1. DUMITRU CUCU Ploiesti City; Prahova – Romania
+40745-900.773
cucudumitru2003@yahoo.com
cucudumitru2003@gmail.com
EXPERIENCED CONSTRUCTION SUPERVISOR
Multilingual (Romanian; English; Russian; and French) experienced construction supervisor seeking challenging
position to utilizing my proven abilities developed through over 24 years of supervisory experience gained working in
construction supervision on shore refineries; platforms (topsides; jackets; FPSO's); power plants; Fmc; Epc; and
other locales domestic and international. Duties included supervising construction; field supervision; supervising pre
commissioning; piping/erection; mechanical erection; piping & pipe supports installations; metallic structure
fabrication/erection shut downs; punch list & reinstatement; painting; hydrotesting (oil; water; nitrogen; air); bolting;
blowing; flushing (oil & water); flange management; equipment; valves; insulation; and commissioning support.
Ultimately I am seeking to develop and advance within a multinational organization or expanding company.
PROFESSIONAL BACKGROUND
Aug 2010 – Oct 2014 Employer: Boccard Romania Srl Position: Piping Specialist
Project: FMC Microcrystalline Cellulose Plant from Rayong‐ Thailand
Client: M+W Group. Role: Overseeing and supervising piping; supports; structures; equipment
(reactors; pumps; tanks; and filters); specifications; drawings and design, pre-commissioning; valves;
hydrotesting; bolting; flange management; insulation and painting; blowing; flushing; cleaning of piping
spools prior to commissioning; and compliance with applicable codes. Served as liaison between field
engineers and crafts to ensure construction drawings and specifications complied with supervisor
expectations. Provided leadership to create organizational structure and accountability system.
Responsible for the subcontractor performance.
Client: SHELL Gumusut Kakap Oil Platform from Pasir Gudang‐ Johor‐ Malaysia
Project: Gumusut Kakap Semi FPS. Project Role: Work as Piping Specialist to lead a
professional team of technical personnel and maintain harmonious working and relations.
Planned & scheduled manpower; material; and equipment efficiently and within set time
frames. Monitored the job including ensuring quality workmanship; productivity
improvements; & elimination of non-value added operations.
Supervised erection of piping on site as per the isometric and P&IDs.
Ensured that the work is performed in line with the planning and within the
approved procedures.
Arranged equipment as per the requirements and priority of jobs.
Monitored the job as well as responsible for quality workmanship in jobs.
Achieving productivity improvements & elimination of non-value added
operations.
Performed line walk and prepared punch list of piping systems.
Prepared red-line mark-up for isometric drawings.
Requested all outstanding piping materials based on punch list issue after line
walking.
Coordinated with piping supervisors to complete all construction works.
Prepared the line for hydrostatic testing as per the approved hydrostatic test
package and marked on the isometric & P&ID drawing for the limit of test.
Conducted and led high pressure hydro test in accordance with the approved
hydrostatic test procedures.
Coordinated the reinstatement stage of piping systems.
Coordinated and led assistance team for Nitrogen/Helium Leak test.
Supervised pre-commissioning.
Elaborated daily activity report.
Project: EDF Power Plant from Martigues‐ France; ARCELOR‐ MITTAL revamping in
Fos sur Mer‐ France; SANOFI AVENTIS Pharma Plant revamping in Sisteron‐ France
2. Responsible for erection of spools in boiler.
Installed high capacity boilers.
Carried out alignments of installed lines.
Maintained proper collaboration with engineering and QA/QC departments.
Lead team and planned daily activities.
Lead daily toolbox talk meetings.
Elaborated on daily activity reports.
Nov .2009– August 2010, S.C.Michalin 2006 Ltd; Foreman Pipe Fitter and hydrotest
Client: JCR CHRISTOF CONSULTING
Project: OMV Petrobrazi, Ploiesti, Romania
Read blueprints, ISO’s, and P&ID’s to ensure all equipment in place and work in
accordance with specifications.
Prepared time sheets and progress reports for staff.
Submitted documentation for staff evaluations, disciplinary action, termination, and
promotion.
Performed hydro/pneumatic testing of piping systems.
Project: Rompertrol Rafinare S.A.,Midia-Navodari ,RAFINERY SHUT DOWN
Attended planning meetings.
Studied blueprints and created work scheduled.
Supervised fabrication and installation of piping systems and equipment.
Instructed foreman on safety and activities for crew.
Reviewed and implemented disciplinary actions as required.
Prepared performance evaluations, time sheets, and progress reports for staff
Conducted hydro/pneumatic testing of piping systems.
July 2007-Oct. 2009, SC Bruno Investment &Development SRL, Bucharest, Romania; Project
Manager
Managed commercial and residential properties.
Directly supervised project teams including construction superintendents, engineers, hourly staff, and
subcontractors.
Maximized revenue and profit through budget negotiation, value engineering, and establishment of lump
sum and GMP budgets.
Implemented and updated budgets and reported status to owners and management.
Met with local authorities, private firms, private businesses, and venders to negotiated materials and
services, share progress, and ensure all was complemented in accordance with specifications and
applicable codes.
Supervised the contracts.
Made supplier evaluations and developed short list of accepted sourcing firms.
Oct 2006 - May 2007, SC RALMA SRL, Ploiesti, Romania ;Foreman pipe fabricator & Metallic
structure fabrication/erection; Client: Plastic waste recycling unit – ecological garbage Bucharest,
Romania
Inspected and monitored workflow to ensure specifications met
Trained staff
Coordinated staff activities and identified appropriate materials for product fabrication
Prepared cost estimates, construction schedules, fabrication directions, staff records, and procedures.
Evaluated assembly and installation procedures.
June 2004 - September 2006, PSL ENERGY SERVICE; Supervisor/technician bolting and hydro test,
hot oil flushing Client:TENGHIZ CHEVRON OIL RAFINERY SHUT DOWN ,Kazahkstan ;AIOC-BP
PROJECT, SANGACHAL OIL TERMINAL,Baku,Azerbaijan ;Shah Deniz Gas Export Project TPG 500-
Technip-BP, Baku,Azerbaijan ;Shah Deniz Gas Export Project TPG 500 Jaking and Locking System
CSC-BP YARD, Baku,Azerbaijan ;AIOC BP PROJECT C&WP PLATFORM. Baku,Azerbaijan
Responsible for understanding values and limits for testing, checking testing equipment, determining
test methods, conducting testing, and preparing testing reports.
Responsible for obtaining specifications from customers and approvals from Executive Engineer.
Responsible for ensuring spools correctly torqued and procedures adhered to by local tradesmen.
Ensured all leak test packs are mechanically complete prior to testing.
Carried out all hydraulic bolt torquing and tensioning, retro jet, flushing, chemical cleaning, hot oil
flushing, water flushing, blowing, and pre-commissioning activities.
3. Dec 2001 – May 2004, Saipem Spa, ENI Group, Italy; Foreman pipe fabricator
Client: OKPAI INDEPENDENT POWER PLANT PROJECT (NIGERIAN AGIP OIL COMPANY) NIGERIA;
Karachaganak Main Works Contractors, Kazakhstan
Supervised fabrication of all piping work base on standard isometric drawing.
Interpreted blue print and construction drawing lay-out/set-up piping fabrication.
Prepared materials to carry out the work, provide assistance as required by the crew.
Trained Angolan employees
Provided general guidance and work direction for assigned group in every area.
Prepared accomplishment and progress report on the job to be discussed at the meetings.
Established and published clear priority issue among project activities.
Supervised day to day activities associated in scheduled manpower work.
Established contingency plan and identified trigger event for safety reason.
Conducted installation and fabrication of pipe spools and support.
Conducted pre-commissioning duties.
Checked temporary installation and maintenance of equipment to ensure they comply with safety
standard and regulations.
Prepared work plan and obtain management approval.
April 1993 – December 2001, S.C. TERMISTUL LTD. Ploiesti – Prahova – Romania; Foreman, pipe
fabricator, metallic structure fabricator, and welder
Client: Steaua Romana Refinery, Campina,Romania; Neptun S.A.; Central Orion Foundry;
Station, City Hall Poiana Campina; Research Institute, Campina; Astra Romanian refinery
S.A.; Factory paper, Boldesti Scaieni
o Conducted site visits to make study regarding piping installation and repair
o Construction and repair of boiler heating, refinery, wastewater treatment, and
demineralization equipment in addition to tanks and other products.
o Lead team through daily activities and staffed worksites.
Client: S.C. UMO LTD. Ploiesti – Prahova – Romania for: Petrotel- refinery Lukoil Ploiesti;
Lukoil Gas Stations, Busteni, Azuga
o Conducted site visits to make study regarding piping installation and repair.
o Conducted all duties including laying down plans for mineral bottling and gas station facilities.
o Lead team through daily activities and staffed worksites.
Client: S.C. TERMASERV LTD. Ploiesti – Prahova – Romania for: Refinery Vega Ploiesti
o Conducted all maintained required for refinery operation.
o Applied drawings and sketch on the field.
October 1991 – March 1993, S.C. ROMPETROL SA ,Pipe fitter and hydro test technician
Client: SOVIETABAD GAS PLANT PROJECT, TURKMENISTAN
Determined layout requirements by reading and interpreting blueprints.
Planed pipe system layouts in accordance to specifications.
Cut openings in walls, ceilings and floors in order to install pipe systems
Cut and hammer pipes to appropriate specifications.
Inspected and tested pipe systems to ensure safety.
Conducted pre-commissioning activities.
Attached pipes to walls, structures and fixtures.
September 1990– September 1991, Romanian Army, Sergeant
February 1988– September 1990, S.C. CONCORDIA SA BUCHAREST ROMANIA Pipe fitter and steel
carpenter Client: Metrou Bucuresti
Assembled metallic constructions and elevated them to the position they were built for.
Cut with electrical grinder and cutting set oxygen & acetylene (gas-propane).
Installed metallic & anti atomics doors.
Assembled steam condensation and sanitary installations.
Performed air blowing, flashing and hydro testing for piping systems.
4. EDUCATION
September 1986 - February 1988 Vocational School no.32 - Bucharest with 1 and 1⁄2 years length extra
session for skilled worker in mechanics - locksmith profession – obtained main degree in mechanics –
locksmith
September 1987 – June 1990 High School no. 23 - Bucharest regular session for skilled worker in
mechanics - locksmith profession – obtained secondary degree in mechanics – locksmith
1993 – attended extra training while working for SC TERMISTUL SRL with company professional
foreman and engineer and obtained qualification in welder electric
Attended from 1990 - 1991 – public regular army service
May 2006 - attended extra training while working for PSL Energy Services with training coordinator
Malcolm Fox, and obtained Qualification assembly and tightening of bolted flange connection
2013 - 2015– Eurocor -distance courses Windows Word, Excel and Internet
REFERENCES PROVIDED UPON REQUEST