SlideShare a Scribd company logo
1 of 4
DUMITRU CUCU Ploiesti City; Prahova – Romania
+40745-900.773
cucudumitru2003@yahoo.com
cucudumitru2003@gmail.com
EXPERIENCED CONSTRUCTION SUPERVISOR
Multilingual (Romanian; English; Russian; and French) experienced construction supervisor seeking challenging
position to utilizing my proven abilities developed through over 24 years of supervisory experience gained working in
construction supervision on shore refineries; platforms (topsides; jackets; FPSO's); power plants; Fmc; Epc; and
other locales domestic and international. Duties included supervising construction; field supervision; supervising pre
commissioning; piping/erection; mechanical erection; piping & pipe supports installations; metallic structure
fabrication/erection shut downs; punch list & reinstatement; painting; hydrotesting (oil; water; nitrogen; air); bolting;
blowing; flushing (oil & water); flange management; equipment; valves; insulation; and commissioning support.
Ultimately I am seeking to develop and advance within a multinational organization or expanding company.
PROFESSIONAL BACKGROUND
Aug 2010 – Oct 2014 Employer: Boccard Romania Srl Position: Piping Specialist
Project: FMC Microcrystalline Cellulose Plant from Rayong‐ Thailand
Client: M+W Group. Role: Overseeing and supervising piping; supports; structures; equipment
(reactors; pumps; tanks; and filters); specifications; drawings and design, pre-commissioning; valves;
hydrotesting; bolting; flange management; insulation and painting; blowing; flushing; cleaning of piping
spools prior to commissioning; and compliance with applicable codes. Served as liaison between field
engineers and crafts to ensure construction drawings and specifications complied with supervisor
expectations. Provided leadership to create organizational structure and accountability system.
Responsible for the subcontractor performance.
Client: SHELL Gumusut Kakap Oil Platform from Pasir Gudang‐ Johor‐ Malaysia
Project: Gumusut Kakap Semi FPS. Project Role: Work as Piping Specialist to lead a
professional team of technical personnel and maintain harmonious working and relations.
Planned & scheduled manpower; material; and equipment efficiently and within set time
frames. Monitored the job including ensuring quality workmanship; productivity
improvements; & elimination of non-value added operations.
 Supervised erection of piping on site as per the isometric and P&IDs.
 Ensured that the work is performed in line with the planning and within the
approved procedures.
 Arranged equipment as per the requirements and priority of jobs.
 Monitored the job as well as responsible for quality workmanship in jobs.
 Achieving productivity improvements & elimination of non-value added
operations.
 Performed line walk and prepared punch list of piping systems.
 Prepared red-line mark-up for isometric drawings.
 Requested all outstanding piping materials based on punch list issue after line
walking.
 Coordinated with piping supervisors to complete all construction works.
 Prepared the line for hydrostatic testing as per the approved hydrostatic test
package and marked on the isometric & P&ID drawing for the limit of test.
 Conducted and led high pressure hydro test in accordance with the approved
hydrostatic test procedures.
 Coordinated the reinstatement stage of piping systems.
 Coordinated and led assistance team for Nitrogen/Helium Leak test.
 Supervised pre-commissioning.
 Elaborated daily activity report.
Project: EDF Power Plant from Martigues‐ France; ARCELOR‐ MITTAL revamping in
Fos sur Mer‐ France; SANOFI AVENTIS Pharma Plant revamping in Sisteron‐ France
 Responsible for erection of spools in boiler.
 Installed high capacity boilers.
 Carried out alignments of installed lines.
 Maintained proper collaboration with engineering and QA/QC departments.
 Lead team and planned daily activities.
 Lead daily toolbox talk meetings.
 Elaborated on daily activity reports.

Nov .2009– August 2010, S.C.Michalin 2006 Ltd; Foreman Pipe Fitter and hydrotest
Client: JCR CHRISTOF CONSULTING
Project: OMV Petrobrazi, Ploiesti, Romania
 Read blueprints, ISO’s, and P&ID’s to ensure all equipment in place and work in
accordance with specifications.
 Prepared time sheets and progress reports for staff.
 Submitted documentation for staff evaluations, disciplinary action, termination, and
promotion.
 Performed hydro/pneumatic testing of piping systems.
Project: Rompertrol Rafinare S.A.,Midia-Navodari ,RAFINERY SHUT DOWN
 Attended planning meetings.
 Studied blueprints and created work scheduled.
 Supervised fabrication and installation of piping systems and equipment.
 Instructed foreman on safety and activities for crew.
 Reviewed and implemented disciplinary actions as required.
 Prepared performance evaluations, time sheets, and progress reports for staff
 Conducted hydro/pneumatic testing of piping systems.
July 2007-Oct. 2009, SC Bruno Investment &Development SRL, Bucharest, Romania; Project
Manager
 Managed commercial and residential properties.
 Directly supervised project teams including construction superintendents, engineers, hourly staff, and
subcontractors.
 Maximized revenue and profit through budget negotiation, value engineering, and establishment of lump
sum and GMP budgets.
 Implemented and updated budgets and reported status to owners and management.
 Met with local authorities, private firms, private businesses, and venders to negotiated materials and
services, share progress, and ensure all was complemented in accordance with specifications and
applicable codes.
 Supervised the contracts.
 Made supplier evaluations and developed short list of accepted sourcing firms.
Oct 2006 - May 2007, SC RALMA SRL, Ploiesti, Romania ;Foreman pipe fabricator & Metallic
structure fabrication/erection; Client: Plastic waste recycling unit – ecological garbage Bucharest,
Romania
 Inspected and monitored workflow to ensure specifications met
 Trained staff
 Coordinated staff activities and identified appropriate materials for product fabrication
 Prepared cost estimates, construction schedules, fabrication directions, staff records, and procedures.
 Evaluated assembly and installation procedures.
June 2004 - September 2006, PSL ENERGY SERVICE; Supervisor/technician bolting and hydro test,
hot oil flushing Client:TENGHIZ CHEVRON OIL RAFINERY SHUT DOWN ,Kazahkstan ;AIOC-BP
PROJECT, SANGACHAL OIL TERMINAL,Baku,Azerbaijan ;Shah Deniz Gas Export Project TPG 500-
Technip-BP, Baku,Azerbaijan ;Shah Deniz Gas Export Project TPG 500 Jaking and Locking System
CSC-BP YARD, Baku,Azerbaijan ;AIOC BP PROJECT C&WP PLATFORM. Baku,Azerbaijan
 Responsible for understanding values and limits for testing, checking testing equipment, determining
test methods, conducting testing, and preparing testing reports.
 Responsible for obtaining specifications from customers and approvals from Executive Engineer.
 Responsible for ensuring spools correctly torqued and procedures adhered to by local tradesmen.
 Ensured all leak test packs are mechanically complete prior to testing.
 Carried out all hydraulic bolt torquing and tensioning, retro jet, flushing, chemical cleaning, hot oil
flushing, water flushing, blowing, and pre-commissioning activities.
Dec 2001 – May 2004, Saipem Spa, ENI Group, Italy; Foreman pipe fabricator
Client: OKPAI INDEPENDENT POWER PLANT PROJECT (NIGERIAN AGIP OIL COMPANY) NIGERIA;
Karachaganak Main Works Contractors, Kazakhstan
 Supervised fabrication of all piping work base on standard isometric drawing.
 Interpreted blue print and construction drawing lay-out/set-up piping fabrication.
 Prepared materials to carry out the work, provide assistance as required by the crew.
 Trained Angolan employees
 Provided general guidance and work direction for assigned group in every area.
 Prepared accomplishment and progress report on the job to be discussed at the meetings.
 Established and published clear priority issue among project activities.
 Supervised day to day activities associated in scheduled manpower work.
 Established contingency plan and identified trigger event for safety reason.
 Conducted installation and fabrication of pipe spools and support.
 Conducted pre-commissioning duties.
 Checked temporary installation and maintenance of equipment to ensure they comply with safety
standard and regulations.
 Prepared work plan and obtain management approval.
April 1993 – December 2001, S.C. TERMISTUL LTD. Ploiesti – Prahova – Romania; Foreman, pipe
fabricator, metallic structure fabricator, and welder
Client: Steaua Romana Refinery, Campina,Romania; Neptun S.A.; Central Orion Foundry;
Station, City Hall Poiana Campina; Research Institute, Campina; Astra Romanian refinery
S.A.; Factory paper, Boldesti Scaieni
o Conducted site visits to make study regarding piping installation and repair
o Construction and repair of boiler heating, refinery, wastewater treatment, and
demineralization equipment in addition to tanks and other products.
o Lead team through daily activities and staffed worksites.
Client: S.C. UMO LTD. Ploiesti – Prahova – Romania for: Petrotel- refinery Lukoil Ploiesti;
Lukoil Gas Stations, Busteni, Azuga
o Conducted site visits to make study regarding piping installation and repair.
o Conducted all duties including laying down plans for mineral bottling and gas station facilities.
o Lead team through daily activities and staffed worksites.
Client: S.C. TERMASERV LTD. Ploiesti – Prahova – Romania for: Refinery Vega Ploiesti
o Conducted all maintained required for refinery operation.
o Applied drawings and sketch on the field.
October 1991 – March 1993, S.C. ROMPETROL SA ,Pipe fitter and hydro test technician
Client: SOVIETABAD GAS PLANT PROJECT, TURKMENISTAN
 Determined layout requirements by reading and interpreting blueprints.
 Planed pipe system layouts in accordance to specifications.
 Cut openings in walls, ceilings and floors in order to install pipe systems
 Cut and hammer pipes to appropriate specifications.
 Inspected and tested pipe systems to ensure safety.
 Conducted pre-commissioning activities.
 Attached pipes to walls, structures and fixtures.
September 1990– September 1991, Romanian Army, Sergeant
February 1988– September 1990, S.C. CONCORDIA SA BUCHAREST ROMANIA Pipe fitter and steel
carpenter Client: Metrou Bucuresti
 Assembled metallic constructions and elevated them to the position they were built for.
 Cut with electrical grinder and cutting set oxygen & acetylene (gas-propane).
 Installed metallic & anti atomics doors.
 Assembled steam condensation and sanitary installations.
 Performed air blowing, flashing and hydro testing for piping systems.
EDUCATION
 September 1986 - February 1988 Vocational School no.32 - Bucharest with 1 and 1⁄2 years length extra
session for skilled worker in mechanics - locksmith profession – obtained main degree in mechanics –
locksmith
 September 1987 – June 1990 High School no. 23 - Bucharest regular session for skilled worker in
mechanics - locksmith profession – obtained secondary degree in mechanics – locksmith
 1993 – attended extra training while working for SC TERMISTUL SRL with company professional
foreman and engineer and obtained qualification in welder electric
 Attended from 1990 - 1991 – public regular army service
 May 2006 - attended extra training while working for PSL Energy Services with training coordinator
Malcolm Fox, and obtained Qualification assembly and tightening of bolted flange connection
 2013 - 2015– Eurocor -distance courses Windows Word, Excel and Internet
REFERENCES PROVIDED UPON REQUEST

More Related Content

What's hot

A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievementsJoseph Bracic
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016Kirana Devasya
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)MUHAMMAD ASIF
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huuhuu ho
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingjaison varkey
 

What's hot (20)

Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) Updated
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
 
Resume Shahid
Resume ShahidResume Shahid
Resume Shahid
 
Henrys Resume 2016 Q3
Henrys Resume 2016 Q3Henrys Resume 2016 Q3
Henrys Resume 2016 Q3
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
Sameer CV-DC
Sameer CV-DCSameer CV-DC
Sameer CV-DC
 

Viewers also liked

(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea water(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea waterAlsayed Yakoot
 
Ram Kumar2015
Ram Kumar2015Ram Kumar2015
Ram Kumar2015ram kumar
 
Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017Kim Kadletz
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014Billy Robb
 
Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copydarren williams
 
Recruitment Department Kp Is
Recruitment Department Kp IsRecruitment Department Kp Is
Recruitment Department Kp Ishsalem
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRYodhia Antariksa
 

Viewers also liked (15)

RAN BIJAY
RAN BIJAYRAN BIJAY
RAN BIJAY
 
AURANG ZEB MALIK
AURANG ZEB MALIKAURANG ZEB MALIK
AURANG ZEB MALIK
 
(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea water(THPS BIOCIDE BASE ) moniotoring in sea water
(THPS BIOCIDE BASE ) moniotoring in sea water
 
Ram Kumar2015
Ram Kumar2015Ram Kumar2015
Ram Kumar2015
 
Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017Contract Manager Resume 2-13-2017
Contract Manager Resume 2-13-2017
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
 
MY CV
MY CVMY CV
MY CV
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
Sachin updated CV
Sachin updated CVSachin updated CV
Sachin updated CV
 
Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copy
 
cv adi(1new)
cv adi(1new)cv adi(1new)
cv adi(1new)
 
Sreekumar_Resume
Sreekumar_ResumeSreekumar_Resume
Sreekumar_Resume
 
Recruitment Department Kp Is
Recruitment Department Kp IsRecruitment Department Kp Is
Recruitment Department Kp Is
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HR
 

Similar to cv 2016

Similar to cv 2016 (20)

Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
NABEEL_SME_23012015
NABEEL_SME_23012015NABEEL_SME_23012015
NABEEL_SME_23012015
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
 
Rakesh
RakeshRakesh
Rakesh
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CV
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015
 

cv 2016

  • 1. DUMITRU CUCU Ploiesti City; Prahova – Romania +40745-900.773 cucudumitru2003@yahoo.com cucudumitru2003@gmail.com EXPERIENCED CONSTRUCTION SUPERVISOR Multilingual (Romanian; English; Russian; and French) experienced construction supervisor seeking challenging position to utilizing my proven abilities developed through over 24 years of supervisory experience gained working in construction supervision on shore refineries; platforms (topsides; jackets; FPSO's); power plants; Fmc; Epc; and other locales domestic and international. Duties included supervising construction; field supervision; supervising pre commissioning; piping/erection; mechanical erection; piping & pipe supports installations; metallic structure fabrication/erection shut downs; punch list & reinstatement; painting; hydrotesting (oil; water; nitrogen; air); bolting; blowing; flushing (oil & water); flange management; equipment; valves; insulation; and commissioning support. Ultimately I am seeking to develop and advance within a multinational organization or expanding company. PROFESSIONAL BACKGROUND Aug 2010 – Oct 2014 Employer: Boccard Romania Srl Position: Piping Specialist Project: FMC Microcrystalline Cellulose Plant from Rayong‐ Thailand Client: M+W Group. Role: Overseeing and supervising piping; supports; structures; equipment (reactors; pumps; tanks; and filters); specifications; drawings and design, pre-commissioning; valves; hydrotesting; bolting; flange management; insulation and painting; blowing; flushing; cleaning of piping spools prior to commissioning; and compliance with applicable codes. Served as liaison between field engineers and crafts to ensure construction drawings and specifications complied with supervisor expectations. Provided leadership to create organizational structure and accountability system. Responsible for the subcontractor performance. Client: SHELL Gumusut Kakap Oil Platform from Pasir Gudang‐ Johor‐ Malaysia Project: Gumusut Kakap Semi FPS. Project Role: Work as Piping Specialist to lead a professional team of technical personnel and maintain harmonious working and relations. Planned & scheduled manpower; material; and equipment efficiently and within set time frames. Monitored the job including ensuring quality workmanship; productivity improvements; & elimination of non-value added operations.  Supervised erection of piping on site as per the isometric and P&IDs.  Ensured that the work is performed in line with the planning and within the approved procedures.  Arranged equipment as per the requirements and priority of jobs.  Monitored the job as well as responsible for quality workmanship in jobs.  Achieving productivity improvements & elimination of non-value added operations.  Performed line walk and prepared punch list of piping systems.  Prepared red-line mark-up for isometric drawings.  Requested all outstanding piping materials based on punch list issue after line walking.  Coordinated with piping supervisors to complete all construction works.  Prepared the line for hydrostatic testing as per the approved hydrostatic test package and marked on the isometric & P&ID drawing for the limit of test.  Conducted and led high pressure hydro test in accordance with the approved hydrostatic test procedures.  Coordinated the reinstatement stage of piping systems.  Coordinated and led assistance team for Nitrogen/Helium Leak test.  Supervised pre-commissioning.  Elaborated daily activity report. Project: EDF Power Plant from Martigues‐ France; ARCELOR‐ MITTAL revamping in Fos sur Mer‐ France; SANOFI AVENTIS Pharma Plant revamping in Sisteron‐ France
  • 2.  Responsible for erection of spools in boiler.  Installed high capacity boilers.  Carried out alignments of installed lines.  Maintained proper collaboration with engineering and QA/QC departments.  Lead team and planned daily activities.  Lead daily toolbox talk meetings.  Elaborated on daily activity reports.  Nov .2009– August 2010, S.C.Michalin 2006 Ltd; Foreman Pipe Fitter and hydrotest Client: JCR CHRISTOF CONSULTING Project: OMV Petrobrazi, Ploiesti, Romania  Read blueprints, ISO’s, and P&ID’s to ensure all equipment in place and work in accordance with specifications.  Prepared time sheets and progress reports for staff.  Submitted documentation for staff evaluations, disciplinary action, termination, and promotion.  Performed hydro/pneumatic testing of piping systems. Project: Rompertrol Rafinare S.A.,Midia-Navodari ,RAFINERY SHUT DOWN  Attended planning meetings.  Studied blueprints and created work scheduled.  Supervised fabrication and installation of piping systems and equipment.  Instructed foreman on safety and activities for crew.  Reviewed and implemented disciplinary actions as required.  Prepared performance evaluations, time sheets, and progress reports for staff  Conducted hydro/pneumatic testing of piping systems. July 2007-Oct. 2009, SC Bruno Investment &Development SRL, Bucharest, Romania; Project Manager  Managed commercial and residential properties.  Directly supervised project teams including construction superintendents, engineers, hourly staff, and subcontractors.  Maximized revenue and profit through budget negotiation, value engineering, and establishment of lump sum and GMP budgets.  Implemented and updated budgets and reported status to owners and management.  Met with local authorities, private firms, private businesses, and venders to negotiated materials and services, share progress, and ensure all was complemented in accordance with specifications and applicable codes.  Supervised the contracts.  Made supplier evaluations and developed short list of accepted sourcing firms. Oct 2006 - May 2007, SC RALMA SRL, Ploiesti, Romania ;Foreman pipe fabricator & Metallic structure fabrication/erection; Client: Plastic waste recycling unit – ecological garbage Bucharest, Romania  Inspected and monitored workflow to ensure specifications met  Trained staff  Coordinated staff activities and identified appropriate materials for product fabrication  Prepared cost estimates, construction schedules, fabrication directions, staff records, and procedures.  Evaluated assembly and installation procedures. June 2004 - September 2006, PSL ENERGY SERVICE; Supervisor/technician bolting and hydro test, hot oil flushing Client:TENGHIZ CHEVRON OIL RAFINERY SHUT DOWN ,Kazahkstan ;AIOC-BP PROJECT, SANGACHAL OIL TERMINAL,Baku,Azerbaijan ;Shah Deniz Gas Export Project TPG 500- Technip-BP, Baku,Azerbaijan ;Shah Deniz Gas Export Project TPG 500 Jaking and Locking System CSC-BP YARD, Baku,Azerbaijan ;AIOC BP PROJECT C&WP PLATFORM. Baku,Azerbaijan  Responsible for understanding values and limits for testing, checking testing equipment, determining test methods, conducting testing, and preparing testing reports.  Responsible for obtaining specifications from customers and approvals from Executive Engineer.  Responsible for ensuring spools correctly torqued and procedures adhered to by local tradesmen.  Ensured all leak test packs are mechanically complete prior to testing.  Carried out all hydraulic bolt torquing and tensioning, retro jet, flushing, chemical cleaning, hot oil flushing, water flushing, blowing, and pre-commissioning activities.
  • 3. Dec 2001 – May 2004, Saipem Spa, ENI Group, Italy; Foreman pipe fabricator Client: OKPAI INDEPENDENT POWER PLANT PROJECT (NIGERIAN AGIP OIL COMPANY) NIGERIA; Karachaganak Main Works Contractors, Kazakhstan  Supervised fabrication of all piping work base on standard isometric drawing.  Interpreted blue print and construction drawing lay-out/set-up piping fabrication.  Prepared materials to carry out the work, provide assistance as required by the crew.  Trained Angolan employees  Provided general guidance and work direction for assigned group in every area.  Prepared accomplishment and progress report on the job to be discussed at the meetings.  Established and published clear priority issue among project activities.  Supervised day to day activities associated in scheduled manpower work.  Established contingency plan and identified trigger event for safety reason.  Conducted installation and fabrication of pipe spools and support.  Conducted pre-commissioning duties.  Checked temporary installation and maintenance of equipment to ensure they comply with safety standard and regulations.  Prepared work plan and obtain management approval. April 1993 – December 2001, S.C. TERMISTUL LTD. Ploiesti – Prahova – Romania; Foreman, pipe fabricator, metallic structure fabricator, and welder Client: Steaua Romana Refinery, Campina,Romania; Neptun S.A.; Central Orion Foundry; Station, City Hall Poiana Campina; Research Institute, Campina; Astra Romanian refinery S.A.; Factory paper, Boldesti Scaieni o Conducted site visits to make study regarding piping installation and repair o Construction and repair of boiler heating, refinery, wastewater treatment, and demineralization equipment in addition to tanks and other products. o Lead team through daily activities and staffed worksites. Client: S.C. UMO LTD. Ploiesti – Prahova – Romania for: Petrotel- refinery Lukoil Ploiesti; Lukoil Gas Stations, Busteni, Azuga o Conducted site visits to make study regarding piping installation and repair. o Conducted all duties including laying down plans for mineral bottling and gas station facilities. o Lead team through daily activities and staffed worksites. Client: S.C. TERMASERV LTD. Ploiesti – Prahova – Romania for: Refinery Vega Ploiesti o Conducted all maintained required for refinery operation. o Applied drawings and sketch on the field. October 1991 – March 1993, S.C. ROMPETROL SA ,Pipe fitter and hydro test technician Client: SOVIETABAD GAS PLANT PROJECT, TURKMENISTAN  Determined layout requirements by reading and interpreting blueprints.  Planed pipe system layouts in accordance to specifications.  Cut openings in walls, ceilings and floors in order to install pipe systems  Cut and hammer pipes to appropriate specifications.  Inspected and tested pipe systems to ensure safety.  Conducted pre-commissioning activities.  Attached pipes to walls, structures and fixtures. September 1990– September 1991, Romanian Army, Sergeant February 1988– September 1990, S.C. CONCORDIA SA BUCHAREST ROMANIA Pipe fitter and steel carpenter Client: Metrou Bucuresti  Assembled metallic constructions and elevated them to the position they were built for.  Cut with electrical grinder and cutting set oxygen & acetylene (gas-propane).  Installed metallic & anti atomics doors.  Assembled steam condensation and sanitary installations.  Performed air blowing, flashing and hydro testing for piping systems.
  • 4. EDUCATION  September 1986 - February 1988 Vocational School no.32 - Bucharest with 1 and 1⁄2 years length extra session for skilled worker in mechanics - locksmith profession – obtained main degree in mechanics – locksmith  September 1987 – June 1990 High School no. 23 - Bucharest regular session for skilled worker in mechanics - locksmith profession – obtained secondary degree in mechanics – locksmith  1993 – attended extra training while working for SC TERMISTUL SRL with company professional foreman and engineer and obtained qualification in welder electric  Attended from 1990 - 1991 – public regular army service  May 2006 - attended extra training while working for PSL Energy Services with training coordinator Malcolm Fox, and obtained Qualification assembly and tightening of bolted flange connection  2013 - 2015– Eurocor -distance courses Windows Word, Excel and Internet REFERENCES PROVIDED UPON REQUEST