Duties and Responsibilities:  Punch list item to be repaired.  Work implementation and supervision.  Inspection of every job package.  Report preparation. Company Name: Ministry of Electricity and Water Company Address: State of Kuwait Position: Mechanical Engineer Department: Emergency Section, Sulaibikhat Area Duration: October 1991 to October 1992
  • 8. Company Profile: The Company is involved in the construction of water line and maintenance. Duties and Responsibilities:  Maintenance of water pipeline.  Rehabilitation of primary line and distribution line.  Mapping of every line.  Monitoring of sub-contractor Company Name: Metropolitan Water Works and Sewerage System Company Address: Philippines Position: Senior Engineer Department: Water Main Valves and hydrant Duration: July 1984 to October 1991 Duties and Responsibilities:  Pipe laying and mapping  Leak Detection  Maintenance of Primary line  Preparation of tools and equipment  Scheduling of works or daily activity  Supervision of works  Preparation of monthly reports Education: Collegiate: National University 1985 Manila Philippines B.S. Mechanical Engineering Board Rating : 75.4% Passed