SlideShare a Scribd company logo
1 of 4
QC SUPERVIROR CIVIL/STRUCTURAL
Shoaib Resume Page 1`
SHOAIB MUSTAFA
E-mail: shoaib.mustafa1984@yahoo.com
 +966-501315920
Education
D.A.E(Civil) - 2003
Govt. college of TechnologyRASULPUNJABPAKISTAN
SAP No# 70014616
Key Qualifications
An accomplished CIVILENGINEERING Professionalwith 13years of Experience inQuality supervisorand
QualityControl invarioustypesof projectsaslike oil &gas Refineries,petrochemical industries (Saudi
Aramco), Infrastructure,Industrial supportFacilities,Commercial andResidential Buildings,which
include specializationsonCastinPlace,Substations& overheadtransmissiontower,Site Preparation,
Tank foundations, AsphaltpavingRoads andmiscellaneousfacilities, pipingetc.
EXPERIENCERECORD
SA KANTZ 01-Dec-2016– TillDate
(Memberof the SNC Lavalin group) UnconventionalGas
QC Supervisor civil/structural Project System B (Turaif)
ARAMCO APPROVED
Main Scope:
 10 WellheadsSite FacilitiesforSPF(total 40)
 6” Flowlines&13.8KV Overheadtransmissionlines
 4 Surface Gas Processing(SPF) Facilities
 16” Trunk linesfromSPFto 30” Gas pipelineincludingvalve station,scraperlaunching/ receiving
 WAS ISFcomplex(Total10 buildings)
El-SeifEngineeringcontractingcompany 05-Jun-2013– 30-Nov-2016
QC SUPERVISOR SADARA DOW chemical
Project Jubail(PKG-126)
SADARA APPROVED
Projectin Hand:
This Project consists of building complex for SADARA staff car parking, mosque and Asphalt Road work.
The buildings are a combination of Concrete, Pre-engineered with Pre-cast Cladding and Metal deck
roofs,and Concrete roofsand Parkingshedetc.
AHC Contracting co, (EPC) 11-Nov-2012 – 03-Jun-2013
QA/QC Inspector Abu Ali gas plant
ARAMCO APPROVED
QC SUPERVIROR CIVIL/STRUCTURAL
Shoaib Resume Page 2`
Worked with the focus of responsibility:
 Performing inspections at site to assure the quality as per IFC drawings, ARAMCO
Engineering Standards. Prepare the work procedures, QC Plans, material submittals, ITPs,
Checklists, test results for concrete Isolated Foundations, retaining walls, Sea water storage
tank, staff building, Air blower building, technical quarries, etc. Performing surveillance at
site. Preparing daily, weekly and monthly quality reports to submit Field Supervisor / Project
Quality Manager. Attending weekly QA/QC and construction meetings and discussing the
quality issues.
Projectin Hand:
Project includes the construction of Fish Hatchery building, Nursery, Concrete foundations, Fire
fighting/RTR pipeline trenches, Asphalt Road works, IWW tanks & SWW tanks, Potable & Fire water
tanks, PEB works and Infrastructure development works.
SUEDROHRBAUSAUDIARABIACO .LTD (EPC) 19-sep-2011-05-Nov-2012
QA/QC Inspector (Civil) manifa plant
ARAMCO APPROVED
Worked with the focus of responsibility:
 Performing inspections at site to assure the quality as per IFC drawings, ARAMCO
Engineering Standards. Prepare the work procedures, QC Plans, material submittals, ITPs,
Checklists, test results for concrete thrust Anchor and Foundations, technical quarries, etc.
Performing surveillance at site. Preparing daily, weekly and monthly quality reports to submit
Field Supervisor / Project Quality Manager. Attending weekly QA/QC and construction
meetings and discussing the quality issues.
Projectin Hand:
Project includes the construction of Thrust Anchor, Concrete foundations, Oil, Gas and water pipeline
trenches, Thrust boring for Road crossing , IWW tanks & SWW tanks, Potable & Fire water tanks,
PEB works and Infrastructure developmentworks.
SAUDIAMANA CONTRACTINGCO. LLC May 2009 –17- July- 2011
QA/QC Inspector (Civil) Jubail KSA
ARAMCO APPROVED
Worked with the focus of responsibility:
 Performing inspections at site to assure the quality as per IFC drawings, EICO Engineering
Standards and International Standards. Prepare the work procedures, QC Plans, material
submittals, ITPs, Checklists, test results, hydro-test packages for concrete tanks, technical
quarries, etc. Performing surveillance at site. Preparing daily, weekly and monthly quality
reports to submit Field Supervisor / Project Quality Manager. Attending weekly QA/QC and
construction meetingsand discussing the quality issues.
QC SUPERVIROR CIVIL/STRUCTURAL
Shoaib Resume Page 3`
Projectin Hand:
Project includes the construction of Admin Building area, Ware house area, Weaving area, Draying
oven area, Fiber forming area, Furnace area, BPM area, IWW tanks & SWW tanks, Potable & Fire
water tanks, PEB works and Infrastructure development works.
PAN GULF HOLDING Jul 2007– Feb 2009
QA/QC Inspector (Civil) Dammam KSA
Worked with the focus of responsibility:
 Construction Supervision of foundation, Columns and slab. Testing and checking of concrete
pouring and epoxy type steel Rebar. Monitoring the implementation of QA/ QC plan. Co-
ordination with the client and contractor for day to day technical matters, maintain
inspection records. To 3rd party inspections as & when required. Co- ordinate with the client
consultants & engineers. Inspection of soil FDT test for back filling layers, formation of sub-
base and grade according to the project specifications. Makes Materials Request for
inspection(MRI)of architectural/structural materials, delivered at site.
Projectcompleted:
Completed infrastructure and buildings project for KSA armed forces in HAFAR BATIN, RAFAH, ARAR
and AL KALIAT.
AVEROXPvt. Ltd May 2005 – May 2007
QA/QC Inspector (Civil) Islam Abad Pakistan
Worked with the focus of responsibility:
 Construction Supervision of foundation, Columns and slab. Testing and checking of concrete
pouring and epoxy type steel Rebar. Monitoring the implementation of QA/ QC plan. Co-
ordination with the client and contractor for day to day technical matters, maintain
inspection records. To 3rd party inspections as & when required. Co- ordinate with the client
consultants & engineers. Inspection of soil FDT test for back filling layers, formation of sub-
base and grade according to the project specifications. Makes Materials Request for
inspection(MRI)of architectural/structural materials, delivered at site.
Projectcompleted:
 Construction of Assembling and Welding Plant for Indus Toyota Motors Karachi.
 Construction of G+2 School building for The Citizen Foundation Karachi.
 Construction of Power Plant for Pakistan International Container Terminal Karachi.
CONTECHINTERNATIONAL (Pvt.) Apr 2003 – May 2005
Site Engineer(civil) Islam Abad Pakistan
Joined as Jr. Site Engineerand upgraded to Site Engineer.
 Organized plan, direct, advice and managed site staff, Allocate Resources to specific aspects of
project. Coordinated tracking and control of project related resources and materials. Actively
initiate the schedule, plan the required resources, set Quality and safety plans and enforced of
the same, perform follow up, analysis and monitoring activities. Prepare interim/completion
QC SUPERVIROR CIVIL/STRUCTURAL
Shoaib Resume Page 4`
project progress reports. Quality control, project estimates, and Interim payment invoice. Liaised
with sub-contractors, consultant and Clients.
Projectcompleted:
 Construction of Multi storey building for PTCL Pakistan head quarter.
 Construction of Morka city housing project
 Construction Creek Vistas 6 Towers of 18 Floors
 Construction of Morka City Hospital
 Construction of Morka city Shopping mall
Personal Details
Date of Birth: 24th
March 1984
Marital Status: Married
Nationality: Pakistani
IQAMA Type: Company
SAP No 70014616

More Related Content

What's hot

CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016Mujahid Ali Akhtar
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep Pandey
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_originalNeeladri varma
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 

What's hot (19)

CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)Resume for Mechanical Engineer (1)
Resume for Mechanical Engineer (1)
 

Viewers also liked

Solución de casos
Solución de casos Solución de casos
Solución de casos norveyruano
 
Iwan fals kel.6
Iwan fals kel.6Iwan fals kel.6
Iwan fals kel.6Dindasarah
 
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento16 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1Oliver Caicedo
 
ಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲು
ಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲುಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲು
ಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲುFAHIM AKTHAR ULLAL
 
Redes 03-tipos de redes de ordenadores versión 2013
Redes 03-tipos de redes de ordenadores versión 2013Redes 03-tipos de redes de ordenadores versión 2013
Redes 03-tipos de redes de ordenadores versión 2013Koldo Parra
 

Viewers also liked (13)

Billy's portfolio
Billy's portfolioBilly's portfolio
Billy's portfolio
 
Internet y navegador
Internet y navegadorInternet y navegador
Internet y navegador
 
Solución de casos
Solución de casos Solución de casos
Solución de casos
 
El asesinato-de-las-muñecas
El asesinato-de-las-muñecasEl asesinato-de-las-muñecas
El asesinato-de-las-muñecas
 
Iwan fals kel.6
Iwan fals kel.6Iwan fals kel.6
Iwan fals kel.6
 
lesson_plan
lesson_planlesson_plan
lesson_plan
 
Ravi Resume (1)
Ravi Resume (1)Ravi Resume (1)
Ravi Resume (1)
 
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento16 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
6 gfpi f-019-formato_guia_de_aprendizaje-mantenimiento1
 
Presentatie dior nieuw
Presentatie dior nieuwPresentatie dior nieuw
Presentatie dior nieuw
 
Travel Technology
Travel Technology Travel Technology
Travel Technology
 
French Touch de l'Education - Slides intervenants du 2 juin 2016
French Touch de l'Education - Slides intervenants du 2 juin 2016French Touch de l'Education - Slides intervenants du 2 juin 2016
French Touch de l'Education - Slides intervenants du 2 juin 2016
 
ಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲು
ಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲುಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲು
ಸುವಾರ್ತೆ ಮತ್ತು ಮುನ್ನಚ್ಚರಿಕೆ ನೀಡಲು
 
Redes 03-tipos de redes de ordenadores versión 2013
Redes 03-tipos de redes de ordenadores versión 2013Redes 03-tipos de redes de ordenadores versión 2013
Redes 03-tipos de redes de ordenadores versión 2013
 

Similar to Shoaib Resume (20)

CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
CV
CVCV
CV
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
 
CV_RKSEN_01.11.2016.pdf
CV_RKSEN_01.11.2016.pdfCV_RKSEN_01.11.2016.pdf
CV_RKSEN_01.11.2016.pdf
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
Ramanathan CV
Ramanathan CVRamanathan CV
Ramanathan CV
 
CIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssssCIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssss
 
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 

Shoaib Resume

  • 1. QC SUPERVIROR CIVIL/STRUCTURAL Shoaib Resume Page 1` SHOAIB MUSTAFA E-mail: shoaib.mustafa1984@yahoo.com  +966-501315920 Education D.A.E(Civil) - 2003 Govt. college of TechnologyRASULPUNJABPAKISTAN SAP No# 70014616 Key Qualifications An accomplished CIVILENGINEERING Professionalwith 13years of Experience inQuality supervisorand QualityControl invarioustypesof projectsaslike oil &gas Refineries,petrochemical industries (Saudi Aramco), Infrastructure,Industrial supportFacilities,Commercial andResidential Buildings,which include specializationsonCastinPlace,Substations& overheadtransmissiontower,Site Preparation, Tank foundations, AsphaltpavingRoads andmiscellaneousfacilities, pipingetc. EXPERIENCERECORD SA KANTZ 01-Dec-2016– TillDate (Memberof the SNC Lavalin group) UnconventionalGas QC Supervisor civil/structural Project System B (Turaif) ARAMCO APPROVED Main Scope:  10 WellheadsSite FacilitiesforSPF(total 40)  6” Flowlines&13.8KV Overheadtransmissionlines  4 Surface Gas Processing(SPF) Facilities  16” Trunk linesfromSPFto 30” Gas pipelineincludingvalve station,scraperlaunching/ receiving  WAS ISFcomplex(Total10 buildings) El-SeifEngineeringcontractingcompany 05-Jun-2013– 30-Nov-2016 QC SUPERVISOR SADARA DOW chemical Project Jubail(PKG-126) SADARA APPROVED Projectin Hand: This Project consists of building complex for SADARA staff car parking, mosque and Asphalt Road work. The buildings are a combination of Concrete, Pre-engineered with Pre-cast Cladding and Metal deck roofs,and Concrete roofsand Parkingshedetc. AHC Contracting co, (EPC) 11-Nov-2012 – 03-Jun-2013 QA/QC Inspector Abu Ali gas plant ARAMCO APPROVED
  • 2. QC SUPERVIROR CIVIL/STRUCTURAL Shoaib Resume Page 2` Worked with the focus of responsibility:  Performing inspections at site to assure the quality as per IFC drawings, ARAMCO Engineering Standards. Prepare the work procedures, QC Plans, material submittals, ITPs, Checklists, test results for concrete Isolated Foundations, retaining walls, Sea water storage tank, staff building, Air blower building, technical quarries, etc. Performing surveillance at site. Preparing daily, weekly and monthly quality reports to submit Field Supervisor / Project Quality Manager. Attending weekly QA/QC and construction meetings and discussing the quality issues. Projectin Hand: Project includes the construction of Fish Hatchery building, Nursery, Concrete foundations, Fire fighting/RTR pipeline trenches, Asphalt Road works, IWW tanks & SWW tanks, Potable & Fire water tanks, PEB works and Infrastructure development works. SUEDROHRBAUSAUDIARABIACO .LTD (EPC) 19-sep-2011-05-Nov-2012 QA/QC Inspector (Civil) manifa plant ARAMCO APPROVED Worked with the focus of responsibility:  Performing inspections at site to assure the quality as per IFC drawings, ARAMCO Engineering Standards. Prepare the work procedures, QC Plans, material submittals, ITPs, Checklists, test results for concrete thrust Anchor and Foundations, technical quarries, etc. Performing surveillance at site. Preparing daily, weekly and monthly quality reports to submit Field Supervisor / Project Quality Manager. Attending weekly QA/QC and construction meetings and discussing the quality issues. Projectin Hand: Project includes the construction of Thrust Anchor, Concrete foundations, Oil, Gas and water pipeline trenches, Thrust boring for Road crossing , IWW tanks & SWW tanks, Potable & Fire water tanks, PEB works and Infrastructure developmentworks. SAUDIAMANA CONTRACTINGCO. LLC May 2009 –17- July- 2011 QA/QC Inspector (Civil) Jubail KSA ARAMCO APPROVED Worked with the focus of responsibility:  Performing inspections at site to assure the quality as per IFC drawings, EICO Engineering Standards and International Standards. Prepare the work procedures, QC Plans, material submittals, ITPs, Checklists, test results, hydro-test packages for concrete tanks, technical quarries, etc. Performing surveillance at site. Preparing daily, weekly and monthly quality reports to submit Field Supervisor / Project Quality Manager. Attending weekly QA/QC and construction meetingsand discussing the quality issues.
  • 3. QC SUPERVIROR CIVIL/STRUCTURAL Shoaib Resume Page 3` Projectin Hand: Project includes the construction of Admin Building area, Ware house area, Weaving area, Draying oven area, Fiber forming area, Furnace area, BPM area, IWW tanks & SWW tanks, Potable & Fire water tanks, PEB works and Infrastructure development works. PAN GULF HOLDING Jul 2007– Feb 2009 QA/QC Inspector (Civil) Dammam KSA Worked with the focus of responsibility:  Construction Supervision of foundation, Columns and slab. Testing and checking of concrete pouring and epoxy type steel Rebar. Monitoring the implementation of QA/ QC plan. Co- ordination with the client and contractor for day to day technical matters, maintain inspection records. To 3rd party inspections as & when required. Co- ordinate with the client consultants & engineers. Inspection of soil FDT test for back filling layers, formation of sub- base and grade according to the project specifications. Makes Materials Request for inspection(MRI)of architectural/structural materials, delivered at site. Projectcompleted: Completed infrastructure and buildings project for KSA armed forces in HAFAR BATIN, RAFAH, ARAR and AL KALIAT. AVEROXPvt. Ltd May 2005 – May 2007 QA/QC Inspector (Civil) Islam Abad Pakistan Worked with the focus of responsibility:  Construction Supervision of foundation, Columns and slab. Testing and checking of concrete pouring and epoxy type steel Rebar. Monitoring the implementation of QA/ QC plan. Co- ordination with the client and contractor for day to day technical matters, maintain inspection records. To 3rd party inspections as & when required. Co- ordinate with the client consultants & engineers. Inspection of soil FDT test for back filling layers, formation of sub- base and grade according to the project specifications. Makes Materials Request for inspection(MRI)of architectural/structural materials, delivered at site. Projectcompleted:  Construction of Assembling and Welding Plant for Indus Toyota Motors Karachi.  Construction of G+2 School building for The Citizen Foundation Karachi.  Construction of Power Plant for Pakistan International Container Terminal Karachi. CONTECHINTERNATIONAL (Pvt.) Apr 2003 – May 2005 Site Engineer(civil) Islam Abad Pakistan Joined as Jr. Site Engineerand upgraded to Site Engineer.  Organized plan, direct, advice and managed site staff, Allocate Resources to specific aspects of project. Coordinated tracking and control of project related resources and materials. Actively initiate the schedule, plan the required resources, set Quality and safety plans and enforced of the same, perform follow up, analysis and monitoring activities. Prepare interim/completion
  • 4. QC SUPERVIROR CIVIL/STRUCTURAL Shoaib Resume Page 4` project progress reports. Quality control, project estimates, and Interim payment invoice. Liaised with sub-contractors, consultant and Clients. Projectcompleted:  Construction of Multi storey building for PTCL Pakistan head quarter.  Construction of Morka city housing project  Construction Creek Vistas 6 Towers of 18 Floors  Construction of Morka City Hospital  Construction of Morka city Shopping mall Personal Details Date of Birth: 24th March 1984 Marital Status: Married Nationality: Pakistani IQAMA Type: Company SAP No 70014616