Just-In-Time (JIT) is a production philosophy aimed at eliminating waste by ensuring that the right parts are available at the right time, encompassing all production processes. JIT operates on principles such as waste elimination, a pull versus push system, and manufacturing cycle time management, while prioritizing close supplier relationships and employee empowerment. The document outlines various aspects of JIT, including its objectives, characteristics, benefits, major tools, and implementation challenges.