SlideShare a Scribd company logo
1 of 6
Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 1 of 6
Full name: Sreekumar Sivasankara Pillai
Date of birth: 22-08-1969 (46 years)
Total Experiences: 24years
Permanent Address: Noorattathu House, Pallarimangalam.P.O, Mavelikara, Alleppey, Kerala-690107.
Phone Number(India): 0091-8281797295(Mob), 0091-9495477404(Mob); 0091-4792401171(LandLine).
Current Position: Sr.BMS Engineer.
Current Project: Headquarters National Bank of Oman
Marital Status: Married. Spouse Santhini.S Children 2 (As on 2016 15 years and 9 years)
E-mail Address: sree22081969@yahoo.com; sree22081969@gmail.com; sree22081969@hotmail.com;
Driving license: Sultanate Of Oman, 87673919 PLACE OF ISSUE: IBRA, ISSUE DATE 30-11-2015,
EXPIRY DATE 30-11-2025,
UAE, 913865 PLACE OF ISSUE: ABUDHABI, ISSUE DATE:17-01-2010,
EXPIRY DATE 16-01-2020. Qatar license - expired
S/N Criteria Skill SetRequired Skill SetOffered Compliance Remarks
1 Qualification
 B.Sc. Eng / BE / B.Tech /
HND in Electronics /
Instrumentation
Engineering
 Diploma in Electronics
Engineering (3 Year
course)
Yes
2 Experience
 4 years of inspection
experience in construction
industries out of which 2
years will be in oil and gas
 ‘23+’ years of total
experience in
instrumentation
construction,
maintenance, QA/QC
etc., works related to Oil
& Gas, steel. Power &
Petrochemical fields
Yes
3 General
Requirement
 Interpersonal and
communication skill
 Communicates well in
English few other Indian
languages
Yes
4 Specific
Requirement
 Shall familiar with
instrument construction
material and construction
methods, testing of
instrumentation and
installations, international
code and standards.
 Experienced in
installation of DCS
cabinets,Telecom panels
/ instruments, installation
of FFB Panels, Analogue
& Digital instruments,
FOC Panel works,
installation of
Miscellaneous Cabinets
& Consoles
 Had good exposure on
various instrument
construction materials
and standards.
 Capable to read / execute
PEFS / P&ID drawings,
location drawings, loop
testing,ILD & wiring
schedule and cabling
works
Yes
Company AL TURKI ENTERPRISES
Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 2 of 6
Nationality Indian
Age 46 years
Profession INSTRUMENTATION
Specialisation BUILDING MANAGEMENT SYSTEM
Year of Joining firm 2015
Passport No N9779166 Date of Issue 12/04/2016 Date of Expiry 11/04/2026
Place of issue Cochin
Qualifications:
Technical:
 Diploma in Electronics Engineering (3 Year Course)
Others:
 Quality Management System Auditor / Lead Auditor training course ISO 9001:2008, IRCA Course No;
A17833, Certificate Number : TVEQ0901135, Course Date 20’th July- 24’th July 2015
 Successfully completed DCS training (TDC 3000 LCN/UCN Operation, maintenance and Implementation from
Tata Honeywell Automation Collage, India.
 Completed management course for Institution of Occupational Safety and Health (IOSH) in association with
National Construction Collage.
 ISO Awareness seminar certificate obtained from Saudi Iron & Steel Co., KSA.
Key Work Experience:
A professional Instrumentation Engineer with ‘24+’ years of total experience in different field of Instrumentation,
Telecom, Electrical, Electronics etc. Independently capable to carry out various types of operation / maintenance and
project works implementation for major continues process plant such as Iron & Steel factories, Oil companies, and
Communication Sectors.Worked in quality management, installation, maintenance, testing etc., areas for various projects
in the middle east region. Possess good knowledge of PDO standards, rules and regulations.
Exposure to Oil and Gas skills ( previous project)
The Amal steamproject is handled as one integrated project comprising of the Amal west and east fields with production
facilities, steam generation plant, water treatment plant etc:- .It is comprise of well testing , production gathering,
degassing, water treatment plant, steam generation plant, steam distribution, APO water gathering and relocation (off
plot), utilities, control and automation and electrical infrastructure upgrade. The new facility have been operated as a
single unit from the centralized control room at Amal steam plant and monitored from NRPS, Marmul CR and coastal
CCR via PDO LAN. This project have been installed a new integrated process automation system for the control,
safeguarding and monitoring of new facilities. Yokogawa FCS systemproviding single window operator interface to the
entire facility. The safeguarding function has been implemented (IPS) separate from the process control system(FCS).
The IPS has been interfaced with FCS to provide shutdown and safety status information to the operator.
Duties and responsibilities
Instrumentation engineer has been responsible for the whole installation of panels, systems,instruments and cables and
to ensure that adequate resources are available for completing the installation work successfully. He is respo nsible for
maintaining the day by day progress report and to co-ordinate with construction teamfor future activities.
Safety and quality are the main concern before and throughout executing any project. As a Quality inspector it is my
responsibility to make sure that all construction activities are carried out as per the specifications, procedures and
following the quality standards according to the client’s requirement. It is to ensure that Approved documents for
construction, approved inspection test plan (ITP) are available before starting any project, and approved manpower list
obtained. Material control is the next stage of activity to make sure that the supplied material are as per the requirement
of client’s specification ,material classification , data sheet and test certificate and stored properly for the designated area
Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 3 of 6
with well packed.NCR shall be raised if any non confirmation occurred. Obtain valid calibration certificates for testing
instruments and make sure that right tools and equipments are using according to the requirement. Follow the ITP and
Co-ordinate with site team to mitigate a flawless project delivery. Check list shall be prepared and signed off according
to the progress ofthe work and ITP. Punch list shall be prepared and co-ordinate with site team to rectify faults, handover
Final documents.
Items Familiar with:
 Quality team works adoption and supervision of material control, approval of documents and inspection
personnel,installation ofcable laying works, installation ofJB, panels and frame, installation of plant instruments,
level instruments, flow instruments, ESD, MOV and control valves. Coordinate with site team for achieving
flawless project delivery. Quantity take off, submission of daily, weekly and monthly progress report. proper
manpower utilization. following safety and integrity standards,procedures and specification in accordance with
the client requirement. check list and punch list preparation and final handover documents.
 AI, AVI, PA system, ACS, SCS,SMATV system, CCTV system and GRMS System - all ELV systemproject
implementation.
 FCU, Chilled water system,AHU, FAHU, Car parking system,Exhaust fan, generator, card barriers, small power
system, VAV units, Stair pressurization system, lift pressurization system, heat exchangers, etc., with optimum
power utilization.
 TDC 2000 i.e. control panel, mimic panels, recorders, field instruments (Absolute pressure Transmitters,
indicators, DP Transmitters, flow meters) are modified to working through TDC3000 universal stations.
 Weighing system Pfister made panels replaced, designed and modified through DCS with more accuracy. ISO
Calibration adopted.
 PLC time interrupted & alarm interrupted program implemented.
 Fire alarm system, access control systems, magnetic doorsystems,card barrier systems,Building management
systems are installed and maintained in and around KOC offices.
 Servicing and maintenance of Fire Alarm System (Conventional and Addressable type), GENT 34000, GENT
3260, GENT 3270, THORN, Simplex, Gate Barriers, Access Control System, Card Readers, Bowling machine
maintenance, swimming pool systemMaintenance (ozone generator analyzers etc.,)
 Installation / programming / implementation for all type of Fire Alarm System, Gate Barrier and access control
system& building management system.
 Allen Bradley Flexo logic PLC based water injection systeminstalled & commissioned under ADCO oil field.
It is included with excavation, cable lying; back filling, MDB modification, cable termination, FCV, PT, FT, pre-
commissioning and Commissioning according to the HSE & ADCO procedure manual.
Career Summary:
Aug., 2015 – Jan., 2016 Al Turki Enterprises L.L.C
Sr.BMS Engineer, Oman
Jun., 2014 – Jan., 2015 INTEGRATED ENGINEERS AND CONTRACTORS
PROJECT MANAGER E&I
Sep., 2011 – mar., 2013 Special Technical Services, Oman
QC Inspector – Instrumentation & Telecom
Jan., 2009 – Mar., 2011 Bond Communication, UAE
QA/QC Engineer / BMS Engineer
Aug., 2006 - Jan., 2008 Galfar, UAE
Instrument Supervisor
Oct., 2003 – Oct., 2005 M/s. Al-Fulaij United Group Company, Kuwait
Instrument Supervisor
Dec., 2002 – Sep., 2003 Somson Power Corporation, India
Service Engineer
Dec., 2000 – Dec., 2002 ARM Limited, India
Engineer In-charge
Mar., 1994 – Mar., 1998 Saudi Iron & Steel Company, KSA
Instrument Technician
Sep., 1989 – Mar., 1994 Tata Iron & Steel Company, India
Technician
Professional Experience:
Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 4 of 6
Aug., 2015 – Jan., 2016 Al Turki Enterprises L.L.C
Sr.BMS Engineer, Oman
Project Involved: Head Quarters National Bank of Oman
Responsibilities:
 BMS Implementation
Jun., 2014 – Jan 2015 IEC, ITS Integrated groups of companies
Project Manager- E&I
Project Involved : GDS SCADA UPGRADATION PROJECT (GSUP) QATAR.
Responsibilities:
 Implementation of project are as per the time frame and mitigating the client requirement .
 Coordinating with the construction personnel for smooth flow of works.
 Progress report, invoice clearance, monitoring all site activities, planning future schedule and reducing risk factors.
 Coordinate with all site activities, man power allocation to various sites and procuring the materials according to the
requirement and as per the client specification .
 To ensure that verification and inspection activities are carried our as per approved Quality Plan, procedures,
standards and project specifications.
 Scheduling training program for the employees and ensure their ability to enhance.
Sep., 2011 – Mar.,2013 Special Technical Services, Oman
QC Inspector – Instrumentation & Telecom
Project Involved : On-Plot Construction Contract for Amal Steam Surface Facilities
Responsibilities:
 To ensure that verification and inspection activities are carried our as per approved Quality Plan , procedures,
standards and project specifications.
 Inspect Instrumentation & Telecom cable Trenches, duct bank, routing etc., prior to cable pulling.
 Coordinating with the construction personnel for smooth flow of works.
 Inspect various types of instrument installation and witnessing works for field & lab instrument calibration like for
valves, Instrument (flow, pressure, level, temperature), CCTV, level trolls, switches etc.,.
 Carried out systemwise inspection works for successful mechanical completion and handover of the systems.
 Prepare inspection reports,non-compliance reports,discrepancy reports and maintain these documents.Familiar with
Quality Plans, ITP’s, Method Statements and QCP’s.
 Continually vigilant with respect to HSE impacts, unsafe acts and conditions on site.
 Attending regular meetings with the client regarding the problems in the field
Jan., 2009 – Mar., 2011 Bond Communication, UAE
QA/QC Engineer / BMS Engineer
Responsibilities:
 Quality assurance and quality control of ELV System implementation AI, AVI, PA system, SMATV, CCTV
System, ACS, SCS, GRMS etc.,
 Worked as EPTW systemcoordinator, Quality report submitting, TQ raising, Method statement preparation, risk
assessment,Submittal preparation, Controlling and supervising a team of technicians and workers were also the
part of team work.
 Prepared Inspection & Test Plans, Quality procedures in accordance to client requirements & Specifications.
 Building Management System tender quoting.
 BMS and BAS design, implementation and project hand over.
 Ensured that all telecom and instrumentation works comply with project specifications, company procedures,
applicable standards, method statement & Quality Assurance & Control documents etc.,
 Coordinated with the client representative and inspector(s) for anticipation of possible non-conformances and
Discrepancies and discussed bothpreventive and corrective actions.Generated reports of conditions found during
inspection activities & notifying management of significant problems
Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 5 of 6
Aug., 2006 - Jan., 2008 Galfar, UAE
Instrument Supervisor
Responsibilities:
 Construction work for wash water header replacement& produced water re-injection pilot project
 Installation & Commissioning of PLC Blend control system, FCV, PT, FT, Chartless recorder, SCADA
Modification
 Supervised the installation, construction, calibration and pre-commissioning activities of field Instrument’s like
flow transmitters, pressure transmitters, level transmitters, temperature transmitters, switches, pressure gauges,
temperature gauges, level gauge, RTD, thermocouple, Junction boxes, cable installation, cable termination,
meggering, cable tray installation, Instrument Tubing etc.,
 Monitor incoming materials, conduct material evaluation based on purchase order and standards.
 Assisted the QC personnel in installation inspection activities and preparation of reports.
 Assisted in preparation of as-built drawings and its approval.
 Managed manpower handling and distribution works as per site requirement.
Oct., 2003 – Oct., 2005 M/s. Al-Fulaij United Group Company, Kuwait
Instrument Supervisor
Responsibilities:
 Servicing and maintenance of Fire Alarm System (Conventional and Addressable type), GENT34000, GENT
3260, GENT 3270, THORN, Simplex, Gate Barriers, Access Control System, Card Readers, Bowling machine
maintenance, swimming pool systemmaintenance (ozone generator analyzers etc:- ).
 Installation / programming / implementation for all type of Fire Alarm System, Gate Barrier and access control
system& building maintenance system.
 Supervision over calibration of instruments, cabinets installation and checking.
 Co-ordinating with other disciplines/contractors for effective progress of work
 Carried out all instrumentation activities strictly in accordance to the KOC PTW and HSE requirements.
Dec., 2002 – Sep., 2003 Somson Power Corporation, India
Service Engineer
Responsibilities:
 Handled servicing and maintenance of solar power products.
 Interacted with customers and solved the technical problems related to our products.
 Assisted in procurement, storage, record keeping, delivery etc., for the items.
Dec., 2000 – Dec., 2002 ARM Limited, India
Engineer In-charge
Responsibilities:
 Supervision of billing for the works executed
 Manage Fibre optic cabling works
 Handled splicing of cables, termination etc.,.
 Monitored the works progress and informed the management for timely invoicing.
Mar., 1994 – Mar., 1998 Saudi Iron & Steel Company, KSA
Instrument Technician
Responsibilities:
 Design, installation and implementation of Honeywell TDC 3000 (AP transmitters, DP Transmitters, Flow meters
are replaced with smart transmitters).
 Modification of TDC 2000 control panels through universal station on TDC 3000(Control desk, mimic panels,
indicators etc: -).
 Designing / commissioning / implementation of weighing systemthrough SCADA.
 Programming and maintenance of PLC Siemens 150S, 155U, 150K etc.,
Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 6 of 6
 Trouble shooting,repairing and calibration of weighing systems, Scheck microcont weighing System and pfister
weighing system(Digital & Analogue type). ISO Calibration adopted for all weighing systems.
Sep., 1989 – Mar., 1994 Tata Iron & Steel Company, India
Technician
Plants Involved:
 Waste Recycling Plant
 LD2 & Slab Caster Plant
Responsibilities:
 Operation & maintenance of various equipments such as PLC (Siemens 110S,101U), V/F Converters, Femco
communication system, metal detectors, Crane(magnetic & Grab etc:- )
 Maintenance of plant control system,SCADA unit (TDC 3000 includes PM, LM, AM, HM, US, NIM, HG, UCN,
LCN), ABB PLC’s (MP 100W, Mastergate,Moor32 control,pic, tic, ziq control, celox lab, qhmx 330, AC Drives
(simovert P), DC Drives (Avtron advantage 32), EOT Cranes (225T, 25T, 50T Opotor Control).
 Obtained training on various Electrical, Electronics & Instrumentation items pertaining to steel industry.
 Performed installation, calibration, loop checking, trouble shooting etc., of various types of gauges,transmitters,
switches, meters etc., in accordance with applicable procedures and standards
 Assisted in various plant start-up activities
Computer Literacy:
 MS Office (MS-WORD, EXCEL, POWER POINT)
 Windows OS XP/Vista/7/8/10
Trainings:
 QMS Auditor/Lead Auditor Course ISO 9001:2008 IRCA Approved
 IOSH
 TDC 3000 Operation Maintenance and Implementation
 HSE Induction
 H2S Awareness & Escape
 Initial Fire Response
 Dealing with Hazards and Risk
Languages Known:
 English
 Hindi
 Malayalam

More Related Content

What's hot

ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project EngineerFahim Mohamed
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
Electrical engineer 2 years of experience
Electrical engineer 2 years of experienceElectrical engineer 2 years of experience
Electrical engineer 2 years of experiencePathan Aslam
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tcBINOY TC
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERShafeek Nazar
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Sarim Mujtaba
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 
Resume to Engineer doc PDF
Resume to Engineer doc PDFResume to Engineer doc PDF
Resume to Engineer doc PDFshaju hossain
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineerimran ahmed
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015PRADIP SAHA,CEng MIGEM
 

What's hot (20)

ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Electrical engineer 2 years of experience
Electrical engineer 2 years of experienceElectrical engineer 2 years of experience
Electrical engineer 2 years of experience
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Piping foreman resume Binoy tc
Piping foreman resume Binoy tcPiping foreman resume Binoy tc
Piping foreman resume Binoy tc
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Resume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV EngineerResume (cv) Naeem Ahmad ELV Engineer
Resume (cv) Naeem Ahmad ELV Engineer
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Resume to Engineer doc PDF
Resume to Engineer doc PDFResume to Engineer doc PDF
Resume to Engineer doc PDF
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Imran Resume HVAC Engineer
Imran Resume HVAC EngineerImran Resume HVAC Engineer
Imran Resume HVAC Engineer
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 

Viewers also liked (20)

Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Pdo cv approvals
Pdo cv approvalsPdo cv approvals
Pdo cv approvals
 
PDO Experience certificate - 2000.PDF
PDO Experience certificate - 2000.PDFPDO Experience certificate - 2000.PDF
PDO Experience certificate - 2000.PDF
 
ANAND SATCHIT JAMMALAMADAKA- 8369710 -ima - Copy
ANAND SATCHIT JAMMALAMADAKA- 8369710 -ima - CopyANAND SATCHIT JAMMALAMADAKA- 8369710 -ima - Copy
ANAND SATCHIT JAMMALAMADAKA- 8369710 -ima - Copy
 
CERTIFICATE-IFC
CERTIFICATE-IFCCERTIFICATE-IFC
CERTIFICATE-IFC
 
diploma attested
diploma attesteddiploma attested
diploma attested
 
JSA-CMA CERTIFICATE-30012015
JSA-CMA CERTIFICATE-30012015JSA-CMA CERTIFICATE-30012015
JSA-CMA CERTIFICATE-30012015
 
CMA
CMACMA
CMA
 
IGCSE Certificate
IGCSE CertificateIGCSE Certificate
IGCSE Certificate
 
Cma certificate
Cma certificateCma certificate
Cma certificate
 
MBA Nyenrode degree
MBA Nyenrode degreeMBA Nyenrode degree
MBA Nyenrode degree
 
CMA certification
CMA certificationCMA certification
CMA certification
 
JSA-CMA -CERT LTR-30012015
JSA-CMA -CERT LTR-30012015JSA-CMA -CERT LTR-30012015
JSA-CMA -CERT LTR-30012015
 
CA INTER CERTIFICATE
CA INTER CERTIFICATECA INTER CERTIFICATE
CA INTER CERTIFICATE
 
CMA Certificate
CMA CertificateCMA Certificate
CMA Certificate
 
CS Executive Marksheet
CS Executive MarksheetCS Executive Marksheet
CS Executive Marksheet
 
B.Com Degree
B.Com DegreeB.Com Degree
B.Com Degree
 
ACMA
ACMAACMA
ACMA
 
CISI
CISICISI
CISI
 
MBA Certificate
MBA CertificateMBA Certificate
MBA Certificate
 

Similar to Sreekumar_Resume (20)

USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
resume
resumeresume
resume
 
Sreekumar_bms
Sreekumar_bmsSreekumar_bms
Sreekumar_bms
 
E&I Eng last update
E&I Eng last updateE&I Eng last update
E&I Eng last update
 
REY CV
REY CVREY CV
REY CV
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
CV
CVCV
CV
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Winston Resume new
Winston Resume newWinston Resume new
Winston Resume new
 
Vijayaraghavan.K-CV
Vijayaraghavan.K-CVVijayaraghavan.K-CV
Vijayaraghavan.K-CV
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
FREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVEFREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVE
 
Abraham CV 03.06.2015
Abraham CV 03.06.2015Abraham CV 03.06.2015
Abraham CV 03.06.2015
 
rineesh cv IN
rineesh cv  INrineesh cv  IN
rineesh cv IN
 
BMS Engineer
BMS EngineerBMS Engineer
BMS Engineer
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
ELV Project Manager CV
ELV Project Manager CVELV Project Manager CV
ELV Project Manager CV
 
Masood Resume - G
Masood Resume - GMasood Resume - G
Masood Resume - G
 
CV
CVCV
CV
 

More from sreekumar sivasankara pillai (9)

sree pp new
sree pp newsree pp new
sree pp new
 
license oman1
license oman1license oman1
license oman1
 
license oman 0
license oman 0license oman 0
license oman 0
 
sree h2s
sree h2ssree h2s
sree h2s
 
Sreehse pp
Sreehse ppSreehse pp
Sreehse pp
 
Sree old passport
Sree old passportSree old passport
Sree old passport
 
Sts exp cert
Sts exp certSts exp cert
Sts exp cert
 
Sreekumar certificates
Sreekumar certificatesSreekumar certificates
Sreekumar certificates
 
Driving license abudhabi
Driving license abudhabiDriving license abudhabi
Driving license abudhabi
 

Sreekumar_Resume

  • 1. Head Quarters National Bank Of Oman (HQ-NBO) AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S. Sr.BMS Engineer. Page 1 of 6 Full name: Sreekumar Sivasankara Pillai Date of birth: 22-08-1969 (46 years) Total Experiences: 24years Permanent Address: Noorattathu House, Pallarimangalam.P.O, Mavelikara, Alleppey, Kerala-690107. Phone Number(India): 0091-8281797295(Mob), 0091-9495477404(Mob); 0091-4792401171(LandLine). Current Position: Sr.BMS Engineer. Current Project: Headquarters National Bank of Oman Marital Status: Married. Spouse Santhini.S Children 2 (As on 2016 15 years and 9 years) E-mail Address: sree22081969@yahoo.com; sree22081969@gmail.com; sree22081969@hotmail.com; Driving license: Sultanate Of Oman, 87673919 PLACE OF ISSUE: IBRA, ISSUE DATE 30-11-2015, EXPIRY DATE 30-11-2025, UAE, 913865 PLACE OF ISSUE: ABUDHABI, ISSUE DATE:17-01-2010, EXPIRY DATE 16-01-2020. Qatar license - expired S/N Criteria Skill SetRequired Skill SetOffered Compliance Remarks 1 Qualification  B.Sc. Eng / BE / B.Tech / HND in Electronics / Instrumentation Engineering  Diploma in Electronics Engineering (3 Year course) Yes 2 Experience  4 years of inspection experience in construction industries out of which 2 years will be in oil and gas  ‘23+’ years of total experience in instrumentation construction, maintenance, QA/QC etc., works related to Oil & Gas, steel. Power & Petrochemical fields Yes 3 General Requirement  Interpersonal and communication skill  Communicates well in English few other Indian languages Yes 4 Specific Requirement  Shall familiar with instrument construction material and construction methods, testing of instrumentation and installations, international code and standards.  Experienced in installation of DCS cabinets,Telecom panels / instruments, installation of FFB Panels, Analogue & Digital instruments, FOC Panel works, installation of Miscellaneous Cabinets & Consoles  Had good exposure on various instrument construction materials and standards.  Capable to read / execute PEFS / P&ID drawings, location drawings, loop testing,ILD & wiring schedule and cabling works Yes Company AL TURKI ENTERPRISES
  • 2. Head Quarters National Bank Of Oman (HQ-NBO) AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S. Sr.BMS Engineer. Page 2 of 6 Nationality Indian Age 46 years Profession INSTRUMENTATION Specialisation BUILDING MANAGEMENT SYSTEM Year of Joining firm 2015 Passport No N9779166 Date of Issue 12/04/2016 Date of Expiry 11/04/2026 Place of issue Cochin Qualifications: Technical:  Diploma in Electronics Engineering (3 Year Course) Others:  Quality Management System Auditor / Lead Auditor training course ISO 9001:2008, IRCA Course No; A17833, Certificate Number : TVEQ0901135, Course Date 20’th July- 24’th July 2015  Successfully completed DCS training (TDC 3000 LCN/UCN Operation, maintenance and Implementation from Tata Honeywell Automation Collage, India.  Completed management course for Institution of Occupational Safety and Health (IOSH) in association with National Construction Collage.  ISO Awareness seminar certificate obtained from Saudi Iron & Steel Co., KSA. Key Work Experience: A professional Instrumentation Engineer with ‘24+’ years of total experience in different field of Instrumentation, Telecom, Electrical, Electronics etc. Independently capable to carry out various types of operation / maintenance and project works implementation for major continues process plant such as Iron & Steel factories, Oil companies, and Communication Sectors.Worked in quality management, installation, maintenance, testing etc., areas for various projects in the middle east region. Possess good knowledge of PDO standards, rules and regulations. Exposure to Oil and Gas skills ( previous project) The Amal steamproject is handled as one integrated project comprising of the Amal west and east fields with production facilities, steam generation plant, water treatment plant etc:- .It is comprise of well testing , production gathering, degassing, water treatment plant, steam generation plant, steam distribution, APO water gathering and relocation (off plot), utilities, control and automation and electrical infrastructure upgrade. The new facility have been operated as a single unit from the centralized control room at Amal steam plant and monitored from NRPS, Marmul CR and coastal CCR via PDO LAN. This project have been installed a new integrated process automation system for the control, safeguarding and monitoring of new facilities. Yokogawa FCS systemproviding single window operator interface to the entire facility. The safeguarding function has been implemented (IPS) separate from the process control system(FCS). The IPS has been interfaced with FCS to provide shutdown and safety status information to the operator. Duties and responsibilities Instrumentation engineer has been responsible for the whole installation of panels, systems,instruments and cables and to ensure that adequate resources are available for completing the installation work successfully. He is respo nsible for maintaining the day by day progress report and to co-ordinate with construction teamfor future activities. Safety and quality are the main concern before and throughout executing any project. As a Quality inspector it is my responsibility to make sure that all construction activities are carried out as per the specifications, procedures and following the quality standards according to the client’s requirement. It is to ensure that Approved documents for construction, approved inspection test plan (ITP) are available before starting any project, and approved manpower list obtained. Material control is the next stage of activity to make sure that the supplied material are as per the requirement of client’s specification ,material classification , data sheet and test certificate and stored properly for the designated area
  • 3. Head Quarters National Bank Of Oman (HQ-NBO) AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S. Sr.BMS Engineer. Page 3 of 6 with well packed.NCR shall be raised if any non confirmation occurred. Obtain valid calibration certificates for testing instruments and make sure that right tools and equipments are using according to the requirement. Follow the ITP and Co-ordinate with site team to mitigate a flawless project delivery. Check list shall be prepared and signed off according to the progress ofthe work and ITP. Punch list shall be prepared and co-ordinate with site team to rectify faults, handover Final documents. Items Familiar with:  Quality team works adoption and supervision of material control, approval of documents and inspection personnel,installation ofcable laying works, installation ofJB, panels and frame, installation of plant instruments, level instruments, flow instruments, ESD, MOV and control valves. Coordinate with site team for achieving flawless project delivery. Quantity take off, submission of daily, weekly and monthly progress report. proper manpower utilization. following safety and integrity standards,procedures and specification in accordance with the client requirement. check list and punch list preparation and final handover documents.  AI, AVI, PA system, ACS, SCS,SMATV system, CCTV system and GRMS System - all ELV systemproject implementation.  FCU, Chilled water system,AHU, FAHU, Car parking system,Exhaust fan, generator, card barriers, small power system, VAV units, Stair pressurization system, lift pressurization system, heat exchangers, etc., with optimum power utilization.  TDC 2000 i.e. control panel, mimic panels, recorders, field instruments (Absolute pressure Transmitters, indicators, DP Transmitters, flow meters) are modified to working through TDC3000 universal stations.  Weighing system Pfister made panels replaced, designed and modified through DCS with more accuracy. ISO Calibration adopted.  PLC time interrupted & alarm interrupted program implemented.  Fire alarm system, access control systems, magnetic doorsystems,card barrier systems,Building management systems are installed and maintained in and around KOC offices.  Servicing and maintenance of Fire Alarm System (Conventional and Addressable type), GENT 34000, GENT 3260, GENT 3270, THORN, Simplex, Gate Barriers, Access Control System, Card Readers, Bowling machine maintenance, swimming pool systemMaintenance (ozone generator analyzers etc.,)  Installation / programming / implementation for all type of Fire Alarm System, Gate Barrier and access control system& building management system.  Allen Bradley Flexo logic PLC based water injection systeminstalled & commissioned under ADCO oil field. It is included with excavation, cable lying; back filling, MDB modification, cable termination, FCV, PT, FT, pre- commissioning and Commissioning according to the HSE & ADCO procedure manual. Career Summary: Aug., 2015 – Jan., 2016 Al Turki Enterprises L.L.C Sr.BMS Engineer, Oman Jun., 2014 – Jan., 2015 INTEGRATED ENGINEERS AND CONTRACTORS PROJECT MANAGER E&I Sep., 2011 – mar., 2013 Special Technical Services, Oman QC Inspector – Instrumentation & Telecom Jan., 2009 – Mar., 2011 Bond Communication, UAE QA/QC Engineer / BMS Engineer Aug., 2006 - Jan., 2008 Galfar, UAE Instrument Supervisor Oct., 2003 – Oct., 2005 M/s. Al-Fulaij United Group Company, Kuwait Instrument Supervisor Dec., 2002 – Sep., 2003 Somson Power Corporation, India Service Engineer Dec., 2000 – Dec., 2002 ARM Limited, India Engineer In-charge Mar., 1994 – Mar., 1998 Saudi Iron & Steel Company, KSA Instrument Technician Sep., 1989 – Mar., 1994 Tata Iron & Steel Company, India Technician Professional Experience:
  • 4. Head Quarters National Bank Of Oman (HQ-NBO) AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S. Sr.BMS Engineer. Page 4 of 6 Aug., 2015 – Jan., 2016 Al Turki Enterprises L.L.C Sr.BMS Engineer, Oman Project Involved: Head Quarters National Bank of Oman Responsibilities:  BMS Implementation Jun., 2014 – Jan 2015 IEC, ITS Integrated groups of companies Project Manager- E&I Project Involved : GDS SCADA UPGRADATION PROJECT (GSUP) QATAR. Responsibilities:  Implementation of project are as per the time frame and mitigating the client requirement .  Coordinating with the construction personnel for smooth flow of works.  Progress report, invoice clearance, monitoring all site activities, planning future schedule and reducing risk factors.  Coordinate with all site activities, man power allocation to various sites and procuring the materials according to the requirement and as per the client specification .  To ensure that verification and inspection activities are carried our as per approved Quality Plan, procedures, standards and project specifications.  Scheduling training program for the employees and ensure their ability to enhance. Sep., 2011 – Mar.,2013 Special Technical Services, Oman QC Inspector – Instrumentation & Telecom Project Involved : On-Plot Construction Contract for Amal Steam Surface Facilities Responsibilities:  To ensure that verification and inspection activities are carried our as per approved Quality Plan , procedures, standards and project specifications.  Inspect Instrumentation & Telecom cable Trenches, duct bank, routing etc., prior to cable pulling.  Coordinating with the construction personnel for smooth flow of works.  Inspect various types of instrument installation and witnessing works for field & lab instrument calibration like for valves, Instrument (flow, pressure, level, temperature), CCTV, level trolls, switches etc.,.  Carried out systemwise inspection works for successful mechanical completion and handover of the systems.  Prepare inspection reports,non-compliance reports,discrepancy reports and maintain these documents.Familiar with Quality Plans, ITP’s, Method Statements and QCP’s.  Continually vigilant with respect to HSE impacts, unsafe acts and conditions on site.  Attending regular meetings with the client regarding the problems in the field Jan., 2009 – Mar., 2011 Bond Communication, UAE QA/QC Engineer / BMS Engineer Responsibilities:  Quality assurance and quality control of ELV System implementation AI, AVI, PA system, SMATV, CCTV System, ACS, SCS, GRMS etc.,  Worked as EPTW systemcoordinator, Quality report submitting, TQ raising, Method statement preparation, risk assessment,Submittal preparation, Controlling and supervising a team of technicians and workers were also the part of team work.  Prepared Inspection & Test Plans, Quality procedures in accordance to client requirements & Specifications.  Building Management System tender quoting.  BMS and BAS design, implementation and project hand over.  Ensured that all telecom and instrumentation works comply with project specifications, company procedures, applicable standards, method statement & Quality Assurance & Control documents etc.,  Coordinated with the client representative and inspector(s) for anticipation of possible non-conformances and Discrepancies and discussed bothpreventive and corrective actions.Generated reports of conditions found during inspection activities & notifying management of significant problems
  • 5. Head Quarters National Bank Of Oman (HQ-NBO) AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S. Sr.BMS Engineer. Page 5 of 6 Aug., 2006 - Jan., 2008 Galfar, UAE Instrument Supervisor Responsibilities:  Construction work for wash water header replacement& produced water re-injection pilot project  Installation & Commissioning of PLC Blend control system, FCV, PT, FT, Chartless recorder, SCADA Modification  Supervised the installation, construction, calibration and pre-commissioning activities of field Instrument’s like flow transmitters, pressure transmitters, level transmitters, temperature transmitters, switches, pressure gauges, temperature gauges, level gauge, RTD, thermocouple, Junction boxes, cable installation, cable termination, meggering, cable tray installation, Instrument Tubing etc.,  Monitor incoming materials, conduct material evaluation based on purchase order and standards.  Assisted the QC personnel in installation inspection activities and preparation of reports.  Assisted in preparation of as-built drawings and its approval.  Managed manpower handling and distribution works as per site requirement. Oct., 2003 – Oct., 2005 M/s. Al-Fulaij United Group Company, Kuwait Instrument Supervisor Responsibilities:  Servicing and maintenance of Fire Alarm System (Conventional and Addressable type), GENT34000, GENT 3260, GENT 3270, THORN, Simplex, Gate Barriers, Access Control System, Card Readers, Bowling machine maintenance, swimming pool systemmaintenance (ozone generator analyzers etc:- ).  Installation / programming / implementation for all type of Fire Alarm System, Gate Barrier and access control system& building maintenance system.  Supervision over calibration of instruments, cabinets installation and checking.  Co-ordinating with other disciplines/contractors for effective progress of work  Carried out all instrumentation activities strictly in accordance to the KOC PTW and HSE requirements. Dec., 2002 – Sep., 2003 Somson Power Corporation, India Service Engineer Responsibilities:  Handled servicing and maintenance of solar power products.  Interacted with customers and solved the technical problems related to our products.  Assisted in procurement, storage, record keeping, delivery etc., for the items. Dec., 2000 – Dec., 2002 ARM Limited, India Engineer In-charge Responsibilities:  Supervision of billing for the works executed  Manage Fibre optic cabling works  Handled splicing of cables, termination etc.,.  Monitored the works progress and informed the management for timely invoicing. Mar., 1994 – Mar., 1998 Saudi Iron & Steel Company, KSA Instrument Technician Responsibilities:  Design, installation and implementation of Honeywell TDC 3000 (AP transmitters, DP Transmitters, Flow meters are replaced with smart transmitters).  Modification of TDC 2000 control panels through universal station on TDC 3000(Control desk, mimic panels, indicators etc: -).  Designing / commissioning / implementation of weighing systemthrough SCADA.  Programming and maintenance of PLC Siemens 150S, 155U, 150K etc.,
  • 6. Head Quarters National Bank Of Oman (HQ-NBO) AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S. Sr.BMS Engineer. Page 6 of 6  Trouble shooting,repairing and calibration of weighing systems, Scheck microcont weighing System and pfister weighing system(Digital & Analogue type). ISO Calibration adopted for all weighing systems. Sep., 1989 – Mar., 1994 Tata Iron & Steel Company, India Technician Plants Involved:  Waste Recycling Plant  LD2 & Slab Caster Plant Responsibilities:  Operation & maintenance of various equipments such as PLC (Siemens 110S,101U), V/F Converters, Femco communication system, metal detectors, Crane(magnetic & Grab etc:- )  Maintenance of plant control system,SCADA unit (TDC 3000 includes PM, LM, AM, HM, US, NIM, HG, UCN, LCN), ABB PLC’s (MP 100W, Mastergate,Moor32 control,pic, tic, ziq control, celox lab, qhmx 330, AC Drives (simovert P), DC Drives (Avtron advantage 32), EOT Cranes (225T, 25T, 50T Opotor Control).  Obtained training on various Electrical, Electronics & Instrumentation items pertaining to steel industry.  Performed installation, calibration, loop checking, trouble shooting etc., of various types of gauges,transmitters, switches, meters etc., in accordance with applicable procedures and standards  Assisted in various plant start-up activities Computer Literacy:  MS Office (MS-WORD, EXCEL, POWER POINT)  Windows OS XP/Vista/7/8/10 Trainings:  QMS Auditor/Lead Auditor Course ISO 9001:2008 IRCA Approved  IOSH  TDC 3000 Operation Maintenance and Implementation  HSE Induction  H2S Awareness & Escape  Initial Fire Response  Dealing with Hazards and Risk Languages Known:  English  Hindi  Malayalam