Large Scale Portable LNG
Response
Santa Cruz/Felton 2015
Austin A. Hastings, P.E., Senior Manager
LNG/CNG Engineering and Operations
Pacific Gas & Electric Company
In Case of Emergency
• Call 911 and Meet First Responders:
Austin
• Sweep Room, Gathering Area, Roster
Check: TC
• CPR Certified?
• Main Gathering Area: Front Gate
• Alternate Gathering Area: Left from tour
trailer through transfer area
Page 2
Agenda
Comparison of LNG and CNG
Overview of LNG/CNG Eng & Ops Department
Portable LNG/CNG equipment
Background on the Project
LNG Planning and Logistics Process
Safety on Your Tour
Page 3
Comparison of LNG and CNG
LNG CNG
Pressures up to (psig): 200 4,500
Temperatures (F): -260F Ambient
Odorized? NO YES
How does PG&E Acquire It? From Third Parties At PG&E CNG Stations
Volume Expansion Ratio 600:1 275:1
Why Liquefy or Compress? Higher Energy Density
Advantages when used in a
Portable Application
Higher Flowrates Easier to Site
Higher Volumes Can be Unmanned
Higher Energy Density Refill at PG&E Facilities
Page 4
LNG/CNG
Engineering and Operations
Created September 2011
Recognition that:
• Assets were treated differently than 49 CFR Part 192 assets
• Small equipment base
Many functions related to these assets in one compact department:
Operations, Project Engineering, Facility Engineering, Standards Development,
Maintenance Planning, Maintenance, Inspection, Budget Management (Capital,
Expense, Distribution, Transmission), Customer Support (Third Party CNG vehicles),
Training
51 Employees
Employee and Hiring Hall Make Up:
• 21 Technicians
• 6 Clerical and Material
• 14 Engineering/Technical
• 4 Portable Response Coordinators
• 6 Supervisory
Page 5
LNG/CNG E&O Asset Base
33 CNG Fueling Stations
• Provide fuel for PG&E CNG vehicles (e.g., passenger cars, fleet trucks)
• Provide fuel for third party fleet operators and individual passenger vehicles
• Maintain a PG&E presence in the CNG “green vehicle” business
218 Pieces of Portable LNG and CNG Equipment
• Provide natural gas supplies to offset or supplement pipeline flowing
supplies for
o Planned outages to reduce pipeline construction, maintenance and
operations costs and complexity
o Winter peak load shaving
o Unplanned outages (emergencies)
Page 6
A Handsome Group!
Page 7
Portable Equipment
Capabilities and Quantities
2010 2015
Storage
Volume
Capacity
Flowrate
Capacity
Application
Example
LNG Tankers 3 10 up to 900,000 scf
5,000+ Residential,
Large Commercial
LNG Fired Vaporizers 3 7 500,000 scfh
LNG Ambient Vaporizers 0 4 200,000 scfh
CNG Tube Trailers 5 24 up to 150,000 scf "Large CNG" - Up to
2,000 Residential,
Medium CommercialCNG Injection Trailers 5 16
up to 50,000
scfh
CNG Gaps 2 19 8,500 scf 2,000 scfh
"Medium CNG" - Up
to 20 Residential,
Small Commercial
CNG Modules 0 90 2,200 scf 500 scfh "Small CNG" - Up to 3
ResidentialCNG Bottle Trailers 4 26 1,800 scf 500 scfh
TOTAL 22 218
Page 8
LNG Vaporizer - Fired
2015 Volume Capacity Flowrate Capacity Application Example
LNG Tankers 10 up to 900,000 scf 5,000+ Residential, Large
CommercialLNG Fired Vaporizers 7 500,000 scfh
Page 9
LNG Vaporizer - Fired
LNG is heated to change phase from liquid
to gas, heated to produce pipeline natural
gas at 60-70oF, and the pressure is
controlled as appropriate
PIPELINE
LNG tanker loaded with LNG,
transported and then parked on site.
LNG TANKER VAPORIZER
Page 10
Vaporizer Components
Page 11
• On board air for pneumatic valves
• 480V electrical mainly for motor for water pump
• Nitrogen loop for cabinet purge and back up
pneumatic control
• Fuel gas system
• Odorant system
• Telemetry
• Methane Detection
• Automatic alarm and shut devices
• Air, electric, motor, pump, heater, control system
redundancies
• No LNG pump or methane compressors
• Focus is on spill elimination, not containment!
LNG Vaporizer - Ambient
2015 Volume Capacity
Flowrate
Capacity
Application Example
LNG Tankers 10 up to 900,000 scf 5,000+ Residential, Large
CommercialLNG Ambient Vaporizers 4 200,000 scfh
Page 12
LNG Vaporizer - Ambient
Page 13
LNG FIRE TRAINING
Page 14
LNG FIRE TRAINING
Page 15
“Large” CNG System
2015 Volume Capacity
Flowrate
Capacity
Application Example
CNG Tube Trailers 24 up to 150,000 scf "Large CNG" - Up to 2,000
Residential, Medium CommercialCNG Injection Trailers 16 up to 50,000 scfh
Page 16
“Medium” CNG System
2015
Volume
Capacity
Flowrate
Capacity
Application Example
CNG Gaps/Double Gaps 19 up to 17,000 scf 2,000 scfh
"Medium CNG" - Up to 20
Residential, Small Commercial
Heat
Exchanger
Bundle
Storage
Cylinders
Pressure
Control
Equipment
Page 17
PIPELINE
Trailer is loaded with CNG, transported,
and then parked on site. CNG pressure
is reduced and then heated to produce
pipeline natural gas at 60-70oF
TRAILER with
STORAGE, HEATING
AND REGULATION
“Small” CNG Systems
2015 Volume Capacity Flowrate Capacity Application Example
CNG Modules 90 2,200 scf 500 scfh "Small CNG" - Up to 3
ResidentialCNG Bottle Trailers 26 1,800 scf 500 scfh
Heat
Exchanger
Bundle
Pressure
Control
Equipment
Storage
Cylinders
Page 18
Telemetry (Levelcon)
• Web based application
• Installed on CNG Equipment and LNG equipment
• Tracks flowrates, pressures, temperatures, GPS location
• Automatic page out capability
• Data can be trended and exported
• The larger the equipment, the greater the Levelcon capability
Page 19
Portable LNG/CNG – Peak Shaving
We use the same equipment to supplement
pipeline supply during high demands (cold
temperatures)
• Long term economic benefit versus pipeline
(+$25M)
• Short term project delay mitigation
(environmental, permit, budget)
• Very infrequent event
• LNG/CNG and Planning to work together for
more advanced coordination
• Same equipment, same people, same overall
process
Page 20
LNG
Auburn Clovis
CNG
Folsom Oakdale
Foster City Red Bluff
Lathrop San Francisco
Los Banos Stanford
Nevada City-1 Waterford
Nevada City-2
CROSS COMPRESSION
Santa Cruz
Portable Natural Gas Usage
Increase
2010 2014 Increase
Tap-Days (Number of Days times
Number of Taps)
370 5,705 15 times
Average Number of Taps Each Day for
the entire Year
1.01 17 (52 at one time) 17 times
Customer Days Supported (majority in
2012 were two long term LNG projects)
14,000 1,317,000 94 times
Overall T-94B/95 Project
Santa Cruz LNG T-94B/95
Project Background:
• 5.58 Miles of hydrotest
• MAOP = 303 PSIG
• Spike pressure during test of 1,020 psig
• 10”, mostly Grade B seamless but some ERW
System Demands:
• Sole natural gas supply for approx. 44,000 customers
for two weeks!
• Injection pressure: 275psig
• 215 Mscfd CNG - Capitola
Equipment:
• 5 portable 300hp compressors – 4 running, 1 stand-by
• 32 tankers
• 3 Vaporizers
• System Emergency Back-up:
• Santa Cruz Underground Holder: ~2.5MMscf
• Line pack: ~1MMscf
T-94B/95 LNGData
• Peak Flowrate
• 490 Mscfh
• 5,975 Gph
• Daily Volume
• 6,944 Mscfd
• 84,500 GPD
• 8.5 tankers per day
• Total Volume (including test)
• 111,100 Mscf
• 1.352 million gallons
• Total Pounds of LNG Injected:
• 4.786 million pounds, 2,400
tons
• 50% more than a World War II
Destroyer
• Miles travelled
• Each Round Trip: 686
• Daily: 5,800
• Entire Project: 92,747
• 15 round trips from San Francisco
to Boston
• Almost 4 times around the earth
Santa Cruz LNG
Logistics
Felton/Santa Cruz
– LNG Injection
Site
Boron – Primary
LNG supply
location
Ehrenberg –
Back-up LNG
supply location
Santa Cruz LNG
Logistics
PG&E Felton
Injection Site
PG&E
PG&E
CE
CE
PG&E
PG&E
PG&E CE
CE LNG TANKER
CE LNG TANKER
Transfer Site near Inj. Site
PIPELINE
PG&E VAPORIZER
PG&E
PG&ETranspo
CE Transpo
Clean Energy LNG
Production Plant
LNG Supply and Transport
Real Time Driver Monitoring
Supply Facility in Boron
Jobsite Overview
Compression
Vaporization
LNG Supply
LNG Transfer
LNG Transfer Yard
Jobsite Overview
Compression
Vaporization
LNG Supply
LNG Transfer
LNG Tankers and Manifold
Jobsite Overview
Compression
Vaporization
LNG Supply
LNG Transfer
LNG Vaporizers
Jobsite Overview
Compression
Vaporization
LNG Supply
LNG Transfer
Vaporizer Discharge Manifold
Jobsite Overview
Compression
Vaporization
LNG Supply
LNG Transfer
Portable Compressors
Connecting to the Pipeline
Page 38
Operational
Site Lead
Logistics
Site Lead
Support
Support
Operator 1 Operator 2 Assistant 1 Assistant 2 Assistant 3
Transfer
Site Lead
Transfer 1
Transfer 2/
Assistant 4
Public
Liaison
In the event of
an incident
AM
Peak
Safety
Compressor
Operator
Jobsite Organizational
Structure
Santa Cruz LNG
Staffing
Total Number of People Involved: 89
• Total Technicians: 24
• Total Site Leads: 10
• Support Personnel and REI: 7
• Drivers/Loaders: 48
THIS IS A TEST
(AND ONLY A TEST)
• Before any large scale LNG response, we test for a minimum of 16
hours. This test is for:
– Testing the specific layout as every project is configured differently.
– Testing the jobsite conditions to ensure no environmental issues impact the
job.
– Confirm the downstream customer load.
– Ensure the equipment is functioning properly and did suffer a failure due to
transport.
• Because this project is so incredibly complex, we are testing for 48
hours one week before the outage begins.
– This gives us time to reconfigure the jobsite, our operations or our process and
even potentially retest before the pipeline outage begins.
• This is the first day of our test, and it will not be unusual for us to
be shut down and changing our operations today.
SAFETY ON YOUR TOUR
•Please stay close to your tour leader. Do NOT wander around the jobsite!!!
•If there is an operational issue, I will escort you to the trailer to allow the technicians to focus.
•If you need to leave or go to trailer, please let TC know and she will escort you.
•Wear PPE:
• At all times: hard hat, vest, eye protection
• Ear plugs and sunscreen as needed.
• Work gloves within 15’ of cryogenic piping.
•You are free to take pictures.
•We will have several spots for group photos along the route.
•Be cautious of tripping hazards.
•ALWAYS look around while walking, many trucks will be leaving/entering the jobsite.
•Properties of LNG reminder:
• -260F boiling point
• Unodorized
• Cold vapor heavier than air
• Asphyxiant
•Other jobsite hazards:
• CNG gas up to 3,600 psig
• Odorant
• Glycol
• Hot temperatures on compressors
STAY HYDRATED! Grab a cold bottle of water on your way out.
THANK YOU
Questions?

More Related Content

What's hot

Q913 re1 w1 lec 2
Q913 re1 w1 lec 2Q913 re1 w1 lec 2
Q913 re1 w1 lec 2AFATous
 
Natural gas storage in the united states
Natural gas storage in the united states Natural gas storage in the united states
Natural gas storage in the united states
BANABAS DOGAH
 
One day gas lift system course
One day gas lift system course One day gas lift system course
One day gas lift system course
Giuseppe Moricca
 
Gas Processing.pdf
Gas Processing.pdfGas Processing.pdf
Gas Processing.pdf
Elsayed Amer
 
Well Workover
Well Workover Well Workover
Well Workover
Christian Akhilome
 
API 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump CompanyAPI 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump Company
Abdulrahman Alkhowaiter
 
Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir Engineering
Farida Ismayilova
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system
Kushjani1
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesMohamed Elnagar
 
Tubing string
Tubing stringTubing string
Tubing string
Elsayed Amer
 
Carbon Capture and Storage
Carbon Capture and StorageCarbon Capture and Storage
Carbon Capture and Storage
AshokaNarayanan3
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
Tarek Erin
 
ADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptx
ADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptxADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptx
ADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptx
RAOULMartialTIENTCHE
 
Heater treater
Heater treaterHeater treater
Heater treater
Karnav Rana
 
Steam boilers interview questions & answers
Steam boilers interview questions & answersSteam boilers interview questions & answers
Steam boilers interview questions & answers
AbdulrahmanAlhafith
 
Gas Processing and Conditioning SLIDE Master DAY ONE.ppt
Gas Processing and Conditioning  SLIDE  Master DAY ONE.pptGas Processing and Conditioning  SLIDE  Master DAY ONE.ppt
Gas Processing and Conditioning SLIDE Master DAY ONE.ppt
TemitopeBello6
 
The Completion String & Accessories.pdf
The Completion String & Accessories.pdfThe Completion String & Accessories.pdf
The Completion String & Accessories.pdf
AbdallahTayea99
 
Gas turbine primer
Gas turbine primerGas turbine primer
Gas turbine primer
عدنان بهجت جليل
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineering
behnamproeng
 

What's hot (20)

Q913 re1 w1 lec 2
Q913 re1 w1 lec 2Q913 re1 w1 lec 2
Q913 re1 w1 lec 2
 
Natural gas storage in the united states
Natural gas storage in the united states Natural gas storage in the united states
Natural gas storage in the united states
 
One day gas lift system course
One day gas lift system course One day gas lift system course
One day gas lift system course
 
Gas Processing.pdf
Gas Processing.pdfGas Processing.pdf
Gas Processing.pdf
 
Well Workover
Well Workover Well Workover
Well Workover
 
API 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump CompanyAPI 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump Company
 
Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir Engineering
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system
 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface Facilities
 
Tubing string
Tubing stringTubing string
Tubing string
 
Carbon Capture and Storage
Carbon Capture and StorageCarbon Capture and Storage
Carbon Capture and Storage
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
 
ADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptx
ADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptxADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptx
ADVANCED ENHANCE OIL RECOVERY. LECTURE NOTES.pptx
 
Heater treater
Heater treaterHeater treater
Heater treater
 
SPE 172686 final
SPE 172686 finalSPE 172686 final
SPE 172686 final
 
Steam boilers interview questions & answers
Steam boilers interview questions & answersSteam boilers interview questions & answers
Steam boilers interview questions & answers
 
Gas Processing and Conditioning SLIDE Master DAY ONE.ppt
Gas Processing and Conditioning  SLIDE  Master DAY ONE.pptGas Processing and Conditioning  SLIDE  Master DAY ONE.ppt
Gas Processing and Conditioning SLIDE Master DAY ONE.ppt
 
The Completion String & Accessories.pdf
The Completion String & Accessories.pdfThe Completion String & Accessories.pdf
The Completion String & Accessories.pdf
 
Gas turbine primer
Gas turbine primerGas turbine primer
Gas turbine primer
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineering
 

Viewers also liked

Tanques
TanquesTanques
Tanques
Katya Ca
 
Corrosión de tanques de almacenamiento
Corrosión de tanques de almacenamientoCorrosión de tanques de almacenamiento
Corrosión de tanques de almacenamiento
Laura Sofia Ramirez
 
US (MARAD) LNG Bunkering Study 2014
US (MARAD) LNG Bunkering Study 2014US (MARAD) LNG Bunkering Study 2014
US (MARAD) LNG Bunkering Study 2014
George Teriakidis
 
Seagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking GraceSeagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking Grace
John Hatley PE
 
Course description H862 - LNG Electrical propulsion system
Course description H862 - LNG Electrical propulsion systemCourse description H862 - LNG Electrical propulsion system
Course description H862 - LNG Electrical propulsion systemMiro Beukovic
 
LNG facilities with conceptual designing and construction support for Wind an...
LNG facilities with conceptual designing and construction support for Wind an...LNG facilities with conceptual designing and construction support for Wind an...
LNG facilities with conceptual designing and construction support for Wind an...
KatthyLucas2100
 
May 22 Webinar: LNG Tech 101
May 22 Webinar: LNG Tech 101May 22 Webinar: LNG Tech 101
Liquefied Natural Gas Report 2015: Part 1
Liquefied Natural Gas Report 2015: Part 1 Liquefied Natural Gas Report 2015: Part 1
Liquefied Natural Gas Report 2015: Part 1
Engineering, Architecture, Design Consultancy, Building Services
 
Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2
Engineering, Architecture, Design Consultancy, Building Services
 
Liquefied Natural Gas Report 2015: Part 3
Liquefied Natural Gas Report 2015: Part 3Liquefied Natural Gas Report 2015: Part 3
Liquefied Natural Gas Report 2015: Part 3
Engineering, Architecture, Design Consultancy, Building Services
 
Autodesk Inventor Professional
Autodesk Inventor ProfessionalAutodesk Inventor Professional
Autodesk Inventor Professional
Othoniel Hernandez Ovando
 
Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...
Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...
Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...
Wisconsin Clean Cities
 
Gasket design criteria
Gasket design criteriaGasket design criteria
Gasket design criteria
Dương Phúc
 
Process Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG PlantsProcess Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG Plants
Shilpa Dubey
 
Separador horizontal
Separador horizontalSeparador horizontal
Separador horizontal
LUIS EDUARDO LEAL MARTINEZ
 

Viewers also liked (20)

MDR UK Safety Case Strategy Rev 0
MDR UK Safety Case Strategy Rev 0MDR UK Safety Case Strategy Rev 0
MDR UK Safety Case Strategy Rev 0
 
HawaiiGas LNG Presentation
HawaiiGas LNG PresentationHawaiiGas LNG Presentation
HawaiiGas LNG Presentation
 
Tanques
TanquesTanques
Tanques
 
Corrosión de tanques de almacenamiento
Corrosión de tanques de almacenamientoCorrosión de tanques de almacenamiento
Corrosión de tanques de almacenamiento
 
US (MARAD) LNG Bunkering Study 2014
US (MARAD) LNG Bunkering Study 2014US (MARAD) LNG Bunkering Study 2014
US (MARAD) LNG Bunkering Study 2014
 
Seagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking GraceSeagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking Grace
 
Course description H862 - LNG Electrical propulsion system
Course description H862 - LNG Electrical propulsion systemCourse description H862 - LNG Electrical propulsion system
Course description H862 - LNG Electrical propulsion system
 
LNG facilities with conceptual designing and construction support for Wind an...
LNG facilities with conceptual designing and construction support for Wind an...LNG facilities with conceptual designing and construction support for Wind an...
LNG facilities with conceptual designing and construction support for Wind an...
 
May 22 Webinar: LNG Tech 101
May 22 Webinar: LNG Tech 101May 22 Webinar: LNG Tech 101
May 22 Webinar: LNG Tech 101
 
Liquefied Natural Gas Report 2015: Part 1
Liquefied Natural Gas Report 2015: Part 1 Liquefied Natural Gas Report 2015: Part 1
Liquefied Natural Gas Report 2015: Part 1
 
Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2
 
API CNG LNG
API CNG LNGAPI CNG LNG
API CNG LNG
 
Liquefied Natural Gas Report 2015: Part 3
Liquefied Natural Gas Report 2015: Part 3Liquefied Natural Gas Report 2015: Part 3
Liquefied Natural Gas Report 2015: Part 3
 
FSRU_projects
FSRU_projectsFSRU_projects
FSRU_projects
 
Autodesk Inventor Professional
Autodesk Inventor ProfessionalAutodesk Inventor Professional
Autodesk Inventor Professional
 
Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...
Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...
Gas Technology Institute & ET Environmental - CNG/LPG Garage Maintenance Cons...
 
Gasket design criteria
Gasket design criteriaGasket design criteria
Gasket design criteria
 
Wps soldadura
Wps soldaduraWps soldadura
Wps soldadura
 
Process Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG PlantsProcess Optimization for Small-Scale LNG Plants
Process Optimization for Small-Scale LNG Plants
 
Separador horizontal
Separador horizontalSeparador horizontal
Separador horizontal
 

Similar to Felton LNG Tour Presentation (PG&E)

Cryoshelter presentation linkedin
Cryoshelter presentation linkedinCryoshelter presentation linkedin
Cryoshelter presentation linkedin
Joost van den Born
 
UPDATED-GTM Presentation v3 email
UPDATED-GTM Presentation v3 emailUPDATED-GTM Presentation v3 email
UPDATED-GTM Presentation v3 emailKen Kelley
 
Choi.ppt
Choi.pptChoi.ppt
Choi.ppt
zeidali3
 
CUBOGAS 2021 Corporate Presentation
CUBOGAS 2021 Corporate PresentationCUBOGAS 2021 Corporate Presentation
CUBOGAS 2021 Corporate Presentation
Valentina Ottini
 
Natural Gas Fuel Consulting Group
Natural Gas Fuel Consulting GroupNatural Gas Fuel Consulting Group
Natural Gas Fuel Consulting GroupKen Kelley
 
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the PipelineVirtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Clean Energy Compression (formerly IMW Industries)
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
Vedam design & Techincal Consultancy Pvt Ltd.
 
Clean Energy Ccompression Corporate Overview 2016
Clean Energy Ccompression Corporate Overview 2016Clean Energy Ccompression Corporate Overview 2016
Clean Energy Ccompression Corporate Overview 2016
Clean Energy Compression (formerly IMW Industries)
 
GE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual Pipeline
GE코리아
 
Basic technology & solutions of LNG
Basic technology & solutions of LNGBasic technology & solutions of LNG
Basic technology & solutions of LNG
Abu Bakar Siddiqui
 
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield MachineDebris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
womgroup
 
MTC Well Test Equipment - Worldwide Oilfield Machine
MTC Well Test Equipment - Worldwide Oilfield MachineMTC Well Test Equipment - Worldwide Oilfield Machine
MTC Well Test Equipment - Worldwide Oilfield Machine
womgroup
 
QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
mubarak2009
 
Recommend pract cng_
Recommend pract cng_Recommend pract cng_
Recommend pract cng_
Eko Hadi Kesuma
 
Lcng 101
Lcng 101Lcng 101
Lcng 101
Pham Hai
 
LNG as fuel innovation 220618
LNG as fuel innovation 220618LNG as fuel innovation 220618
LNG as fuel innovation 220618
MARTIAL CLAUDEPIERRE
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut
 
June 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationJune 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationRebecca Markillie
 
Small and medium scale LNG for power generation
Small and medium scale LNG for power generationSmall and medium scale LNG for power generation
Small and medium scale LNG for power generation
Smart Power Generation
 

Similar to Felton LNG Tour Presentation (PG&E) (20)

Cryoshelter presentation linkedin
Cryoshelter presentation linkedinCryoshelter presentation linkedin
Cryoshelter presentation linkedin
 
UPDATED-GTM Presentation v3 email
UPDATED-GTM Presentation v3 emailUPDATED-GTM Presentation v3 email
UPDATED-GTM Presentation v3 email
 
Choi.ppt
Choi.pptChoi.ppt
Choi.ppt
 
CUBOGAS 2021 Corporate Presentation
CUBOGAS 2021 Corporate PresentationCUBOGAS 2021 Corporate Presentation
CUBOGAS 2021 Corporate Presentation
 
Natural Gas Fuel Consulting Group
Natural Gas Fuel Consulting GroupNatural Gas Fuel Consulting Group
Natural Gas Fuel Consulting Group
 
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the PipelineVirtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
Virtual pipelines 201: Industrial CNG Applications Beyond the Pipeline
 
Lng paper v2_lq
Lng paper v2_lqLng paper v2_lq
Lng paper v2_lq
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
Clean Energy Ccompression Corporate Overview 2016
Clean Energy Ccompression Corporate Overview 2016Clean Energy Ccompression Corporate Overview 2016
Clean Energy Ccompression Corporate Overview 2016
 
GE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual PipelineGE ADGT Application - Virtual Pipeline
GE ADGT Application - Virtual Pipeline
 
Basic technology & solutions of LNG
Basic technology & solutions of LNGBasic technology & solutions of LNG
Basic technology & solutions of LNG
 
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield MachineDebris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
 
MTC Well Test Equipment - Worldwide Oilfield Machine
MTC Well Test Equipment - Worldwide Oilfield MachineMTC Well Test Equipment - Worldwide Oilfield Machine
MTC Well Test Equipment - Worldwide Oilfield Machine
 
QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
 
Recommend pract cng_
Recommend pract cng_Recommend pract cng_
Recommend pract cng_
 
Lcng 101
Lcng 101Lcng 101
Lcng 101
 
LNG as fuel innovation 220618
LNG as fuel innovation 220618LNG as fuel innovation 220618
LNG as fuel innovation 220618
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student Placement
 
June 2015 ITM Power Company Presentation
June 2015 ITM Power Company PresentationJune 2015 ITM Power Company Presentation
June 2015 ITM Power Company Presentation
 
Small and medium scale LNG for power generation
Small and medium scale LNG for power generationSmall and medium scale LNG for power generation
Small and medium scale LNG for power generation
 

More from Robert Singleton

Downtown Streets Team Presentation to SCCBC
Downtown Streets Team Presentation to SCCBCDowntown Streets Team Presentation to SCCBC
Downtown Streets Team Presentation to SCCBC
Robert Singleton
 
Soquel Creek Water District Presentation to SCCBC
Soquel Creek Water District Presentation to SCCBCSoquel Creek Water District Presentation to SCCBC
Soquel Creek Water District Presentation to SCCBC
Robert Singleton
 
SCCBC - 2015 Annual Report
SCCBC - 2015 Annual ReportSCCBC - 2015 Annual Report
SCCBC - 2015 Annual Report
Robert Singleton
 
Tour of UCSC Campus Housing Strategies and Stock
Tour of UCSC Campus Housing Strategies and StockTour of UCSC Campus Housing Strategies and Stock
Tour of UCSC Campus Housing Strategies and Stock
Robert Singleton
 
Affordable Housing Tour - Santa Cruz
Affordable Housing Tour - Santa CruzAffordable Housing Tour - Santa Cruz
Affordable Housing Tour - Santa Cruz
Robert Singleton
 
MBEP State of the Region Agenda Nov 4, 2015
MBEP State of the Region Agenda Nov 4, 2015MBEP State of the Region Agenda Nov 4, 2015
MBEP State of the Region Agenda Nov 4, 2015
Robert Singleton
 
Water Supply Advisory Committee Draft Agreement on New Supply Options
Water Supply Advisory Committee Draft Agreement on New Supply OptionsWater Supply Advisory Committee Draft Agreement on New Supply Options
Water Supply Advisory Committee Draft Agreement on New Supply Options
Robert Singleton
 
Water Supply Advisory Committee Open House Flyer
Water Supply Advisory Committee Open House FlyerWater Supply Advisory Committee Open House Flyer
Water Supply Advisory Committee Open House Flyer
Robert Singleton
 
Rick Longinotti's Presentation to the Santa Cruz County Business Council Board
Rick Longinotti's Presentation to the Santa Cruz County Business Council BoardRick Longinotti's Presentation to the Santa Cruz County Business Council Board
Rick Longinotti's Presentation to the Santa Cruz County Business Council Board
Robert Singleton
 
Dew Point Proposal for City of Santa Cruz v6
Dew Point Proposal for City of Santa Cruz v6Dew Point Proposal for City of Santa Cruz v6
Dew Point Proposal for City of Santa Cruz v6
Robert Singleton
 
Water – Energy Nexus, revised PDF by Candace Brown
Water – Energy Nexus, revised PDF by Candace BrownWater – Energy Nexus, revised PDF by Candace Brown
Water – Energy Nexus, revised PDF by Candace Brown
Robert Singleton
 
Water – Energy Nexus Slideshow for the Santa Cruz Water Advisory Submission
Water – Energy Nexus Slideshow for the Santa Cruz Water Advisory SubmissionWater – Energy Nexus Slideshow for the Santa Cruz Water Advisory Submission
Water – Energy Nexus Slideshow for the Santa Cruz Water Advisory Submission
Robert Singleton
 
Dutch Girls Santa Cruz Water Supply Advisory Committee Slideshow
Dutch Girls Santa Cruz Water Supply Advisory Committee SlideshowDutch Girls Santa Cruz Water Supply Advisory Committee Slideshow
Dutch Girls Santa Cruz Water Supply Advisory Committee Slideshow
Robert Singleton
 

More from Robert Singleton (13)

Downtown Streets Team Presentation to SCCBC
Downtown Streets Team Presentation to SCCBCDowntown Streets Team Presentation to SCCBC
Downtown Streets Team Presentation to SCCBC
 
Soquel Creek Water District Presentation to SCCBC
Soquel Creek Water District Presentation to SCCBCSoquel Creek Water District Presentation to SCCBC
Soquel Creek Water District Presentation to SCCBC
 
SCCBC - 2015 Annual Report
SCCBC - 2015 Annual ReportSCCBC - 2015 Annual Report
SCCBC - 2015 Annual Report
 
Tour of UCSC Campus Housing Strategies and Stock
Tour of UCSC Campus Housing Strategies and StockTour of UCSC Campus Housing Strategies and Stock
Tour of UCSC Campus Housing Strategies and Stock
 
Affordable Housing Tour - Santa Cruz
Affordable Housing Tour - Santa CruzAffordable Housing Tour - Santa Cruz
Affordable Housing Tour - Santa Cruz
 
MBEP State of the Region Agenda Nov 4, 2015
MBEP State of the Region Agenda Nov 4, 2015MBEP State of the Region Agenda Nov 4, 2015
MBEP State of the Region Agenda Nov 4, 2015
 
Water Supply Advisory Committee Draft Agreement on New Supply Options
Water Supply Advisory Committee Draft Agreement on New Supply OptionsWater Supply Advisory Committee Draft Agreement on New Supply Options
Water Supply Advisory Committee Draft Agreement on New Supply Options
 
Water Supply Advisory Committee Open House Flyer
Water Supply Advisory Committee Open House FlyerWater Supply Advisory Committee Open House Flyer
Water Supply Advisory Committee Open House Flyer
 
Rick Longinotti's Presentation to the Santa Cruz County Business Council Board
Rick Longinotti's Presentation to the Santa Cruz County Business Council BoardRick Longinotti's Presentation to the Santa Cruz County Business Council Board
Rick Longinotti's Presentation to the Santa Cruz County Business Council Board
 
Dew Point Proposal for City of Santa Cruz v6
Dew Point Proposal for City of Santa Cruz v6Dew Point Proposal for City of Santa Cruz v6
Dew Point Proposal for City of Santa Cruz v6
 
Water – Energy Nexus, revised PDF by Candace Brown
Water – Energy Nexus, revised PDF by Candace BrownWater – Energy Nexus, revised PDF by Candace Brown
Water – Energy Nexus, revised PDF by Candace Brown
 
Water – Energy Nexus Slideshow for the Santa Cruz Water Advisory Submission
Water – Energy Nexus Slideshow for the Santa Cruz Water Advisory SubmissionWater – Energy Nexus Slideshow for the Santa Cruz Water Advisory Submission
Water – Energy Nexus Slideshow for the Santa Cruz Water Advisory Submission
 
Dutch Girls Santa Cruz Water Supply Advisory Committee Slideshow
Dutch Girls Santa Cruz Water Supply Advisory Committee SlideshowDutch Girls Santa Cruz Water Supply Advisory Committee Slideshow
Dutch Girls Santa Cruz Water Supply Advisory Committee Slideshow
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 

Felton LNG Tour Presentation (PG&E)

  • 1. Large Scale Portable LNG Response Santa Cruz/Felton 2015 Austin A. Hastings, P.E., Senior Manager LNG/CNG Engineering and Operations Pacific Gas & Electric Company
  • 2. In Case of Emergency • Call 911 and Meet First Responders: Austin • Sweep Room, Gathering Area, Roster Check: TC • CPR Certified? • Main Gathering Area: Front Gate • Alternate Gathering Area: Left from tour trailer through transfer area Page 2
  • 3. Agenda Comparison of LNG and CNG Overview of LNG/CNG Eng & Ops Department Portable LNG/CNG equipment Background on the Project LNG Planning and Logistics Process Safety on Your Tour Page 3
  • 4. Comparison of LNG and CNG LNG CNG Pressures up to (psig): 200 4,500 Temperatures (F): -260F Ambient Odorized? NO YES How does PG&E Acquire It? From Third Parties At PG&E CNG Stations Volume Expansion Ratio 600:1 275:1 Why Liquefy or Compress? Higher Energy Density Advantages when used in a Portable Application Higher Flowrates Easier to Site Higher Volumes Can be Unmanned Higher Energy Density Refill at PG&E Facilities Page 4
  • 5. LNG/CNG Engineering and Operations Created September 2011 Recognition that: • Assets were treated differently than 49 CFR Part 192 assets • Small equipment base Many functions related to these assets in one compact department: Operations, Project Engineering, Facility Engineering, Standards Development, Maintenance Planning, Maintenance, Inspection, Budget Management (Capital, Expense, Distribution, Transmission), Customer Support (Third Party CNG vehicles), Training 51 Employees Employee and Hiring Hall Make Up: • 21 Technicians • 6 Clerical and Material • 14 Engineering/Technical • 4 Portable Response Coordinators • 6 Supervisory Page 5
  • 6. LNG/CNG E&O Asset Base 33 CNG Fueling Stations • Provide fuel for PG&E CNG vehicles (e.g., passenger cars, fleet trucks) • Provide fuel for third party fleet operators and individual passenger vehicles • Maintain a PG&E presence in the CNG “green vehicle” business 218 Pieces of Portable LNG and CNG Equipment • Provide natural gas supplies to offset or supplement pipeline flowing supplies for o Planned outages to reduce pipeline construction, maintenance and operations costs and complexity o Winter peak load shaving o Unplanned outages (emergencies) Page 6
  • 8. Portable Equipment Capabilities and Quantities 2010 2015 Storage Volume Capacity Flowrate Capacity Application Example LNG Tankers 3 10 up to 900,000 scf 5,000+ Residential, Large Commercial LNG Fired Vaporizers 3 7 500,000 scfh LNG Ambient Vaporizers 0 4 200,000 scfh CNG Tube Trailers 5 24 up to 150,000 scf "Large CNG" - Up to 2,000 Residential, Medium CommercialCNG Injection Trailers 5 16 up to 50,000 scfh CNG Gaps 2 19 8,500 scf 2,000 scfh "Medium CNG" - Up to 20 Residential, Small Commercial CNG Modules 0 90 2,200 scf 500 scfh "Small CNG" - Up to 3 ResidentialCNG Bottle Trailers 4 26 1,800 scf 500 scfh TOTAL 22 218 Page 8
  • 9. LNG Vaporizer - Fired 2015 Volume Capacity Flowrate Capacity Application Example LNG Tankers 10 up to 900,000 scf 5,000+ Residential, Large CommercialLNG Fired Vaporizers 7 500,000 scfh Page 9
  • 10. LNG Vaporizer - Fired LNG is heated to change phase from liquid to gas, heated to produce pipeline natural gas at 60-70oF, and the pressure is controlled as appropriate PIPELINE LNG tanker loaded with LNG, transported and then parked on site. LNG TANKER VAPORIZER Page 10
  • 11. Vaporizer Components Page 11 • On board air for pneumatic valves • 480V electrical mainly for motor for water pump • Nitrogen loop for cabinet purge and back up pneumatic control • Fuel gas system • Odorant system • Telemetry • Methane Detection • Automatic alarm and shut devices • Air, electric, motor, pump, heater, control system redundancies • No LNG pump or methane compressors • Focus is on spill elimination, not containment!
  • 12. LNG Vaporizer - Ambient 2015 Volume Capacity Flowrate Capacity Application Example LNG Tankers 10 up to 900,000 scf 5,000+ Residential, Large CommercialLNG Ambient Vaporizers 4 200,000 scfh Page 12
  • 13. LNG Vaporizer - Ambient Page 13
  • 16. “Large” CNG System 2015 Volume Capacity Flowrate Capacity Application Example CNG Tube Trailers 24 up to 150,000 scf "Large CNG" - Up to 2,000 Residential, Medium CommercialCNG Injection Trailers 16 up to 50,000 scfh Page 16
  • 17. “Medium” CNG System 2015 Volume Capacity Flowrate Capacity Application Example CNG Gaps/Double Gaps 19 up to 17,000 scf 2,000 scfh "Medium CNG" - Up to 20 Residential, Small Commercial Heat Exchanger Bundle Storage Cylinders Pressure Control Equipment Page 17 PIPELINE Trailer is loaded with CNG, transported, and then parked on site. CNG pressure is reduced and then heated to produce pipeline natural gas at 60-70oF TRAILER with STORAGE, HEATING AND REGULATION
  • 18. “Small” CNG Systems 2015 Volume Capacity Flowrate Capacity Application Example CNG Modules 90 2,200 scf 500 scfh "Small CNG" - Up to 3 ResidentialCNG Bottle Trailers 26 1,800 scf 500 scfh Heat Exchanger Bundle Pressure Control Equipment Storage Cylinders Page 18
  • 19. Telemetry (Levelcon) • Web based application • Installed on CNG Equipment and LNG equipment • Tracks flowrates, pressures, temperatures, GPS location • Automatic page out capability • Data can be trended and exported • The larger the equipment, the greater the Levelcon capability Page 19
  • 20. Portable LNG/CNG – Peak Shaving We use the same equipment to supplement pipeline supply during high demands (cold temperatures) • Long term economic benefit versus pipeline (+$25M) • Short term project delay mitigation (environmental, permit, budget) • Very infrequent event • LNG/CNG and Planning to work together for more advanced coordination • Same equipment, same people, same overall process Page 20 LNG Auburn Clovis CNG Folsom Oakdale Foster City Red Bluff Lathrop San Francisco Los Banos Stanford Nevada City-1 Waterford Nevada City-2 CROSS COMPRESSION Santa Cruz
  • 21. Portable Natural Gas Usage Increase 2010 2014 Increase Tap-Days (Number of Days times Number of Taps) 370 5,705 15 times Average Number of Taps Each Day for the entire Year 1.01 17 (52 at one time) 17 times Customer Days Supported (majority in 2012 were two long term LNG projects) 14,000 1,317,000 94 times
  • 23. Santa Cruz LNG T-94B/95 Project Background: • 5.58 Miles of hydrotest • MAOP = 303 PSIG • Spike pressure during test of 1,020 psig • 10”, mostly Grade B seamless but some ERW System Demands: • Sole natural gas supply for approx. 44,000 customers for two weeks! • Injection pressure: 275psig • 215 Mscfd CNG - Capitola Equipment: • 5 portable 300hp compressors – 4 running, 1 stand-by • 32 tankers • 3 Vaporizers • System Emergency Back-up: • Santa Cruz Underground Holder: ~2.5MMscf • Line pack: ~1MMscf
  • 24. T-94B/95 LNGData • Peak Flowrate • 490 Mscfh • 5,975 Gph • Daily Volume • 6,944 Mscfd • 84,500 GPD • 8.5 tankers per day • Total Volume (including test) • 111,100 Mscf • 1.352 million gallons • Total Pounds of LNG Injected: • 4.786 million pounds, 2,400 tons • 50% more than a World War II Destroyer • Miles travelled • Each Round Trip: 686 • Daily: 5,800 • Entire Project: 92,747 • 15 round trips from San Francisco to Boston • Almost 4 times around the earth
  • 25. Santa Cruz LNG Logistics Felton/Santa Cruz – LNG Injection Site Boron – Primary LNG supply location Ehrenberg – Back-up LNG supply location
  • 26. Santa Cruz LNG Logistics PG&E Felton Injection Site PG&E PG&E CE CE PG&E PG&E PG&E CE CE LNG TANKER CE LNG TANKER Transfer Site near Inj. Site PIPELINE PG&E VAPORIZER PG&E PG&ETranspo CE Transpo Clean Energy LNG Production Plant
  • 27. LNG Supply and Transport Real Time Driver Monitoring Supply Facility in Boron
  • 31. LNG Tankers and Manifold
  • 38. Connecting to the Pipeline Page 38
  • 39. Operational Site Lead Logistics Site Lead Support Support Operator 1 Operator 2 Assistant 1 Assistant 2 Assistant 3 Transfer Site Lead Transfer 1 Transfer 2/ Assistant 4 Public Liaison In the event of an incident AM Peak Safety Compressor Operator Jobsite Organizational Structure
  • 40. Santa Cruz LNG Staffing Total Number of People Involved: 89 • Total Technicians: 24 • Total Site Leads: 10 • Support Personnel and REI: 7 • Drivers/Loaders: 48
  • 41. THIS IS A TEST (AND ONLY A TEST) • Before any large scale LNG response, we test for a minimum of 16 hours. This test is for: – Testing the specific layout as every project is configured differently. – Testing the jobsite conditions to ensure no environmental issues impact the job. – Confirm the downstream customer load. – Ensure the equipment is functioning properly and did suffer a failure due to transport. • Because this project is so incredibly complex, we are testing for 48 hours one week before the outage begins. – This gives us time to reconfigure the jobsite, our operations or our process and even potentially retest before the pipeline outage begins. • This is the first day of our test, and it will not be unusual for us to be shut down and changing our operations today.
  • 42. SAFETY ON YOUR TOUR •Please stay close to your tour leader. Do NOT wander around the jobsite!!! •If there is an operational issue, I will escort you to the trailer to allow the technicians to focus. •If you need to leave or go to trailer, please let TC know and she will escort you. •Wear PPE: • At all times: hard hat, vest, eye protection • Ear plugs and sunscreen as needed. • Work gloves within 15’ of cryogenic piping. •You are free to take pictures. •We will have several spots for group photos along the route. •Be cautious of tripping hazards. •ALWAYS look around while walking, many trucks will be leaving/entering the jobsite. •Properties of LNG reminder: • -260F boiling point • Unodorized • Cold vapor heavier than air • Asphyxiant •Other jobsite hazards: • CNG gas up to 3,600 psig • Odorant • Glycol • Hot temperatures on compressors STAY HYDRATED! Grab a cold bottle of water on your way out.