Diaphragm walls are underground structural elements.
It is an in-situ reinforced concrete structure that is constructed panel by panel.
Diaphragm walls are ideal for soft clays and loose sands below the water table where there is a need to control lateral movements.
Diaphragm walls are underground structural elements.
It is an in-situ reinforced concrete structure that is constructed panel by panel.
Diaphragm walls are ideal for soft clays and loose sands below the water table where there is a need to control lateral movements.
Pile foundation are essential in case where SBC is low or the load coming from superstructure is too heavy,
Topics covered includes Materials used for making piles, Type of piles, load transfer mechanism, factors affecting selection of piles, Installation methods, load carrying capacity of piles, different load tests performed and the behavior of piles as a group.
Diaphragm wall: Construction and DesignUmer Farooq
Diaphragm walls are concrete or reinforced concrete walls constructed in slurry-supported, open trenches below existing ground.
Concrete is placed using the Tremie installation method or by installing pre-cast concrete panels (known as a pre-cast diaphragm wall). Diaphragm walls can be constructed to depths of 150 meters and to widths of 0.5 to 1.50 meters.
Deep foundation work in urban areas are great task to execute , and need to do engineering innovation to accomplish them . Secant pile construction is one of the way to execute .
HCSE Provide Didderent Types of Retaining Walls in USA. A retaining wall is a structure that retains (holds back) any material (usually earth) and prevents it from sliding or eroding away.
Pile foundation are essential in case where SBC is low or the load coming from superstructure is too heavy,
Topics covered includes Materials used for making piles, Type of piles, load transfer mechanism, factors affecting selection of piles, Installation methods, load carrying capacity of piles, different load tests performed and the behavior of piles as a group.
Diaphragm wall: Construction and DesignUmer Farooq
Diaphragm walls are concrete or reinforced concrete walls constructed in slurry-supported, open trenches below existing ground.
Concrete is placed using the Tremie installation method or by installing pre-cast concrete panels (known as a pre-cast diaphragm wall). Diaphragm walls can be constructed to depths of 150 meters and to widths of 0.5 to 1.50 meters.
Deep foundation work in urban areas are great task to execute , and need to do engineering innovation to accomplish them . Secant pile construction is one of the way to execute .
HCSE Provide Didderent Types of Retaining Walls in USA. A retaining wall is a structure that retains (holds back) any material (usually earth) and prevents it from sliding or eroding away.
Triaxial shear test and shear strength properties of soilsatish dulla
experiments to test the soil strength has given with illstrations. mainly concentrates on the most effective test, triaxial shear test along with brief introdction.
FOR MOVIES
http://movie-rulz.xyz/category/hollywood-movies/2016-english-movies/
http://movie-rulz.xyz/
http://movie-rulz.xyz/category/telugu-movies/2016-telugu-movies/
Silver Lake Reservoir Complex Storage Replacement; Construction Phase I Photo...Tina Howell, MBA LEED AP
The Los Angeles Department of Water and Power intends to build a new Reservoir Storage Facility at the Headworks spreading grounds, a 43-acre site adjacent to the Los Angeles River and between the City of Burbank and Griffith Park.
In January 2006, the U.S. Environmental Protection Agency promulgated the Long Term 2 Enhanced Surface Water Treatment Rule and the Stage 2 Disinfectants and Disinfection Byproducts Rule. These stringent water quality regulations resulted in the LADWP’s decision to remove some open reservoirs from service because they are open to the environment and subject to contamination. To comply with the aforementioned regulations, these reservoirs must either be covered, have their water treated prior to use, or be bypassed. Compliance with the regulations requires removal of the Silver Lake and Ivanhoe reservoirs from potable water supply service and construction of two underground reservoirs and a large-diameter pipeline located at the Headworks property, replacing the operational function of Silver Lake and Ivanhoe. The replacement storage will be below grade and consists of two water storage facilities, the Headworks East Reservoir and the Headworks West Reservoir. In order to take advantage of the renewable energy source developed by the flowing water, a four-megawatt hydroelectric plant will be built on site to generate power. After the completion of these projects, the ecosystem will be developed to establish environmental habitats and recreational facilities for community use.
The project will ultimately consist of four (4) phases:
1) Phase I consists of the Headworks East Reservoir, Valve Vaults, Associated Site Piping and Grading, River Supply Conduit 1A East, and Tunnel Section.
2) Phase II consists of construction of the Headworks West Reservoir.
3) Phase III consists of the River Supply Conduit 1A West, Hydroelectric Power Plant and Regulating Station.
4) Phase IV consists of the Eco-System Restoration of the entire project site.
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresShivananda Roy
Generally excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include back-filling with new or original materials to voids, spreading and leveling over an area.
Micro-piling is one of the efficient and cost effective ground improvement technique which can be use various condition. It can use to support foundation as well as soil retention.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
2. Content
• Diaphragm wall construction.
• Diaphragm wall.
• Further explanation on the work sequences.
• Using hydrofraise (reverse circulation trench
cutter) to form diaphragm wall panel.
• Construction sequences of a hydrofraise panel.
• Application of diaphragm wall in construction.
• Reference. 2
3. Diaphragm wall Construction
Diaphragm wall is a continuous wall constructed in ground in to
facilitate certain construction activities,
such as:
a) As a retaining wall
b) As a cut-off provision to support deep excavation
c) As the final wall for basement or other underground structure
(e.g. tunnel)
d) As a separating structure between major underground
facilities
e) As a form of foundation (rectangular pile) 3
4. Diaphragm wall
Diaphragm wall is a reinforced concrete structure constructed in-
situ panel by panel. The wall is usually designed to reach very
great depth, sometimes up to 50m.
Typical sequence of work includes:
a) Construct the guide wall
b) Excavation to form the diaphragm wall trench
c) Support the trench cutting using bentonite slurry
d) Inert reinforcement and placing of concrete to form the wall
panel. 4
5. Further explanation on the work sequences
Guide wall – guide wall is two parallel concrete
beams constructed along the side of the wall as a
guide to the lampshell which is used for
the excavation of the diaphragm wall
reaches.
Trench excavation – In normal soil condition
excavation is done using a clamshell or grab
suspended by cables to a crane. The grab can easily
cut through soft ground. In case of encountering
boulders, a gravity hammer will be used to break the
rock and then take the spoil out using the grab. 5
6. • Excavation support – the sides inside the trench cut can
collapse easily. Bentonite slurry is used to protect the sides
of soil. Bontonite is a specially selected fine clay, when
added to water, forms an impervious cakelike slurry with
very large viscosity. The slurry will produce a great lateral
pressure sufficient enough to retain the vertical soil.
• Reinforcement – reinforcement is inserted in the form of a
steel cage.
• Concreting – placing of concrete is done using tremie pipes
to avoid the segregation of concrete. As Concrete being
poured down, bontonite will be displaced due to its lower
density than concrete. Bontonite is then collected and
reused.` 6
7. Joining for the diaphragm wall panel – Diaphragm wall cannot be
constructed continually for a very long section due to limitation and size
of the mechanical plant. The wall is usually constructed in alternative
section. Two stop end tubes will be placed at the ends of the excavated
trench before concreting. The tubes are withdrawn at the same time of
concreting so that a semi-circular end section is formed. Wall sections
are formed alternatively leaving an intermediate section in between. In-
between sections are built similarly afterward but without the end tube.
At the end a continual diaphragm wall is constructed with the panel
sections tightly joined by the semi-circular groove.
7
12. Using Hydro fraise (reverse circulation trench cutter) to form
diaphragm wall panel
Bored piles of square section can be installed using the
Hydro fraise or similar drilling techniques. The bore
hole is stabilised by drilling mud. The "Hydrofraise" is
a drilling machine powered by three down-the-hole
motors, operating with reverse circulation.
A heavy metal frame, serving as a guide, is fitted at its
base with two cutter drums carrying tungsten carbide
tipped cutters. These rotate in opposite directions and
break up the soil. A pump is placed just above the
drums and evacuates the loosened soil, which is carried
up to the surface by the drilling mud. The mud with
cuttings is continuously filtered and then poured back
into the trench.
12
13. • A heavy crawler crane supports and manipulates the machine. It carries the
power pack supplying the hydraulic power, which is conveyed through hoses
to the three down-the-hole motors, two of them driving the cutter drums
and the third driving the pump. The hydraulic cutting device is designed to
give the cutter drums a high torque at low speed of rotation.
• The guide frame is suspended from the cable-operated crane. A hydraulic
feed cylinder is used to achieve a constant rate of advance or to maintain a
constant weight on the cutter drums.
• Another important advantage is that the drilling mud is constantly screened
and de-sanded during excavation. Thus the reinforcement can be placed and
concreting carried out as soon as the required depth has been reached. This
excavation system makes it possible to drill piles panels or diaphragm wall
elements in a very wide range of soils, from cohesion-less soils to hard rock. 13
15. Construction sequences of a Hydro fraise panel
1. Excavation of the pre trench
2. Start of drilling of a primary panel,
1st element
3. Continuation of drilling of a
primary panel, 2nd element
4. End of drilling of primary panel,
3rd element
5. Pouring the concrete of a primary
panel
6. Construction of the next primary
panel
7. Drilling of an intermediate
secondary panel
8. Pouring the concrete of the
secondary panel
9. Continuation of the excavation of
the pre trench.`
15
[2]
20. 20
De-sanding equipment – the bontonite slurry carrying the soil and gravel re-
circulate to this equipment with the bontonite slurry and the debris being
removed. The debris will be collected in the storage tank for disposal later.