I am a qualified and seasoned professional with more than 14 years of experience in overall project planning, master
scheduling, detailed scheduling, risk analysis, cost control, cost estimation, budget preparation, claim
management and all related project control activities for FEED, Detailed Engineering, Procurement and
Construction (EPC) Projects and Maintenance/Shutdown works for Oil & Gas, Power & Petrochemical plants and
Gas/Oil
Pipelines. I am proficient in application of project management software e.g. Primavera Project Planner
Microsoft Project and MS Office applications. I am also conversant with Computerized Maintenance
Management System (CMMS) software e.g. MAXIMO. Also, I have been actively involved in for proposal preparation
and
estimation of various projects in UAE region.
I have working experience in United Arab Emirates (UAE), Qatar, Pakistan, Algeria and Kazakhstan.
EDUCATIONEDUCATIONEDUCATION
B.Sc Mechanical Engineering (1999-2003) 1.Jan.03*
From University of Engineering & Technology Lahore Pakistan
WORK EXPERIENCEWORK EXPERIENCEWORK EXPERIENCE
DESCON ENGINEERING, UAEDESCON ENGINEERING, UAEDESCON ENGINEERING, UAE
Deputy Manager - Planning & Control 18.Nov.15* 30.Nov.16
EMDAD SERVICES LLC, UAEEMDAD SERVICES LLC, UAEEMDAD SERVICES LLC, UAE
Sr. Project Planning & Control Engineer 5.Mar.14* 30.Jun.15
ILF CONSULTING ENGINEERS, UAEILF CONSULTING ENGINEERS, UAEILF CONSULTING ENGINEERS, UAE
Sr. Planning Engineer 10.Mar.10* 20.Feb.14
CH2MHILL , UAE & ALGERIACH2MHILL , UAE & ALGERIACH2MHILL , UAE & ALGERIA
Planning & Scheduling Engineer 27.Jul.08* 19.Nov.09
GAMAQATAR LLC, QATARGAMAQATAR LLC, QATARGAMAQATAR LLC, QATAR
Planning & Scheduling Engineering 26.Oct.07* 17.Jul.08
DESCON ENGINEERING, PAKISTAN, QATAR, UAEDESCON ENGINEERING, PAKISTAN, QATAR, UAEDESCON ENGINEERING, PAKISTAN, QATAR, UAE
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
EXPERIENCE SUMMARY
I am a qualified and seasoned professional with more than 14 years of experience in overall project planning, master
scheduling, detailed scheduling, risk analysis, cost control, cost estimation, budget preparation, claim
management and all related project control activities for FEED, Detailed Engineering, Procurement and
Construction (EPC) Projects and Maintenance/Shutdown works for Oil & Gas, Power & Petrochemical plants and Gas/Oil
Pipelines. I am proficient in application of project management software e.g. Primavera Project Planner
Microsoft Project and MS Office applications. I am also conversant with Computerized Maintenance
Management System (CMMS) software e.g. MAXIMO. Also, I have been actively involved in for proposal preparation and
estimation of various projects in UAE region.
I have working experience in United Arab Emirates (UAE), Qatar, Pakistan, Algeria and Kazakhstan.
EDUCATION
B.Sc Mechanical Engineering (1999-2003)
From University of Engineering & Technology Lahore Pakistan
EMDAD SERVI
Sr. Project Plann
ILF CONSULTING ENGINEERS, UAE
Sr. Planning Engineer
CH2MHILL , UAE & ALGERIA
Planning & Scheduling Engineer
GAMA QATAR LLC, QATAR
Planning & Scheduling Engineering
DESCON ENGINEERING, PAKISTAN, QATAR, UAE
RESUME: MUJAHID AKHTAR
PLANNING & CONTROL PROFESSIONAL
MECHANICAL ENGINEER (PE)
CONTACT DETAILS:
PHONE: +971-55-5210079
EMAIL: AKHTAR.SIPSC@GMAIL.COM
Date Revision Checked Approved
28.Jun.16 RESUME REV. 0 MA MA
Page 1 of 4
Activity Name Start Finish
Planning Engineer 3.Jan.05* 25.Oct.07
IKAN ENGINEERING SERVICES, PAKISTANIKAN ENGINEERING SERVICES, PAKISTANIKAN ENGINEERING SERVICES, PAKISTAN
Project Planning & Execution Engineer 10.Jul.03* 30.Dec.04
ROLES & RESPONSIBILITIESROLES & RESPONSIBILITIESROLES & RESPONSIBILITIES
1. Preparing Planning & Cost Control System (Progress Measurement, Schedules, S-Curves, Man-power
Histograms and Work Breakdown Structure etc.) according to the Specifications of the projects
2. Prepare and maintain a valid overall project schedules & establish a cost reporting system
3. Review and process change orders; assesses impact of changes on contract scope, schedule and budget;
4. Produce timely reports for assigned projects; identifies and trends potential project risks and issues
5. Lead teams to develop and validate reporting input; prepare variance analysis and recovery plans for review
6. Develop, implement, and monitor earned value systems that accurately measure progress and performance
7. Review, comment and verify the Sub-contractor's Progress Measurement and Reports
8. Preparation of cost estimates for EPC, Pipelines, Shutdowns, FEED and other projects
9. Prepare, Review and Issue the Progress Invoices as well as certify progress payment to sub-contractors
10. Understand emerging industry trends & implications of these trends on cost control/planning/estimating
11. Identify project control risks and recommend mitigation and contingency plans to address the risks
12. Prepare improvement plans for future projects and review lesson learned during the execution of work
13. Ensure Company Health, Safety and Environmental, and Quality rules & perform the activities as per IMS
14. Guide project controls staff & project team members in project controls fundamentals, procedures and guidelines
MAJOR PROJECTSMAJOR PROJECTSMAJOR PROJECTS
CONSTRUCTION, PMC & EPC PROJECTSCONSTRUCTION, PMC & EPC PROJECTSCONSTRUCTION, PMC & EPC PROJECTS
PMC for EPC of Abu Dhabi Crude Oil Pipeline Project - UAE - CLIENT: IPIC 30.Nov.11* 20.Feb.13
PMC for EPC project of 48" N2-Pipeline from Mirfa to Habshan (45km), Abu Dhabi, UAE - CLIENT : LINDE 30.Mar.10* 30.Aug.11
PMC for EPC of Zarzaitine Oilfield Expansion Project in Algeria. CLIENT: SONATRACH 28.Jul.08* 19.Nov.09
Civil & Electro-Mechanical Works for Train 6 & 7 Facilities Ras Laffan Industrial City, Qatar CLIENT : CTJV 26.Oct.07* 17.Jul.08
FEED, & DETAILED ENGINEERING PROJECTSFEED, & DETAILED ENGINEERING PROJECTSFEED, & DETAILED ENGINEERING PROJECTS
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Planning Engineer
IKAN ENGINEERING SERVICES, PAKISTAN
Project Planning & Execution Engineer
ROLES & RESPONSIBILITIES
1. Preparing Planning & Cost Control System (Progress Measurement, Schedules, S-Curves, Man-power
Histograms and Work Breakdown Structure etc.) according to the Specifications of the projects
2. Prepare and maintain a valid overall project schedules & establish a cost reporting system
3. Review and process change orders; assesses impact of changes on contract scope, schedule and budget;
4. Produce timely reports for assigned projects; identifies and trends potential project risks and issues
5. Lead teams to develop and validate reporting input; prepare variance analysis and recovery plans for review
6. Develop, implement, and monitor earned value systems that accurately measure progress and performance
7. Review, comment and verify the Sub-contractor's Progress Measurement and Reports
8. Preparation of cost estimates for EPC, Pipelines, Shutdowns, FEED and other projects
9. Prepare, Review and Issue the Progress Invoices as well as certify progress payment to sub-contractors
10. Understand emerging industry trends & implications of these trends on cost control/planning/estimating
11. Identify project control risks and recommend mitigation and contingency plans to address the risks
12. Prepare improvement plans for future projects and review lesson learned during the execution of work
13. Ensure Company Health, Safety and Environmental, and Quality rules & perform the activities as per IMS
14. Guide project controls staff & project team members in project controls fundamentals, procedures and guidelines
MAJO
CONSTRUCTION, PMC & EPC PROJECTS
PMC for EPC of Abu Dhabi Crude Oil Pipel
PMC for EPC project of 48" N2-Pipeline from Mirfa to Habsh
PMC for EPC of Zarzaitine Oilfield Expansion Project in Algeria. CLIENT: SONATRACH
Civil & Electro-Mechanical Works for Train 6 & 7 Facilities Ras Laffan Industrial City, Qatar CLIENT : CTJV
FEED, & DETAILED ENGINEERING PROJECTS
RESUME: MUJAHID AKHTAR
PLANNING & CONTROL PROFESSIONAL
MECHANICAL ENGINEER (PE)
CONTACT DETAILS:
PHONE: +971-55-5210079
EMAIL: AKHTAR.SIPSC@GMAIL.COM
Date Revision Checked Approved
28.Jun.16 RESUME REV. 0 MA MA
Page 2 of 4
Activity Name Start Finish
Sewage System and Tie-in to ADSSC Grid (ASU Plant Mirfa) - CLIENT : LINDE 6.Jan.11* 4.Jul.11
Replacement of 20" Lean Gas Pipeline from Buhasa to Bab & Bab to Th.C- CLIENT : GASCO 6.Jan.11* 5.Jun.11
Replacement of RDS-3 Transfer Line in BAB & Conceptual Study of Flow Lines De-Congestion - CLIENT : ADCO 10.Nov.10* 30.Apr.11
Design Services for Replacement of Passive Cooled Shelters (19 Nos.) - CLIENT : GASCO 27.May.10* 20.Sep.10
Design Services for the Fire Water Back-up Connection MOT - CLIENT : ADCOP 11.Apr.10* 31.Aug.10
Installation of a New 30" ROV Station at BAB - Maqta Pipeline and Conversion of Two 42" Manual Valves 16.Nov.09* 30.Jun.10
Natural Gas Supply to Global Foundries Wafer Fabrication Plant - CLIENT : GASCO 16.Apr.09* 30.Sep.09
SHUTDOWN/TURNAROUNS & REVAMPING PROJECTSSHUTDOWN/TURNAROUNS & REVAMPING PROJECTSSHUTDOWN/TURNAROUNS & REVAMPING PROJECTS
ENOC Refinery Turnaround and Inspection - Jabel Ali Dubai - UAE CLIEN: EPCL 18.Nov.15* 30.Apr.16
Shutdown of Train-2 Plant - (Ruwais-2014 & 2015), UAE CLIENT: GASCO 1.Feb.15* 15.Mar.15
Shutdown of ASAB 0, 1 , 2 & 3 Plants - (Asab-2014 & 2015) UAE CLIENT: GASCO 1.Oct.14* 15.Mar.15
Shutdown for Off-Stream Inspection At North East Bab Fields - (Rumaitha), UAE CLIENT: ADCO 20.Mar.14* 20.May.14
OGD-I, Train-II Shutdown Bab Plant Total Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO 1.Apr.07* 10.Sep.07
OGD-I, Train-II Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO 1.Apr.07* 19.Oct.07
Revamping/Maintenance Fauji Fertilizer Bin Qasim Limited Karachi, Pakistan 20.Feb.06* 30.May.06
Underground Piping Project, Uch Power Station Dera Murad Jamali, Pakistan 1.Oct.05* 30.Jan.06
Shutdown/Maintenance National Refinery Limited (Lube-II) Karachi, Pakistan 1.Jul.05* 22.Sep.05
Annual Turnaround of PPL Adhi LPG/NGL Plant, Pakistan 22.May.05* 30.Jun.05
Pakistan PTA Plant ICI (T11) Karachi, Pakistan 28.Apr.05* 20.May.05
De-bottlenecking Project of Qatar Gas LPG Plant (Train-III), Ras Laffan Qatar 10.Mar.05* 25.Apr.05
Revamping Project of Abu-Dhabi Polymer Company (Borouge) Rawais, Abu Dhabi UAE 6.Jan.05* 5.Mar.05
SOFTWARE SKILLSSOFTWARE SKILLSSOFTWARE SKILLS
Oracle Primavera Project Management - P6 1.Jan.03
Microsoft Project - All Versions 1.Jan.06*
Primavera RiskAnaylsis ver. 6.2 9.Nov.08*
Microsoft Office - All Versions 1.Jan.03*
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Sewage System and Tie-in to ADSSC Grid (ASU Plant Mirfa) -
Replacement of 20" Lean Gas Pipeline from Buhasa to Bab & B
Replacement of RDS-3 Transfer Line in BAB & Conceptual Stud
Design Services for Replacement of Passive Cooled Shelters (19 Nos.)
Design Services for the Fire Water Back-up Connection MOT - CLIENT : ADCOP
Installation of a New 30" ROV Station at BAB - Maqta Pipeline and Conve
Natural Gas Supply to Global Foundries Wafer Fabrication Plant - CLIENT : GASCO
SHUT
ENOC
Shutdown of Train-
Shutdown of ASAB
Shutdown for Off-Stream Ins
OGD-I, Train-II Shutdown Bab Plant Total Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO
OGD-I, Train-II Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO
Revamping/Maintenance Fauji Fertilizer Bin Qasim Limited Karachi, Pakistan
Underground Piping Project, Uch Power Station Dera Murad Jamali, Pakistan
Shutdown/Maintenance National Refinery Limited (Lube-II) Karachi, Pakistan
Annual Turnaround of PPL Adhi LPG/NGL Plant, Pakistan
Pakistan PTA Plant ICI (T11) Karachi, Pakistan
De-bottlenecking Project of Qatar Gas LPG Plant (Train-III), Ras Laffan Qatar
Revamping Project of Abu-Dhabi Polymer Company (Borouge) Rawais, Abu Dhabi UAE
SOFTWARE SKILLS
Oracle Primavera Project Management - P6
Microsoft Project - All Versions
Primavera RiskAnaylsis ver. 6.2
Microsoft Office - All Versions
RESUME: MUJAHID AKHTAR
PLANNING & CONTROL PROFESSIONAL
MECHANICAL ENGINEER (PE)
CONTACT DETAILS:
PHONE: +971-55-5210079
EMAIL: AKHTAR.SIPSC@GMAIL.COM
Date Revision Checked Approved
28.Jun.16 RESUME REV. 0 MA MA
Page 3 of 4
Activity Name Start Finish
Maximo 4.0.1 / AutoCAD 2002 2.Jan.06*
Advanced Windows & Internet User 1.Jan.03*
MEMBERSHIPSMEMBERSHIPSMEMBERSHIPS
Pakistan Engineering Council - 2004 1.Aug.04*
TRAININGSTRAININGSTRAININGS
Project Management in Primavera 6.0 Client Server (Advance Course 106-P) by CMCS, UAE 1.Oct.07*
Resource Management in Primavera 6.0 Client Server (Advance Course 106-R) by CMCS, UAE 11.Nov.07*
Primavera Project Planner P6 Administration (Course 106-A) by CMCS, UAE 1.Jan.03
GASCO Shutdown Management System Training by AP Networks USA 1.Jan.03*
Construction Technology and Management Training for improvement of staff skills by DESCON Engineering 1.Jan.03*
Training on "Safe Work System" at Qatar Gas arranged by CTJV (Chiyoda Technip Joint Venture) 1.Jan.03*
Permit to Work System Training at Qatar Gas, Ras Laffan-Qatar 1.Jul.06*
PERSONAL INFORMATIONPERSONAL INFORMATIONPERSONAL INFORMATION
Date of Birth: 24-Dec-1979
Marital Status: Married
No. of Dependents: 3
Nationality: Pakistani
Languages: English, Urdu, Punjabi, BasicArabic & Russian
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Maximo 4.0.1 / AutoCAD 2002
Advanced Windows & Internet User
MEMBERSHIPS
Pakistan Engineering Council - 2004
TRAININGS
Project Management in Primavera 6.0 Client Server (Advance Course 106-P) by CMCS, UAE
Resource Management in Primavera 6.0 Client Server (Advance Course 106-R) by CMCS, UAE
Primavera Project Planner P6 Administration (Course 106-A) by CMCS, UAE
GASCO Shutdown Management System Training by AP Networks USA
Construction Technology and Management Training for improvement of staff skills by DESCON Engineering
Training on "Safe Work System" at Qatar Gas arranged by CTJV (Chiyoda Technip Joint Venture)
Permit to Work System Training at Qatar Gas, Ras Laffan-Qatar
PERSONAL INFORMATION
Date of Birth: 24-Dec-1979
Marital Status: Married
No. of Dependents: 3
Nationality: Pakistani
Languages: English, Urdu, Punjabi, BasicArabic & Russian
RESUME: MUJAHID AKHTAR
PLANNING & CONTROL PROFESSIONAL
MECHANICAL ENGINEER (PE)
CONTACT DETAILS:
PHONE: +971-55-5210079
EMAIL: AKHTAR.SIPSC@GMAIL.COM
Date Revision Checked Approved
28.Jun.16 RESUME REV. 0 MA MA
Page 4 of 4

Resume Built Using Primavera P6

  • 1.
    Activity Name StartFinish RESUME - PROJECT PLANNING & CONTROL PROFESSIONALRESUME - PROJECT PLANNING & CONTROL PROFESSIONALRESUME - PROJECT PLANNING & CONTROL PROFESSIONAL EXPERIENCE SUMMARYEXPERIENCE SUMMARYEXPERIENCE SUMMARY I am a qualified and seasoned professional with more than 14 years of experience in overall project planning, master scheduling, detailed scheduling, risk analysis, cost control, cost estimation, budget preparation, claim management and all related project control activities for FEED, Detailed Engineering, Procurement and Construction (EPC) Projects and Maintenance/Shutdown works for Oil & Gas, Power & Petrochemical plants and Gas/Oil Pipelines. I am proficient in application of project management software e.g. Primavera Project Planner Microsoft Project and MS Office applications. I am also conversant with Computerized Maintenance Management System (CMMS) software e.g. MAXIMO. Also, I have been actively involved in for proposal preparation and estimation of various projects in UAE region. I have working experience in United Arab Emirates (UAE), Qatar, Pakistan, Algeria and Kazakhstan. EDUCATIONEDUCATIONEDUCATION B.Sc Mechanical Engineering (1999-2003) 1.Jan.03* From University of Engineering & Technology Lahore Pakistan WORK EXPERIENCEWORK EXPERIENCEWORK EXPERIENCE DESCON ENGINEERING, UAEDESCON ENGINEERING, UAEDESCON ENGINEERING, UAE Deputy Manager - Planning & Control 18.Nov.15* 30.Nov.16 EMDAD SERVICES LLC, UAEEMDAD SERVICES LLC, UAEEMDAD SERVICES LLC, UAE Sr. Project Planning & Control Engineer 5.Mar.14* 30.Jun.15 ILF CONSULTING ENGINEERS, UAEILF CONSULTING ENGINEERS, UAEILF CONSULTING ENGINEERS, UAE Sr. Planning Engineer 10.Mar.10* 20.Feb.14 CH2MHILL , UAE & ALGERIACH2MHILL , UAE & ALGERIACH2MHILL , UAE & ALGERIA Planning & Scheduling Engineer 27.Jul.08* 19.Nov.09 GAMAQATAR LLC, QATARGAMAQATAR LLC, QATARGAMAQATAR LLC, QATAR Planning & Scheduling Engineering 26.Oct.07* 17.Jul.08 DESCON ENGINEERING, PAKISTAN, QATAR, UAEDESCON ENGINEERING, PAKISTAN, QATAR, UAEDESCON ENGINEERING, PAKISTAN, QATAR, UAE Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 EXPERIENCE SUMMARY I am a qualified and seasoned professional with more than 14 years of experience in overall project planning, master scheduling, detailed scheduling, risk analysis, cost control, cost estimation, budget preparation, claim management and all related project control activities for FEED, Detailed Engineering, Procurement and Construction (EPC) Projects and Maintenance/Shutdown works for Oil & Gas, Power & Petrochemical plants and Gas/Oil Pipelines. I am proficient in application of project management software e.g. Primavera Project Planner Microsoft Project and MS Office applications. I am also conversant with Computerized Maintenance Management System (CMMS) software e.g. MAXIMO. Also, I have been actively involved in for proposal preparation and estimation of various projects in UAE region. I have working experience in United Arab Emirates (UAE), Qatar, Pakistan, Algeria and Kazakhstan. EDUCATION B.Sc Mechanical Engineering (1999-2003) From University of Engineering & Technology Lahore Pakistan EMDAD SERVI Sr. Project Plann ILF CONSULTING ENGINEERS, UAE Sr. Planning Engineer CH2MHILL , UAE & ALGERIA Planning & Scheduling Engineer GAMA QATAR LLC, QATAR Planning & Scheduling Engineering DESCON ENGINEERING, PAKISTAN, QATAR, UAE RESUME: MUJAHID AKHTAR PLANNING & CONTROL PROFESSIONAL MECHANICAL ENGINEER (PE) CONTACT DETAILS: PHONE: +971-55-5210079 EMAIL: AKHTAR.SIPSC@GMAIL.COM Date Revision Checked Approved 28.Jun.16 RESUME REV. 0 MA MA Page 1 of 4
  • 2.
    Activity Name StartFinish Planning Engineer 3.Jan.05* 25.Oct.07 IKAN ENGINEERING SERVICES, PAKISTANIKAN ENGINEERING SERVICES, PAKISTANIKAN ENGINEERING SERVICES, PAKISTAN Project Planning & Execution Engineer 10.Jul.03* 30.Dec.04 ROLES & RESPONSIBILITIESROLES & RESPONSIBILITIESROLES & RESPONSIBILITIES 1. Preparing Planning & Cost Control System (Progress Measurement, Schedules, S-Curves, Man-power Histograms and Work Breakdown Structure etc.) according to the Specifications of the projects 2. Prepare and maintain a valid overall project schedules & establish a cost reporting system 3. Review and process change orders; assesses impact of changes on contract scope, schedule and budget; 4. Produce timely reports for assigned projects; identifies and trends potential project risks and issues 5. Lead teams to develop and validate reporting input; prepare variance analysis and recovery plans for review 6. Develop, implement, and monitor earned value systems that accurately measure progress and performance 7. Review, comment and verify the Sub-contractor's Progress Measurement and Reports 8. Preparation of cost estimates for EPC, Pipelines, Shutdowns, FEED and other projects 9. Prepare, Review and Issue the Progress Invoices as well as certify progress payment to sub-contractors 10. Understand emerging industry trends & implications of these trends on cost control/planning/estimating 11. Identify project control risks and recommend mitigation and contingency plans to address the risks 12. Prepare improvement plans for future projects and review lesson learned during the execution of work 13. Ensure Company Health, Safety and Environmental, and Quality rules & perform the activities as per IMS 14. Guide project controls staff & project team members in project controls fundamentals, procedures and guidelines MAJOR PROJECTSMAJOR PROJECTSMAJOR PROJECTS CONSTRUCTION, PMC & EPC PROJECTSCONSTRUCTION, PMC & EPC PROJECTSCONSTRUCTION, PMC & EPC PROJECTS PMC for EPC of Abu Dhabi Crude Oil Pipeline Project - UAE - CLIENT: IPIC 30.Nov.11* 20.Feb.13 PMC for EPC project of 48" N2-Pipeline from Mirfa to Habshan (45km), Abu Dhabi, UAE - CLIENT : LINDE 30.Mar.10* 30.Aug.11 PMC for EPC of Zarzaitine Oilfield Expansion Project in Algeria. CLIENT: SONATRACH 28.Jul.08* 19.Nov.09 Civil & Electro-Mechanical Works for Train 6 & 7 Facilities Ras Laffan Industrial City, Qatar CLIENT : CTJV 26.Oct.07* 17.Jul.08 FEED, & DETAILED ENGINEERING PROJECTSFEED, & DETAILED ENGINEERING PROJECTSFEED, & DETAILED ENGINEERING PROJECTS Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Planning Engineer IKAN ENGINEERING SERVICES, PAKISTAN Project Planning & Execution Engineer ROLES & RESPONSIBILITIES 1. Preparing Planning & Cost Control System (Progress Measurement, Schedules, S-Curves, Man-power Histograms and Work Breakdown Structure etc.) according to the Specifications of the projects 2. Prepare and maintain a valid overall project schedules & establish a cost reporting system 3. Review and process change orders; assesses impact of changes on contract scope, schedule and budget; 4. Produce timely reports for assigned projects; identifies and trends potential project risks and issues 5. Lead teams to develop and validate reporting input; prepare variance analysis and recovery plans for review 6. Develop, implement, and monitor earned value systems that accurately measure progress and performance 7. Review, comment and verify the Sub-contractor's Progress Measurement and Reports 8. Preparation of cost estimates for EPC, Pipelines, Shutdowns, FEED and other projects 9. Prepare, Review and Issue the Progress Invoices as well as certify progress payment to sub-contractors 10. Understand emerging industry trends & implications of these trends on cost control/planning/estimating 11. Identify project control risks and recommend mitigation and contingency plans to address the risks 12. Prepare improvement plans for future projects and review lesson learned during the execution of work 13. Ensure Company Health, Safety and Environmental, and Quality rules & perform the activities as per IMS 14. Guide project controls staff & project team members in project controls fundamentals, procedures and guidelines MAJO CONSTRUCTION, PMC & EPC PROJECTS PMC for EPC of Abu Dhabi Crude Oil Pipel PMC for EPC project of 48" N2-Pipeline from Mirfa to Habsh PMC for EPC of Zarzaitine Oilfield Expansion Project in Algeria. CLIENT: SONATRACH Civil & Electro-Mechanical Works for Train 6 & 7 Facilities Ras Laffan Industrial City, Qatar CLIENT : CTJV FEED, & DETAILED ENGINEERING PROJECTS RESUME: MUJAHID AKHTAR PLANNING & CONTROL PROFESSIONAL MECHANICAL ENGINEER (PE) CONTACT DETAILS: PHONE: +971-55-5210079 EMAIL: AKHTAR.SIPSC@GMAIL.COM Date Revision Checked Approved 28.Jun.16 RESUME REV. 0 MA MA Page 2 of 4
  • 3.
    Activity Name StartFinish Sewage System and Tie-in to ADSSC Grid (ASU Plant Mirfa) - CLIENT : LINDE 6.Jan.11* 4.Jul.11 Replacement of 20" Lean Gas Pipeline from Buhasa to Bab & Bab to Th.C- CLIENT : GASCO 6.Jan.11* 5.Jun.11 Replacement of RDS-3 Transfer Line in BAB & Conceptual Study of Flow Lines De-Congestion - CLIENT : ADCO 10.Nov.10* 30.Apr.11 Design Services for Replacement of Passive Cooled Shelters (19 Nos.) - CLIENT : GASCO 27.May.10* 20.Sep.10 Design Services for the Fire Water Back-up Connection MOT - CLIENT : ADCOP 11.Apr.10* 31.Aug.10 Installation of a New 30" ROV Station at BAB - Maqta Pipeline and Conversion of Two 42" Manual Valves 16.Nov.09* 30.Jun.10 Natural Gas Supply to Global Foundries Wafer Fabrication Plant - CLIENT : GASCO 16.Apr.09* 30.Sep.09 SHUTDOWN/TURNAROUNS & REVAMPING PROJECTSSHUTDOWN/TURNAROUNS & REVAMPING PROJECTSSHUTDOWN/TURNAROUNS & REVAMPING PROJECTS ENOC Refinery Turnaround and Inspection - Jabel Ali Dubai - UAE CLIEN: EPCL 18.Nov.15* 30.Apr.16 Shutdown of Train-2 Plant - (Ruwais-2014 & 2015), UAE CLIENT: GASCO 1.Feb.15* 15.Mar.15 Shutdown of ASAB 0, 1 , 2 & 3 Plants - (Asab-2014 & 2015) UAE CLIENT: GASCO 1.Oct.14* 15.Mar.15 Shutdown for Off-Stream Inspection At North East Bab Fields - (Rumaitha), UAE CLIENT: ADCO 20.Mar.14* 20.May.14 OGD-I, Train-II Shutdown Bab Plant Total Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO 1.Apr.07* 10.Sep.07 OGD-I, Train-II Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO 1.Apr.07* 19.Oct.07 Revamping/Maintenance Fauji Fertilizer Bin Qasim Limited Karachi, Pakistan 20.Feb.06* 30.May.06 Underground Piping Project, Uch Power Station Dera Murad Jamali, Pakistan 1.Oct.05* 30.Jan.06 Shutdown/Maintenance National Refinery Limited (Lube-II) Karachi, Pakistan 1.Jul.05* 22.Sep.05 Annual Turnaround of PPL Adhi LPG/NGL Plant, Pakistan 22.May.05* 30.Jun.05 Pakistan PTA Plant ICI (T11) Karachi, Pakistan 28.Apr.05* 20.May.05 De-bottlenecking Project of Qatar Gas LPG Plant (Train-III), Ras Laffan Qatar 10.Mar.05* 25.Apr.05 Revamping Project of Abu-Dhabi Polymer Company (Borouge) Rawais, Abu Dhabi UAE 6.Jan.05* 5.Mar.05 SOFTWARE SKILLSSOFTWARE SKILLSSOFTWARE SKILLS Oracle Primavera Project Management - P6 1.Jan.03 Microsoft Project - All Versions 1.Jan.06* Primavera RiskAnaylsis ver. 6.2 9.Nov.08* Microsoft Office - All Versions 1.Jan.03* Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Sewage System and Tie-in to ADSSC Grid (ASU Plant Mirfa) - Replacement of 20" Lean Gas Pipeline from Buhasa to Bab & B Replacement of RDS-3 Transfer Line in BAB & Conceptual Stud Design Services for Replacement of Passive Cooled Shelters (19 Nos.) Design Services for the Fire Water Back-up Connection MOT - CLIENT : ADCOP Installation of a New 30" ROV Station at BAB - Maqta Pipeline and Conve Natural Gas Supply to Global Foundries Wafer Fabrication Plant - CLIENT : GASCO SHUT ENOC Shutdown of Train- Shutdown of ASAB Shutdown for Off-Stream Ins OGD-I, Train-II Shutdown Bab Plant Total Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO OGD-I, Train-II Shutdown, Habshan Abu-Dhabi, UAE CLIENT: GASCO Revamping/Maintenance Fauji Fertilizer Bin Qasim Limited Karachi, Pakistan Underground Piping Project, Uch Power Station Dera Murad Jamali, Pakistan Shutdown/Maintenance National Refinery Limited (Lube-II) Karachi, Pakistan Annual Turnaround of PPL Adhi LPG/NGL Plant, Pakistan Pakistan PTA Plant ICI (T11) Karachi, Pakistan De-bottlenecking Project of Qatar Gas LPG Plant (Train-III), Ras Laffan Qatar Revamping Project of Abu-Dhabi Polymer Company (Borouge) Rawais, Abu Dhabi UAE SOFTWARE SKILLS Oracle Primavera Project Management - P6 Microsoft Project - All Versions Primavera RiskAnaylsis ver. 6.2 Microsoft Office - All Versions RESUME: MUJAHID AKHTAR PLANNING & CONTROL PROFESSIONAL MECHANICAL ENGINEER (PE) CONTACT DETAILS: PHONE: +971-55-5210079 EMAIL: AKHTAR.SIPSC@GMAIL.COM Date Revision Checked Approved 28.Jun.16 RESUME REV. 0 MA MA Page 3 of 4
  • 4.
    Activity Name StartFinish Maximo 4.0.1 / AutoCAD 2002 2.Jan.06* Advanced Windows & Internet User 1.Jan.03* MEMBERSHIPSMEMBERSHIPSMEMBERSHIPS Pakistan Engineering Council - 2004 1.Aug.04* TRAININGSTRAININGSTRAININGS Project Management in Primavera 6.0 Client Server (Advance Course 106-P) by CMCS, UAE 1.Oct.07* Resource Management in Primavera 6.0 Client Server (Advance Course 106-R) by CMCS, UAE 11.Nov.07* Primavera Project Planner P6 Administration (Course 106-A) by CMCS, UAE 1.Jan.03 GASCO Shutdown Management System Training by AP Networks USA 1.Jan.03* Construction Technology and Management Training for improvement of staff skills by DESCON Engineering 1.Jan.03* Training on "Safe Work System" at Qatar Gas arranged by CTJV (Chiyoda Technip Joint Venture) 1.Jan.03* Permit to Work System Training at Qatar Gas, Ras Laffan-Qatar 1.Jul.06* PERSONAL INFORMATIONPERSONAL INFORMATIONPERSONAL INFORMATION Date of Birth: 24-Dec-1979 Marital Status: Married No. of Dependents: 3 Nationality: Pakistani Languages: English, Urdu, Punjabi, BasicArabic & Russian Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Maximo 4.0.1 / AutoCAD 2002 Advanced Windows & Internet User MEMBERSHIPS Pakistan Engineering Council - 2004 TRAININGS Project Management in Primavera 6.0 Client Server (Advance Course 106-P) by CMCS, UAE Resource Management in Primavera 6.0 Client Server (Advance Course 106-R) by CMCS, UAE Primavera Project Planner P6 Administration (Course 106-A) by CMCS, UAE GASCO Shutdown Management System Training by AP Networks USA Construction Technology and Management Training for improvement of staff skills by DESCON Engineering Training on "Safe Work System" at Qatar Gas arranged by CTJV (Chiyoda Technip Joint Venture) Permit to Work System Training at Qatar Gas, Ras Laffan-Qatar PERSONAL INFORMATION Date of Birth: 24-Dec-1979 Marital Status: Married No. of Dependents: 3 Nationality: Pakistani Languages: English, Urdu, Punjabi, BasicArabic & Russian RESUME: MUJAHID AKHTAR PLANNING & CONTROL PROFESSIONAL MECHANICAL ENGINEER (PE) CONTACT DETAILS: PHONE: +971-55-5210079 EMAIL: AKHTAR.SIPSC@GMAIL.COM Date Revision Checked Approved 28.Jun.16 RESUME REV. 0 MA MA Page 4 of 4