© Wärtsilä
SEA GAS LNG BUNKERING
VIKING GRACE
4.10.2016 [Presentation name / Author]1
John Hatley PE
Gas Initiatives ( MBA, MSE )
Wartsila North America
Cell 281 221 4209
john.hatley@wartsila.com
Singapore Maritime Ports Authority
LNG Bunkering Roundtable
Resorts World Convention Center
Singapore
4 October 2016
© Wärtsilä
13 May 2016 25 August 2016
4.10.2016 [Presentation name / Author]2
LNG Fuel Milestones
Summer 2016… Viking Grace 4 million Passengers &, 1,000 LNG bunkerings
Source: http://shipandbunker.com/news/world/515838-viking-cruise-vessel-
marks-1000-lng-bunkering-milestone
© Wärtsilä
Viking Grace ROPAX
4.10.2016 [Presentation name / Author]3
Length: 214.0 m
Breadth: 31.8 m
Cruise Speed 22 knots
Passengers: 2,800
RoRo Lane Meters 1,275m
Car Lane Meters 1,000m
Crew 200
Cabins 880
Ice class: 1A Super
In service: 2013
Shipyard STX Finland Oy
Ship Owner: Viking Line
Fuel LNG
Power Wartsila 4x 8L50DF
31,200 kW ( 41,800 HP )
© Wärtsilä
Viking Grace LNG Fuel
4.10.2016 [Presentation name / Author]4
LNG Fuel Capacity 3 Round Trips
2 LNGpac tanks @ 200 m3 each
Daily LNG Fuel Consumption
≈ 45 tons ( 105 m3 )
© Wärtsilä
Viking Grace LNG System
4.10.2016 [Presentation name / Author]5
LNGpac
Port LNG
Bunker Station
Starboard LNG
Bunker Station
Gas Valve
Unit “GVU”
2x 8L50DF
Engines
2x 8L50DF
Engines
Vent Mast
© Wärtsilä
Viking Grace Route
4.10.2016 [Presentation name / Author]6
24 Hour Round Trip
Turku evening…
Stockholm morning…
Midpoint stopover Mariehamn.
Bunkering LNG Stockholm daily…
© Wärtsilä
LNGF SEAGAS Bunker Vessel
4.10.2016 [Presentation name / Author]7
Ex Car Ferry Fjalir
Length: 49.6 m
Breadth: 11.2 m
Cruise Speed 13 knots
Accommodation 4
Conversion March 2013
Shipyard Fiskerstrand Verft
Owner AGA Gas AB
Fuel Diesel
Power 735 kW
LNG Capacity ≈ 86 tons ( 185 m3 )
1 Cryogenic Tank Type 1870-HCB-15-DNV/PED
Source: http://www.fiskerstrand.no/site/img/208/FV--Fact-
sheets-Conversion-and-Rebuilding---LNGF-Seagas.pdf
Source: photo by John Hatley June 2016 Stockholm harbor
© Wärtsilä
Seagas Route
4.10.2016 [Presentation name / Author]8
Loading LNG @ Loudden
Transit Short 3.3 Nm Distance
Arrive Stadsgarden Terminal
Bunker LNG Fuel to Viking Grace
Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
© Wärtsilä
LNG Logistic Modes
4.10.2016 [Presentation name / Author]9
Source: LNG Supply Security LNG Infrastructure, Bryan Luftglass, The Linde Group, June 2013
LNGC… Ship to Shore
Shore to Truck Truck to Ship
Ship to Ship
© Wärtsilä
Loudden LNG Terminal… Truck to Ship
4.10.2016 [Presentation name / Author]10
3 Truck Loads to Seagas
Total LNG ≈ 75 Tons (160 m3)Source: LNG in the Port of Stockholm, Ola Joslin, Port of
Stockholm, 2013-10-14
© Wärtsilä
Sea Gas Route
4.10.2016 [Presentation name / Author]11
Loaded LNG @ Loudden
Transit about ½ hour to Stadsgarden
Terminal Bunker Viking Grace
Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
© Wärtsilä
Viking Grace LNG Bunker Plan
4.10.2016 [Presentation name / Author]12
Source: John Hatley detailed LNG bunkering notes, SEAGAS to Viking Grace, 21 May
2014.
Wednesday 21 May
8 minutes prep
40 minutes LNG transfer
8 minutes conclude
© Wärtsilä
Stockholm Stagsgarden Terminal Ship to Ship
4.10.2016 [Presentation name / Author]13
Source: LNG in the Port of Stockholm, Ola
Joslin, Port of Stockholm, 2013-10-14
SEAGAS Alongside Aft Port
Quarter of Viking Grace …
Readying to commence LNG fueling
© Wärtsilä
Bunker Safety Zone
4.10.2016 [Presentation name / Author]14
Source: photo John Hatley, Stockholm LNG Fueling,
June 2016
25 Meters
© Wärtsilä
Bunkering Safety Zone
4.10.2016 [Presentation name / Author]15
25 Meters
© Wärtsilä
Seagas LNG Hose Rig
4.10.2016 [Presentation name / Author]16
Source: photo John Hatley, Stockholm LNG Fueling,
June 2016
Hydraulic Knuckle Boom
6 inch Cryogenic hose
Safe Break Away Coupling
Quick Connect Dry
Disconnect Coupling
© Wärtsilä
LNG Hose Coupling Details
4.10.2016
[Presentation name / Author]
17
Mann-Tek 6” Safe Break Away
Coupling “SBC”
Mann-Tek 6” Dry Disconnect
Coupling “DDC”
Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
© Wärtsilä
Alongside Begin Hose Connection
4.10.2016 [Presentation name / Author]18
Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
Viking Grace Bunker Port
© Wärtsilä
LNG Fueling
4.10.2016 [Presentation name / Author]19
Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
Discharge LNG Fuel to Viking Grace
© Wärtsilä
Sea Gas LNG Fueling Viking Grace
4.10.2016 [Presentation name / Author]20
© Wärtsilä
LNG fueling
4.10.2016 [Presentation name / Author]21
Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
Viking Grace Bunker Port Onboard Sea Gas
© Wärtsilä
Time Events
4.10.2016 [Presentation name / Author]22
© Wärtsilä
Connection Details
4.10.2016 [Presentation name / Author]23
Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
Viking Grace Bunker Port Onboard Sea Gas
© Wärtsilä
Simultaneous Operations “SIMOPS”
4.10.2016 [Presentation name / Author]24
Roll On Roll Off Vehicles
@ Bow
Adjacent Terminal Roadway Traffic
Passengers
LNG Fueling
© Wärtsilä
Viking Grace LNG Bunkering Timeline
4.10.2016 [Presentation name / Author]25
0725 Viking Grace All Fast Stockholm
0730 SEAGAS alongside aft port quarter
0731 LNG hose in position
0735 Cool down complete
0817 Liquid LNG Transfer complete
0825 Nitrogen Purge Complete
0826 SEAGAS Retrieves LNG hose onboard
0827 SEAGAS last line to Viking Grace
0827 SEAGAS maneuvers away
0842 Viking Grace last line Port Stockholm
Source: John Hatley detailed LNG bunkering notes, SEAGAS to Viking Grace, 21 May
2014.
Bunker Plan
Wednesday 21 May
8 minutes prep
40 minutes LNG transfer
8 minutes conclude
LNG Bunker Log Wednesday 21 May
© Wärtsilä
Viking Grace
4.10.2016 [Presentation name / Author]26
© Wärtsilä
SEA GAS LNG BUNKERING
VIKING GRACE
QUESTIONS ?
4.10.2016 [Presentation name / Author]27
John Hatley PE
Gas Initiatives ( MBA, MSE )
Wartsila North America
Cell 281 221 4209
john.hatley@wartsila.com
Singapore Maritime Ports Authority
LNG Bunkering Roundtable
4 October 2016

Seagas LNG Bunkering Viking Grace

  • 1.
    © Wärtsilä SEA GASLNG BUNKERING VIKING GRACE 4.10.2016 [Presentation name / Author]1 John Hatley PE Gas Initiatives ( MBA, MSE ) Wartsila North America Cell 281 221 4209 john.hatley@wartsila.com Singapore Maritime Ports Authority LNG Bunkering Roundtable Resorts World Convention Center Singapore 4 October 2016
  • 2.
    © Wärtsilä 13 May2016 25 August 2016 4.10.2016 [Presentation name / Author]2 LNG Fuel Milestones Summer 2016… Viking Grace 4 million Passengers &, 1,000 LNG bunkerings Source: http://shipandbunker.com/news/world/515838-viking-cruise-vessel- marks-1000-lng-bunkering-milestone
  • 3.
    © Wärtsilä Viking GraceROPAX 4.10.2016 [Presentation name / Author]3 Length: 214.0 m Breadth: 31.8 m Cruise Speed 22 knots Passengers: 2,800 RoRo Lane Meters 1,275m Car Lane Meters 1,000m Crew 200 Cabins 880 Ice class: 1A Super In service: 2013 Shipyard STX Finland Oy Ship Owner: Viking Line Fuel LNG Power Wartsila 4x 8L50DF 31,200 kW ( 41,800 HP )
  • 4.
    © Wärtsilä Viking GraceLNG Fuel 4.10.2016 [Presentation name / Author]4 LNG Fuel Capacity 3 Round Trips 2 LNGpac tanks @ 200 m3 each Daily LNG Fuel Consumption ≈ 45 tons ( 105 m3 )
  • 5.
    © Wärtsilä Viking GraceLNG System 4.10.2016 [Presentation name / Author]5 LNGpac Port LNG Bunker Station Starboard LNG Bunker Station Gas Valve Unit “GVU” 2x 8L50DF Engines 2x 8L50DF Engines Vent Mast
  • 6.
    © Wärtsilä Viking GraceRoute 4.10.2016 [Presentation name / Author]6 24 Hour Round Trip Turku evening… Stockholm morning… Midpoint stopover Mariehamn. Bunkering LNG Stockholm daily…
  • 7.
    © Wärtsilä LNGF SEAGASBunker Vessel 4.10.2016 [Presentation name / Author]7 Ex Car Ferry Fjalir Length: 49.6 m Breadth: 11.2 m Cruise Speed 13 knots Accommodation 4 Conversion March 2013 Shipyard Fiskerstrand Verft Owner AGA Gas AB Fuel Diesel Power 735 kW LNG Capacity ≈ 86 tons ( 185 m3 ) 1 Cryogenic Tank Type 1870-HCB-15-DNV/PED Source: http://www.fiskerstrand.no/site/img/208/FV--Fact- sheets-Conversion-and-Rebuilding---LNGF-Seagas.pdf Source: photo by John Hatley June 2016 Stockholm harbor
  • 8.
    © Wärtsilä Seagas Route 4.10.2016[Presentation name / Author]8 Loading LNG @ Loudden Transit Short 3.3 Nm Distance Arrive Stadsgarden Terminal Bunker LNG Fuel to Viking Grace Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  • 9.
    © Wärtsilä LNG LogisticModes 4.10.2016 [Presentation name / Author]9 Source: LNG Supply Security LNG Infrastructure, Bryan Luftglass, The Linde Group, June 2013 LNGC… Ship to Shore Shore to Truck Truck to Ship Ship to Ship
  • 10.
    © Wärtsilä Loudden LNGTerminal… Truck to Ship 4.10.2016 [Presentation name / Author]10 3 Truck Loads to Seagas Total LNG ≈ 75 Tons (160 m3)Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  • 11.
    © Wärtsilä Sea GasRoute 4.10.2016 [Presentation name / Author]11 Loaded LNG @ Loudden Transit about ½ hour to Stadsgarden Terminal Bunker Viking Grace Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  • 12.
    © Wärtsilä Viking GraceLNG Bunker Plan 4.10.2016 [Presentation name / Author]12 Source: John Hatley detailed LNG bunkering notes, SEAGAS to Viking Grace, 21 May 2014. Wednesday 21 May 8 minutes prep 40 minutes LNG transfer 8 minutes conclude
  • 13.
    © Wärtsilä Stockholm StagsgardenTerminal Ship to Ship 4.10.2016 [Presentation name / Author]13 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 SEAGAS Alongside Aft Port Quarter of Viking Grace … Readying to commence LNG fueling
  • 14.
    © Wärtsilä Bunker SafetyZone 4.10.2016 [Presentation name / Author]14 Source: photo John Hatley, Stockholm LNG Fueling, June 2016 25 Meters
  • 15.
    © Wärtsilä Bunkering SafetyZone 4.10.2016 [Presentation name / Author]15 25 Meters
  • 16.
    © Wärtsilä Seagas LNGHose Rig 4.10.2016 [Presentation name / Author]16 Source: photo John Hatley, Stockholm LNG Fueling, June 2016 Hydraulic Knuckle Boom 6 inch Cryogenic hose Safe Break Away Coupling Quick Connect Dry Disconnect Coupling
  • 17.
    © Wärtsilä LNG HoseCoupling Details 4.10.2016 [Presentation name / Author] 17 Mann-Tek 6” Safe Break Away Coupling “SBC” Mann-Tek 6” Dry Disconnect Coupling “DDC” Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14
  • 18.
    © Wärtsilä Alongside BeginHose Connection 4.10.2016 [Presentation name / Author]18 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Viking Grace Bunker Port
  • 19.
    © Wärtsilä LNG Fueling 4.10.2016[Presentation name / Author]19 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Discharge LNG Fuel to Viking Grace
  • 20.
    © Wärtsilä Sea GasLNG Fueling Viking Grace 4.10.2016 [Presentation name / Author]20
  • 21.
    © Wärtsilä LNG fueling 4.10.2016[Presentation name / Author]21 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Viking Grace Bunker Port Onboard Sea Gas
  • 22.
    © Wärtsilä Time Events 4.10.2016[Presentation name / Author]22
  • 23.
    © Wärtsilä Connection Details 4.10.2016[Presentation name / Author]23 Source: LNG in the Port of Stockholm, Ola Joslin, Port of Stockholm, 2013-10-14 Viking Grace Bunker Port Onboard Sea Gas
  • 24.
    © Wärtsilä Simultaneous Operations“SIMOPS” 4.10.2016 [Presentation name / Author]24 Roll On Roll Off Vehicles @ Bow Adjacent Terminal Roadway Traffic Passengers LNG Fueling
  • 25.
    © Wärtsilä Viking GraceLNG Bunkering Timeline 4.10.2016 [Presentation name / Author]25 0725 Viking Grace All Fast Stockholm 0730 SEAGAS alongside aft port quarter 0731 LNG hose in position 0735 Cool down complete 0817 Liquid LNG Transfer complete 0825 Nitrogen Purge Complete 0826 SEAGAS Retrieves LNG hose onboard 0827 SEAGAS last line to Viking Grace 0827 SEAGAS maneuvers away 0842 Viking Grace last line Port Stockholm Source: John Hatley detailed LNG bunkering notes, SEAGAS to Viking Grace, 21 May 2014. Bunker Plan Wednesday 21 May 8 minutes prep 40 minutes LNG transfer 8 minutes conclude LNG Bunker Log Wednesday 21 May
  • 26.
    © Wärtsilä Viking Grace 4.10.2016[Presentation name / Author]26
  • 27.
    © Wärtsilä SEA GASLNG BUNKERING VIKING GRACE QUESTIONS ? 4.10.2016 [Presentation name / Author]27 John Hatley PE Gas Initiatives ( MBA, MSE ) Wartsila North America Cell 281 221 4209 john.hatley@wartsila.com Singapore Maritime Ports Authority LNG Bunkering Roundtable 4 October 2016