SlideShare a Scribd company logo
1 of 7
Curriculum Vitae
FILEMON G. LIM
noylim_kiosk@yahoo.com
Civil Engineer
Doha,QATAR
Mobile # +97433855186
To be a member of a well-established company that will provide opportunities for career
advancement and to perform challenging roles in the construction business.
Personal Details
Date of Birth : June 19th
, 1968
Nationality : Filipino
Languages Known : English, Filipino
Self- Appraisal
Efficient and diplomatic with excellent inter-personal skills, adaptable and self motivated, has the
ability to work individually and handle work smoothly and confidently even when under pressure,
a good team player, can get along with all my co-workers convincingly enthusiastic and a quick
learner.
Objective
To able to practice my profession with the company of known track record in the field of my work,
and also to share my expertise and as well as to gain more experience and be more productive,
effective and efficient in performing duty.
Educational Qualifications
Universidad de Zamboanga – Bachelor of Science in Civil Engineering Philippines,
October 1993
WORK EXPERIENCE:
CURRENT EMPLOYMENT PROFILE:
Organization : Doha Petroleum- Doha ,Qatar
Period : Feb 2013 up May 2014
Designation : Civil Engineer
Project
 EPIC for Injection of KHUFF GAS to ARAB-D Cap Using NFIS-Phase 1(Qatar petroleum)-
Dukhan , QATAR
• Installation of 1.4 kilometer 16 inch Pipe line (Manifold Manhl - NFIS Station)
• Construction of 4 stations Plot 7A,NFIS ,WHTP 6LL H&L & 71-HIPPS.
 EPIC for Automation Upgrade at FS, FN, FSPO at NPIS(Qatar Petroleum)-,Dukhan
,QATAR
• Construction of Blast Proof Control Building
• Construction of Blast Proof Guard House
• Construction of DG Building.
Work Description
 Overall in charge for Civil Discipline.
 Feasible study of all the drawings related.
 Preparing All necessary document for approval such as method statement, material
approval, technical query & etc..
 Coordinate with other discipline & supervised civil construction activities to ensure that all
works shall be as Client codes & Standards, practices and specifications.
 Liaise with the client QP on day to day matters related to the project and report the same
to Project Manager.
 Monitoring all necessary permit and approvals.
 Assess Manpower, equipment required to achieve target.
 Coordinate with sub-contractor and ensure execution of work as per planned schedule.
 Take action to deal with the results of delay, bad weather at construction site.
 Ensure safety and environment protection is implemented throughout project schedule.
 Preparing As-built Drawing.
 Dealing with punch list item for closure.
PREVIOUS EMPLOYMENT HISTORY:
Organization : Merit International L.L.C.- United Arab Emirates, Dubai.
Period : April 2011 up January 2013
Designation : Civil Engineer
Project
 Halul Centralized Industrial Area Shoreline Protection(Qatar Petroleum)-Halul
Island,QATAR
• Shoring Sheet pile protection for Blasting/Painting Booth Foundation.
• Earthworks(Excavation and 4500cu m Gravel backfilling) for Shoreline Area
• 250 m length/7m height/24m width Revetment Rock Armored Work.
 Maintenance Dredging of KJO Channel & Rock Protection Saudi Khafji Port(ARAMCO)-
KSA
• Dredging Work
• 300 m revetment Rock Armored Work
 UAQ Fishing Harbour/AL Manzel Eng’g & Consultancy(UAE Municipality)-Umm Al Quwain
,UAE
• 750m Breakwater Rock Armored work
• 200m Revetment Rock Armored work
• 4500 sq m Interlocking masonry work
• 80m Retaining wall
• Construction of Slipway
• Dredging Work
 HQ Shore Protection & Stabilization Project, (Abu Dhabi Defense), UAE
• Reclaimed Area of 80,000 Cu. M of Gravel Fill Materials.
• 650 m of Revetment armor Work.
 The Ritz-Carlton Grand Canal –OTAK Consultancy/HLG Eng’g-Abu Dhabi,UAE
• Beach Nourishment
• Revetment and Breakwater Rock Armored work
• Jetty Installation works
• Sheet Piling works
Work Description
 Supervised and coordinated civil construction activities to ensure that all works
shall be as per Client codes, practices and specifications.
 Verify and review construction drawings, procedures and specifications prior to
commence.
 Managing the site on a day to day basis that includes monitoring the labor work force.
 Preparing Site work Setting-out, survey for the slope and formation level with the
Surveyor.
 Resolving unexpected technical problems that may arise on site.
 Coordinating with the Consultant and Qa/Qc Engineer for proper implementation.
 Responsible for the implementation of quality control procedures and plans for providing
the more efficient onsite construction work.
 Preparing method statement.
 Preparing All Request form such as IRF,MAR,MIR.and etc..
 Ensuring that all the materials used are according to the Plan and Specifications.
 Expedite a day-to-day work scheduling, planning and control.
Organization : Island Diamond Building Contracting L.L.C.United Arab
Emirates,Dubai
Period : April 2009 up January 2011
Designation : Company Resident Civil Engineer
Project
 4-Villas G+1---- Al-Barsha south 2nd
 1-villa G+1-----Al-Barsha south 1st
 2-Villas G+1-----Al Quoz land 2nd
 1-Villa G--------Al Barsha 2nd
 1-Villa G--------Al Warqua
 1-Villa G+1----Al Barsha 2nd
 1-Villa G-------Al Manara
Work Description
 Checking plans, drawings and quantities for accuracy of calculations
 Preparing Site files prior to Excavation and Layout.
 Conduct layout or setting out survey.
 Prepare daily work schedule.
 Day-to-day management of the site, including monitoring the site labor force and the work
of any subcontractors where necessary.
 Ensuring materials and workmanship in accordance with plans and specification
 Ensure site safety and correct any site activity prone to penalties and violation.
 Prepare daily and weekly progress report.
 Coordinating with consultant Engineer regarding changes in plans (structural/architectural)
or any actual situation arising on site.
 Resolving any unexpected technical difficulties, and other problems that may arise.
 Coordinating with DM Engineer regarding site instruction...
 Assist on DM Engineer during final inspection.
Organization : Emirates Link Maltauro L.L.C., United Arab Emirates, Abu Dhabi
Period : Dec 2008 – February 2009
Designation : Site Civil Engineer/QA/QC
Project
 Al-Rheem Tower –Abu dhabi,UAE
Work Description
 Ensuring that the Site engineers understand the requirement of the method statement /
Quality plan.
 Preparing and issuing the internal site instruction and non- conformance report to the Site
Engineers and subcontractors and ensuring that the corrective and preventive actions are
taken.
 Coordination of inspection and test results / records and certificate of acceptance tests.
Ensure that only approve materials are being used.
 Maintain quality records specified by relevant inspection test plan and contract documents
and ensuring all original copies of records are handed over to document and data
controller.
Organization : FH Gopiteo Construction & Supply, Philippines
Period : March 2000 – October 2008
Designation : Project Engineer
Project
 Construction of Bungalow Type Residential House(G)
 Construction of Provincial Hospital ( Annex Building )(G+3)
 Construction of commercial building(G+5)
 Construction of Notre Dame school library Building(G+2)
 Repair and installation of 2 km. box culvert and lined canal.
Work Description
 Field Supervision of construction work
 Prepare project cost estimate
 Carrying out construction activities
 Implementing job site material management
 Supervision of field adjustment orders
 Monitoring construction progress including subcontractor activities
 Prepares weekly and monthly progress report
 Certify progresses needed for the quality requirement are established
 Examined and approves testing of new raw materials samples and mock up
 Coordinating with site construction team for taking corrective actions
 Follow up client with the coordination with the site construction team
 Conduct all quality control procedures test and confirmed statistical analysis results
Organization : Alcatel Philippines Incorporation, Phiippines
Period : December 1998 – November 2000
Designation : Site Inspector/Primary and Secondary
Projects
 Cotobato – PLDT X6 – ZB project
 Bacolod – PLDT X6 – ZB project
 PLDT ZB – Paco Project Davao
 Telicphil ZB – Paco Project
Work Description for Primary Network
 Conduct actual verification manhole for existing conduit & sub - conduit configuration &
cable location on conduit
 Measuring actual distances as per manhole span
 Up – dating forms & primary plans base on verified data for future references
 Checking cable length base on actual data for the specific location of specific on manhole
 Supervision on daily work activity
 Preparing certification on materials installed for submission of confirmation with the
installation
 Monitoring acceptance test activity
Work Description for Secondary Network
 Conduct staking together with the client representative prior upon implementation of the
project
 Securing right of way permit & coordinating with the lot owner regarding the exact location
of poles to be erected.
 Supervision on aerial activity as on follows:
a) Aerial Hardware
b) Messenger wires
c) Aerial Cables ( copper or fiber optic )
d) Aerial splicing
e) Testing & commissioning
Organization : Jaz Cola Bottling Corporation, Philippines
Period : December 1998 – November 2000
Designation : Project Engineer
Projects
 Construction of RC Cola department office(G+4)
 Construction of Motor pool warehouse (G)
 Construction of Advertising department office (G+2)
Work Description
 Project supervision
 Prepare project cost estimate
 Prepare and monitor daily work schedule
 Prepare weekly and monthly progress report
 Conduct all quality control test
 Monitoring and implementing all safety procedures
Training and Seminars Attended
Computer Aided Design Alcatel Personal Software
“CIRCEE” for Primary and Secondary Network Design
Telecphil Standards Hardware & Aerial Distribution
Self – supported (ADSS) fiber optic
Cable Installation
H2S & BA Hydrogen-sulfide & Breathing Apparatus
HUET Helicopter Underwater Escape Training
Workshop Seminar on Material Testing
University of Mindanao Program December 2003
Workshop Seminar on Material Testing
Central Philippine University January 2003
Seminar on Design and Construction of Precast
Skills_________________________________________________________________________
_
• Strong client/customer oriented.
• Proven analytical & problem resolving abilities.
• Ability to present ideas & solutions in user-friendly language.
• Team oriented.
Other skills
• Compute /Internet Literate including System/Application software troubleshoot/
MS Word / Excel
Membership
• Society of Engineers-UAE

More Related Content

What's hot (20)

CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)CV-R.B.Guinir Jr.(01-15-17)
CV-R.B.Guinir Jr.(01-15-17)
 
Cris' Updated resume
Cris' Updated resumeCris' Updated resume
Cris' Updated resume
 
cv-sammy
cv-sammycv-sammy
cv-sammy
 
GERRY PANTIG MANICLANG
GERRY PANTIG MANICLANGGERRY PANTIG MANICLANG
GERRY PANTIG MANICLANG
 
Jozwel cv
Jozwel cvJozwel cv
Jozwel cv
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
 
Omar Al Nadi CV عمر
Omar Al Nadi CV عمرOmar Al Nadi CV عمر
Omar Al Nadi CV عمر
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Gerry_Garciano_resume
Gerry_Garciano_resumeGerry_Garciano_resume
Gerry_Garciano_resume
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
Ernie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - UpdatedErnie Engr. Supervisor or Commissioning Engr. - Updated
Ernie Engr. Supervisor or Commissioning Engr. - Updated
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Resume
ResumeResume
Resume
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Clifton SC - CV 2017
Clifton SC - CV 2017Clifton SC - CV 2017
Clifton SC - CV 2017
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 

Similar to Curriculum Vitae lim

CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IIdanilo acosta
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docShahbazAhmad953994
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)ahmed sirajuddin
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)ahmed sirajuddin
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -Earlvic Torcino
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Sami resume new
Sami resume newSami resume new
Sami resume newsamiuae
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Naveed Gohar
 

Similar to Curriculum Vitae lim (20)

CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer II
 
resume with daewoo
resume with daewooresume with daewoo
resume with daewoo
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)
 
Civil finishing engineer(2)
Civil finishing engineer(2)Civil finishing engineer(2)
Civil finishing engineer(2)
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Resume
ResumeResume
Resume
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
CV of Raffy Feliciano
CV of Raffy FelicianoCV of Raffy Feliciano
CV of Raffy Feliciano
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 

Curriculum Vitae lim

  • 1. Curriculum Vitae FILEMON G. LIM noylim_kiosk@yahoo.com Civil Engineer Doha,QATAR Mobile # +97433855186 To be a member of a well-established company that will provide opportunities for career advancement and to perform challenging roles in the construction business. Personal Details Date of Birth : June 19th , 1968 Nationality : Filipino Languages Known : English, Filipino Self- Appraisal Efficient and diplomatic with excellent inter-personal skills, adaptable and self motivated, has the ability to work individually and handle work smoothly and confidently even when under pressure, a good team player, can get along with all my co-workers convincingly enthusiastic and a quick learner. Objective To able to practice my profession with the company of known track record in the field of my work, and also to share my expertise and as well as to gain more experience and be more productive, effective and efficient in performing duty. Educational Qualifications Universidad de Zamboanga – Bachelor of Science in Civil Engineering Philippines, October 1993
  • 2. WORK EXPERIENCE: CURRENT EMPLOYMENT PROFILE: Organization : Doha Petroleum- Doha ,Qatar Period : Feb 2013 up May 2014 Designation : Civil Engineer Project  EPIC for Injection of KHUFF GAS to ARAB-D Cap Using NFIS-Phase 1(Qatar petroleum)- Dukhan , QATAR • Installation of 1.4 kilometer 16 inch Pipe line (Manifold Manhl - NFIS Station) • Construction of 4 stations Plot 7A,NFIS ,WHTP 6LL H&L & 71-HIPPS.  EPIC for Automation Upgrade at FS, FN, FSPO at NPIS(Qatar Petroleum)-,Dukhan ,QATAR • Construction of Blast Proof Control Building • Construction of Blast Proof Guard House • Construction of DG Building. Work Description  Overall in charge for Civil Discipline.  Feasible study of all the drawings related.  Preparing All necessary document for approval such as method statement, material approval, technical query & etc..  Coordinate with other discipline & supervised civil construction activities to ensure that all works shall be as Client codes & Standards, practices and specifications.  Liaise with the client QP on day to day matters related to the project and report the same to Project Manager.  Monitoring all necessary permit and approvals.  Assess Manpower, equipment required to achieve target.  Coordinate with sub-contractor and ensure execution of work as per planned schedule.  Take action to deal with the results of delay, bad weather at construction site.  Ensure safety and environment protection is implemented throughout project schedule.  Preparing As-built Drawing.  Dealing with punch list item for closure. PREVIOUS EMPLOYMENT HISTORY: Organization : Merit International L.L.C.- United Arab Emirates, Dubai. Period : April 2011 up January 2013 Designation : Civil Engineer Project  Halul Centralized Industrial Area Shoreline Protection(Qatar Petroleum)-Halul Island,QATAR • Shoring Sheet pile protection for Blasting/Painting Booth Foundation.
  • 3. • Earthworks(Excavation and 4500cu m Gravel backfilling) for Shoreline Area • 250 m length/7m height/24m width Revetment Rock Armored Work.  Maintenance Dredging of KJO Channel & Rock Protection Saudi Khafji Port(ARAMCO)- KSA • Dredging Work • 300 m revetment Rock Armored Work  UAQ Fishing Harbour/AL Manzel Eng’g & Consultancy(UAE Municipality)-Umm Al Quwain ,UAE • 750m Breakwater Rock Armored work • 200m Revetment Rock Armored work • 4500 sq m Interlocking masonry work • 80m Retaining wall • Construction of Slipway • Dredging Work  HQ Shore Protection & Stabilization Project, (Abu Dhabi Defense), UAE • Reclaimed Area of 80,000 Cu. M of Gravel Fill Materials. • 650 m of Revetment armor Work.  The Ritz-Carlton Grand Canal –OTAK Consultancy/HLG Eng’g-Abu Dhabi,UAE • Beach Nourishment • Revetment and Breakwater Rock Armored work • Jetty Installation works • Sheet Piling works Work Description  Supervised and coordinated civil construction activities to ensure that all works shall be as per Client codes, practices and specifications.  Verify and review construction drawings, procedures and specifications prior to commence.  Managing the site on a day to day basis that includes monitoring the labor work force.  Preparing Site work Setting-out, survey for the slope and formation level with the Surveyor.  Resolving unexpected technical problems that may arise on site.  Coordinating with the Consultant and Qa/Qc Engineer for proper implementation.  Responsible for the implementation of quality control procedures and plans for providing the more efficient onsite construction work.  Preparing method statement.  Preparing All Request form such as IRF,MAR,MIR.and etc..  Ensuring that all the materials used are according to the Plan and Specifications.  Expedite a day-to-day work scheduling, planning and control. Organization : Island Diamond Building Contracting L.L.C.United Arab Emirates,Dubai Period : April 2009 up January 2011 Designation : Company Resident Civil Engineer Project
  • 4.  4-Villas G+1---- Al-Barsha south 2nd  1-villa G+1-----Al-Barsha south 1st  2-Villas G+1-----Al Quoz land 2nd  1-Villa G--------Al Barsha 2nd  1-Villa G--------Al Warqua  1-Villa G+1----Al Barsha 2nd  1-Villa G-------Al Manara Work Description  Checking plans, drawings and quantities for accuracy of calculations  Preparing Site files prior to Excavation and Layout.  Conduct layout or setting out survey.  Prepare daily work schedule.  Day-to-day management of the site, including monitoring the site labor force and the work of any subcontractors where necessary.  Ensuring materials and workmanship in accordance with plans and specification  Ensure site safety and correct any site activity prone to penalties and violation.  Prepare daily and weekly progress report.  Coordinating with consultant Engineer regarding changes in plans (structural/architectural) or any actual situation arising on site.  Resolving any unexpected technical difficulties, and other problems that may arise.  Coordinating with DM Engineer regarding site instruction...  Assist on DM Engineer during final inspection. Organization : Emirates Link Maltauro L.L.C., United Arab Emirates, Abu Dhabi Period : Dec 2008 – February 2009 Designation : Site Civil Engineer/QA/QC Project  Al-Rheem Tower –Abu dhabi,UAE Work Description  Ensuring that the Site engineers understand the requirement of the method statement / Quality plan.  Preparing and issuing the internal site instruction and non- conformance report to the Site Engineers and subcontractors and ensuring that the corrective and preventive actions are taken.  Coordination of inspection and test results / records and certificate of acceptance tests. Ensure that only approve materials are being used.  Maintain quality records specified by relevant inspection test plan and contract documents and ensuring all original copies of records are handed over to document and data controller. Organization : FH Gopiteo Construction & Supply, Philippines Period : March 2000 – October 2008
  • 5. Designation : Project Engineer Project  Construction of Bungalow Type Residential House(G)  Construction of Provincial Hospital ( Annex Building )(G+3)  Construction of commercial building(G+5)  Construction of Notre Dame school library Building(G+2)  Repair and installation of 2 km. box culvert and lined canal. Work Description  Field Supervision of construction work  Prepare project cost estimate  Carrying out construction activities  Implementing job site material management  Supervision of field adjustment orders  Monitoring construction progress including subcontractor activities  Prepares weekly and monthly progress report  Certify progresses needed for the quality requirement are established  Examined and approves testing of new raw materials samples and mock up  Coordinating with site construction team for taking corrective actions  Follow up client with the coordination with the site construction team  Conduct all quality control procedures test and confirmed statistical analysis results Organization : Alcatel Philippines Incorporation, Phiippines Period : December 1998 – November 2000 Designation : Site Inspector/Primary and Secondary Projects  Cotobato – PLDT X6 – ZB project  Bacolod – PLDT X6 – ZB project  PLDT ZB – Paco Project Davao  Telicphil ZB – Paco Project Work Description for Primary Network  Conduct actual verification manhole for existing conduit & sub - conduit configuration & cable location on conduit  Measuring actual distances as per manhole span  Up – dating forms & primary plans base on verified data for future references  Checking cable length base on actual data for the specific location of specific on manhole  Supervision on daily work activity
  • 6.  Preparing certification on materials installed for submission of confirmation with the installation  Monitoring acceptance test activity Work Description for Secondary Network  Conduct staking together with the client representative prior upon implementation of the project  Securing right of way permit & coordinating with the lot owner regarding the exact location of poles to be erected.  Supervision on aerial activity as on follows: a) Aerial Hardware b) Messenger wires c) Aerial Cables ( copper or fiber optic ) d) Aerial splicing e) Testing & commissioning Organization : Jaz Cola Bottling Corporation, Philippines Period : December 1998 – November 2000 Designation : Project Engineer Projects  Construction of RC Cola department office(G+4)  Construction of Motor pool warehouse (G)  Construction of Advertising department office (G+2) Work Description  Project supervision  Prepare project cost estimate  Prepare and monitor daily work schedule  Prepare weekly and monthly progress report  Conduct all quality control test  Monitoring and implementing all safety procedures Training and Seminars Attended Computer Aided Design Alcatel Personal Software “CIRCEE” for Primary and Secondary Network Design Telecphil Standards Hardware & Aerial Distribution Self – supported (ADSS) fiber optic Cable Installation H2S & BA Hydrogen-sulfide & Breathing Apparatus HUET Helicopter Underwater Escape Training Workshop Seminar on Material Testing
  • 7. University of Mindanao Program December 2003 Workshop Seminar on Material Testing Central Philippine University January 2003 Seminar on Design and Construction of Precast Skills_________________________________________________________________________ _ • Strong client/customer oriented. • Proven analytical & problem resolving abilities. • Ability to present ideas & solutions in user-friendly language. • Team oriented. Other skills • Compute /Internet Literate including System/Application software troubleshoot/ MS Word / Excel Membership • Society of Engineers-UAE