1. Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 1 of 6
Full name: Sreekumar Sivasankara Pillai
Date of birth: 22-08-1969 (46 years)
Total Experiences: 24years
Permanent Address: Noorattathu House, Pallarimangalam.P.O, Mavelikara, Alleppey, Kerala-690107.
Phone Number(India): 0091-8281797295(Mob), 0091-9495477404(Mob); 0091-4792401171(LandLine).
Current Position: Sr.BMS Engineer.
Current Project: Headquarters National Bank of Oman
Marital Status: Married. Spouse Santhini.S Children 2 (As on 2016 15 years and 9 years)
E-mail Address: sree22081969@yahoo.com; sree22081969@gmail.com; sree22081969@hotmail.com;
Driving license: Sultanate Of Oman, 87673919 PLACE OF ISSUE: IBRA, ISSUE DATE 30-11-2015,
EXPIRY DATE 30-11-2025,
UAE, 913865 PLACE OF ISSUE: ABUDHABI, ISSUE DATE:17-01-2010,
EXPIRY DATE 16-01-2020. Qatar license - expired
S/N Criteria Skill SetRequired Skill SetOffered Compliance Remarks
1 Qualification
B.Sc. Eng / BE / B.Tech /
HND in Electronics /
Instrumentation
Engineering
Diploma in Electronics
Engineering (3 Year
course)
Yes
2 Experience
4 years of inspection
experience in construction
industries out of which 2
years will be in oil and gas
‘23+’ years of total
experience in
instrumentation
construction,
maintenance, QA/QC
etc., works related to Oil
& Gas, steel. Power &
Petrochemical fields
Yes
3 General
Requirement
Interpersonal and
communication skill
Communicates well in
English few other Indian
languages
Yes
4 Specific
Requirement
Shall familiar with
instrument construction
material and construction
methods, testing of
instrumentation and
installations, international
code and standards.
Experienced in
installation of DCS
cabinets,Telecom panels
/ instruments, installation
of FFB Panels, Analogue
& Digital instruments,
FOC Panel works,
installation of
Miscellaneous Cabinets
& Consoles
Had good exposure on
various instrument
construction materials
and standards.
Capable to read / execute
PEFS / P&ID drawings,
location drawings, loop
testing,ILD & wiring
schedule and cabling
works
Yes
Company AL TURKI ENTERPRISES
2. Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 2 of 6
Nationality Indian
Age 46 years
Profession INSTRUMENTATION
Specialisation BUILDING MANAGEMENT SYSTEM
Year of Joining firm 2015
Passport No N9779166 Date of Issue 12/04/2016 Date of Expiry 11/04/2026
Place of issue Cochin
Qualifications:
Technical:
Diploma in Electronics Engineering (3 Year Course)
Others:
Quality Management System Auditor / Lead Auditor training course ISO 9001:2008, IRCA Course No;
A17833, Certificate Number : TVEQ0901135, Course Date 20’th July- 24’th July 2015
Successfully completed DCS training (TDC 3000 LCN/UCN Operation, maintenance and Implementation from
Tata Honeywell Automation Collage, India.
Completed management course for Institution of Occupational Safety and Health (IOSH) in association with
National Construction Collage.
ISO Awareness seminar certificate obtained from Saudi Iron & Steel Co., KSA.
Key Work Experience:
A professional Instrumentation Engineer with ‘24+’ years of total experience in different field of Instrumentation,
Telecom, Electrical, Electronics etc. Independently capable to carry out various types of operation / maintenance and
project works implementation for major continues process plant such as Iron & Steel factories, Oil companies, and
Communication Sectors.Worked in quality management, installation, maintenance, testing etc., areas for various projects
in the middle east region. Possess good knowledge of PDO standards, rules and regulations.
Exposure to Oil and Gas skills ( previous project)
The Amal steamproject is handled as one integrated project comprising of the Amal west and east fields with production
facilities, steam generation plant, water treatment plant etc:- .It is comprise of well testing , production gathering,
degassing, water treatment plant, steam generation plant, steam distribution, APO water gathering and relocation (off
plot), utilities, control and automation and electrical infrastructure upgrade. The new facility have been operated as a
single unit from the centralized control room at Amal steam plant and monitored from NRPS, Marmul CR and coastal
CCR via PDO LAN. This project have been installed a new integrated process automation system for the control,
safeguarding and monitoring of new facilities. Yokogawa FCS systemproviding single window operator interface to the
entire facility. The safeguarding function has been implemented (IPS) separate from the process control system(FCS).
The IPS has been interfaced with FCS to provide shutdown and safety status information to the operator.
Duties and responsibilities
Instrumentation engineer has been responsible for the whole installation of panels, systems,instruments and cables and
to ensure that adequate resources are available for completing the installation work successfully. He is respo nsible for
maintaining the day by day progress report and to co-ordinate with construction teamfor future activities.
Safety and quality are the main concern before and throughout executing any project. As a Quality inspector it is my
responsibility to make sure that all construction activities are carried out as per the specifications, procedures and
following the quality standards according to the client’s requirement. It is to ensure that Approved documents for
construction, approved inspection test plan (ITP) are available before starting any project, and approved manpower list
obtained. Material control is the next stage of activity to make sure that the supplied material are as per the requirement
of client’s specification ,material classification , data sheet and test certificate and stored properly for the designated area
3. Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 3 of 6
with well packed.NCR shall be raised if any non confirmation occurred. Obtain valid calibration certificates for testing
instruments and make sure that right tools and equipments are using according to the requirement. Follow the ITP and
Co-ordinate with site team to mitigate a flawless project delivery. Check list shall be prepared and signed off according
to the progress ofthe work and ITP. Punch list shall be prepared and co-ordinate with site team to rectify faults, handover
Final documents.
Items Familiar with:
Quality team works adoption and supervision of material control, approval of documents and inspection
personnel,installation ofcable laying works, installation ofJB, panels and frame, installation of plant instruments,
level instruments, flow instruments, ESD, MOV and control valves. Coordinate with site team for achieving
flawless project delivery. Quantity take off, submission of daily, weekly and monthly progress report. proper
manpower utilization. following safety and integrity standards,procedures and specification in accordance with
the client requirement. check list and punch list preparation and final handover documents.
AI, AVI, PA system, ACS, SCS,SMATV system, CCTV system and GRMS System - all ELV systemproject
implementation.
FCU, Chilled water system,AHU, FAHU, Car parking system,Exhaust fan, generator, card barriers, small power
system, VAV units, Stair pressurization system, lift pressurization system, heat exchangers, etc., with optimum
power utilization.
TDC 2000 i.e. control panel, mimic panels, recorders, field instruments (Absolute pressure Transmitters,
indicators, DP Transmitters, flow meters) are modified to working through TDC3000 universal stations.
Weighing system Pfister made panels replaced, designed and modified through DCS with more accuracy. ISO
Calibration adopted.
PLC time interrupted & alarm interrupted program implemented.
Fire alarm system, access control systems, magnetic doorsystems,card barrier systems,Building management
systems are installed and maintained in and around KOC offices.
Servicing and maintenance of Fire Alarm System (Conventional and Addressable type), GENT 34000, GENT
3260, GENT 3270, THORN, Simplex, Gate Barriers, Access Control System, Card Readers, Bowling machine
maintenance, swimming pool systemMaintenance (ozone generator analyzers etc.,)
Installation / programming / implementation for all type of Fire Alarm System, Gate Barrier and access control
system& building management system.
Allen Bradley Flexo logic PLC based water injection systeminstalled & commissioned under ADCO oil field.
It is included with excavation, cable lying; back filling, MDB modification, cable termination, FCV, PT, FT, pre-
commissioning and Commissioning according to the HSE & ADCO procedure manual.
Career Summary:
Aug., 2015 – Jan., 2016 Al Turki Enterprises L.L.C
Sr.BMS Engineer, Oman
Jun., 2014 – Jan., 2015 INTEGRATED ENGINEERS AND CONTRACTORS
PROJECT MANAGER E&I
Sep., 2011 – mar., 2013 Special Technical Services, Oman
QC Inspector – Instrumentation & Telecom
Jan., 2009 – Mar., 2011 Bond Communication, UAE
QA/QC Engineer / BMS Engineer
Aug., 2006 - Jan., 2008 Galfar, UAE
Instrument Supervisor
Oct., 2003 – Oct., 2005 M/s. Al-Fulaij United Group Company, Kuwait
Instrument Supervisor
Dec., 2002 – Sep., 2003 Somson Power Corporation, India
Service Engineer
Dec., 2000 – Dec., 2002 ARM Limited, India
Engineer In-charge
Mar., 1994 – Mar., 1998 Saudi Iron & Steel Company, KSA
Instrument Technician
Sep., 1989 – Mar., 1994 Tata Iron & Steel Company, India
Technician
Professional Experience:
4. Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 4 of 6
Aug., 2015 – Jan., 2016 Al Turki Enterprises L.L.C
Sr.BMS Engineer, Oman
Project Involved: Head Quarters National Bank of Oman
Responsibilities:
BMS Implementation
Jun., 2014 – Jan 2015 IEC, ITS Integrated groups of companies
Project Manager- E&I
Project Involved : GDS SCADA UPGRADATION PROJECT (GSUP) QATAR.
Responsibilities:
Implementation of project are as per the time frame and mitigating the client requirement .
Coordinating with the construction personnel for smooth flow of works.
Progress report, invoice clearance, monitoring all site activities, planning future schedule and reducing risk factors.
Coordinate with all site activities, man power allocation to various sites and procuring the materials according to the
requirement and as per the client specification .
To ensure that verification and inspection activities are carried our as per approved Quality Plan, procedures,
standards and project specifications.
Scheduling training program for the employees and ensure their ability to enhance.
Sep., 2011 – Mar.,2013 Special Technical Services, Oman
QC Inspector – Instrumentation & Telecom
Project Involved : On-Plot Construction Contract for Amal Steam Surface Facilities
Responsibilities:
To ensure that verification and inspection activities are carried our as per approved Quality Plan , procedures,
standards and project specifications.
Inspect Instrumentation & Telecom cable Trenches, duct bank, routing etc., prior to cable pulling.
Coordinating with the construction personnel for smooth flow of works.
Inspect various types of instrument installation and witnessing works for field & lab instrument calibration like for
valves, Instrument (flow, pressure, level, temperature), CCTV, level trolls, switches etc.,.
Carried out systemwise inspection works for successful mechanical completion and handover of the systems.
Prepare inspection reports,non-compliance reports,discrepancy reports and maintain these documents.Familiar with
Quality Plans, ITP’s, Method Statements and QCP’s.
Continually vigilant with respect to HSE impacts, unsafe acts and conditions on site.
Attending regular meetings with the client regarding the problems in the field
Jan., 2009 – Mar., 2011 Bond Communication, UAE
QA/QC Engineer / BMS Engineer
Responsibilities:
Quality assurance and quality control of ELV System implementation AI, AVI, PA system, SMATV, CCTV
System, ACS, SCS, GRMS etc.,
Worked as EPTW systemcoordinator, Quality report submitting, TQ raising, Method statement preparation, risk
assessment,Submittal preparation, Controlling and supervising a team of technicians and workers were also the
part of team work.
Prepared Inspection & Test Plans, Quality procedures in accordance to client requirements & Specifications.
Building Management System tender quoting.
BMS and BAS design, implementation and project hand over.
Ensured that all telecom and instrumentation works comply with project specifications, company procedures,
applicable standards, method statement & Quality Assurance & Control documents etc.,
Coordinated with the client representative and inspector(s) for anticipation of possible non-conformances and
Discrepancies and discussed bothpreventive and corrective actions.Generated reports of conditions found during
inspection activities & notifying management of significant problems
5. Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 5 of 6
Aug., 2006 - Jan., 2008 Galfar, UAE
Instrument Supervisor
Responsibilities:
Construction work for wash water header replacement& produced water re-injection pilot project
Installation & Commissioning of PLC Blend control system, FCV, PT, FT, Chartless recorder, SCADA
Modification
Supervised the installation, construction, calibration and pre-commissioning activities of field Instrument’s like
flow transmitters, pressure transmitters, level transmitters, temperature transmitters, switches, pressure gauges,
temperature gauges, level gauge, RTD, thermocouple, Junction boxes, cable installation, cable termination,
meggering, cable tray installation, Instrument Tubing etc.,
Monitor incoming materials, conduct material evaluation based on purchase order and standards.
Assisted the QC personnel in installation inspection activities and preparation of reports.
Assisted in preparation of as-built drawings and its approval.
Managed manpower handling and distribution works as per site requirement.
Oct., 2003 – Oct., 2005 M/s. Al-Fulaij United Group Company, Kuwait
Instrument Supervisor
Responsibilities:
Servicing and maintenance of Fire Alarm System (Conventional and Addressable type), GENT34000, GENT
3260, GENT 3270, THORN, Simplex, Gate Barriers, Access Control System, Card Readers, Bowling machine
maintenance, swimming pool systemmaintenance (ozone generator analyzers etc:- ).
Installation / programming / implementation for all type of Fire Alarm System, Gate Barrier and access control
system& building maintenance system.
Supervision over calibration of instruments, cabinets installation and checking.
Co-ordinating with other disciplines/contractors for effective progress of work
Carried out all instrumentation activities strictly in accordance to the KOC PTW and HSE requirements.
Dec., 2002 – Sep., 2003 Somson Power Corporation, India
Service Engineer
Responsibilities:
Handled servicing and maintenance of solar power products.
Interacted with customers and solved the technical problems related to our products.
Assisted in procurement, storage, record keeping, delivery etc., for the items.
Dec., 2000 – Dec., 2002 ARM Limited, India
Engineer In-charge
Responsibilities:
Supervision of billing for the works executed
Manage Fibre optic cabling works
Handled splicing of cables, termination etc.,.
Monitored the works progress and informed the management for timely invoicing.
Mar., 1994 – Mar., 1998 Saudi Iron & Steel Company, KSA
Instrument Technician
Responsibilities:
Design, installation and implementation of Honeywell TDC 3000 (AP transmitters, DP Transmitters, Flow meters
are replaced with smart transmitters).
Modification of TDC 2000 control panels through universal station on TDC 3000(Control desk, mimic panels,
indicators etc: -).
Designing / commissioning / implementation of weighing systemthrough SCADA.
Programming and maintenance of PLC Siemens 150S, 155U, 150K etc.,
6. Head Quarters National Bank Of Oman (HQ-NBO)
AL TURKI ENTERPRISES LLC/ AL-TASNIM Sreekumar S.
Sr.BMS Engineer.
Page 6 of 6
Trouble shooting,repairing and calibration of weighing systems, Scheck microcont weighing System and pfister
weighing system(Digital & Analogue type). ISO Calibration adopted for all weighing systems.
Sep., 1989 – Mar., 1994 Tata Iron & Steel Company, India
Technician
Plants Involved:
Waste Recycling Plant
LD2 & Slab Caster Plant
Responsibilities:
Operation & maintenance of various equipments such as PLC (Siemens 110S,101U), V/F Converters, Femco
communication system, metal detectors, Crane(magnetic & Grab etc:- )
Maintenance of plant control system,SCADA unit (TDC 3000 includes PM, LM, AM, HM, US, NIM, HG, UCN,
LCN), ABB PLC’s (MP 100W, Mastergate,Moor32 control,pic, tic, ziq control, celox lab, qhmx 330, AC Drives
(simovert P), DC Drives (Avtron advantage 32), EOT Cranes (225T, 25T, 50T Opotor Control).
Obtained training on various Electrical, Electronics & Instrumentation items pertaining to steel industry.
Performed installation, calibration, loop checking, trouble shooting etc., of various types of gauges,transmitters,
switches, meters etc., in accordance with applicable procedures and standards
Assisted in various plant start-up activities
Computer Literacy:
MS Office (MS-WORD, EXCEL, POWER POINT)
Windows OS XP/Vista/7/8/10
Trainings:
QMS Auditor/Lead Auditor Course ISO 9001:2008 IRCA Approved
IOSH
TDC 3000 Operation Maintenance and Implementation
HSE Induction
H2S Awareness & Escape
Initial Fire Response
Dealing with Hazards and Risk
Languages Known:
English
Hindi
Malayalam