SlideShare a Scribd company logo
1 of 6
Download to read offline
Rey Arnold Z. Macalalad
Mobile +974 77609599
Email arnold.macalalad@yahoo.com
Technical Skills/ Proficiencies
Skilled / dynamic person andTeam-oriented
Proven track record in operational strategic management and development functions.
Hands on experience in development and management customer relation
Hands on experience in recruiting, training and development of functional staff
Computer proficient
Excellent in oral and written English communication
Ability in problem solving matter / decision making
Procurement Coordinator
Canvasser / Purchaser
Handles Warehouse control
Material Controller /checker
With valid Qatar drivers licensed and capable to handle heavy vehicle/fork lift
Work Area Involvement
SIEMENS WLL Kahramaa Project Phase IX, X
Sheraton Park (underground Sub-station)
Vegetable Market B Sub Station, DIC Sub Station, Abu Sidra Sub Station
Musherieb Property Phase 1B Heart of Doha (underground Sub-station)
Infrastructure/Cable routes/Lusail CP1 Tunnel
Kahramaa Project Phase IXA-B GTC 240A 11KV, 66KV, 132KV, 220KV & 400KV
Ezdan Al Wakra Sites , Naeeja, LDS II, Dukhan Jumailah, Al Kharaasa,DSS, Ummbab,
Al Wajba, Rayyan, Lusail CP1-2,Tunnel cable route, AREVA Sub-station, Siemens Sub-station,
Mitsubishi cable route, LS cable route, Mesaeed cable route/Sub-station
Kahramaa Phase IV-VIII ABB-NEXANS, Qatalum Project
Purchase tools & materials needed in all discipline
Inspection of trench / sub-station
Cable laying / Cable Settings
Cable Meggering / Support fixing / Clamping
Link box fixing & Earthling works
Training Accomplishment
ABB Safety Induction
Doosan Safety Induction
Qatalum Safety Induction
SNC Lavalin Safety Induction
SNC Lavalin Pro-Fac Gulf Management
Areva Safety Induction
TCC Safety Induction
Siemens Cables Safety Induction
Mitsubishi Cables Safety Induction
Carillion Safety Induction
Engineering Construction Industry Training Board
Siemens Safety Induction
QDVC Safety Induction
QDVC Confined Space Induction
QDVC Scissor Lift Training
QDVC Fire Warden Officer
QDVC First Aid Officer
Work Experience
NOH2-JV
Utilities Coordinator July 2015 – Present
Prepare site for mobilization prior for target schedule
Secure manpower program as week routine program schedule
Evaluate necessary requirements prior for work mobilization
Ensure services are free form crossing to other existing/future services
Raise Inspection request for all necessary on site such as setting-out prior for excavation
Ensure survey-excavation made as inside required corridor
Assist consultant on site pertaining for site visit either technical inspection request
Request additional materials for site requirement to avoid delay
Arrangement of stock materials as per specifications of materials
Rendering closure of documentation issues such as noncompliance, site notes, etc..
Coordinates to all department for proper-effective workmanship hence work implementation
Prepare daily progress report for manager,construction,clients information thus commercial department
Convey work program and monitor sub-contractors workmanship for efficient mobilization
Maintain communication to HSE department in ensuring standard-safe workmanship
Work involvement
– TSE line (GRP Pipes “400 – 1000 dia”)
– HDPE (250 – 700 dia)
– Potable Water Duct Tile Iron (600 dia)
– Relocation of 11KV line
– Relocation overhead 400KV
– Relocation 66KV line
– MEP for new sub-station
– Procurement (canvassing-purchasing)
– Cost center department (collection prior for Inspection Request Approval)
QDVC SPP August 2014 - July 2015
MEP Coordinator
Develops quality plan,objectives and ensure effective implemented quality management system in accordance
with clients specification
Monitor effectiveness of corrective and preventive actions
Handle ad prepare methodology requirements that comply for clients procedures
Develop quality,objectives and ensure effective implementation and report to top management performance of
the quality management system as for any need of improvement
Monitor site progress ,feedback of job and requirement relates to technical query
Monitor and handle materials quantification as requires for project
Prepares daily work schedule for securing immediate and organize planning of installation to avoid delays
Handle supervision and execution of works of sub contractors
Manage and handle of workmanship for temporary works
Perform pre-inspection of all MEP services and materials prior for consultants inspection
Responsible on site / field engineering modifications installations,drawing and materials materials for ensuring
effective interface in all discipline
Adapt new system in installation
Manage clients specifications interface and planning and installation for HVAC, controls, plumbing, process
piping, and fire protection design/construction coordination (validated and non- validated systems)
Responsible for providing construction support for MEP systems and will oversee the balancing,
commissioning and validation certification of these systems, including the turnover package
Work Involvement
Road works for Utilities TSE1000,800,500,710,600
Line relocation Potable Water HDPE duct tile iron pipe and MV cables 11KV
HV cables 220-400 Telephone line, street lights, traffic lights – signs, MEP works for sub stations work
TSE Line ( HDPE / Ductile ) Piping Works
Irrigation Tank Piping Works
Drainage Storm Water Line
Sewage Line ( HDPE / GRP ) Piping Works
Domestic Water Line
Foul Water Piping Works
Copper Piping Works
Water Feature Piping Works
Earthing Works
Fire Fighting Re-routing
Diesel Line Piping Works
HVAC Re-routing
Electrical HVC Re-routing / modification
Irrigation ( Pen stock valve,Valve Chamber & HDPE ) Piping Works
Manhole Piping ( HDPE / Cast Iron)
Siemens WLL (Earth Smart Solution) August 2013- August 2104
MEP Site Inspector
Supervising all construction activities including providing technical inputs for methodologies of construction
and coordination with superior officer for efficient activities.
Coordinating with Contractors; monitor their performance in view of project schedule and providing the feed
backs of work in progress to the Project Managers.
Ensuring the timely completion and smooth operation of work.
Networking with consultants, contractors, to ascertain technical specifications, design related essentials
requirements based on the prevalent rules or snag points for immediate rectification
Cautioning short fall and delay in the progress to the responsible authority.
Weekly tracking and updating the Schedule of work and generating Progress report,
Coordination to consultants, sub-contractor and work colleagues on different department before or during the
course of execution.
Supervising and monitoring the performance level of the staff for ensuring accomplishment of the target.
Coordinate with the internal issues regarding design management department on project mechanical or
electrical issues
Specifies and qualifies mechanical and electro-mechanical components
Plans and conducts technical projects or phases of projects
Review variation requests and coordinate with the procurement department for necessary actions
Additional Responsibilities
Verify ducting, fire alarm and deluge drawings prior for work implementation as for site condition
Assess materials before implementation as part of mobilization base from submittals approved
Check the actual site situations and convey civil site colleagues for proper coordination
Convey issues of design that are required for modifications to attain clearances and for future corrective
maintenance of ducting, FM200, deluge system and fire alarm services
Provisions are made during work progress to secure services will be implemented
Layouts are made for confirmation to avoid clashes
Red line drawings are requested and coordinated to design team for any alterations
Ensure ducting, FM200, truncking/cable trays installations are properly align to avoid rectification
Secure all materials used for FM200, deluge pipes and ducting works installations are the approved inspected
materials
Internal inspections are being made prior for final inspection with consultant
Address neither designer/contractor for corrective alterations according to client’s specifications
Facilitate proper sealing materials to ensure sleeves/openings are sealed as per client’s requirements
Conduct daily instructions to contractor to maintain proper coordination on all services
Provide daily report for site progress for proper work evaluation
Carillion Qatar LLC April 2012 – June 2013
MEP Site Inspector
Provide support and advice management, quality management system and assessment
Support the assessment, pre-qualification of sub-contractor and suppliers. Arrange preliminary inspections as
installation according to specification are made. Responsible for supervision, inspection as of approved quality
standards and procedures on all Phases of MEP / mechanical and electrical installations. Witness along with
consultant mock-up/testing on site as part of quality assurance. Ensure safety standard are being followed
according to site work procedure to attain proper workmanship. Responsible for identifying non conformity of
work and proposed corrective actions to ensure work being done as per specification. Attend daily construction
meetings for site progress assessment to maintain weekly pouring target schedule
Attend daily inspection for conformity that all procedure pertaining to clients specification
Provide immediate response for rectification if necessary to achieved completion within the day
Prepares daily site progress report to MEP manager, construction director and Project Director
Organized sub-contractors manpower to achieve consistency and efficient implementation for fast track
construction progress. Assist consultant during inspection for verification of proper implementation of MEP
services. Allocate report to MEP manager, construction manager, IMS manager and construction director
pertaining to consultant assessment on MEP installation of services. Coordinate disposition if necessary to
close none compliance report for QAQC manager. Render to civil inspectors the areas that has none services
for efficient productive progress.
Ensure safe area condition for manpower to a better/fast site mobilization of implementation
Additional Responsibilities
Assist senior MEP engineer on verifying services prior for site implementation
Implementation of either slab penetration-wall penetration for hvac ducting/electrical, fire fighting and deluge
line supply are coordinated during civil works
Prepare site orientation for any MEP works (ducting/FM200 and gas line provision) if there are any alterations
Mock –up are raise before installation for proper co ordinations
Discuss to site inspector along with designer on modifications prior for site conditions to improve hence before
installations of fire fighting, ducting and deluge system
Ensure installations are made prior for approved inspected materials
Secure partial inspection before raising final confirmation from inspector
Maintain proper clearances of ducting works prior for municipal requirements
NEWTON Power Engineering W.L.L June 2011 – April 2012
Electrical Site Engineer/Logistic Personnel
Inspect daily sites before pulling cable as for proper pulling preparation.
Report directly to manager the daily routine and the site development. Assist the Sub-contractor pertaining to
their scope of work. Prepare and handle the team in different site and work discipline. Ensure the work being
handled safe, efficient and organized
Coordinates all work to main contractor, sub-contractor and consultant to maintain effective site development.
Supervise workers in developing awareness, workmanship and to be functional in all disciplines. Conduct site
inspection for preparation of cable route arrangement. Confirm materials availability to main contractor.
Advise main contractor to inspect upon completion of work. Continually carry out surveillance inspection on
the project recording and documenting any and all deviations from the project quality program and company
integrated management system. Provides a report as a correspondence of completion. Make a proposal for all
materials/tools needed in all discipline. Canvass materials, tools, equipment, etc…
Provides reports pertaining to canvass made to have it file for approval. Present and arrange correspondence to
ensure the work will be done effectively. Maintain good record keeping of activities carried out and
inspections, surveillance report, etc…
Keeping material certification for further safety procedure inspection.
Ensure daily reports for the remaining materials needed for more effective workmanship
SNC Lavalin Pro-Fac Gulf Management October 2010-April 2011
Lead Maintenance Technician / Inspector
Provide additional information for qualification of building standard and safety.
Assist Supervisor/ Client Coordinator for pre-qualification of the sub-contractor requirements. Conduct site
inspection for FM200, deluge supply, water tank, fire fighting equipment, sauna/steam room, cctv camera
along with perimeter light, window water flash, swimming pool, jet fans, etc.. to attain standard as client’s
requirements and preparation for efficient operations.
Assess weekly routine operation for street sweeper, barrier and fire equipment for preventive maintenance
Provides support for the sub-contractors preparation of work implementation.
Report daily operational of swimming pool, water pump and hvac to improve operational facilities.
Provides safety procedures, additional knowledge for preventive maintenance and awareness in site for all
manpower.
Conduct along with consultants in site operation, inspection and deliberation of duties and responsibilities.
Provide reports for daily/monthly inspection and information for site progress. Ensure the effective
communication/coordination projects between all disciplines and all project participants. Prepare
correspondence in team management and functional develop customer relations. Routine site monitoring to
facilitate secure area progress as part of preventive maintenance. Weekly over look of tanks, generators &
other machines for efficient operation, facilities & workmanship. Coordinate any monthly/yearly warranties of
services from company suppliers to maintain or prevent unnecessary break down
IrinaTech June 2010–September 2010
MEP Department of Sinohydro (Main contractor)
Lusail Development Project CP1
Electrical Inspector
Provide additional information for qualification of electrical standards.
Assist Project Manager for pre-qualification, submittals of sub-contractor requirements. Conduct site
inspection that also includes civil works for the preparation of cable management. Provides support for the
sub-contractors preparation in cable management. Support, conduct and inspect the Survey for the cable route.
Provides Safety information and awareness in site for all manpower working within the site/tunnel. Assist
consultants in site operation, inspection and deliberation of duties/responsibilities. Provide reports for
daily/monthly inspection and information for site progress. Ensure the effective communication/coordination
projects between all disciplines and all project participants.
Purchaser / Canvasser
Canvass office supplies, furniture, transportation, accommodation, etc…
Purchase transport vehicles, accommodation and furniture’s within the company and accommodation. Arrange
materials needed to purchase by the other branch for the procedure of the cable jointing/cable termination.
Present necessary items and materials need to be purchase for site and office.
ABB Power Technologies AB HVC December 2006-October 2010
Assistant Cable Jointer and Logistic Personnel
Cable Pulling, Cable Settings (support fixing),
Cable Snaking, Cable Sheath Testing, Assistant Cable Jointing, Assistant Cable Termination, Assistant Cable
Screen Separation, Fiber Optic Installation, Sheath Testing, Ground Cable /Link, Box Installation, Link box
(meggering), Electrical testing, Safety Personnel, High Voltage Personnel, Filling bitumen/asphalt/ silicon
compound, Material controller, Transportation coordinator, Material evaluator, Purchaser, Material Dispatcher,
Coordinator & Canvasser
Education Attainment
PATTS College of Aeronautics From 1987 -1991
Filled of Study Aircraft Maintenance Technician
Discipline of Air Frame / Structural Design
Methods of Oil Production
Civil Air Aviation Rules and Regulation
Hydraulics System and Gyro Instrumentation.
Interface Computer Learning Center From Aug‘1989 – Sept ‘1989
Basic Programming
RPG, C Language, Cobol, Pascal
References
Yousef Al Salem Site Engineer LS Cables +974 55552042
Peter John Lundgren Senior Project Manager ABB HVC AB +974 55127742
Engr. Nicomedes Dagaraga Senior Inspector AECOM +974 77360595
Arthur M. Santos Site Inspector Energo Consult +974 55897599
Engr. Cesar Baria Site Engineer NEXANS Cables +971 50350693
Engr. Aquilino Harina Site Inspector Energo Consult +974 55570028
Abraham Fortunato Site Inspector Energo Consult +974 33677437
Additional Details
Transferable visa
Valid Qatari Driver’s License
Available Immediately

More Related Content

What's hot

2.annexure mep projects executed
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executedArun Das
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
Pierce, Kevin_Resume_05.13.2016
Pierce, Kevin_Resume_05.13.2016Pierce, Kevin_Resume_05.13.2016
Pierce, Kevin_Resume_05.13.2016Kevin Pierce
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mepArun Das
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineerMaire Tecnimont
 
HOCH,_Randall_E_2
HOCH,_Randall_E_2HOCH,_Randall_E_2
HOCH,_Randall_E_2Randy Hoch
 
Mr.Lacy Resume 2
Mr.Lacy Resume 2Mr.Lacy Resume 2
Mr.Lacy Resume 2NATE LACY
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen
 

What's hot (17)

Giridhar
GiridharGiridhar
Giridhar
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
2.annexure mep projects executed
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executed
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
Pierce, Kevin_Resume_05.13.2016
Pierce, Kevin_Resume_05.13.2016Pierce, Kevin_Resume_05.13.2016
Pierce, Kevin_Resume_05.13.2016
 
2.annexure mep
2.annexure mep2.annexure mep
2.annexure mep
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Instrument commissioning engineer
Instrument commissioning engineerInstrument commissioning engineer
Instrument commissioning engineer
 
HOCH,_Randall_E_2
HOCH,_Randall_E_2HOCH,_Randall_E_2
HOCH,_Randall_E_2
 
Mr.Lacy Resume 2
Mr.Lacy Resume 2Mr.Lacy Resume 2
Mr.Lacy Resume 2
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
Jeff Ross Resume
Jeff Ross ResumeJeff Ross Resume
Jeff Ross Resume
 
Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12Allen Schmitgen Resume' #12
Allen Schmitgen Resume' #12
 
Anthony_M._Antigulas
Anthony_M._AntigulasAnthony_M._Antigulas
Anthony_M._Antigulas
 

Viewers also liked

отчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный год
отчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный годотчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный год
отчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный годvirtualtaganrog
 
Irfan Lakna Resume (Houston,TX)
Irfan Lakna Resume (Houston,TX)Irfan Lakna Resume (Houston,TX)
Irfan Lakna Resume (Houston,TX)Irfan Lakna
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouriimy2010x
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resumesuresh babu
 
Asignacion 2 matematica
Asignacion 2 matematicaAsignacion 2 matematica
Asignacion 2 matematicabrando125
 
Kathy Grossbauer Résumé 2-7-2017
Kathy Grossbauer Résumé 2-7-2017Kathy Grossbauer Résumé 2-7-2017
Kathy Grossbauer Résumé 2-7-2017Kathy Grossbauer
 
Rahn Resume Current
Rahn Resume CurrentRahn Resume Current
Rahn Resume CurrentColey Rahn
 
CV - Nasir Muzaffar (Chemical Eng.)
CV - Nasir Muzaffar (Chemical Eng.)CV - Nasir Muzaffar (Chemical Eng.)
CV - Nasir Muzaffar (Chemical Eng.)Nasir Muzaffar
 
Sohail Ansari CV Oct2016
Sohail Ansari CV Oct2016Sohail Ansari CV Oct2016
Sohail Ansari CV Oct2016sohail ansari
 

Viewers also liked (17)

отчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный год
отчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный годотчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный год
отчет о самообследовании Mбдоу дс №92 за 2013 2014 учебный год
 
Thesis Defense
Thesis DefenseThesis Defense
Thesis Defense
 
Irfan Lakna Resume (Houston,TX)
Irfan Lakna Resume (Houston,TX)Irfan Lakna Resume (Houston,TX)
Irfan Lakna Resume (Houston,TX)
 
JIBY RESUME
JIBY RESUMEJIBY RESUME
JIBY RESUME
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouri
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resume
 
srinivas CV
srinivas CV srinivas CV
srinivas CV
 
Asignacion 2 matematica
Asignacion 2 matematicaAsignacion 2 matematica
Asignacion 2 matematica
 
Prad resume
Prad resumePrad resume
Prad resume
 
Descon Qatar Exp. Cert
Descon Qatar Exp. CertDescon Qatar Exp. Cert
Descon Qatar Exp. Cert
 
Kathy Grossbauer Résumé 2-7-2017
Kathy Grossbauer Résumé 2-7-2017Kathy Grossbauer Résumé 2-7-2017
Kathy Grossbauer Résumé 2-7-2017
 
Rahn Resume Current
Rahn Resume CurrentRahn Resume Current
Rahn Resume Current
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
cv-imtiaz ahmed
cv-imtiaz ahmedcv-imtiaz ahmed
cv-imtiaz ahmed
 
CV - Nasir Muzaffar (Chemical Eng.)
CV - Nasir Muzaffar (Chemical Eng.)CV - Nasir Muzaffar (Chemical Eng.)
CV - Nasir Muzaffar (Chemical Eng.)
 
Sohail Ansari CV Oct2016
Sohail Ansari CV Oct2016Sohail Ansari CV Oct2016
Sohail Ansari CV Oct2016
 
SYED NAVEED ALI cv
SYED NAVEED ALI cvSYED NAVEED ALI cv
SYED NAVEED ALI cv
 

Similar to cv 2016 (20)

CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Vineeth biodata
Vineeth biodataVineeth biodata
Vineeth biodata
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Nallusamy Gandhi
Nallusamy GandhiNallusamy Gandhi
Nallusamy Gandhi
 
nestor
nestornestor
nestor
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Tabrez
TabrezTabrez
Tabrez
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 

cv 2016

  • 1. Rey Arnold Z. Macalalad Mobile +974 77609599 Email arnold.macalalad@yahoo.com Technical Skills/ Proficiencies Skilled / dynamic person andTeam-oriented Proven track record in operational strategic management and development functions. Hands on experience in development and management customer relation Hands on experience in recruiting, training and development of functional staff Computer proficient Excellent in oral and written English communication Ability in problem solving matter / decision making Procurement Coordinator Canvasser / Purchaser Handles Warehouse control Material Controller /checker With valid Qatar drivers licensed and capable to handle heavy vehicle/fork lift Work Area Involvement SIEMENS WLL Kahramaa Project Phase IX, X Sheraton Park (underground Sub-station) Vegetable Market B Sub Station, DIC Sub Station, Abu Sidra Sub Station Musherieb Property Phase 1B Heart of Doha (underground Sub-station) Infrastructure/Cable routes/Lusail CP1 Tunnel Kahramaa Project Phase IXA-B GTC 240A 11KV, 66KV, 132KV, 220KV & 400KV Ezdan Al Wakra Sites , Naeeja, LDS II, Dukhan Jumailah, Al Kharaasa,DSS, Ummbab, Al Wajba, Rayyan, Lusail CP1-2,Tunnel cable route, AREVA Sub-station, Siemens Sub-station, Mitsubishi cable route, LS cable route, Mesaeed cable route/Sub-station Kahramaa Phase IV-VIII ABB-NEXANS, Qatalum Project Purchase tools & materials needed in all discipline Inspection of trench / sub-station Cable laying / Cable Settings Cable Meggering / Support fixing / Clamping Link box fixing & Earthling works Training Accomplishment ABB Safety Induction Doosan Safety Induction Qatalum Safety Induction SNC Lavalin Safety Induction SNC Lavalin Pro-Fac Gulf Management
  • 2. Areva Safety Induction TCC Safety Induction Siemens Cables Safety Induction Mitsubishi Cables Safety Induction Carillion Safety Induction Engineering Construction Industry Training Board Siemens Safety Induction QDVC Safety Induction QDVC Confined Space Induction QDVC Scissor Lift Training QDVC Fire Warden Officer QDVC First Aid Officer Work Experience NOH2-JV Utilities Coordinator July 2015 – Present Prepare site for mobilization prior for target schedule Secure manpower program as week routine program schedule Evaluate necessary requirements prior for work mobilization Ensure services are free form crossing to other existing/future services Raise Inspection request for all necessary on site such as setting-out prior for excavation Ensure survey-excavation made as inside required corridor Assist consultant on site pertaining for site visit either technical inspection request Request additional materials for site requirement to avoid delay Arrangement of stock materials as per specifications of materials Rendering closure of documentation issues such as noncompliance, site notes, etc.. Coordinates to all department for proper-effective workmanship hence work implementation Prepare daily progress report for manager,construction,clients information thus commercial department Convey work program and monitor sub-contractors workmanship for efficient mobilization Maintain communication to HSE department in ensuring standard-safe workmanship Work involvement – TSE line (GRP Pipes “400 – 1000 dia”) – HDPE (250 – 700 dia) – Potable Water Duct Tile Iron (600 dia) – Relocation of 11KV line – Relocation overhead 400KV – Relocation 66KV line – MEP for new sub-station – Procurement (canvassing-purchasing) – Cost center department (collection prior for Inspection Request Approval) QDVC SPP August 2014 - July 2015 MEP Coordinator Develops quality plan,objectives and ensure effective implemented quality management system in accordance with clients specification Monitor effectiveness of corrective and preventive actions Handle ad prepare methodology requirements that comply for clients procedures Develop quality,objectives and ensure effective implementation and report to top management performance of the quality management system as for any need of improvement Monitor site progress ,feedback of job and requirement relates to technical query Monitor and handle materials quantification as requires for project
  • 3. Prepares daily work schedule for securing immediate and organize planning of installation to avoid delays Handle supervision and execution of works of sub contractors Manage and handle of workmanship for temporary works Perform pre-inspection of all MEP services and materials prior for consultants inspection Responsible on site / field engineering modifications installations,drawing and materials materials for ensuring effective interface in all discipline Adapt new system in installation Manage clients specifications interface and planning and installation for HVAC, controls, plumbing, process piping, and fire protection design/construction coordination (validated and non- validated systems) Responsible for providing construction support for MEP systems and will oversee the balancing, commissioning and validation certification of these systems, including the turnover package Work Involvement Road works for Utilities TSE1000,800,500,710,600 Line relocation Potable Water HDPE duct tile iron pipe and MV cables 11KV HV cables 220-400 Telephone line, street lights, traffic lights – signs, MEP works for sub stations work TSE Line ( HDPE / Ductile ) Piping Works Irrigation Tank Piping Works Drainage Storm Water Line Sewage Line ( HDPE / GRP ) Piping Works Domestic Water Line Foul Water Piping Works Copper Piping Works Water Feature Piping Works Earthing Works Fire Fighting Re-routing Diesel Line Piping Works HVAC Re-routing Electrical HVC Re-routing / modification Irrigation ( Pen stock valve,Valve Chamber & HDPE ) Piping Works Manhole Piping ( HDPE / Cast Iron) Siemens WLL (Earth Smart Solution) August 2013- August 2104 MEP Site Inspector Supervising all construction activities including providing technical inputs for methodologies of construction and coordination with superior officer for efficient activities. Coordinating with Contractors; monitor their performance in view of project schedule and providing the feed backs of work in progress to the Project Managers. Ensuring the timely completion and smooth operation of work. Networking with consultants, contractors, to ascertain technical specifications, design related essentials requirements based on the prevalent rules or snag points for immediate rectification Cautioning short fall and delay in the progress to the responsible authority. Weekly tracking and updating the Schedule of work and generating Progress report, Coordination to consultants, sub-contractor and work colleagues on different department before or during the course of execution. Supervising and monitoring the performance level of the staff for ensuring accomplishment of the target. Coordinate with the internal issues regarding design management department on project mechanical or electrical issues Specifies and qualifies mechanical and electro-mechanical components Plans and conducts technical projects or phases of projects Review variation requests and coordinate with the procurement department for necessary actions Additional Responsibilities Verify ducting, fire alarm and deluge drawings prior for work implementation as for site condition Assess materials before implementation as part of mobilization base from submittals approved
  • 4. Check the actual site situations and convey civil site colleagues for proper coordination Convey issues of design that are required for modifications to attain clearances and for future corrective maintenance of ducting, FM200, deluge system and fire alarm services Provisions are made during work progress to secure services will be implemented Layouts are made for confirmation to avoid clashes Red line drawings are requested and coordinated to design team for any alterations Ensure ducting, FM200, truncking/cable trays installations are properly align to avoid rectification Secure all materials used for FM200, deluge pipes and ducting works installations are the approved inspected materials Internal inspections are being made prior for final inspection with consultant Address neither designer/contractor for corrective alterations according to client’s specifications Facilitate proper sealing materials to ensure sleeves/openings are sealed as per client’s requirements Conduct daily instructions to contractor to maintain proper coordination on all services Provide daily report for site progress for proper work evaluation Carillion Qatar LLC April 2012 – June 2013 MEP Site Inspector Provide support and advice management, quality management system and assessment Support the assessment, pre-qualification of sub-contractor and suppliers. Arrange preliminary inspections as installation according to specification are made. Responsible for supervision, inspection as of approved quality standards and procedures on all Phases of MEP / mechanical and electrical installations. Witness along with consultant mock-up/testing on site as part of quality assurance. Ensure safety standard are being followed according to site work procedure to attain proper workmanship. Responsible for identifying non conformity of work and proposed corrective actions to ensure work being done as per specification. Attend daily construction meetings for site progress assessment to maintain weekly pouring target schedule Attend daily inspection for conformity that all procedure pertaining to clients specification Provide immediate response for rectification if necessary to achieved completion within the day Prepares daily site progress report to MEP manager, construction director and Project Director Organized sub-contractors manpower to achieve consistency and efficient implementation for fast track construction progress. Assist consultant during inspection for verification of proper implementation of MEP services. Allocate report to MEP manager, construction manager, IMS manager and construction director pertaining to consultant assessment on MEP installation of services. Coordinate disposition if necessary to close none compliance report for QAQC manager. Render to civil inspectors the areas that has none services for efficient productive progress. Ensure safe area condition for manpower to a better/fast site mobilization of implementation Additional Responsibilities Assist senior MEP engineer on verifying services prior for site implementation Implementation of either slab penetration-wall penetration for hvac ducting/electrical, fire fighting and deluge line supply are coordinated during civil works Prepare site orientation for any MEP works (ducting/FM200 and gas line provision) if there are any alterations Mock –up are raise before installation for proper co ordinations Discuss to site inspector along with designer on modifications prior for site conditions to improve hence before installations of fire fighting, ducting and deluge system Ensure installations are made prior for approved inspected materials Secure partial inspection before raising final confirmation from inspector Maintain proper clearances of ducting works prior for municipal requirements NEWTON Power Engineering W.L.L June 2011 – April 2012 Electrical Site Engineer/Logistic Personnel Inspect daily sites before pulling cable as for proper pulling preparation. Report directly to manager the daily routine and the site development. Assist the Sub-contractor pertaining to their scope of work. Prepare and handle the team in different site and work discipline. Ensure the work being handled safe, efficient and organized
  • 5. Coordinates all work to main contractor, sub-contractor and consultant to maintain effective site development. Supervise workers in developing awareness, workmanship and to be functional in all disciplines. Conduct site inspection for preparation of cable route arrangement. Confirm materials availability to main contractor. Advise main contractor to inspect upon completion of work. Continually carry out surveillance inspection on the project recording and documenting any and all deviations from the project quality program and company integrated management system. Provides a report as a correspondence of completion. Make a proposal for all materials/tools needed in all discipline. Canvass materials, tools, equipment, etc… Provides reports pertaining to canvass made to have it file for approval. Present and arrange correspondence to ensure the work will be done effectively. Maintain good record keeping of activities carried out and inspections, surveillance report, etc… Keeping material certification for further safety procedure inspection. Ensure daily reports for the remaining materials needed for more effective workmanship SNC Lavalin Pro-Fac Gulf Management October 2010-April 2011 Lead Maintenance Technician / Inspector Provide additional information for qualification of building standard and safety. Assist Supervisor/ Client Coordinator for pre-qualification of the sub-contractor requirements. Conduct site inspection for FM200, deluge supply, water tank, fire fighting equipment, sauna/steam room, cctv camera along with perimeter light, window water flash, swimming pool, jet fans, etc.. to attain standard as client’s requirements and preparation for efficient operations. Assess weekly routine operation for street sweeper, barrier and fire equipment for preventive maintenance Provides support for the sub-contractors preparation of work implementation. Report daily operational of swimming pool, water pump and hvac to improve operational facilities. Provides safety procedures, additional knowledge for preventive maintenance and awareness in site for all manpower. Conduct along with consultants in site operation, inspection and deliberation of duties and responsibilities. Provide reports for daily/monthly inspection and information for site progress. Ensure the effective communication/coordination projects between all disciplines and all project participants. Prepare correspondence in team management and functional develop customer relations. Routine site monitoring to facilitate secure area progress as part of preventive maintenance. Weekly over look of tanks, generators & other machines for efficient operation, facilities & workmanship. Coordinate any monthly/yearly warranties of services from company suppliers to maintain or prevent unnecessary break down IrinaTech June 2010–September 2010 MEP Department of Sinohydro (Main contractor) Lusail Development Project CP1 Electrical Inspector Provide additional information for qualification of electrical standards. Assist Project Manager for pre-qualification, submittals of sub-contractor requirements. Conduct site inspection that also includes civil works for the preparation of cable management. Provides support for the sub-contractors preparation in cable management. Support, conduct and inspect the Survey for the cable route. Provides Safety information and awareness in site for all manpower working within the site/tunnel. Assist consultants in site operation, inspection and deliberation of duties/responsibilities. Provide reports for daily/monthly inspection and information for site progress. Ensure the effective communication/coordination projects between all disciplines and all project participants. Purchaser / Canvasser Canvass office supplies, furniture, transportation, accommodation, etc… Purchase transport vehicles, accommodation and furniture’s within the company and accommodation. Arrange materials needed to purchase by the other branch for the procedure of the cable jointing/cable termination. Present necessary items and materials need to be purchase for site and office. ABB Power Technologies AB HVC December 2006-October 2010 Assistant Cable Jointer and Logistic Personnel
  • 6. Cable Pulling, Cable Settings (support fixing), Cable Snaking, Cable Sheath Testing, Assistant Cable Jointing, Assistant Cable Termination, Assistant Cable Screen Separation, Fiber Optic Installation, Sheath Testing, Ground Cable /Link, Box Installation, Link box (meggering), Electrical testing, Safety Personnel, High Voltage Personnel, Filling bitumen/asphalt/ silicon compound, Material controller, Transportation coordinator, Material evaluator, Purchaser, Material Dispatcher, Coordinator & Canvasser Education Attainment PATTS College of Aeronautics From 1987 -1991 Filled of Study Aircraft Maintenance Technician Discipline of Air Frame / Structural Design Methods of Oil Production Civil Air Aviation Rules and Regulation Hydraulics System and Gyro Instrumentation. Interface Computer Learning Center From Aug‘1989 – Sept ‘1989 Basic Programming RPG, C Language, Cobol, Pascal References Yousef Al Salem Site Engineer LS Cables +974 55552042 Peter John Lundgren Senior Project Manager ABB HVC AB +974 55127742 Engr. Nicomedes Dagaraga Senior Inspector AECOM +974 77360595 Arthur M. Santos Site Inspector Energo Consult +974 55897599 Engr. Cesar Baria Site Engineer NEXANS Cables +971 50350693 Engr. Aquilino Harina Site Inspector Energo Consult +974 55570028 Abraham Fortunato Site Inspector Energo Consult +974 33677437 Additional Details Transferable visa Valid Qatari Driver’s License Available Immediately