Group Members:
Nicole Thain Huey Wei
Phon Kit Poi
Pui Chun Shian
Ranee Leow Kai Yen
Satesh Raj A/L P. Devaraj
Sew Yue Ling
Soo Ping Zheng
Soo Yon Li
Tam Zhao Wei
Tan Jia San
Farah Aida
TRADITIONAL
PROCUREMENT
WHY TRADITIONAL PROCUREMENT ?
Completion on time (5 years)
Variation in design
Minimum variation in Contract Sum
Deal with minimum parties
Full control of design
1. Brief
Stage
2. Design
Stage
3. Tendering
(Competition) Stage
4. Construction
Stage
Completion on time (5 years)✔
Variation in design
Minimum variation in Contract Sum
✔
✔
↓ Cost Risk
↓ Design Risk
Deal with minimum parties
Full control of design
✔
✔
CONCLUSION
- ↑ Time frame
- Construction cost certainty
- ↓ Price variation
- Partial / Full control of
design
- ↓ Design Variation
- ↓ Parties to deal with
TWO STAGE SELECTIVE
TENDERING
WHY TWO STAGE SELECTIVE
TENDERING ?
Reasonably transparent
Eliminate non-performing contractors
TWO STAGE SELECTIVE TENDERING
Open to only
selected numbers
of “Pre-qualified”
contractors
Reduce tender
cost, saves time &
resources
Low risk but high
reward
Lower risk of
buildability issue
Reasonably transparent
✔
STAGE 1
❏ An advertisement will be placed
on major newspaper/social
platform
❏ Interested tenderers will submit
their companies particulars in a
“Pre-qualification Form”
Eliminate non-performing contractors
✔
STAGE 2
❏ A “Pre-qualification” form will be
attached with the advertisement
❏ Evaluation Stage : based on the
“Pre-qualification Form”
TWO-STAGE SELECTIVE TENDERING
TIMELINE
Invitation To Tender
● Advertisement
● Pre-Qualification
Form
Pre-Qualification Stage
● Based on experience,
financial capabilities
and competencies.
Collection of Tender
● Charged with
documentation fees
Tender Closing
● Submit into a “tender
box”
● QS submit Pre-Tender
Estimate
Tender Opening
● Tender figures are
recorded and jointly
verified
Tender Evaluation
● Check for major
arithmetical errors
● Prepare tender report
● Call lowest 3 tenderers for
tender interview
Tender Interview
● Queried on any issues
● May be requested to
submit a revised
tender
Tender Award
● Prepare and issue
Letter of Award
● Return within 14
days
CONTRACT
ARRANGEMENT
LUMP SUM CONTRACT
WHY LUMP SUM CONTRACT?
● Construction designs are completed > Requested work is well-defined
● Minimize variations during construction > minimize variation to price
as well
● Reduce owner risks
● Contractor has greater control over profit expectations
LIQUIDATED ASCERTAINED DAMAGES (LAD)
● Client’s Requirement : Imposed Liquidated Damages of RM
250,000.00 a day.
Ensure project to complete on time
✔
Include early completion
compensation for the
contractor
Early completion might
produce higher savings
for the project owner
LUMP SUM CONTRACT
PAM CONTRACT 2006 (WITH QUANTITIES)
● Home base form : Risks are known to be local industry
● Intended to be used as a building contractor and not as civil
engineering contract
● It is estimated that 90% of the building contracts in the private sector are
based on the PAM Contract 2006
Functions of PAM Contract 2006 (With Quantities)
● Evidences legal relationship between parties in the contract
● Provides the administrative procedure
● Incorporate all special requirements and circumstances of a project
● Expresses the obligation of the parties
● Set out reasonable clarity of the project
PAM CONTRACT 2006 (WITH QUANTITIES)
Clause 6.1 - Standards of works, materials, goods and workmanship
● Materials, goods and workmanship shall be according to the standards
described in the contract documents
● If there is any discrepancy, the contractor can instruct sub-contractors to
demolish and rectify the defect works
Clause 15.4 - Schedule of defects
● Sub-contractor must provide defect liability period after completion of works
and correct the defects within 28 Days from receipt of schedule of defects
from contractor.
QUALITY
HEALTH & SAFETY
OSHA (Occupational Safety & Health Administration)
- The Occupational Safety & Health Act 1970
- To keep their work environment safe
- < 10 workers X file injury / illness report
- Compulsory training to the workers as a guarantee to
the employer
1. Appoint a Safety
Advisor
HOW TO ENHANCE HEALTH & SAFETY ?
Essential to give professional
advices.
OSHA Clause 8.1
- Training & Competency
2. Proposed Site
Management Plan
(SMP)
Compliance to Occupational Safety
and Health in Construction Industry
(Management)
- Ensure a safer working
environment
3. Allow Separate
Specification for
Health & Safety
The Health & Safety
Specification may include any
details regarding health and
safety matters
THANK YOU
THANK YOU

More Related Content

What's hot

Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
Arissa Loh
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
Pui Chun Shian
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
Timun Loh
 
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...Francis Ho
 
Persons involved in tenders and contract
Persons involved in tenders and contractPersons involved in tenders and contract
Persons involved in tenders and contract
shiva prakash
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
Daniel Ross
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
Shahin MB
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
Francis Ho
 
Professional practice 1
Professional practice 1Professional practice 1
Professional practice 1
tfkc1212
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lee Pei Gie
 
Single stage design and build method & construction project management
Single stage design and build method & construction project managementSingle stage design and build method & construction project management
Single stage design and build method & construction project management
John Constance
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
Sarah Fox
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
Kai Yun Pang
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 

What's hot (17)

Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
Considerations in Procurement Strategy - 2014 Olswang Construction Law Confer...
 
Persons involved in tenders and contract
Persons involved in tenders and contractPersons involved in tenders and contract
Persons involved in tenders and contract
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Procurement Methods
Procurement MethodsProcurement Methods
Procurement Methods
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
 
Professional practice 1
Professional practice 1Professional practice 1
Professional practice 1
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Single stage design and build method & construction project management
Single stage design and build method & construction project managementSingle stage design and build method & construction project management
Single stage design and build method & construction project management
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 

Similar to Pp1 group assignment presentation slides

4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
Ngo Jia Haur
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lin Hui
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slides
ashleyyeap
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
Kailyn Lee
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
Pang Khai Shuen
 
A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...
A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...
A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...Alberto Sanchez
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)
Kai Yun Pang
 
Project managment (pm) solved assignments summer 2015
Project managment  (pm) solved assignments summer 2015Project managment  (pm) solved assignments summer 2015
Project managment (pm) solved assignments summer 2015
smumbahelp
 
Questions in notes
Questions in notesQuestions in notes
Questions in notes
CKMCforstudents
 
Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)
Eng.Ahmed Said Mohamed Refaei
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
Sukhdarshan Singh
 
Change management and dispute resolution
Change management and dispute resolutionChange management and dispute resolution
Change management and dispute resolutionAlex Iskandar
 
Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3
ashleyyeap
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
Lwj Welson
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
Lwj Welson
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
JB Nartey
 

Similar to Pp1 group assignment presentation slides (20)

4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slides
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
 
A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...
A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...
A.Sanchez_Part2_Planning and Scheduling Construction Projects_The Schedule As...
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)
 
Project managment (pm) solved assignments summer 2015
Project managment  (pm) solved assignments summer 2015Project managment  (pm) solved assignments summer 2015
Project managment (pm) solved assignments summer 2015
 
Questions in notes
Questions in notesQuestions in notes
Questions in notes
 
Questions in notes
Questions in notesQuestions in notes
Questions in notes
 
Questions in notes
Questions in notesQuestions in notes
Questions in notes
 
Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
 
Change management and dispute resolution
Change management and dispute resolutionChange management and dispute resolution
Change management and dispute resolution
 
Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3Professional Practice 1 Tutorial 3
Professional Practice 1 Tutorial 3
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 

More from Pui Chun Shian

Fm chun part a to c
Fm chun part a to cFm chun part a to c
Fm chun part a to c
Pui Chun Shian
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
Pui Chun Shian
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slides
Pui Chun Shian
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journal
Pui Chun Shian
 
Compiled report
Compiled reportCompiled report
Compiled report
Pui Chun Shian
 
Software app slides
Software app slidesSoftware app slides
Software app slides
Pui Chun Shian
 
Software
SoftwareSoftware
Software
Pui Chun Shian
 
Estimating
Estimating Estimating
Estimating
Pui Chun Shian
 
Management science
Management scienceManagement science
Management science
Pui Chun Shian
 
Plumeria obtusa
Plumeria obtusaPlumeria obtusa
Plumeria obtusa
Pui Chun Shian
 
Circle of life
Circle of lifeCircle of life
Circle of life
Pui Chun Shian
 
Biodiversity report
Biodiversity reportBiodiversity report
Biodiversity report
Pui Chun Shian
 
Bio
BioBio
Sustainable
SustainableSustainable
Sustainable
Pui Chun Shian
 
Sustainable housing development
Sustainable housing developmentSustainable housing development
Sustainable housing development
Pui Chun Shian
 
Sustainable housing development presentation
Sustainable housing development presentationSustainable housing development presentation
Sustainable housing development presentation
Pui Chun Shian
 
Group assignment-final
Group assignment-finalGroup assignment-final
Group assignment-final
Pui Chun Shian
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentation
Pui Chun Shian
 
Bs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slidesBs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slides
Pui Chun Shian
 
Bs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioningBs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioning
Pui Chun Shian
 

More from Pui Chun Shian (20)

Fm chun part a to c
Fm chun part a to cFm chun part a to c
Fm chun part a to c
 
Pp2 final report
Pp2 final reportPp2 final report
Pp2 final report
 
Final csi slides
Final csi slidesFinal csi slides
Final csi slides
 
Csi individual journal
Csi individual journalCsi individual journal
Csi individual journal
 
Compiled report
Compiled reportCompiled report
Compiled report
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software
SoftwareSoftware
Software
 
Estimating
Estimating Estimating
Estimating
 
Management science
Management scienceManagement science
Management science
 
Plumeria obtusa
Plumeria obtusaPlumeria obtusa
Plumeria obtusa
 
Circle of life
Circle of lifeCircle of life
Circle of life
 
Biodiversity report
Biodiversity reportBiodiversity report
Biodiversity report
 
Bio
BioBio
Bio
 
Sustainable
SustainableSustainable
Sustainable
 
Sustainable housing development
Sustainable housing developmentSustainable housing development
Sustainable housing development
 
Sustainable housing development presentation
Sustainable housing development presentationSustainable housing development presentation
Sustainable housing development presentation
 
Group assignment-final
Group assignment-finalGroup assignment-final
Group assignment-final
 
Ct iii presentation
Ct iii presentationCt iii presentation
Ct iii presentation
 
Bs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slidesBs mechanical ventilation and air conditioning presentation slides
Bs mechanical ventilation and air conditioning presentation slides
 
Bs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioningBs mechanical-and-air-conditioning
Bs mechanical-and-air-conditioning
 

Recently uploaded

Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
Celine George
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
AzmatAli747758
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 

Recently uploaded (20)

Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 

Pp1 group assignment presentation slides

  • 1. Professional Practice 1 Group Members: Nicole Thain Huey Wei Phon Kit Poi Pui Chun Shian Ranee Leow Kai Yen Satesh Raj A/L P. Devaraj Sew Yue Ling Soo Ping Zheng Soo Yon Li Tam Zhao Wei Tan Jia San Farah Aida
  • 3. WHY TRADITIONAL PROCUREMENT ? Completion on time (5 years) Variation in design Minimum variation in Contract Sum Deal with minimum parties Full control of design
  • 4. 1. Brief Stage 2. Design Stage 3. Tendering (Competition) Stage 4. Construction Stage Completion on time (5 years)✔
  • 5. Variation in design Minimum variation in Contract Sum ✔ ✔ ↓ Cost Risk ↓ Design Risk
  • 6. Deal with minimum parties Full control of design ✔ ✔
  • 7. CONCLUSION - ↑ Time frame - Construction cost certainty - ↓ Price variation - Partial / Full control of design - ↓ Design Variation - ↓ Parties to deal with
  • 9. WHY TWO STAGE SELECTIVE TENDERING ? Reasonably transparent Eliminate non-performing contractors
  • 10. TWO STAGE SELECTIVE TENDERING Open to only selected numbers of “Pre-qualified” contractors Reduce tender cost, saves time & resources Low risk but high reward Lower risk of buildability issue
  • 11. Reasonably transparent ✔ STAGE 1 ❏ An advertisement will be placed on major newspaper/social platform ❏ Interested tenderers will submit their companies particulars in a “Pre-qualification Form”
  • 12. Eliminate non-performing contractors ✔ STAGE 2 ❏ A “Pre-qualification” form will be attached with the advertisement ❏ Evaluation Stage : based on the “Pre-qualification Form”
  • 13. TWO-STAGE SELECTIVE TENDERING TIMELINE Invitation To Tender ● Advertisement ● Pre-Qualification Form Pre-Qualification Stage ● Based on experience, financial capabilities and competencies. Collection of Tender ● Charged with documentation fees Tender Closing ● Submit into a “tender box” ● QS submit Pre-Tender Estimate Tender Opening ● Tender figures are recorded and jointly verified Tender Evaluation ● Check for major arithmetical errors ● Prepare tender report ● Call lowest 3 tenderers for tender interview Tender Interview ● Queried on any issues ● May be requested to submit a revised tender Tender Award ● Prepare and issue Letter of Award ● Return within 14 days
  • 15. LUMP SUM CONTRACT WHY LUMP SUM CONTRACT? ● Construction designs are completed > Requested work is well-defined ● Minimize variations during construction > minimize variation to price as well ● Reduce owner risks ● Contractor has greater control over profit expectations
  • 16. LIQUIDATED ASCERTAINED DAMAGES (LAD) ● Client’s Requirement : Imposed Liquidated Damages of RM 250,000.00 a day. Ensure project to complete on time ✔ Include early completion compensation for the contractor Early completion might produce higher savings for the project owner LUMP SUM CONTRACT
  • 17. PAM CONTRACT 2006 (WITH QUANTITIES) ● Home base form : Risks are known to be local industry ● Intended to be used as a building contractor and not as civil engineering contract ● It is estimated that 90% of the building contracts in the private sector are based on the PAM Contract 2006
  • 18. Functions of PAM Contract 2006 (With Quantities) ● Evidences legal relationship between parties in the contract ● Provides the administrative procedure ● Incorporate all special requirements and circumstances of a project ● Expresses the obligation of the parties ● Set out reasonable clarity of the project PAM CONTRACT 2006 (WITH QUANTITIES)
  • 19. Clause 6.1 - Standards of works, materials, goods and workmanship ● Materials, goods and workmanship shall be according to the standards described in the contract documents ● If there is any discrepancy, the contractor can instruct sub-contractors to demolish and rectify the defect works Clause 15.4 - Schedule of defects ● Sub-contractor must provide defect liability period after completion of works and correct the defects within 28 Days from receipt of schedule of defects from contractor. QUALITY
  • 20. HEALTH & SAFETY OSHA (Occupational Safety & Health Administration) - The Occupational Safety & Health Act 1970 - To keep their work environment safe - < 10 workers X file injury / illness report - Compulsory training to the workers as a guarantee to the employer
  • 21. 1. Appoint a Safety Advisor HOW TO ENHANCE HEALTH & SAFETY ? Essential to give professional advices. OSHA Clause 8.1 - Training & Competency 2. Proposed Site Management Plan (SMP) Compliance to Occupational Safety and Health in Construction Industry (Management) - Ensure a safer working environment 3. Allow Separate Specification for Health & Safety The Health & Safety Specification may include any details regarding health and safety matters

Editor's Notes

  1. Based on BQ and drawings( contractor qs has to estimate) The type of contract that we have chosen is the lump sum contract. Why lump sum contract? The reason being is because lump sum contract is based on completed construction design. This allow a well defined work scope to be delivered to the contractor. Hence, the variation during the construction can be minimize and eventually the variation of price will be minimized too. By using lump sum contract, the risk of the owner will be transferred to the contractor. And the contractor will have greater control over profit expectations.
  2. Based on BQ and drawings( contractor qs has to estimate) So for the Clients requirement for LAD, the client would like to impose RM250,000 a day which is a big amount. By using the lump sum contract, one of the its characteristics is that it includes early completion compensation for the contractor by this means the project owner can have higher savings.
  3. For form of contract, we chose the PAM Contract 2006 (With Quantities). This is because it is a home base form where the risks are known to local industry. Besides that, it is intended to be used as a building contractor and not as civil engineering contract unlike FIDIC which can only be used for civil engineering projects such as oil rigs etc. And by using the PAM Contract, its obviously gives flexibility to the employer and the contractor It is estimated that 90% of the building contracts in the private sector are based on PAM Contract 2006, because it includes relevant clauses to assure the rights for the involved parties. This is the reason why PWD Contract is not our choice for this project.
  4. As for the functions of PAM Contract, it gives and evidences legal relationship between parties in the contract so that if either side of the party breach the contract, legal actions can be made. With this, it reminds the parties to follow the contract whenever the project is ongoing. It also provide administrative procedure so qthat any professions that would look at the PAM contract would not get lost or would know what to do if let’s say there’s a claim for extension of time. And the PAM contract has also written clearly all the special requirements and what are the circumstances of a project. What to do if something happens and so on. Sometimes, parties do not know what actually is their obligations towards the job but by referring to PAM contract, the obligations of the parties will be stated clearly in the Contract. As mentioned that most of the times claims happen due to different type of reasons like extension of time, late site possessions and so on. To look for what should be done or what are the clarifications, contractors can refer back to the PAM contract and the clarifications are definitely reasonable.
  5. The employer has also mentioned about the quality of the works carried out. And we can guarantee the standard of works, materials, goods and workmanship under clause 6.1 of the PAM Contract. It also says that if there is any difference in the works, the contractors or the subcons are liable to change the demolish the works and changed it into the original plan. Basically the employers do not need to worry about it because under clause 15.4 of the PAM Contract, it has stated that the contractor must issue the DLP after the completion of works and the contractors need to amend the defects within 28 days from the receipt of schedule of defects from contractor.
  6. A single construction has lots of management that need to be handled appropriately, one of the most concern factor while the construction is going on is the safety of everyone near to the site, mainly the workers on site. So the one that we will introduce to the employer is the Occupational Safety & Health Administration which is also known as OSHA. Well, to know more about them, they actually practice the Occupational Safety & Health Act which is published in 1970. The main reason they have established the act is to keep the workers’ and the working environment safe. By that, they could save more lives by reducing the accidents that will happen. They have also mentioned that if the company has less than 10 workers, there’s no need for filing an injury or illness report to them. And the employer can communicate plans made orally to the workers. But, the plan must be written if there are over 10 employees. The written plan should be kept in the workplace, and must be always available for employee review. The main purpose of OSHA is they provide compulsory trainings to the worker as a guarantee to the employer. In such way, the workers would work professionally and diligently in the construction site.
  7. So there are ways to enhance healthy & safety. But first, the Employer should appoint a safety advisor. A safety advisor is extremely essential for the construction works to give professional advices on the precautions and safety measures and by that, there will be a huge improvement in the Site’s health and safety standard. OSHA has mentioned clearly about the safe environment in a working place. Under clause 8.1 of OSHA, Training and Competency has been one of the most highlighted part for them as they only prefer workers who have learnt about the safety precautions and make sure workers will apply them on site. Sometimes, workers are not aware of the safety signs but the safety signs are one of the ways to help workers to know what is going on on the particular work site. So the second step is to Propose a Site Management Plan. As you have already appoint a safety advisor, he/she will help you in doing the management plan. But make sure it is compliance to OSHA in construction industry and it is to ensure a safer working environment for all involved individuals such as employees, contractors, visitors and the community. It is a documented safety plans for a specific construction workplace that should include the following matters: (i) General principles of prevention (ii) Minimum welfare facilities required for construction sites (iii) Work involving particular risks Last step is to Allow Specification for Health & Safety. Besides specifications for building designs, a separate specifications for health and safety can be developed to enhance the Health & Safety requirement of the project. The Health & Safety Specification may include any details regarding health and safety matters that needs extra attention from all relevant parties.