Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
1. CURRICULUM VITAE
MOHAMAD ANWAR MALIK
Senior Supervisor, Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion
Pre-Commissioning,
AZAD NAGAR, SIWANDIH ,Dist. – BOKARO STEEL CITY, (Jharkhand) INDIA,
CONTACT NO: +91-8294677165, +91-7209602226 E-MAIL> anwarmallick@yahoo.com
SUMMARY OF EXPERIENCE:
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical. An excellent Knowledge of
Isometric and General Arrangement drawing of Piping Structural and equipment’s as well as Erection
fabrication, sound knowledge in API Standard and cods. Worked in CS / SS / LTCS /HDPE GI monal
aluminum brass alloy steel and Hydro testing Commissioning Pre.Commissioning. in all aspects of
mechanical construction including Offshore / Onshore Pipelines, Piping, Welding, Structural Steelwork,
Modules Fabrication & Piping hook-ups, Vessels, Separators, Towers (columns),Drums, Heat Exchangers,
Pots, Sumps, Pig launchers (receivers, pigs), Pump Packages, Blowers,Tank construction and associated
Piping systems etc.- in industries such as Oil & Gas, Petroleum, Petro-chemicals, Refineries , Power &
Desalination industries related projects plants etc.
PROJECT MANAGEMENT ACTIVITIES:
➢ Discussions with client and consultant for work front availability and technical clarifications.
➢ Discussions with subcontractor and subordinates to achieve scheduled targets.
➢ Analyzing total scope and planning of site activities as per client requirements.
➢ Discussions with top management staff and manpower
➢ Preparing weekly, monthly schedules for piping jobs and getting approval from clients.
➢ Preparing measurement sheets and getting approval from clients.
➢ Discussions with client for changes in routing of pipelines, deviation and site problems.
➢ Certification/Approval of subcontract billing.
➢ Preparing reconciliation statement at the end of project activities.
➢ Prepare punch list of completed piping as per test packages.
➢ Quality management includes organization. Inspection planning & scheduling supervision
Documentation and procedure
SUMMARY OF SKILLS:
➢ 17+ years of experience in Supervisory level with emphasis on Mechanical
➢ Hands on exposure to Petroleum & Petrochemical Construction Projects
➢ In-depth knowledge & Experience in Refinery, Power Plant & Petrochemical Projects
➢ Strong familiarity with industry specifications and codes
➢ Strength of technical know – how in AG/UG Piping (Metallic, Non Metallic &Jacketed), Structural Pre-
Fabrication & Erection
➢ Considerable years of experience in Offshore, Onshore Oil & Gas Pipeline projects
➢ Ample exposure to Heavy Equipment’s, Storage tanks and related activities
➢ Sound Knowledge in international codes & standards like ASME, ANSI, ASTM, API
➢ Strong knowledge in Joint Integrity Management (JIM) Systems
➢ Pro-active attitude&strong commitment to safety
➢ Good supervisory and organizational skills
➢ Highly motivated and self-reliantConfident and assertive
➢ Problem solver, Open thinker and innovator
➢ Able to monitor and lead a group & assignments entrusted
➢ Good language skills (written and verbal)
2. EXPERIENCE TRACK IN OVERSEAS:
Company : NCOC N.V/AGIP KCO-ENI/ PMT/PMC/EPC
Project : EskeneWest Rail Project (KAZAKHSTAN)
Client : NCOC NV/AGIP KCO-ENI
Position : PipingSupervisor
Period : 12/October 2013. TO31/December.2017
DUTIES AND RESPONSIBILITIES:
• Working as a COMPANY REPRESENTATIVE in NCOC.NV/AKCO.ENI – Eskene West Rail
Project, Rail Loading Facility(RLF) LEAD PIPING CONSTRUCTION SUPERVISOR /Responsible
for the fabrication, erection, testing Mechanical Completion &Pre-commissioning Activity
• Supervise subcontractor all the above ground Carbon steel, Stainless steel, Alloy steel Pipe
etc. & Underground HDPE piping activities. Responsible for the supervision of fabrication
and installation of carbon steel and stainless steel pipes. The work included installation of
mechanical equipment’s and Undergrounds HDPE piping
• Pipe spool fabrication at fabrication shop. Erection of spools on pipe racks at site .Line check
& Hydro test activities. Reinstatement of hydro tested piping test packs. Dry out and
preservation of reinstated piping systems.
• Conformity checks during erection and installation of piping and equipment against
Isometrics, P&ID’s and GA/ layout drawings
• Pipe line checking (Line WALK) and issue the punch as per the site condition with the
reference of Isometric drawing & support drawing. Update the daily and weekly progress
report of the modules construction and pre-commissioning closing the punches prior to start
the Hydrostatic or Pneumatic Witness the Re-instatement of the piping activities with
reference of TEST PACKAGES. Witness the hydrostatic / pneumatic test
• To perform punch listing at the relevant stage of completion and follow-up clearance by
Contractor/Subcontractor
• To review within own discipline all Contractors periodic reports related to construction &
pre-commissioning. Identify potential risk of delay in the construction or pre- commissioning
execution and report this to line manager. Develop tools to follow-up all construction and
pre-commissioning matters and make sure that the related actions are implemented.
• To ask, follow-up and close quality issues via quality observation cards or NCRs in close
coordination with the COMPANY QA/QC Dept.’s.
• Daily surveillance of Contractor construction activities with regards to safe working
conditions, work permits, adequate numbers of experienced/qualified supervision and
manpower, proper PPE and well maintained equipment to execute the works as per schedule
and targets.
• To supervise the execution of commissioning of piping, To plan the mobilization of the
Vendors in accordance with the Project planning and the commissioning progress.
To monitor and to follow up the execution of completion activities to achieve the
commissioning safely and prepare a smooth hand over the Production team
• Review and comment Contractor documents such as method statements, lifting plans, risk
assessments and job safety analysis.
• Conformity checks during erection and installation of piping and equipment against
Isometrics, P&ID’s and GA/ layout drawings.
• Conformity checks during erection and installation of piping and equipment against
Isometrics, P&ID’s and GA/ layout drawings.
• Monitor Piping flushing, Hydro, Pneumatic-tests, Re-instatement, Dry out, Leak testing,
Preservation activities & Closed out check lists after that completions.
• Validate Permits To Work and Closed out the same as PRA after that activity completions
3. Company _ :SAIPEM ENI (KAZAKHSTAN)EPC
Project : Kashagan Experimental Development project (KAZAKHSTAN)
Client : AGIP KCO-ENI (KAZAKHSTAN)
Position : PipingSupervisor
Period : 03/January 2013.TO 31/May2013
DUTIES AND RESPONSIBILITIES:
• Responsible for leading a team towards mechanical completion activities Train 1&2
.Checking the piping system against P & ID and creating punch list. Carrying out the punch
clearing activities with the assigned mechanical team.
• Insure that the installation of the equipment is properly done with access for the
maintenance. Control the piping preparation / cleaning / drying is done in accordance with
the Company requirements.
• Responsible for mechanical completion and pre - commissioning activities for Agip KCO
offshore oil and gas experimental project Kashagan, D - Island (first phase processing facility
for oil, natural gas, H2S - Gas dehydration, glycol regeneration system).
• Reporting to the Completions Manager. Scope Of Work is mechanical completions through
ITR’s and punch list system, managing & coordination of all sub systems in all process
modules of Train 1 and 2, process utility area, well heads, launching/receiving pigs areas
&associated Piping systems handover to the owner representatives and the representatives
of classification society.
• Carry out progressive Punch listing within the authorized areas of responsibility to ensure
that the works are completed to the fullest extent possible prior to Acceptance of the work
Company : KCOI (Kazakhstan Caspian Offshore Industries) EPC
Project : Kashagan Experimental Development project (KAZAKHSTAN)
Client : AGIP KCO-ENI (KAZAKHSTAN)
Position : Piping Supervisor
Period : 13/January 2012.TO02/December2012
DUTIES AND RESPONSIBILITIES:
• Responsible for mechanical completion and pre - commissioning activities for Agip KCO
offshore oil and gas experimental project Kashagan, D - Island (first phase processing facility
for oil, natural gas, H2S - Gas dehydration, glycol regeneration system).
• Reporting to the Completions Manager. Scope Of Work is mechanical completions through
ITR’s and punch list system, managing & coordination of all sub systems in all process
modules of Train 1 and 2, process utility area, well heads, launching/receiving pigs areas
&associated Piping systems handover to the owner representatives and the representatives
of classification society.
• Carry out progressive Punch listing within the authorized areas of responsibility to ensure
that the works are completed to the fullest extent possible prior to Acceptance of the work
• Sign-off punch lists after the completion of the work
• To supervise the execution of commissioning of piping, To plan the mobilization of the
Vendors in accordance with the Project planning and the commissioning progress.
To monitor and to follow up the execution of offshore completion activities to achieve the
commissioning safely and prepare a smooth hand over the Production team.
• Mechanical completion activities Train 1 .Checking the piping system against P & ID and
creating punch list. Carrying out the punch clearing activities with the assigned mechanical
team.
• Reporting to mechanical completion manager regarding the day to day progress Checking all
fastener and gaskets provided are as per standard Arranging temporary inlet and outlet lines
for flushing Checking the torque required for flange connection tightness
• Getting approval from client for box-up and pre-commissioning Provide flushing package
with system & sub-system wise Carried out Field Inspections with system wise To provide
complete work procedure for Pre-Commissioning activities.
• Carryout witness, inspection and surveillance checks in accordance with Site Quality Plans
and procedures
4. Company : Mohammad Al-Mojil Group (MMG)
Project : IPP RABIGH (KSA)
Client : Sepco.III Electric Power Construction group
Position : Senior PipingSupervisor
Period : 01/May 2011 .TO 12/ December/2011
DUTIES AND RESPONSIBILITIES:
• Erection, Testing and Commissioning of 2x660 MW power Boiler IPP Power Project, . Job
responsibilities includes preparation of schedules for manpower, material and equipment
• Piping Supervisor – Responsible for the supervision of fabrication and installation of carbon
steel and stainless steel pipes. The work included installation of mechanical equipment’s
• Coordinating with QA/QC departments. Preparation of daily and weekly status report and
attending the progress meeting with client. Planning for fabrication, erection depends upon
the manpower, materials, Arranging manpower, tools and tackles,
Company : Mohammad Al-Mojil Group (MMG)
Project : Saudi Polymers. Project, Al-Jubail (KSA)
Client : N.C.P. Daelim Arabia LTD KSA
Position : Senior PipingSupervisor
Period : 01/April 2010.TO30/April2011
DUTIES AND RESPONSIBILITIES:
• Responsible for the supervision of fabrication and installation of carbon steel and stainless
steel pipes. The work included installation of mechanical equipment’s fabrication and
installation of connecting Carbon Steel and Stainless Steel pipe work,
• Installation of chemical dosing equipment and pipe work, installation of pump stations,
pressure testing. Receiving the approved drawing for fabrication. Preparing the fabrication
schedule according to priority. Preparing the spool pack for traceability Resolving field
problems and liaison client under the supervision of Mech. Egg. Andprocess Depts.
Company : Mohammad Al-Mojil Group (MMG)
Project : Kayan 21 off plot Petrochemical complex Project, Al-Jubail (KSA)
Client : Flour Arabia LTD KSA
Position : Senior PipingSupervisor
Period : 01/September 2008 .TO 28/March2010
DUTIES AND RESPONSIBILITIES:
• Controlling & Monitoring of resources, Manpower Materials, Equipment’s etc.
• Planning of Work and scheduling Work permit management for safe Working Ensuring
proper Safety systems at the work place,visual inspection of pipes and all fittings, edge
preparation, fit up of the pipe, Co-ordination with concerned person. during fabrication &
erection.Planning & supervision of piping fabrication. Checking the daily progress report .
Company : Mohammad Al-Mojil Group (MMG)
Project : Sharq3rd expansion Petrochemical project, Al-Jubail (KSA)
Client : Linde Arabia LTDCO. (LINARCO)
Position : Senior Piping Supervisor
Period : 28/October 2007.TO 30/August 2008
DUTIES AND RESPONSIBILITIES:
• Monitoring of Erection of Piping and related Structural work Co-ordination with Materials
Department for issue and delivery.
• Checking for quality control Discussions with client for changes in routing of pipelines,
deviation and site problems. Preparing reconciliation statement at the end of project
activities. Prepare punch list of completed piping as per test packages. Quality management
includes organization. Inspection planning& scheduling supervision Documentation and
procedureEnsure that construction contractors adhere to the latest approved for
construction project drawings, specifications, procedures and site instructions.
• Ensure by leadership and guidance that contracted works meets all practical, commercial,
requirements of productivity, quality and contract target completions.
5. Company : lahoud engineering company
Project : OGD 3rd Gass plant Habsan Abu Dhabi (U A E)
Client : Eastern Bechtel LTD.
Position : Piping Supervisor
Period : 10/ September 2006 .TO05/September 2007.
DUTIES AND RESPONSIBILITIES:
• Reading and comparing isometric with G.A.D & P&ID Preparation of isometric for small bor
Planning for fabrication,
• Erection depends upon the manpower, Arranging manpower, tools and tackles, consumables
for making fit up Checking fit up as per standards and codes
• Coordination with the client for fit up inspection and clearance
• Inspect the proper tools use for specified job like stainless steel grinding wheels for stainless
steel pipes and fittings.Inspect the work always fulfill the requirement of codes and
standardsKeep track with material group to avoid any material shortage..
Company : lahoud engineering company
Project : G T L Raslaffan Ras gass (DOHA QATAR)
Client : Technip LTD.
Position : Piping Supervisor
Period : 29/ October 2005.TO 13/March 2006.
DUTIES AND RESPONSIBILITIES:
• Inspect all the drawings are latest revisions.
• Check and inspect the pipes and fittings going to be fabricate are correct and free from
defects. Inspect all material going to be used are as per the drawing.
• Giving instructions to the subcontractor to solve their day to day matters and supply newly
revised drawings.
• Inspect the proper tools use for specified job like stainless steel grinding wheels for stainless
steel pipes and fittings.
• Inspect the work always fulfill the requirement of codes and standards
• Keep track with material group to avoid any material shortage.
Company : lahoud engineering company
Project : SajaGass plant Sarjah(U A E)
Client : Petrofac LTD. CO
Position : Piping Supervisor
Period : 12/ April 2005.TO 28/ September 2005
DUTIES AND RESPONSIBILITIES:
• Responsible for the supervision of fabrication and installation of carbon steel and stainless
steel pipes. The work included installation of mechanical equipment fabrication and
installation of connecting Carbon Steel and Stainless Steel pipe work, installation of chemical
dosing equipment and pipe work, installation of pump stations, pressure testing.
• Receiving the approved drawing for fabrication. Preparing the fabrication schedule
according to priority receiving the approved drawing for fabrication.
• Preparing the fabrication schedule according to priority.
• Preparing the spool pack for traceability.
• Allocating the task according to the ability of foreman’s.
• Preparing the material request according to the requirement of spool
• Supervision of Piping Pre – Fabrication, Erection, Hydro& Pneumatic – Testing &
Commissioning
• Supervision of Boiler Structure and Piping Erection
• Coordination of Tank construction works
• Work Permit Management for Safe working
• Inspection of the work to adhere to strict Quality Maintenance
• Overseeing of Safety Management System at the work place
• Handling of Complete Documentation work & Record Keeping
6. Company : lahoud engineering company
Project : Al Hidd Power and Water Desalination Plant (BAHRAIN)
Client : Alstom power ItalyLTD CO.
Position : Piping Supervisor
Period : 15/January 2003 .TO 10/April 2005
DUTIES AND RESPONSIBILITIES:
• Monitoring of Erection of Piping and related Structural work Co-ordination with Materials Dep
issue and delivery. Checking for quality control.
• Erection, Testing and Commissioning of steam Turbo generator in Power Project, .
Job responsibilities includes preparation of schedules for manpowermaterial and equipment,
• Coordinating with QA/QC departments. Preparation of daily and weekly status report and
Attending the progress meeting with client.
• The erection Planning of pipes as per work front availabilityArranging manpower to shift
• The piping spools from fabrication yard to erection site Carryout witness, inspection and
surveillance checks in accordance with Site Quality Plans and procedures.
• Ensure that all safety practices and procedures for safe working are fully implemented.
• Planning of Work and scheduling.
• Work permit management for safe working.
Records keeping & File work for administrative purpose
Company : GAMA AL MORSAGAH ARABIA LTD
Project : Hawayai gass plant (K S A)
Client : Saudi Armco
Position : Acting Piping Supervisor
Period : 6/ June1999.TO 29/ September 2001
DUTIES AND RESPONSIBILITIES:
• Project involves Prefabrication and Erection of unit piping and rack piping. Assembling and
Erection of Air fin fan coolers.
• Assembling and Erection of Flare stack having height of more than 60mtr. Heavy equipment
erection weighing more than 100 tons, Organizes material and equipment for upcoming jobs
in advance. Prepares daily progress reports and forward to planning department. Prepares
work schedule and supervise fabrication. During the fabrication activities visual inspection
of pipes and all fittings, edge preparation, fit up of the pipe, welding quality of the pipe and
D.P.T.Co-ordination with concerned person. During fabrication & erection.Planning &
supervision of piping fabrication
EXPERIENCE TRACK IN INDIA:
Company : Larson &Toubro LTD
Project : Bokaro steel Plant Jharkhand (India)
Position : Acting Piping Supervisor
Period : 15/ December 1997.TO 10/March 1999
DUTIES AND RESPONSIBILITIES:
• Responsible for the supervision of fabrication and installation of carbon steel and stainless
steel pipes. The work included installation of mechanical equipment’s fabrication and
installation of connecting Carbon Steel and Stainless Steel pipe work,
• Installation of pump stations, pressure testing. Receiving the approved drawing for
fabrication. Preparing the fabrication schedule according to priority. Preparing the spool
pack for traceability. Preparing the material request according to the requirement of spool.
• During the fabrication activities visual inspection of pipes and all fittings, edge preparation,
fit up of the pipe, welding quality of the pipe and D.P.T.
• Co-ordination with concerned person. during fabrication & erectionPlanning & supervision
of piping fabrication
7. Personal Details:
NAME : MOHAMAD ANWAR MALIK
FATHER NAME : ASHARF MALLICK
DATE OF BIRTH : 15th JUNE 1974.
SEX : MALE
NATIONALITY : INDIAN
MARITAL STATUS : MARRIED
LANGUAGE KNOWN : ENGLISH, HINDI, URDU, ARBIC.
RELIGION : ISLAM
PASSPORT DETALS : PASSPORT.NO - Z 2719932
: PLACE OFF ISUE - RANCHI
: DATE OFF ISUE - 23 JAN 2014
: DATE OFF EXPIRY- 22JAN 2024
EDUCATIONAL & TECHNICAL QUALIFICATION
➢ DIPLOMA IN MECHANICAL ENGINEERING with 2nd Class Passed from Oxford Polytechnic College
Bangalore.
➢ 12thStandard Passed from JHARKHAND (BIHAR) INDIA.
➢ DIPLOMA IN COMPUTER APPLICATION (DCA) with first class from Indian Institute.
COUNTRY VISITED ON ASSIGNMENT:
➢ KAZAKHASTAN,UAE,BAHRAIN,QATAR,SAUDI ARAB,
TRAINING & SEMINARS ATTENDED
➢ BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING (BOSIET)&(HUET)H2S
OPITO LEVEL 1, FACE FIT TEST, SWAH, CSE Standard Level, WRAP&TRIC
➢ PTW, Training, Agip KCO, Kazakhstan (Level ll)
➢ PTW Training, D Island, YKK. KAZAKHASTAN,
➢ Crane and Rigging Safety Training Course, Emergency Preparedness & General Safety Course,
➢ Working on height safety training, confined space entry safety training course,
➢ H2S & Face Fit training ,SEFtec Global Training Atyrau
COMPUTERLITERACY:
➢ Smart Plant Review, Microsoft office ,Microsoft word, Microsoft excel
Permanent Address:
S/O – ASHARF MALIK
POST – SIWANDIH, AZAD NAGAR
Dist. – BOKARO STEEL CITY, (Jharkhand) INDIA,
CONTACT NO: +918294677165:+917209602226
Skype; a.mallick24, e-mail:anwarmallick@yahoo.com
I hereby declare that all the information furnished by me is true to best of my knowledge and belief.
MOHD ANWAR MALIK