SlideShare a Scribd company logo
1 of 3
Download to read offline
OLAKUNBI TOSIN GEORGE, PMP
Sex: Female 4, Peace Lane, Goodwill Estate, Berger, Lagos.
Marital Status: Married
Place of birth: Lagos 0803 063 1695 or 0802 386 0109
Nationality: Nigerian Email: kdarams2704@gmail.com
EDUCATIONAL QUALIFICATION
2015 - 2017 Masters in Oil and Gas Management (MBA)
Middlesex University, London, United Kingdom
2007 Computer Science, Post Graduate Diploma, Lagos State
Lagos State University, Lagos, Nigeria
2002 Electrical / Electronics Engineering, Higher National Diploma
Yaba College of Technology, Lagos, Nigeria
1999 Electrical / Electronics Engineering, Ordinary National Diploma
Yaba College of Technology, Lagos, Nigeria
PROFESSIONAL QUALIFICATION
2009 PMP (Project Management Professional) – PMP Number 986937
CAREER SUMMARY
Kunbi George is a go-getter who sees opportunities in every challenge, and seeks for ways to proffer solutions. She is a die-hard believer, first in
God, and in herself. She is self-motivated and always inspired. She knows the sky is her playing field and it will take her diligence, dedication, and
discipline to reach it. She is a qualified and skilled Project Engineer with over nine years’ experience in Oil & Gas Project Management. She is
well-focused with ability to achieve set goals. Her experience in management spans across bidding, interfacing, supervising, planning, monitoring,
leading, and team building. Works very well as a team member and equally independently; and loves to take on challenges.
SKILLS
 Customer Relationship Management
Management of customer service, interface to ensure transaction experiences become more effective and efficient; thereby developing and
enhancing good relationship with clients in order to maximize customer value and guaranteeing corporate profitability.
 Communication Management
Presentation of accurate information to team members and stakeholders.
 Project Management
Up-to-date on the project management methodology in ensuring that projects are delivered on schedule and, based on budget, while maintaining
the quality of service.
SOFTWARE
Proficient in the following software:
 Microsoft Project 2007, 2010 (MSP)
 Primavera (P3, P6)
 Microsoft Office 98, 2003, 2007, 2010 & XP (Excel Word, PowerPoint)
EXPERIENCE
Project Engineer at International Energy Services Limited (October 2011 till Date)
Location: 1661, Oyin Jolayemi Street, Victoria Island, Lagos
PROJECTS:
 WAPCo TAKORADI GHANA GAS INTERCONNECT - DETAILED ENGINEERING DESIGN, Aug - Dec 2015
The detailed design of gas supply interconnection of its Takoradi R&M (Regulating & Metering) Station with Ghana Gas to enable the supply of gas
from Ghana Gas facility at Takoradi to power plants located at Tema and its surroundings through WAPCo’s 20” offshore pipeline.
 AGBAMI STABILIZER THERMODYNAMIC BALANCING PROJECT – FEED, DETAILED ENGINEERING DESIGN, May – Sept 2015
The detailed design to achieve operational stability of stabilizer and downstream equipment by reducing Stabilizer column operating temperature
which will enhance topsides (crude oil cooler) product Specifications in terms of RVP.
 AGBAMI OPTIMIZATION OF TEST SEPARATOR PROJECT – PRE-FEED, FEED, DETAILED ENGINEERING DESIGN, Feb – Jun 2015
The engineering design to increase gas handling capacity at the HP separator to 283 MMSCFD corresponding to GOR of 2000 on maximum oil
case. Increase operational flexibility and potentially increase overall capacity by modifying process piping to allow crossover of oil between trains at
discharge of test separator.
 AGBAMI FPSO LIFEBOAT EXPANSION PROJECT - DETAILED ENGINEERING DESIGN, Oct – Jan 2014
Detailed engineering for the relocation of FRB (Fast Rescue Boat), installation of new free-fall lifeboat, and of additional life rafts.
 Gbaran Ubie Phase II Infill (SPDC) - DETAILED ENGINEERING DESIGN, Jul – Nov 2014
The Gbaran Infill Project is primarily aimed at sustaining gas supplies to NLNG and support future domestic gas markets from the Gbaran Node. In
order to meet this objective, the Gbaran Infill Project will construct facilities to develop additional reserves through nine (9) new NAG development
wells (one (1) in the Gbaran field, five (5) in the Koroama field and three (3) in Epu, in addition to one (1) appraisal well Koroama SPUU-1, and
completion/hook-up of the Koroama-002 well.
 CHEVRON DOMESTIC SUPPLY OBLIGATION (DSO) – MEREN 12-MAN ACCOMMODATION PROJECT - DETAILED
ENGINEERING DESIGN, Feb - Dec 2013
Design of a deck extension that supports a new 12-man accommodation caravan, to comply with regulatory and corporate OE requirements.
Architectural / Fire Classification Design of the 12-Man Living Quarter Caravan. Utilities Integration of the proposed accommodation module unto the
existing Meren Living quarters (electrical, potable water, sewage piping, and fire & gas).
 SAPELE GAS PLANT INTEGRITY UPGRADE PROJECT (SEPLAT) – FEED PHASE, Apr-Jul 2013
The FEED and Detailed engineering design is necessary for the upgrade of the gas plant, from the inlet manifold through the gas processing and
dehydrating module to the gas sales line.
Responsibilities:
 Scope clarification and progress control of project activities.
 Participate in project progress meetings.
 Prepare and issue Project management deliverables to client.
 Prepare project weekly/monthly reports.
 Monitor progress to ensure that any departure from the schedule is identified promptly.
 Co-ordinate and manage client reps, team members and all engineering activities to ensure adherence to scope and time
schedule for projects.
 Manage changes to tasks, work, or dates resulting from interaction with the Client.
 Ensure the correct flow of design deliverables for client’s review, monitor the performance of the engineering review process,
establish trends and advise on corrective action.
 Coordinate and provide input during contract bidding to generate the CTR (Cost Time Resource), and other technical
requirements. Collation and co-ordination of requests for technical information to client, follow up for responses and channel
responses appropriately when received.
 Attend design review meetings, workshops, and interface meetings.
 Ensure compliance with lndustry codes and specifications.
Project Engineer / Interface Coordinator for PNL (Ponticelli Nigeria Limited) at IESL (International Energy Services Limited)
PROJECT: OFON PHASE 2 EPCI5 Tie-Ins & Integration (TEPNL) – DETAILED ENGINEERING DESIGN, Nov 2011 - Dec 2012
The key objectives of the Ofon Phase 2 project were:
a) To stop gas flaring on Ofon
b) To deliver gas to Bonny LNG plant via Amenam facilities
c) To increase production from current 50,000 bopd to about 100,000 bopd
d) To improve operating conditions by installing living quarters on site, resizing water injection, installing water treatment capacity, and providing gas-lift
activation to existing and new wells
Responsibilities:
 Managed 5 Interface Groups including liaising between PONTICELLI internal organization, TOTAL E&P Nigeria and other EPCI Contractors
involved in the Project.
 Developed, updated and maintained the Interface Registers and the Interface Document Registers within Interface Groups. Prepared
interface data to be transmitted through Interface Data Sheets using eRoom.
 Reviewed interface data received through Interface Data Sheets from Interfacing Contractors and verifying all required information is
provided.
 Organised or participated in meetings with TOTAL and Interfacing Contractors to progress and resolve interface subjects. Prepared interface
weekly and monthly reports and statistics.
Project Engineer at Seaark International Ltd. July to September 2011
Location: 4B, Ayinde Akinmade Street, Lekki Phase 1, Lagos 
Responsibilities:
Prepare bid documents, Cost Benefit Analysis of proposed contracts, Planning, Monitoring and Controlling of contract execution, administrative duties in
the office, Report to the Managing Director, Liaise with clients, and bank representatives. 
OakInterlink Company Ltd. May 2010 – June 2011
Location: NDM Centre, Plot C12 Ikosi Road, Oregun, Lagos
Responsibilities:
Project management facilitator
Operations Manager at Opel Cleaning Services September to December 2009
Location: 270, Ikorodu Road, Lagos
Responsibilities:
Planning and coordinating the activities of the operations team, Monitoring and supervising the various team leads, Reporting directly to the Chief
Operating Officer and the General Manager, Meeting with clients to ensure prompt service and compliance with contract terms, Weekly attendance of
management meetings to give progress reports.
Achievements
Effective client relationship management.
Effectively leading and managing about five hundred employees of the company.
Project Engineer at Euroflow Designs Limited January 2008 to September 2009
Location: 1601, Adeola Hopewell Street, Lagos
PROJECTS:
OLERO CREEK WATER INJECTION PROJECT (CNL) – DETAILED ENGINEERING DESIGN, Jan - Mar 08
FUNIWA AND NORTH APOI GASLIFT PROJECT (CNL) – DETAILED ENGINEERING DESIGN, Apr-Aug 2008
Responsibilities:
Worked with the Senior Project Controls Engineer, Participated in project progress meetings, Prepared project weekly reports, Created Work
Breakdown Structure WBS with team leads.
Instrumentation Engineer at Euroflow Designs Limited February 2007 to January 2008
Location: 1601, Adeola Hopewell Street, Lagos
PROJECTS:
FUNIWA AND NORTH APOI PRODUCTION PLATFORM REVAMP PROJECT (CNL) – Apr 2007 - Aug 2007
ESCRAVOS PORTABLE WATER TREATMENT PROJECT (CNL) – DETAILED ENGINEERING DESIGN, Aug 2007 - Jan 2008
Responsibilities:
Prepared and generated discipline deliverables: Instrument Index, Material Take Off, Loop Diagrams, Document Index, Data Sheets, etc.
Maintenance / Planning Engineer (NYSC) at Nigerian Telecommunication Ltd February 2004 to February 2005
Location: Adelabu Street, Umuahia, Abia
Maintenance Engineer (Industrial Training) at Data Sciences Nigeria Ltd April – November 2000
Location: 235, Ikorodu Road, Lagos
Trainee Engineer at 7-Up Bottling Company Ltd September 1999 to December 1999
Location: Billing Way, Oregun, Lagos
PROFESSIONAL MEMBERSHIP
Project Management Institute (PMI) – member – PMI Number 1277969
Project Management Institute Lagos, Nigeria (PMILN) – Ex-executive member, Vice President Membership
REFERENCES
Available on request

More Related Content

What's hot (20)

Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 
Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16Venkat updated resume Latest 11-01-16
Venkat updated resume Latest 11-01-16
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
Mvcv v10
Mvcv v10Mvcv v10
Mvcv v10
 
latest sammy 2
latest sammy 2latest sammy 2
latest sammy 2
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
RESUME_080615_FLUOR
RESUME_080615_FLUORRESUME_080615_FLUOR
RESUME_080615_FLUOR
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Gangopadhaya Shekhar CV
Gangopadhaya Shekhar CVGangopadhaya Shekhar CV
Gangopadhaya Shekhar CV
 
GOPINATH DEVANI
GOPINATH DEVANIGOPINATH DEVANI
GOPINATH DEVANI
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
GregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeaderGregPhilpott__CV_ProcLeader
GregPhilpott__CV_ProcLeader
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 

Viewers also liked (20)

Peter Aaldring CV
Peter Aaldring CVPeter Aaldring CV
Peter Aaldring CV
 
Curriculum Vitae edson 2016
Curriculum Vitae edson 2016Curriculum Vitae edson 2016
Curriculum Vitae edson 2016
 
Paul Hickey CV.
Paul Hickey CV.Paul Hickey CV.
Paul Hickey CV.
 
CURRICULUM VITAE - E
CURRICULUM VITAE - ECURRICULUM VITAE - E
CURRICULUM VITAE - E
 
CV
CV CV
CV
 
Anibal_Carias_CV(1)
Anibal_Carias_CV(1)Anibal_Carias_CV(1)
Anibal_Carias_CV(1)
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CV
 
CV Antonie - 21 Jan 2016
CV Antonie - 21 Jan 2016CV Antonie - 21 Jan 2016
CV Antonie - 21 Jan 2016
 
ori PAUSON CV ING ed.
ori PAUSON CV ING ed.ori PAUSON CV ING ed.
ori PAUSON CV ING ed.
 
Cv RM Final
Cv RM FinalCv RM Final
Cv RM Final
 
1 S. Munisamy Latest CV
1 S. Munisamy Latest CV1 S. Munisamy Latest CV
1 S. Munisamy Latest CV
 
Arnold CV
Arnold CVArnold CV
Arnold CV
 
Ibrahim Mazhar CV
Ibrahim Mazhar CVIbrahim Mazhar CV
Ibrahim Mazhar CV
 
CV Mr Michael Marley-Savage
CV Mr Michael Marley-SavageCV Mr Michael Marley-Savage
CV Mr Michael Marley-Savage
 
Summarized CV J Nagel (AME) 2016
Summarized CV J Nagel (AME) 2016Summarized CV J Nagel (AME) 2016
Summarized CV J Nagel (AME) 2016
 
BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1
 
Kirchner, Adam L - CV - Dec 2014
Kirchner, Adam L - CV - Dec 2014Kirchner, Adam L - CV - Dec 2014
Kirchner, Adam L - CV - Dec 2014
 
Isaac Williams CV
Isaac Williams CVIsaac Williams CV
Isaac Williams CV
 
Igor.S.Carvalho_CV
Igor.S.Carvalho_CVIgor.S.Carvalho_CV
Igor.S.Carvalho_CV
 
DOUGLAS EFFAH BANFUL-CV
DOUGLAS EFFAH BANFUL-CVDOUGLAS EFFAH BANFUL-CV
DOUGLAS EFFAH BANFUL-CV
 

Similar to CV (20)

CeeVee-10th January 2017_update
CeeVee-10th January 2017_updateCeeVee-10th January 2017_update
CeeVee-10th January 2017_update
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
John Okusolubo Resume 2015
John Okusolubo Resume 2015John Okusolubo Resume 2015
John Okusolubo Resume 2015
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
Resume_P Prakosa 201605
Resume_P Prakosa 201605Resume_P Prakosa 201605
Resume_P Prakosa 201605
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Ukeje CV
Ukeje CVUkeje CV
Ukeje CV
 
Geraldine_Goh-CV
Geraldine_Goh-CVGeraldine_Goh-CV
Geraldine_Goh-CV
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Akin Akinsipe CV.doc
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_update
 

CV

  • 1. OLAKUNBI TOSIN GEORGE, PMP Sex: Female 4, Peace Lane, Goodwill Estate, Berger, Lagos. Marital Status: Married Place of birth: Lagos 0803 063 1695 or 0802 386 0109 Nationality: Nigerian Email: kdarams2704@gmail.com EDUCATIONAL QUALIFICATION 2015 - 2017 Masters in Oil and Gas Management (MBA) Middlesex University, London, United Kingdom 2007 Computer Science, Post Graduate Diploma, Lagos State Lagos State University, Lagos, Nigeria 2002 Electrical / Electronics Engineering, Higher National Diploma Yaba College of Technology, Lagos, Nigeria 1999 Electrical / Electronics Engineering, Ordinary National Diploma Yaba College of Technology, Lagos, Nigeria PROFESSIONAL QUALIFICATION 2009 PMP (Project Management Professional) – PMP Number 986937 CAREER SUMMARY Kunbi George is a go-getter who sees opportunities in every challenge, and seeks for ways to proffer solutions. She is a die-hard believer, first in God, and in herself. She is self-motivated and always inspired. She knows the sky is her playing field and it will take her diligence, dedication, and discipline to reach it. She is a qualified and skilled Project Engineer with over nine years’ experience in Oil & Gas Project Management. She is well-focused with ability to achieve set goals. Her experience in management spans across bidding, interfacing, supervising, planning, monitoring, leading, and team building. Works very well as a team member and equally independently; and loves to take on challenges. SKILLS  Customer Relationship Management Management of customer service, interface to ensure transaction experiences become more effective and efficient; thereby developing and enhancing good relationship with clients in order to maximize customer value and guaranteeing corporate profitability.  Communication Management Presentation of accurate information to team members and stakeholders.  Project Management Up-to-date on the project management methodology in ensuring that projects are delivered on schedule and, based on budget, while maintaining the quality of service. SOFTWARE Proficient in the following software:  Microsoft Project 2007, 2010 (MSP)  Primavera (P3, P6)  Microsoft Office 98, 2003, 2007, 2010 & XP (Excel Word, PowerPoint) EXPERIENCE Project Engineer at International Energy Services Limited (October 2011 till Date) Location: 1661, Oyin Jolayemi Street, Victoria Island, Lagos PROJECTS:  WAPCo TAKORADI GHANA GAS INTERCONNECT - DETAILED ENGINEERING DESIGN, Aug - Dec 2015 The detailed design of gas supply interconnection of its Takoradi R&M (Regulating & Metering) Station with Ghana Gas to enable the supply of gas from Ghana Gas facility at Takoradi to power plants located at Tema and its surroundings through WAPCo’s 20” offshore pipeline.  AGBAMI STABILIZER THERMODYNAMIC BALANCING PROJECT – FEED, DETAILED ENGINEERING DESIGN, May – Sept 2015 The detailed design to achieve operational stability of stabilizer and downstream equipment by reducing Stabilizer column operating temperature which will enhance topsides (crude oil cooler) product Specifications in terms of RVP.  AGBAMI OPTIMIZATION OF TEST SEPARATOR PROJECT – PRE-FEED, FEED, DETAILED ENGINEERING DESIGN, Feb – Jun 2015 The engineering design to increase gas handling capacity at the HP separator to 283 MMSCFD corresponding to GOR of 2000 on maximum oil
  • 2. case. Increase operational flexibility and potentially increase overall capacity by modifying process piping to allow crossover of oil between trains at discharge of test separator.  AGBAMI FPSO LIFEBOAT EXPANSION PROJECT - DETAILED ENGINEERING DESIGN, Oct – Jan 2014 Detailed engineering for the relocation of FRB (Fast Rescue Boat), installation of new free-fall lifeboat, and of additional life rafts.  Gbaran Ubie Phase II Infill (SPDC) - DETAILED ENGINEERING DESIGN, Jul – Nov 2014 The Gbaran Infill Project is primarily aimed at sustaining gas supplies to NLNG and support future domestic gas markets from the Gbaran Node. In order to meet this objective, the Gbaran Infill Project will construct facilities to develop additional reserves through nine (9) new NAG development wells (one (1) in the Gbaran field, five (5) in the Koroama field and three (3) in Epu, in addition to one (1) appraisal well Koroama SPUU-1, and completion/hook-up of the Koroama-002 well.  CHEVRON DOMESTIC SUPPLY OBLIGATION (DSO) – MEREN 12-MAN ACCOMMODATION PROJECT - DETAILED ENGINEERING DESIGN, Feb - Dec 2013 Design of a deck extension that supports a new 12-man accommodation caravan, to comply with regulatory and corporate OE requirements. Architectural / Fire Classification Design of the 12-Man Living Quarter Caravan. Utilities Integration of the proposed accommodation module unto the existing Meren Living quarters (electrical, potable water, sewage piping, and fire & gas).  SAPELE GAS PLANT INTEGRITY UPGRADE PROJECT (SEPLAT) – FEED PHASE, Apr-Jul 2013 The FEED and Detailed engineering design is necessary for the upgrade of the gas plant, from the inlet manifold through the gas processing and dehydrating module to the gas sales line. Responsibilities:  Scope clarification and progress control of project activities.  Participate in project progress meetings.  Prepare and issue Project management deliverables to client.  Prepare project weekly/monthly reports.  Monitor progress to ensure that any departure from the schedule is identified promptly.  Co-ordinate and manage client reps, team members and all engineering activities to ensure adherence to scope and time schedule for projects.  Manage changes to tasks, work, or dates resulting from interaction with the Client.  Ensure the correct flow of design deliverables for client’s review, monitor the performance of the engineering review process, establish trends and advise on corrective action.  Coordinate and provide input during contract bidding to generate the CTR (Cost Time Resource), and other technical requirements. Collation and co-ordination of requests for technical information to client, follow up for responses and channel responses appropriately when received.  Attend design review meetings, workshops, and interface meetings.  Ensure compliance with lndustry codes and specifications. Project Engineer / Interface Coordinator for PNL (Ponticelli Nigeria Limited) at IESL (International Energy Services Limited) PROJECT: OFON PHASE 2 EPCI5 Tie-Ins & Integration (TEPNL) – DETAILED ENGINEERING DESIGN, Nov 2011 - Dec 2012 The key objectives of the Ofon Phase 2 project were: a) To stop gas flaring on Ofon b) To deliver gas to Bonny LNG plant via Amenam facilities c) To increase production from current 50,000 bopd to about 100,000 bopd d) To improve operating conditions by installing living quarters on site, resizing water injection, installing water treatment capacity, and providing gas-lift activation to existing and new wells Responsibilities:  Managed 5 Interface Groups including liaising between PONTICELLI internal organization, TOTAL E&P Nigeria and other EPCI Contractors involved in the Project.  Developed, updated and maintained the Interface Registers and the Interface Document Registers within Interface Groups. Prepared interface data to be transmitted through Interface Data Sheets using eRoom.  Reviewed interface data received through Interface Data Sheets from Interfacing Contractors and verifying all required information is provided.  Organised or participated in meetings with TOTAL and Interfacing Contractors to progress and resolve interface subjects. Prepared interface weekly and monthly reports and statistics. Project Engineer at Seaark International Ltd. July to September 2011 Location: 4B, Ayinde Akinmade Street, Lekki Phase 1, Lagos  Responsibilities: Prepare bid documents, Cost Benefit Analysis of proposed contracts, Planning, Monitoring and Controlling of contract execution, administrative duties in the office, Report to the Managing Director, Liaise with clients, and bank representatives. 
  • 3. OakInterlink Company Ltd. May 2010 – June 2011 Location: NDM Centre, Plot C12 Ikosi Road, Oregun, Lagos Responsibilities: Project management facilitator Operations Manager at Opel Cleaning Services September to December 2009 Location: 270, Ikorodu Road, Lagos Responsibilities: Planning and coordinating the activities of the operations team, Monitoring and supervising the various team leads, Reporting directly to the Chief Operating Officer and the General Manager, Meeting with clients to ensure prompt service and compliance with contract terms, Weekly attendance of management meetings to give progress reports. Achievements Effective client relationship management. Effectively leading and managing about five hundred employees of the company. Project Engineer at Euroflow Designs Limited January 2008 to September 2009 Location: 1601, Adeola Hopewell Street, Lagos PROJECTS: OLERO CREEK WATER INJECTION PROJECT (CNL) – DETAILED ENGINEERING DESIGN, Jan - Mar 08 FUNIWA AND NORTH APOI GASLIFT PROJECT (CNL) – DETAILED ENGINEERING DESIGN, Apr-Aug 2008 Responsibilities: Worked with the Senior Project Controls Engineer, Participated in project progress meetings, Prepared project weekly reports, Created Work Breakdown Structure WBS with team leads. Instrumentation Engineer at Euroflow Designs Limited February 2007 to January 2008 Location: 1601, Adeola Hopewell Street, Lagos PROJECTS: FUNIWA AND NORTH APOI PRODUCTION PLATFORM REVAMP PROJECT (CNL) – Apr 2007 - Aug 2007 ESCRAVOS PORTABLE WATER TREATMENT PROJECT (CNL) – DETAILED ENGINEERING DESIGN, Aug 2007 - Jan 2008 Responsibilities: Prepared and generated discipline deliverables: Instrument Index, Material Take Off, Loop Diagrams, Document Index, Data Sheets, etc. Maintenance / Planning Engineer (NYSC) at Nigerian Telecommunication Ltd February 2004 to February 2005 Location: Adelabu Street, Umuahia, Abia Maintenance Engineer (Industrial Training) at Data Sciences Nigeria Ltd April – November 2000 Location: 235, Ikorodu Road, Lagos Trainee Engineer at 7-Up Bottling Company Ltd September 1999 to December 1999 Location: Billing Way, Oregun, Lagos PROFESSIONAL MEMBERSHIP Project Management Institute (PMI) – member – PMI Number 1277969 Project Management Institute Lagos, Nigeria (PMILN) – Ex-executive member, Vice President Membership REFERENCES Available on request