SlideShare a Scribd company logo
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR IN QUANTITY SURVEYING (HONOURS)
SOFTWARE APPLICATION FOR QUANTITY SURVEYING (CSC 60603)
ASSIGNMENT 2: INDIVIDUAL ASSIGNMMENT
NAME STUDENT ID
Ee Hui Teng 0322548
Lim Hong Wei 0322741
Loo Siah Mong 0321995
Pui Chun Shian 0323740
Tan Jia San 0322406
Yip Xiao Jung 0323852
Table of Content
1
Part Title Pages
Introduction 2
A 1.1 Vico Office Takeoff Manager Software
1.1.1 Function of Vico Office Takeoff Manager
1.1.2 Limitation of Vico Office Takeoff Manager
1.2 Cost X
1.2.1 Function of Cost X
1.2.2 Limitation of Cost X
1.3 Buildsoft Cubit
1.3.1 Function of Buildsoft Cubit
1.3.2 Limitation of Buildsoft Cubit
1.4 Cubicost (Glodon)
1.4.1 Function of Cubicost
1.4.2 Limitation of Cubicost
1.5 Summary
3-8
9-10
11-12
13-15
15-16
B 2.1 BIM
2.1.1 Preparation Stage
2.1.2 Design Stage
2.1.3 Pre-construction Stage
2.1.4 Construction Stage
2.1.5 Post Construction Stage
17-19
2.2 CAD
2.2.1 Preparation Stage
2.2.2 Design Stage
2.2.3 Pre-construction Stage
2.2.4 Construction Stage
2.2.5 Post Construction Stage
20-23
2.3 Manual Measurement
2.3.1 Preparation Stage
2.3.2 Design Stage
2.3.3 Pre-construction Stage
2.3.4 Construction Stage
2.3.5 Post Construction Stage
24-26
2
3
Introduction
Moving forward to the 21st century, the age of Building Information Modeling (BIM) has come.
BIM describes the process of designing a building collaboratively using one coherent system of computer
models rather than as separate sets of drawings.This system is often adopted by construction companies to
improve the 3 most important aspects to their projects, namely time, cost, and quality. BIM covers the
whole construction lifecycle from the briefing stage all the way to the operation and maintenance of a
building. Generally, the application of BIM is divided into 3 levels, starting from Level 1 with minimal
collaboration between parties up to Level 3, where all parties collaborate on the same model and share the
same data on the same repository.
As the industry shifts towards the massive use of BIM softwares for construction, the industry
professionals, including the Quantity Surveyor, has taken a step forward to fully utilise the benefits that
can be obtained from BIM. Several BIM QS softwares on the market can now enable a QS to easily take
off quantities and estimate the project costs from any drawings or models available. As BIM is more than
3D-CAD, information such as Schedules and Cost plans can be included in the files. Undoubtedly what
BIM brings is a complete transformation by helping a construction project move from the design desks to
physical reality. It prunes redundant data, erases communication lag and noise, maintains updated
information, brings operational efficiency, improves coordination among departments and gives an
overall efficiency to the whole lifespan of the project. With large infrastructural projects BIM is a must.
So in this report, we look into massive BIM QS softwares that are available in the market and
analysed their respective functions and limitations. In our opinions, these 4 softwares not only well versed
in the BIM industry compared to others, we are also well exposed to these softwares in terms of
understanding level and functionality of the softwares.
● Vico Office Takeoff Manager
● CostX
● Buildsoft cubit
● Cubicost (Glodon)
From these 4 softwares available, a detailed comparison on the functions and limitations as well
as how well it works on measurements will be conveyed through this report.
1.1 Vico Office TakeoffManager
4
Vico Office is a purpose-built software for construction, provides an integrated BIM workflow
for construction which enables users to perform functions such as extending basic 3D model with
constructability analysis and coordination, 4D location-based scheduling and production control, 5D
estimating, quantity takeoff and layout. Vico Office is designed in a modular way which allows a
consistent and easy use in order to maximize efficiency and achieving the needs of various construction
process trades and stages.
By utilizing Vico Office, building owners and general contractors are able to work together more
efficiently, enhance predictability, manage cost as well as lowering risk and optimizing workflow on
large, complex building projects. Vico Office also provides flexibility in modelling, scheduling and
estimating for project teams and are still able to work together with all stakeholders in terms of
coordination, budgeting and project control.
1.1.1 Functions
2D to 3D Change Management
5
Vico Document Controller allows 2D drawings to be converted into 3D models. This feature is also able
to identify the changes of 2D and 3D versions as well as comparing the coordinated 3D model to 2D
contract documents for final checking.
3D BIM for Visualization
Vico Office performs well with practical BIM authoring tools such as Autodesk Revit, Graphisoft
ArchiCAD and Tekla Structures including additional import softwares such as Google SketchUp, 3D
DWG, CAD Duct and IFC files.
6
3D BIM for Clash Detection
Vico Constructability Manager enables the project team to identify constructability problems in the
planning process by providing integrated solutions for clash detections and coordination resolution.
3D BIM for Layout
Vico Layout Manager offers a precise analysis of virtual model critical points matching to job site's
physical points. This feature also offers speedy installation and remove costly rework.
3D BIM for Quantity Takeoff
7
Vico Takeoff Manager provides more precise, up to date schedules, estimating and cost planning. With its
unique geometry analysis algorithm, this feature scans a 3D model’s content and automatically generates
take of items with a set of construction-caliber quantities off the 3D model.
4D BIM for Scheduling and Production Control
➔ Vico LBS Manager - functions to divide the project into work locations which allows smooth flow of
work without interference.
➔ Vico Schedule Planner - utilizes BIM model elements to generate construction schedules and
associating them with the corresponding resources,materials and labor.
➔ Vico Production Controller - manages on-site production and planning schedules during the build
phase. This feature provides sufficient time for forecasting schedules to identify problems.
8
➔ Vico 4D Manager - a 4D simulation presentation tool for the construction team which provides the
team with a clear 3D visualization of the project timeline.
5D BIM for Estimating
➔ Vico Cost Planner - a strong model-based cost estimating solution. This feature uses Vico Takeoff
Manager to provide a precise estimation within a short period of time which ensures the project does
not exceeds its budget.
9
➔ Vico Cost Explorer - enables project team to visualize the elements of the projects that are affecting
the changes in the cost in order to keep track
of the budget. It is also the first model-based
budgeting application.
Construction Management Report
Vico Office Client forms the foundation of Vico Office Suite. This feature enable information to be
communicate across the project team, delivers constructability reports, provide cost and resource loaded
schedules, cash flow reports, cost estimates and proposed design changes.
1.1.2 Limitations of Vico Office
Vico Office allows only one model file to be used at one time because when two models are
placed together, Vico Office is unable to detect any collisions automatically. Hence, this will require more
time to complete the 3D model.
1.2 CostX
10
CostX® is an exciting software innovation developed by award winning software designers and
construction industry professionals. It allows non-CAD users to measure from PDF or CAD files without
running CAD software, and, dependent upon the version of CostX® being used, create detailed workbook
documents such as estimates, cost plans, bills of quantities or tenders – all within a fully integrated,
paperless, electronic environment. A powerful and flexible report writer allows professional quality
output to be produced and issued either as paper documents or electronic files.
1.2.1 Functions of CostX
Auto-revisioning
This is one of the unique functions of CostX where it has the ability to compare and review the
contemporary drawings with the previous one and highlight the changes that is being made. This function
allows the user safe plenty of time and fastens the work. Auto- revisioning function will continue by
creating an audit trail likewise revises the previous quantities and workbooks as well as updating the latest
quantities.
Subcontractor Comparison
Subcontractor comparisons workbooks can be generated in CostX allow the user to compare with the
subcontractors information. Subcontractor Comparison system able to link the report and quotation detail
of every subcontractor and allow the user have better view and make comparison with one another about
the cost and quality.
Able to support various files types
11
By using CostX, it can support scanned, PDF or CAD drawings and 3D models/BIM without the need to
buy CAD software. Not only that, it also supports various drawing file formats such as, SKP, SWG,
DWF, DGN and IFC. This allows quantity surveyors to extract quantities and measure through existing
project drawings since it is compatible with any industry standard drawings including Revit support and
do on-screen measurement for taking-off quantities. Letting technology do its part in removing manual
entry tasks and the possibility of human error allows for a productive back office and streamlined process.
3D / BIM Takeoff
By using 3D taking off, it enables them to visualise their measurement in 3D, leveraging the latest
developments in automated take-off so that they can populate their cost plan. This allows the QS have a
more accurate estimate quantities and costs compare to traditional measurement. The database
information from 3D model view and 2D plans, sections and elevations can be utilize by QS to initiate
quantities mechanically and improve on the database quantities with additional measurement of 2D or 3D
drawing sheets. Besides that, 3D view helps users to visualize and understand the drawing have a general
idea of the building before build.
1.2.2 Limitations of CostX
Add-on Cost
In order to exploit the software to its full potential including its function, QS firms need to pay more for
other products like Cost XL.
Rebar detection
While measuring rebar in CostX, the main reinforcement bar of the beam or column could not be detected
by using the software. Bents for mesh fabric reinforcement (BRC) cannot be detected in CostX as well
hence the users will have to measure the length of fabric reinforcement of the whole beam or column
assuming it is the reinforcement bars.
12
1.3
Bui
lds
oft
Cu
bit
Cubit delivers a unique and natural solution for estimating building and construction projects. By
combining estimating and takeoff in one seamless software package, it will able to save us lots of time
and money, plus its ease of use means after an hour of training we’ll be up and running.
1.3.1 Function of buildsoft cubit
Natural Estimating
Estimating and takeoff, one seamless process as Cubit is a specialised estimating system with flexible
functionality that allows us to estimate the way we wanted. It’s the only application that seamlessly
integrates takeoff with estimating for an all-in-one solution that called Natural Estimating. It’s all laid out
in one view, meaning the information is where we want it, when we need it.
3D Takeoff
Pinpoint accurate takeoff with a review from any angle. By tracing directly over imported plans, simple or
complex quantity takeoffs are performed quickly and accurately. See elements of the takeoff from any
angle in 3D, and use this as a cross-referencing tool to make sure we don’t miss taking off any items, or to
check all your openings. Perform quantity takeoffs from PDF, CAD (DWG, DXF), BIM (DWFx), and
image files.
Price Lists
Use template price lists and jobs as the source for new estimates.Collect pricing information and save
them as template price lists (or even import supplier price lists) to control how the company prices jobs,
ensuring accuracy and maximising profitability. Go even further by creating template jobs that collate all
the common trades and items, making it easier to start next estimate, time and time again.
Job Analysis
13
Group similar information together to increase visibility over jobs. Code our estimate in a way that allows
us to sort data into different formats, giving us the ability to quickly analyse or breakdown a job by cost
code or material. For example, if you were asked the volume of concrete on a particular level of a multi
storey apartment block, this information can be achieved by coding the estimate by material. This handy
feature allows us split the job across different stages and budgets, and export more detailed estimates into
other workflows, like our Subcontractor Comparison Program, Microsoft Excel, and other third-party
applications.
Automatic Plan Revisions
Able to save countless hours estimating as revisions to plans are overlaid on an existing plan you’ve
already taken off. Not only that, it allows you to edit plans as part of the revision process.Within the
viewport, we can clearly see where the differences occur and update the takeoff to reflect any revisions.
1.3.2 Limitation of Buildsoft Cubit
Permanently deleted
The job file that had been created in Buildsoft will be permanently deleted when we do the amendment on
the existing data. Its mean the amendment that had been done cannot be called back. So the user must be
carefully in doing the amendment.
Typing errors
This software has not created to check or identify the typing errors like numbers or figure that already
type in. We have to use human skill to check the errors. For an example; we want to put 6.86m length but
we was type in 6.68m in the computer. So the figure will be wrong because it’s human errors. This
method of BQ preparation will need extra time to key-in the figure into the computer to avoid the
mistakes or errors.
Virus Attack
Virus attack is common problem to all the computer users especially using internet. The user should have
licensed anti-virus software so that the virus definition can be updated daily. The software can detect the
virus attack and quarantined or killed the virus and also protect the computer and system. The problem is
when no anti-virus was installed, the virus can attack the computer system and also all the content of the
computer. If this happen, the data may be lost and may be can not be recovered by any means.
1.4 Cubicost (Glodon)
14
In Cubicost (Glodon), it is comprised of four individual BIM-based software products (TAS,
TRB, TME, TBQ) that are focused on different needs of quantity surveying business. All these four
products together virtually cover all general requirements in construction cost estimation business.
Moreover, BIM model and related data can be easily transferred between four products, bringing you the
most professional, efficient and accurate BIM cost estimation experience. Not only that, Cubicost
(Glodon) has established its international presence, with US, Finland and UK subsidiaries targeting the
European and American markets as well as Singapore, Hong Kong and Malaysia subsidiaries driving its
development in SEA markets such as Taiwan, Indonesia and Thailand. With that being said, Cubicost
(Glodon) may be the one of the best BIM softwares technology that is used by current Quantity Surveyor.
Cubicost Takeoff for Architecture and Structure (TAS)
Cubicost Takeoff for Rebar (TRB)
Cubicost TBQ (TBQ)
Cubicost Takeoff for Mechanical & Electric (TME)
1.4.1 Functions ofCubicost (Glodon)
Quick modelling and BIM-based quantity takeoff
15
Build BIM model efficiently by identifying DWG, JPG, PDF or by tracking 2D drawings. Only one click
is needed to complete quantity takeoff based on model. Deals with variations quickly by only adjusting
model information and performing calculation again.
Professional, accurate and easy to check
Built-in local measurement methods, which has been proved by users from many countries. It can also
deduct automatically based on the relations among elements in BIM model to ensure calculation
accuracy. It has support viewing calculation basis and expressions to facilitate rapid result checking and
less calculation errors.
Various quantity reports
Cubicost has the ability to generate reports by floor, element type or other conditions. Unique Reversely
Check helps to trace the origin of quantities in BIM models, making it easy to check and modify
quantities. It can also provide a variety of report formats and support exporting Excel for different
requirements.
Teamwork high efficiency
Cubicost supports the rapid adjustment and reuse of BIM models, to reduce the working intensity and
greatly increase the efficiency of team collaboration.
1.4.2 Limitations of Cubicost (Glodon)
Cost
16
The license to own Cubicost (Glodon) installed is extremely costly which resulted some of the smaller
Quantity Surveyor firm not being able to afford. Therefore alternatives like CostX or eTakeoff would be
their choice with a downside of having less functions compared to Cubicost (Glodon). Not only that,
when an update is released to implement new features of functions, a certain amount of fee must be paid
in order to update. This can cause commitment issue in the long run as the price can be far beyond than
the initial price of the product.
17
1.5 Summary
Feature Glodon Cost X Buildsoft Cubit Vico Office
3D Model
Visualization
✓ ✓ ✓ ✓
Simplicity ✓ ✓ ⅹ ⅹ
Auto-revisioning ✓ ✓ ⅹ ⅹ
Able to export into
others format
✓ ⅹ ⅹ ⅹ
Able to read
different types of
drawings
✓ ✓ ✓ ✓
Overall throughout our research, we conclude that Glodon BIM software has the best features
compared among the other software as BIM QS software. The reason why we chose this software as the
most user friendly and Glodon’s BIM software is internationally recognised and focuses on the entire
lifecycle of construction projects with the support of big data and internet finance services. Besides, this
software focused on different needs of quantity surveying business. All these four products together
virtually cover all general requirements in construction cost estimation business. Moreover, BIM model
and related data can be easily transferred between four products, bringing the most professional, efficient
and accurate BIM cost estimation experience. Most importantly it is the best solution for cost estimation,
which is different from traditional method as it enables data and model sharing among other popular
software from upstream to downstream in the industry.
But as a recommendation, we would suggest that BIM software will improvised in terms of
reducing the workflow of QS’s in construction industry.
2.1 Building Information Modelling (BIM)
18
2.1.1 Preparation / Briefing Stage
Benefits
Provide Visualization of Project
2D drawings are often hard to visualize and communicated due to imagination constraints. With Building
Information Modelling (BIM), various parties such as the client's, future occupants and site workers are
provided with a visual to know how a building will look like way before the project commences. This
enables the parties to have a better insight of the project.
Ability for Collaboration
Project data are readily accessible to parties such as architects, engineers, quantity surveyors and
contractors. Everyone can address any issues effectively and efficiently. Moreover, all parties are able to
input information and make necessary amendments quickly. Therefore, BIM provides the ability for
different parties to collaborate together.
Constraints
Cost of Software
Building Information Modelling (BIM) software are very costly and is a huge capital investment. This
investment is worthwhile only if it is being used to its fullest potential. Other than that, this expense is a
huge restriction for small companies who have difficulties to afford it.
Lack of Experts
BIM software are rather new to the industry, many were not exposed to it yet. Therefore, there are very
limited number of experts in the field. Moreover, it requires additional investment in time to train and
educate an individual to be an expert.
2.1.2 Design Stage
Benefits
Amendments Can Be Made Easily
Building Information Modelling (BIM) software links all data related to the construction together. All
components are interrelated to each other. Therefore, when a change is made, it automatically amend the
other related data. This saves time and minimise errors.
Ability to Design Complex Projects
19
BIM is able to help in designing complex projects. A complex project consist of many different and
connected parts. With the aid of beams, any design complication and clashes can be detected easily.
Constraints
Requires Adaptation Period
As Building Information Modelling (BIM) is new to the industry, BIM users require a long period to
adapt and get used to functioning it. Extra time and effort is essential before one can fully operate
effectively it.
Incompatibility
Due to the high initial cost BIM, it may be a barrier for many especially small scale companies.
Therefore, many do not have the software. This makes it incompatible to be used if one of the parties
involved in the project do not own the software.
2.1.3 Pre-construction Stage
Benefits
Effective and Efficient
With the aid of Building Information Modelling (BIM), clashes of elements can be detected immediately
and with ease at early stage. It ensures all elements to be perfect fit for each other. This save cost and
minimise errors. As result, a better quality design is produced.
Time Saving
BIM is able to simplify the process of measurement and pricing as it features an automatic quantity taking
off and cost estimation. This will then save time and one can focus more on other tasks.
Constraints
Lack of Single Point of Responsibility
Any party that made a mistake will be difficult to be identified and the responsibility will be push to one
another. This is because BIM enables all parties to make any amendments easily without consent. This
results in the lack of single point of responsibility.
2.1.4 Construction Stage
Benefits
20
Promote use of Prefabricated Components
Pre-fabricated components are components manufactured in controlled conditions. This ensures that
better quality product are produced. However, it is rarely used as it only has very minimal allowance for
errors which makes it important for all construction components to be perfect fit for each other if it is
used. This can be achieved by BIM thus promote the use of it.
Waste Reduction
With the use of BIM, the quantities extracted are very accurate which not only reduces time for
measurement, but also time for ordering. Not only that, it also reduces waste of storage space and labour
cost. Therefore, the usage of BIM can maximize waste reduction effectively and efficiently.
Constraints
Cost Variation
Despite all the benefits that BIM offers, BIM does not take external factors into consideration. As
example, BIM does not take the price fluctuation of materials throughout the construction period into
account. Therefore, extra effort is required to ensure that all these factors are being considered.
2.1.5 Post Construction Stage
Benefits
Data Management
One of the key feature of BIM is the ability to gather all project related data and store it together in one
place. Various information such as architectural drawings, structural drawings, building materials and
models can be kept in an ordering manner and tracked easily.
Constraints
High Maintenance
The world of information technology (IT) is constantly and rapidly changing so is BIM. BIM software are
continuously being updated to fulfil client’s needs. Updates of software are fairly costly. In order to get
the most updated version of the software, users need to spend extra money from time to time.This results
in a high maintenance cost.
2.2 Computer Aided Design ( CAD)
2.2.1 Preparation / Briefing Stage
Benefits
21
Provide the data base for manufacturing
Designers will include the data such as dimension, material and details of components in CAD when
creating the documentation for designing purpose. A 2D drafting tool is generally used to design diagrams
and input directions on the data.
Visualisation
With CAD, the size and resolution of the drawings can be changed as needed. It helps designer in
visualizing the final product that is to be made, it subassemblies and the constituent parts. The product
can also be given animation and see how the actual product will work, thus helping the designer to
immediately make the modifications if required.
Improve the quality of the design
CAD offers a large number of tools that help in carrying out through engineering analysis of the proposed
design. The tools help designers to consider large number of investigations. Since the software offers
greater accuracy, the errors are reduced and leading to better design.
Constraints
High initial cost
High expenses incurred to implement CAD which includes the cost of software itself, cost of computer
hardware, software updates and training cost for the workers.
Training is required
Training need to be conducted for the staff to ensure that they know how to use the software effectively
and efficiently.
Higher risk of loss of information
CAD software does not have a backup system so it cannot autosave projects . Hence, the users need to
save their work manually in order to safely back it up and prevent lost or corrupted information in the
software.
2.2.2 Design Stage
Benefits
Higher accuracy of design
22
With CAD, you can use several methods to obtain exact dimensions. It can draw to scale to produce a
very accurate design. The designer must first decide the unit of measurement to be used , then draw the
model at 1 : 1 scale.
Easy to edit
When you are designing, there wil always the need to make alterations. With CAD, it will be much easier
to make any changes because you can fix the errors and modify the drawings easily. Instead of using
pencils, scales , compasses and other manual drafting tools. CAD has a variety of drawing tools that can
create straight lines, circles, curves and many more.
Constraints
Lack of standardisation in design
There are few methods of drawing the plans which are depends on the architect preferences. As different
methods will used, user cannot standardise the methods they need to use and it is very difficult to
standardize all architects to use the same method as they would not be aware of its effect towards quantity
surveyors.
Higher risk of loss of information
CAD software does not have a backup system so it cannot autosave projects . Hence, the users need to
save their work manually in order to safely back it up and prevent lost or corrupted information in the
software.
Requires update of skills
With every updates released, the users have to update their skills time to time to ensure that they can use
the software properly and efficiently. Therefore, this will consume more time and money.
2.2.3 Pre-Construction Stage
Benefits
On-screen takeoff
23
CAD enables users to do on-screen takeoff from 2D and 3D drawings easily. Since CAD drawings are
produced according to the actual size, hence measurement produced will be accurate. Users can also
choose to measure any elements and several items can be measured together with one simple drawing.
Data managing
With CAD, it is able to manage data effectively by categorizing it into two categories such as graphic or
non-graphic. Graphic refers to drawings of the project and Non-graphic refers to data such as quantities
and specifications. Both data are grouped and arranged systematically. Cost data can be done in this stage
by using the data stored which is very convenient and save time compared to manual method.
Constraints
Unable to produce bill of quantities
CAD software is limited to taking-off only but not production of Bills of Quantities. Therefore, the data
has to be transferred manually or imported to other software to prepare BQ which consume more time.
Mistake tend to occur when transferring data from CAD to other software.
2.2.4 Pre-Construction Stage
Benefits
Improve communication process
CAD software improves communication processes due to the easier understanding of the design and
measurement. This can also reduce the misinterpretations and uncertainty in reading plans. CAD can
generate clear perspective views of a structure to provide accurate information.
Reduce confusion
By improving the communication process, ability of CAD to show design information clearly and
accurately, it reduces confusion. Also, the dimensions of the complex shapes of the layout can be
accurately defined without error.
24
Increase the speed in measurement
CAD produces the sem-automatic ability to measure the quantities. Measurement is also more accurate as
CAD drawings are produced in actual size and errors in quantities due to usage of wrong scale will be
reduced.
Constraints
Limited measurement
As the drawings are in 2-dimensional, it is just for unit of measurement of 2D only. It is not able to
measure quantities that require three dimensions like volume, it can only measure two-dimensions.
Therefore, it may affect the comprehensiveness of the final quantities.
Higher expenses incurred on site
The use of CAD at construction site may require a computer, which means extra expenses may require for
a computer system. Hence, higher construction cost is needed.
2.2.5 Post Construction Stage
Benefits
Extension of information
3D CAD files provides information given in the Manual by visualising the various compartments of the
building to create a virtual reality view to client, including the hidden items such as wirings. This will
ease major maintenance works to be carried out accurately.
Commonly usable
CAD files can be read in a variety of software in the market today , most of them even provide free file
readers which is very convenient. The files will be universally accessible and usable by all parties,
including maintenance team.
Constraints
Limited information
CAD files only comprises of the building hardscape, there little to no information provided for the
softscape of a building, which includes the population density and designated space usage. Lack of
information leads to an inadequate of visualisation of the designated space usage.
2.3 Manual measurement
25
2.3.1 Preparation Stage
Benefits
Cost
In the preparation/briefing stage of a project, using manual measurement can be very beneficial. This is
because manual measurement does not require any purchasing of any specialized software, like BIM or
CAD. Companies would only require purchasing paper, which is cheap when compared to purchasing
softwares.
Training
Furthermore, training is not required as even fresh graduates have plenty experience on manual
measurement. When using the software, training is required to ensure the software is fully utilized. Extra
cost is needed to teach them.
Constraints
Experience
During the preparation stage, a cost plan is required to be prepared. This is to help advise the clients about
the budgeting and any variations that may occur on the project. A QS will require cost data to produce the
cost plan. An inexperienced QS will have trouble due to the lack of previous projects.
2.3.2 Design Stage
Constraints
Changes
During the design stage, there can be many changes to the drawings. In this case, the QS will be required
to change their measurements in the taking off & dimension list. The changes might cause the QS to make
human errors due to the quick and the possible small, unnoticeable changes to the drawing.
Limitations
It is also much slower compared to the software due to the limitations of the human.
26
2.3.3 Pre-construction Stage
Benefits
Data Security
When using manual measurement, any possibility of the files being corrupted or damaged due to
computer error, power loss & others will be nil due to every file being accessible even if there is no
power. Therefore, there will be no risk of losing the information due to any unforeseen circumstances.
Constraints
Human Error
During the pre-construction stage, the complexity of the projects will start to take shape due to the many
detailed drawings. There is a risk of miscalculating as we humans are not perfect and are prone to make
mistakes, especially due to external factors like emotion and distractions.
2.3.4 Construction Stage
Constraints
Error Identification
During the construction stage, any errors will be harder to spot as there is no tools to identify errors,
unlike the likes of the superior software. It t will take longer time to spot any errors, may cause delays.
Information
Manual measurement is also not able to provide the detailed information from the 4D, 5D & 6D.
2.3.5 Post Construction Stage
Benefits
Experience
The manual information is also very easy to understand, and does not require any knowledge of any
software. The reader must only know basic knowledge of construction and will be able to understand.
This is perfect for the senior QS which might not have much knowledge on the software.
Constraints
27
Time
After the completion of the BQ, dimension sheet & taking-off list, time is needed to scan the documents
and print copies of it. Manual measurement also does not provide the information generated based on
project like BIM.

More Related Content

What's hot

Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
Hasif Alias
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
Shze Hwa Lee
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - Report
Pang Khai Shuen
 
Software report-complete-final
Software report-complete-finalSoftware report-complete-final
Software report-complete-final
Yong Sy
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slides
Doreen Yeo
 
software assignment
software assignmentsoftware assignment
software assignment
seenyeeyong
 
Software assignment
Software assignmentSoftware assignment
Software assignment
Syafiq Zariful
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
Lee Pei Gie
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
마 이환
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
Syafiq Zariful
 
Assignment 1 - Software
Assignment 1 - SoftwareAssignment 1 - Software
Assignment 1 - Software
Kai Yun Pang
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
lohwenjun
 
Glodon bim software presentation slide
Glodon bim software presentation slideGlodon bim software presentation slide
Glodon bim software presentation slide
lucaschinsheng
 
Software Application
Software ApplicationSoftware Application
Software Application
kohwenqi
 
Software application
Software application Software application
Software application
Lee Pei Gie
 
Software app slides
Software app slidesSoftware app slides
Software app slides
Pui Chun Shian
 
Software app slides
Software app slidesSoftware app slides
Software app slides
ahmong4
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
Hasif Alias
 
Software Report
Software ReportSoftware Report
Software Report
Arissa Loh
 

What's hot (19)

Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - Report
 
Software report-complete-final
Software report-complete-finalSoftware report-complete-final
Software report-complete-final
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slides
 
software assignment
software assignmentsoftware assignment
software assignment
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Assignment 1 - Software
Assignment 1 - SoftwareAssignment 1 - Software
Assignment 1 - Software
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
Glodon bim software presentation slide
Glodon bim software presentation slideGlodon bim software presentation slide
Glodon bim software presentation slide
 
Software Application
Software ApplicationSoftware Application
Software Application
 
Software application
Software application Software application
Software application
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
 
Software Report
Software ReportSoftware Report
Software Report
 

Similar to Software

Vico
VicoVico
Software Assignment
Software AssignmentSoftware Assignment
Software Assignment
ashleyyeap
 
Software Application report
Software Application reportSoftware Application report
Software Application report
Kailyn Lee
 
Software
Software Software
Software
Kailyn Lee
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
Est
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
Cesare Caoduro
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
XinYee Khoo
 
What is the role of revit 3 d modelling in construction
What is the role of revit 3 d modelling in constructionWhat is the role of revit 3 d modelling in construction
What is the role of revit 3 d modelling in construction
ArpitGautam20
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
Ruchy Lakhani
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
IRJET Journal
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
Veetil Digital Service
 
What does bim mean to you
What does bim mean to youWhat does bim mean to you
What does bim mean to you
Onyema Udeze
 
Software application report
Software application report Software application report
Software application report
Lin Hui
 
BuilderHub Pro by ChangSoft I&I
BuilderHub Pro by ChangSoft I&IBuilderHub Pro by ChangSoft I&I
BuilderHub Pro by ChangSoft I&I
Claire Kim
 
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMBuilding Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Yee Len Wan
 
BIM
BIMBIM
Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
jk tan
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdf
irfanakram32
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
BIMLABS GLOBAL
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
vaibhavchaudhary7017
 

Similar to Software (20)

Vico
VicoVico
Vico
 
Software Assignment
Software AssignmentSoftware Assignment
Software Assignment
 
Software Application report
Software Application reportSoftware Application report
Software Application report
 
Software
Software Software
Software
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
What is the role of revit 3 d modelling in construction
What is the role of revit 3 d modelling in constructionWhat is the role of revit 3 d modelling in construction
What is the role of revit 3 d modelling in construction
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
What does bim mean to you
What does bim mean to youWhat does bim mean to you
What does bim mean to you
 
Software application report
Software application report Software application report
Software application report
 
BuilderHub Pro by ChangSoft I&I
BuilderHub Pro by ChangSoft I&IBuilderHub Pro by ChangSoft I&I
BuilderHub Pro by ChangSoft I&I
 
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMBuilding Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
 
BIM
BIMBIM
BIM
 
Cscm group assignment
Cscm group assignmentCscm group assignment
Cscm group assignment
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdf
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
 

More from Pui Chun Shian

Fm chun part a to c
Fm chun part a to cFm chun part a to c
Fm chun part a to c
Pui Chun Shian
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
Pui Chun Shian
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slides
Pui Chun Shian
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journal
Pui Chun Shian
 
Compiled report
Compiled reportCompiled report
Compiled report
Pui Chun Shian
 
Estimating
Estimating Estimating
Estimating
Pui Chun Shian
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
Pui Chun Shian
 
Pp1 group assignment presentation slides
Pp1 group assignment presentation slidesPp1 group assignment presentation slides
Pp1 group assignment presentation slides
Pui Chun Shian
 
Management science
Management scienceManagement science
Management science
Pui Chun Shian
 
Plumeria obtusa
Plumeria obtusaPlumeria obtusa
Plumeria obtusa
Pui Chun Shian
 
Circle of life
Circle of lifeCircle of life
Circle of life
Pui Chun Shian
 
Biodiversity report
Biodiversity reportBiodiversity report
Biodiversity report
Pui Chun Shian
 
Bio
BioBio
Sustainable
SustainableSustainable
Sustainable
Pui Chun Shian
 
Sustainable housing development
Sustainable housing developmentSustainable housing development
Sustainable housing development
Pui Chun Shian
 
Sustainable housing development presentation
Sustainable housing development presentationSustainable housing development presentation
Sustainable housing development presentation
Pui Chun Shian
 
Group assignment-final
Group assignment-finalGroup assignment-final
Group assignment-final
Pui Chun Shian
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentation
Pui Chun Shian
 
Bs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slidesBs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slides
Pui Chun Shian
 
Bs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioningBs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioning
Pui Chun Shian
 

More from Pui Chun Shian (20)

Fm chun part a to c
Fm chun part a to cFm chun part a to c
Fm chun part a to c
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slides
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journal
 
Compiled report
Compiled reportCompiled report
Compiled report
 
Estimating
Estimating Estimating
Estimating
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Pp1 group assignment presentation slides
Pp1 group assignment presentation slidesPp1 group assignment presentation slides
Pp1 group assignment presentation slides
 
Management science
Management scienceManagement science
Management science
 
Plumeria obtusa
Plumeria obtusaPlumeria obtusa
Plumeria obtusa
 
Circle of life
Circle of lifeCircle of life
Circle of life
 
Biodiversity report
Biodiversity reportBiodiversity report
Biodiversity report
 
Bio
BioBio
Bio
 
Sustainable
SustainableSustainable
Sustainable
 
Sustainable housing development
Sustainable housing developmentSustainable housing development
Sustainable housing development
 
Sustainable housing development presentation
Sustainable housing development presentationSustainable housing development presentation
Sustainable housing development presentation
 
Group assignment-final
Group assignment-finalGroup assignment-final
Group assignment-final
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentation
 
Bs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slidesBs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slides
 
Bs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioningBs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioning
 

Recently uploaded

Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 

Recently uploaded (20)

Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 

Software

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR IN QUANTITY SURVEYING (HONOURS) SOFTWARE APPLICATION FOR QUANTITY SURVEYING (CSC 60603) ASSIGNMENT 2: INDIVIDUAL ASSIGNMMENT NAME STUDENT ID Ee Hui Teng 0322548 Lim Hong Wei 0322741 Loo Siah Mong 0321995 Pui Chun Shian 0323740 Tan Jia San 0322406 Yip Xiao Jung 0323852 Table of Content
  • 2. 1 Part Title Pages Introduction 2 A 1.1 Vico Office Takeoff Manager Software 1.1.1 Function of Vico Office Takeoff Manager 1.1.2 Limitation of Vico Office Takeoff Manager 1.2 Cost X 1.2.1 Function of Cost X 1.2.2 Limitation of Cost X 1.3 Buildsoft Cubit 1.3.1 Function of Buildsoft Cubit 1.3.2 Limitation of Buildsoft Cubit 1.4 Cubicost (Glodon) 1.4.1 Function of Cubicost 1.4.2 Limitation of Cubicost 1.5 Summary 3-8 9-10 11-12 13-15 15-16 B 2.1 BIM 2.1.1 Preparation Stage 2.1.2 Design Stage 2.1.3 Pre-construction Stage 2.1.4 Construction Stage 2.1.5 Post Construction Stage 17-19 2.2 CAD 2.2.1 Preparation Stage 2.2.2 Design Stage 2.2.3 Pre-construction Stage 2.2.4 Construction Stage 2.2.5 Post Construction Stage 20-23 2.3 Manual Measurement 2.3.1 Preparation Stage 2.3.2 Design Stage 2.3.3 Pre-construction Stage 2.3.4 Construction Stage 2.3.5 Post Construction Stage 24-26
  • 3. 2
  • 4. 3 Introduction Moving forward to the 21st century, the age of Building Information Modeling (BIM) has come. BIM describes the process of designing a building collaboratively using one coherent system of computer models rather than as separate sets of drawings.This system is often adopted by construction companies to improve the 3 most important aspects to their projects, namely time, cost, and quality. BIM covers the whole construction lifecycle from the briefing stage all the way to the operation and maintenance of a building. Generally, the application of BIM is divided into 3 levels, starting from Level 1 with minimal collaboration between parties up to Level 3, where all parties collaborate on the same model and share the same data on the same repository. As the industry shifts towards the massive use of BIM softwares for construction, the industry professionals, including the Quantity Surveyor, has taken a step forward to fully utilise the benefits that can be obtained from BIM. Several BIM QS softwares on the market can now enable a QS to easily take off quantities and estimate the project costs from any drawings or models available. As BIM is more than 3D-CAD, information such as Schedules and Cost plans can be included in the files. Undoubtedly what BIM brings is a complete transformation by helping a construction project move from the design desks to physical reality. It prunes redundant data, erases communication lag and noise, maintains updated information, brings operational efficiency, improves coordination among departments and gives an overall efficiency to the whole lifespan of the project. With large infrastructural projects BIM is a must. So in this report, we look into massive BIM QS softwares that are available in the market and analysed their respective functions and limitations. In our opinions, these 4 softwares not only well versed in the BIM industry compared to others, we are also well exposed to these softwares in terms of understanding level and functionality of the softwares. ● Vico Office Takeoff Manager ● CostX ● Buildsoft cubit ● Cubicost (Glodon) From these 4 softwares available, a detailed comparison on the functions and limitations as well as how well it works on measurements will be conveyed through this report. 1.1 Vico Office TakeoffManager
  • 5. 4 Vico Office is a purpose-built software for construction, provides an integrated BIM workflow for construction which enables users to perform functions such as extending basic 3D model with constructability analysis and coordination, 4D location-based scheduling and production control, 5D estimating, quantity takeoff and layout. Vico Office is designed in a modular way which allows a consistent and easy use in order to maximize efficiency and achieving the needs of various construction process trades and stages. By utilizing Vico Office, building owners and general contractors are able to work together more efficiently, enhance predictability, manage cost as well as lowering risk and optimizing workflow on large, complex building projects. Vico Office also provides flexibility in modelling, scheduling and estimating for project teams and are still able to work together with all stakeholders in terms of coordination, budgeting and project control. 1.1.1 Functions 2D to 3D Change Management
  • 6. 5 Vico Document Controller allows 2D drawings to be converted into 3D models. This feature is also able to identify the changes of 2D and 3D versions as well as comparing the coordinated 3D model to 2D contract documents for final checking. 3D BIM for Visualization Vico Office performs well with practical BIM authoring tools such as Autodesk Revit, Graphisoft ArchiCAD and Tekla Structures including additional import softwares such as Google SketchUp, 3D DWG, CAD Duct and IFC files.
  • 7. 6 3D BIM for Clash Detection Vico Constructability Manager enables the project team to identify constructability problems in the planning process by providing integrated solutions for clash detections and coordination resolution. 3D BIM for Layout Vico Layout Manager offers a precise analysis of virtual model critical points matching to job site's physical points. This feature also offers speedy installation and remove costly rework. 3D BIM for Quantity Takeoff
  • 8. 7 Vico Takeoff Manager provides more precise, up to date schedules, estimating and cost planning. With its unique geometry analysis algorithm, this feature scans a 3D model’s content and automatically generates take of items with a set of construction-caliber quantities off the 3D model. 4D BIM for Scheduling and Production Control ➔ Vico LBS Manager - functions to divide the project into work locations which allows smooth flow of work without interference. ➔ Vico Schedule Planner - utilizes BIM model elements to generate construction schedules and associating them with the corresponding resources,materials and labor. ➔ Vico Production Controller - manages on-site production and planning schedules during the build phase. This feature provides sufficient time for forecasting schedules to identify problems.
  • 9. 8 ➔ Vico 4D Manager - a 4D simulation presentation tool for the construction team which provides the team with a clear 3D visualization of the project timeline. 5D BIM for Estimating ➔ Vico Cost Planner - a strong model-based cost estimating solution. This feature uses Vico Takeoff Manager to provide a precise estimation within a short period of time which ensures the project does not exceeds its budget.
  • 10. 9 ➔ Vico Cost Explorer - enables project team to visualize the elements of the projects that are affecting the changes in the cost in order to keep track of the budget. It is also the first model-based budgeting application. Construction Management Report Vico Office Client forms the foundation of Vico Office Suite. This feature enable information to be communicate across the project team, delivers constructability reports, provide cost and resource loaded schedules, cash flow reports, cost estimates and proposed design changes. 1.1.2 Limitations of Vico Office Vico Office allows only one model file to be used at one time because when two models are placed together, Vico Office is unable to detect any collisions automatically. Hence, this will require more time to complete the 3D model. 1.2 CostX
  • 11. 10 CostX® is an exciting software innovation developed by award winning software designers and construction industry professionals. It allows non-CAD users to measure from PDF or CAD files without running CAD software, and, dependent upon the version of CostX® being used, create detailed workbook documents such as estimates, cost plans, bills of quantities or tenders – all within a fully integrated, paperless, electronic environment. A powerful and flexible report writer allows professional quality output to be produced and issued either as paper documents or electronic files. 1.2.1 Functions of CostX Auto-revisioning This is one of the unique functions of CostX where it has the ability to compare and review the contemporary drawings with the previous one and highlight the changes that is being made. This function allows the user safe plenty of time and fastens the work. Auto- revisioning function will continue by creating an audit trail likewise revises the previous quantities and workbooks as well as updating the latest quantities. Subcontractor Comparison Subcontractor comparisons workbooks can be generated in CostX allow the user to compare with the subcontractors information. Subcontractor Comparison system able to link the report and quotation detail of every subcontractor and allow the user have better view and make comparison with one another about the cost and quality. Able to support various files types
  • 12. 11 By using CostX, it can support scanned, PDF or CAD drawings and 3D models/BIM without the need to buy CAD software. Not only that, it also supports various drawing file formats such as, SKP, SWG, DWF, DGN and IFC. This allows quantity surveyors to extract quantities and measure through existing project drawings since it is compatible with any industry standard drawings including Revit support and do on-screen measurement for taking-off quantities. Letting technology do its part in removing manual entry tasks and the possibility of human error allows for a productive back office and streamlined process. 3D / BIM Takeoff By using 3D taking off, it enables them to visualise their measurement in 3D, leveraging the latest developments in automated take-off so that they can populate their cost plan. This allows the QS have a more accurate estimate quantities and costs compare to traditional measurement. The database information from 3D model view and 2D plans, sections and elevations can be utilize by QS to initiate quantities mechanically and improve on the database quantities with additional measurement of 2D or 3D drawing sheets. Besides that, 3D view helps users to visualize and understand the drawing have a general idea of the building before build. 1.2.2 Limitations of CostX Add-on Cost In order to exploit the software to its full potential including its function, QS firms need to pay more for other products like Cost XL. Rebar detection While measuring rebar in CostX, the main reinforcement bar of the beam or column could not be detected by using the software. Bents for mesh fabric reinforcement (BRC) cannot be detected in CostX as well hence the users will have to measure the length of fabric reinforcement of the whole beam or column assuming it is the reinforcement bars.
  • 13. 12 1.3 Bui lds oft Cu bit Cubit delivers a unique and natural solution for estimating building and construction projects. By combining estimating and takeoff in one seamless software package, it will able to save us lots of time and money, plus its ease of use means after an hour of training we’ll be up and running. 1.3.1 Function of buildsoft cubit Natural Estimating Estimating and takeoff, one seamless process as Cubit is a specialised estimating system with flexible functionality that allows us to estimate the way we wanted. It’s the only application that seamlessly integrates takeoff with estimating for an all-in-one solution that called Natural Estimating. It’s all laid out in one view, meaning the information is where we want it, when we need it. 3D Takeoff Pinpoint accurate takeoff with a review from any angle. By tracing directly over imported plans, simple or complex quantity takeoffs are performed quickly and accurately. See elements of the takeoff from any angle in 3D, and use this as a cross-referencing tool to make sure we don’t miss taking off any items, or to check all your openings. Perform quantity takeoffs from PDF, CAD (DWG, DXF), BIM (DWFx), and image files. Price Lists Use template price lists and jobs as the source for new estimates.Collect pricing information and save them as template price lists (or even import supplier price lists) to control how the company prices jobs, ensuring accuracy and maximising profitability. Go even further by creating template jobs that collate all the common trades and items, making it easier to start next estimate, time and time again. Job Analysis
  • 14. 13 Group similar information together to increase visibility over jobs. Code our estimate in a way that allows us to sort data into different formats, giving us the ability to quickly analyse or breakdown a job by cost code or material. For example, if you were asked the volume of concrete on a particular level of a multi storey apartment block, this information can be achieved by coding the estimate by material. This handy feature allows us split the job across different stages and budgets, and export more detailed estimates into other workflows, like our Subcontractor Comparison Program, Microsoft Excel, and other third-party applications. Automatic Plan Revisions Able to save countless hours estimating as revisions to plans are overlaid on an existing plan you’ve already taken off. Not only that, it allows you to edit plans as part of the revision process.Within the viewport, we can clearly see where the differences occur and update the takeoff to reflect any revisions. 1.3.2 Limitation of Buildsoft Cubit Permanently deleted The job file that had been created in Buildsoft will be permanently deleted when we do the amendment on the existing data. Its mean the amendment that had been done cannot be called back. So the user must be carefully in doing the amendment. Typing errors This software has not created to check or identify the typing errors like numbers or figure that already type in. We have to use human skill to check the errors. For an example; we want to put 6.86m length but we was type in 6.68m in the computer. So the figure will be wrong because it’s human errors. This method of BQ preparation will need extra time to key-in the figure into the computer to avoid the mistakes or errors. Virus Attack Virus attack is common problem to all the computer users especially using internet. The user should have licensed anti-virus software so that the virus definition can be updated daily. The software can detect the virus attack and quarantined or killed the virus and also protect the computer and system. The problem is when no anti-virus was installed, the virus can attack the computer system and also all the content of the computer. If this happen, the data may be lost and may be can not be recovered by any means. 1.4 Cubicost (Glodon)
  • 15. 14 In Cubicost (Glodon), it is comprised of four individual BIM-based software products (TAS, TRB, TME, TBQ) that are focused on different needs of quantity surveying business. All these four products together virtually cover all general requirements in construction cost estimation business. Moreover, BIM model and related data can be easily transferred between four products, bringing you the most professional, efficient and accurate BIM cost estimation experience. Not only that, Cubicost (Glodon) has established its international presence, with US, Finland and UK subsidiaries targeting the European and American markets as well as Singapore, Hong Kong and Malaysia subsidiaries driving its development in SEA markets such as Taiwan, Indonesia and Thailand. With that being said, Cubicost (Glodon) may be the one of the best BIM softwares technology that is used by current Quantity Surveyor. Cubicost Takeoff for Architecture and Structure (TAS) Cubicost Takeoff for Rebar (TRB) Cubicost TBQ (TBQ) Cubicost Takeoff for Mechanical & Electric (TME) 1.4.1 Functions ofCubicost (Glodon) Quick modelling and BIM-based quantity takeoff
  • 16. 15 Build BIM model efficiently by identifying DWG, JPG, PDF or by tracking 2D drawings. Only one click is needed to complete quantity takeoff based on model. Deals with variations quickly by only adjusting model information and performing calculation again. Professional, accurate and easy to check Built-in local measurement methods, which has been proved by users from many countries. It can also deduct automatically based on the relations among elements in BIM model to ensure calculation accuracy. It has support viewing calculation basis and expressions to facilitate rapid result checking and less calculation errors. Various quantity reports Cubicost has the ability to generate reports by floor, element type or other conditions. Unique Reversely Check helps to trace the origin of quantities in BIM models, making it easy to check and modify quantities. It can also provide a variety of report formats and support exporting Excel for different requirements. Teamwork high efficiency Cubicost supports the rapid adjustment and reuse of BIM models, to reduce the working intensity and greatly increase the efficiency of team collaboration. 1.4.2 Limitations of Cubicost (Glodon) Cost
  • 17. 16 The license to own Cubicost (Glodon) installed is extremely costly which resulted some of the smaller Quantity Surveyor firm not being able to afford. Therefore alternatives like CostX or eTakeoff would be their choice with a downside of having less functions compared to Cubicost (Glodon). Not only that, when an update is released to implement new features of functions, a certain amount of fee must be paid in order to update. This can cause commitment issue in the long run as the price can be far beyond than the initial price of the product.
  • 18. 17 1.5 Summary Feature Glodon Cost X Buildsoft Cubit Vico Office 3D Model Visualization ✓ ✓ ✓ ✓ Simplicity ✓ ✓ ⅹ ⅹ Auto-revisioning ✓ ✓ ⅹ ⅹ Able to export into others format ✓ ⅹ ⅹ ⅹ Able to read different types of drawings ✓ ✓ ✓ ✓ Overall throughout our research, we conclude that Glodon BIM software has the best features compared among the other software as BIM QS software. The reason why we chose this software as the most user friendly and Glodon’s BIM software is internationally recognised and focuses on the entire lifecycle of construction projects with the support of big data and internet finance services. Besides, this software focused on different needs of quantity surveying business. All these four products together virtually cover all general requirements in construction cost estimation business. Moreover, BIM model and related data can be easily transferred between four products, bringing the most professional, efficient and accurate BIM cost estimation experience. Most importantly it is the best solution for cost estimation, which is different from traditional method as it enables data and model sharing among other popular software from upstream to downstream in the industry. But as a recommendation, we would suggest that BIM software will improvised in terms of reducing the workflow of QS’s in construction industry. 2.1 Building Information Modelling (BIM)
  • 19. 18 2.1.1 Preparation / Briefing Stage Benefits Provide Visualization of Project 2D drawings are often hard to visualize and communicated due to imagination constraints. With Building Information Modelling (BIM), various parties such as the client's, future occupants and site workers are provided with a visual to know how a building will look like way before the project commences. This enables the parties to have a better insight of the project. Ability for Collaboration Project data are readily accessible to parties such as architects, engineers, quantity surveyors and contractors. Everyone can address any issues effectively and efficiently. Moreover, all parties are able to input information and make necessary amendments quickly. Therefore, BIM provides the ability for different parties to collaborate together. Constraints Cost of Software Building Information Modelling (BIM) software are very costly and is a huge capital investment. This investment is worthwhile only if it is being used to its fullest potential. Other than that, this expense is a huge restriction for small companies who have difficulties to afford it. Lack of Experts BIM software are rather new to the industry, many were not exposed to it yet. Therefore, there are very limited number of experts in the field. Moreover, it requires additional investment in time to train and educate an individual to be an expert. 2.1.2 Design Stage Benefits Amendments Can Be Made Easily Building Information Modelling (BIM) software links all data related to the construction together. All components are interrelated to each other. Therefore, when a change is made, it automatically amend the other related data. This saves time and minimise errors. Ability to Design Complex Projects
  • 20. 19 BIM is able to help in designing complex projects. A complex project consist of many different and connected parts. With the aid of beams, any design complication and clashes can be detected easily. Constraints Requires Adaptation Period As Building Information Modelling (BIM) is new to the industry, BIM users require a long period to adapt and get used to functioning it. Extra time and effort is essential before one can fully operate effectively it. Incompatibility Due to the high initial cost BIM, it may be a barrier for many especially small scale companies. Therefore, many do not have the software. This makes it incompatible to be used if one of the parties involved in the project do not own the software. 2.1.3 Pre-construction Stage Benefits Effective and Efficient With the aid of Building Information Modelling (BIM), clashes of elements can be detected immediately and with ease at early stage. It ensures all elements to be perfect fit for each other. This save cost and minimise errors. As result, a better quality design is produced. Time Saving BIM is able to simplify the process of measurement and pricing as it features an automatic quantity taking off and cost estimation. This will then save time and one can focus more on other tasks. Constraints Lack of Single Point of Responsibility Any party that made a mistake will be difficult to be identified and the responsibility will be push to one another. This is because BIM enables all parties to make any amendments easily without consent. This results in the lack of single point of responsibility. 2.1.4 Construction Stage Benefits
  • 21. 20 Promote use of Prefabricated Components Pre-fabricated components are components manufactured in controlled conditions. This ensures that better quality product are produced. However, it is rarely used as it only has very minimal allowance for errors which makes it important for all construction components to be perfect fit for each other if it is used. This can be achieved by BIM thus promote the use of it. Waste Reduction With the use of BIM, the quantities extracted are very accurate which not only reduces time for measurement, but also time for ordering. Not only that, it also reduces waste of storage space and labour cost. Therefore, the usage of BIM can maximize waste reduction effectively and efficiently. Constraints Cost Variation Despite all the benefits that BIM offers, BIM does not take external factors into consideration. As example, BIM does not take the price fluctuation of materials throughout the construction period into account. Therefore, extra effort is required to ensure that all these factors are being considered. 2.1.5 Post Construction Stage Benefits Data Management One of the key feature of BIM is the ability to gather all project related data and store it together in one place. Various information such as architectural drawings, structural drawings, building materials and models can be kept in an ordering manner and tracked easily. Constraints High Maintenance The world of information technology (IT) is constantly and rapidly changing so is BIM. BIM software are continuously being updated to fulfil client’s needs. Updates of software are fairly costly. In order to get the most updated version of the software, users need to spend extra money from time to time.This results in a high maintenance cost. 2.2 Computer Aided Design ( CAD) 2.2.1 Preparation / Briefing Stage Benefits
  • 22. 21 Provide the data base for manufacturing Designers will include the data such as dimension, material and details of components in CAD when creating the documentation for designing purpose. A 2D drafting tool is generally used to design diagrams and input directions on the data. Visualisation With CAD, the size and resolution of the drawings can be changed as needed. It helps designer in visualizing the final product that is to be made, it subassemblies and the constituent parts. The product can also be given animation and see how the actual product will work, thus helping the designer to immediately make the modifications if required. Improve the quality of the design CAD offers a large number of tools that help in carrying out through engineering analysis of the proposed design. The tools help designers to consider large number of investigations. Since the software offers greater accuracy, the errors are reduced and leading to better design. Constraints High initial cost High expenses incurred to implement CAD which includes the cost of software itself, cost of computer hardware, software updates and training cost for the workers. Training is required Training need to be conducted for the staff to ensure that they know how to use the software effectively and efficiently. Higher risk of loss of information CAD software does not have a backup system so it cannot autosave projects . Hence, the users need to save their work manually in order to safely back it up and prevent lost or corrupted information in the software. 2.2.2 Design Stage Benefits Higher accuracy of design
  • 23. 22 With CAD, you can use several methods to obtain exact dimensions. It can draw to scale to produce a very accurate design. The designer must first decide the unit of measurement to be used , then draw the model at 1 : 1 scale. Easy to edit When you are designing, there wil always the need to make alterations. With CAD, it will be much easier to make any changes because you can fix the errors and modify the drawings easily. Instead of using pencils, scales , compasses and other manual drafting tools. CAD has a variety of drawing tools that can create straight lines, circles, curves and many more. Constraints Lack of standardisation in design There are few methods of drawing the plans which are depends on the architect preferences. As different methods will used, user cannot standardise the methods they need to use and it is very difficult to standardize all architects to use the same method as they would not be aware of its effect towards quantity surveyors. Higher risk of loss of information CAD software does not have a backup system so it cannot autosave projects . Hence, the users need to save their work manually in order to safely back it up and prevent lost or corrupted information in the software. Requires update of skills With every updates released, the users have to update their skills time to time to ensure that they can use the software properly and efficiently. Therefore, this will consume more time and money. 2.2.3 Pre-Construction Stage Benefits On-screen takeoff
  • 24. 23 CAD enables users to do on-screen takeoff from 2D and 3D drawings easily. Since CAD drawings are produced according to the actual size, hence measurement produced will be accurate. Users can also choose to measure any elements and several items can be measured together with one simple drawing. Data managing With CAD, it is able to manage data effectively by categorizing it into two categories such as graphic or non-graphic. Graphic refers to drawings of the project and Non-graphic refers to data such as quantities and specifications. Both data are grouped and arranged systematically. Cost data can be done in this stage by using the data stored which is very convenient and save time compared to manual method. Constraints Unable to produce bill of quantities CAD software is limited to taking-off only but not production of Bills of Quantities. Therefore, the data has to be transferred manually or imported to other software to prepare BQ which consume more time. Mistake tend to occur when transferring data from CAD to other software. 2.2.4 Pre-Construction Stage Benefits Improve communication process CAD software improves communication processes due to the easier understanding of the design and measurement. This can also reduce the misinterpretations and uncertainty in reading plans. CAD can generate clear perspective views of a structure to provide accurate information. Reduce confusion By improving the communication process, ability of CAD to show design information clearly and accurately, it reduces confusion. Also, the dimensions of the complex shapes of the layout can be accurately defined without error.
  • 25. 24 Increase the speed in measurement CAD produces the sem-automatic ability to measure the quantities. Measurement is also more accurate as CAD drawings are produced in actual size and errors in quantities due to usage of wrong scale will be reduced. Constraints Limited measurement As the drawings are in 2-dimensional, it is just for unit of measurement of 2D only. It is not able to measure quantities that require three dimensions like volume, it can only measure two-dimensions. Therefore, it may affect the comprehensiveness of the final quantities. Higher expenses incurred on site The use of CAD at construction site may require a computer, which means extra expenses may require for a computer system. Hence, higher construction cost is needed. 2.2.5 Post Construction Stage Benefits Extension of information 3D CAD files provides information given in the Manual by visualising the various compartments of the building to create a virtual reality view to client, including the hidden items such as wirings. This will ease major maintenance works to be carried out accurately. Commonly usable CAD files can be read in a variety of software in the market today , most of them even provide free file readers which is very convenient. The files will be universally accessible and usable by all parties, including maintenance team. Constraints Limited information CAD files only comprises of the building hardscape, there little to no information provided for the softscape of a building, which includes the population density and designated space usage. Lack of information leads to an inadequate of visualisation of the designated space usage. 2.3 Manual measurement
  • 26. 25 2.3.1 Preparation Stage Benefits Cost In the preparation/briefing stage of a project, using manual measurement can be very beneficial. This is because manual measurement does not require any purchasing of any specialized software, like BIM or CAD. Companies would only require purchasing paper, which is cheap when compared to purchasing softwares. Training Furthermore, training is not required as even fresh graduates have plenty experience on manual measurement. When using the software, training is required to ensure the software is fully utilized. Extra cost is needed to teach them. Constraints Experience During the preparation stage, a cost plan is required to be prepared. This is to help advise the clients about the budgeting and any variations that may occur on the project. A QS will require cost data to produce the cost plan. An inexperienced QS will have trouble due to the lack of previous projects. 2.3.2 Design Stage Constraints Changes During the design stage, there can be many changes to the drawings. In this case, the QS will be required to change their measurements in the taking off & dimension list. The changes might cause the QS to make human errors due to the quick and the possible small, unnoticeable changes to the drawing. Limitations It is also much slower compared to the software due to the limitations of the human.
  • 27. 26 2.3.3 Pre-construction Stage Benefits Data Security When using manual measurement, any possibility of the files being corrupted or damaged due to computer error, power loss & others will be nil due to every file being accessible even if there is no power. Therefore, there will be no risk of losing the information due to any unforeseen circumstances. Constraints Human Error During the pre-construction stage, the complexity of the projects will start to take shape due to the many detailed drawings. There is a risk of miscalculating as we humans are not perfect and are prone to make mistakes, especially due to external factors like emotion and distractions. 2.3.4 Construction Stage Constraints Error Identification During the construction stage, any errors will be harder to spot as there is no tools to identify errors, unlike the likes of the superior software. It t will take longer time to spot any errors, may cause delays. Information Manual measurement is also not able to provide the detailed information from the 4D, 5D & 6D. 2.3.5 Post Construction Stage Benefits Experience The manual information is also very easy to understand, and does not require any knowledge of any software. The reader must only know basic knowledge of construction and will be able to understand. This is perfect for the senior QS which might not have much knowledge on the software. Constraints
  • 28. 27 Time After the completion of the BQ, dimension sheet & taking-off list, time is needed to scan the documents and print copies of it. Manual measurement also does not provide the information generated based on project like BIM.