Procedure of Chain Surveying
In Chain Surveying, the whole area to be surveyed is divided
into framework of triangles of suitable sizes. Network of
triangles is selected as these are simple geometrical figures
which can be easily plotted with the measurements of its sides
only. It is advisable to use well-conditioned triangles whose
sides are as nearly equal as possible with angles between 30° to
120°. The chain survey is preferred when the ground is nearly
flat and open and also when the area to be surveyed is smaller.
2Engr.Shams Ul Islam (shams@cecos.edu.pk)
Technical Terms Used in chain Surveying
Survey Stations
These are important point fixed on ground indicating the starting
point and the end point of the survey line. These are also the basic
control points of the survey. There can be two types of survey
stations.
Main Station
Main stations are control points at the ends of the chain lines
commanding the boundaries of survey.
3Engr.Shams Ul Islam (shams@cecos.edu.pk)
Continue..
Subsidiary or Tie Station
These are stations selected on the main survey lines for running
auxiliary lines drawn to locate, measure and plot interior details.
The survey stations are suitably selected with care so that at
least main survey stations are mutually visible and survey
lines run through as flat ground as possible and are as close
to the boundaries as possible.
4Engr.Shams Ul Islam (shams@cecos.edu.pk)
Continue..
5Engr.Shams Ul Islam (shams@cecos.edu.pk)
Survey Lines
The lines joining survey stations are the survey lines. The survey
lines between main stations are thus called main survey lines or
chain lines. The longest of the main survey line is normally called
Base Line (Line BE in Figure 1) running primarily through the
middle of the area to be surveyed.
The framework of triangles shall have one or two base lines since
the entire survey is built around base line. It shall be measured
with higher care and accuracy. The survey line joining the
subsidiary or tie stations on main line is termed Tie Line
6Engr.Shams Ul Islam (shams@cecos.edu.pk)
Offsets
The details on ground such as fences, buildings and towers, etc. are
to be located with reference to main chain lines by means of lateral
measurements. These lateral measurements with reference to the
chain line are referred to as offsets.
Type of Offsets
• Perpendicular offset/right angle offset
• Oblique offset
7Engr.Shams Ul Islam (shams@cecos.edu.pk)
Engr.Shams Ul Islam (shams@cecos.edu.pk)
Operations Involved in Chain Surveying
Various operations involved in the process of chain surveying
are as follows:
(a) Marking the stations
(b) Ranging
(c) Measurement of survey lines
(d) Offset measurements.
9Engr.Shams Ul Islam (shams@cecos.edu.pk)
Marking the Stations
The first step in chain survey is to decide and locate stations so that
they are distinctly visible and are quasi-permanently fixed during the
surveying process. The position of stations are located on map such
that the base survey line and other main survey lines are so aligned
that the positions of all salient ground features, either natural or
manmade, can be located and measured. The position of stations is
fixed with reference to some permanent ground features so that they
can be unambiguously and accurately located on ground at any time in
future also, if the station pegs are removed/misplaced.
10Engr.Shams Ul Islam (shams@cecos.edu.pk)
Engr.Shams Ul Islam (shams@cecos.edu.pk)
Continue…
It can be noted that the distance of station A must be measured from at least
three permanent ground features, e.g. large tree, electric pole, building or
culvert etc. existing in the vicinity of the station. The location sketch of the
station as given in Figure (previous slide) is very helpful in retracing the
station position in future.
The survey stations are marked temporarily on ground by fixing the ranging
rod at their location. A wooden peg is driven in the ground such that it is
projecting at least 40 mm above the ground to provide some permanency. A
cross can be painted or etched on ground if some hard surface like road,
pavement or rock is encountered at station location. For permanent marking, a
stone or concrete block can be embedded in ground.
12Engr.Shams Ul Islam (shams@cecos.edu.pk)
Offset Measurements
The chain survey is started with measurements along base line and
extended along all the frameworks of survey lines. The laying of
chain line and making measurement of distances along the survey
line were described in earlier section. The next important part of
distance measurement is locating the important details of features in
the vicinity of survey lines by means of offsets. Offsets up to or less
than 15 m from the survey lines are generally termed short offsets
while those larger than 15 m are called long offsets.
13Engr.Shams Ul Islam (shams@cecos.edu.pk)
Continue….
In normal course of chain surveying, perpendicular offsets are
measured. Oblique offsets are recorded only in exceptional cases
when it is difficult to obtain normal offsets or else these are
absolutely essential. Perpendicular offsets can be set either (a)
manually by 3-4-5 method or (b) with the help of offset
instruments like cross staff or optical square.
14Engr.Shams Ul Islam (shams@cecos.edu.pk)

More Related Content

What's hot

Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Parimal Jha
 
Ranging 170811123447
Ranging 170811123447Ranging 170811123447
Ranging 170811123447
Mir Zafarullah
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
HastarajPandey
 
Levelling
LevellingLevelling
Levelling
KHUSHBU SHAH
 
surveying instruments
surveying instrumentssurveying instruments
surveying instruments
Self-employed
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
Mujeeb Muji
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Rakesh Verma
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
Mujeeb Muji
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
GAURAV. H .TANDON
 
Levelling
LevellingLevelling
Contouring
ContouringContouring
Contouring
GAURAV. H .TANDON
 
Leveling
LevelingLeveling
Leveling
1396Surjeet
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
sathyan s
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
Dolat Ram
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Linear measurement
Linear measurement Linear measurement
Linear measurement
RAMPRASAD KUMAWAT
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
neharajpl
 
Surveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxSurveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptx
Denish Jangid
 

What's hot (20)

Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Ranging 170811123447
Ranging 170811123447Ranging 170811123447
Ranging 170811123447
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Levelling
LevellingLevelling
Levelling
 
surveying instruments
surveying instrumentssurveying instruments
surveying instruments
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 
Levelling
LevellingLevelling
Levelling
 
tacheometric surveying
tacheometric surveyingtacheometric surveying
tacheometric surveying
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Levelling
LevellingLevelling
Levelling
 
Contouring
ContouringContouring
Contouring
 
Leveling
LevelingLeveling
Leveling
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
Linear measurement
Linear measurement Linear measurement
Linear measurement
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Surveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxSurveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptx
 

Viewers also liked

Plane table surveying
Plane table surveyingPlane table surveying
Plane table surveying
tirath prajapati
 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveyingShaker Ullah
 
Modern surveying instruments - Assignment
Modern surveying instruments - AssignmentModern surveying instruments - Assignment
Modern surveying instruments - Assignment
Vijay Parmar
 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instrumentsShanALi
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
Kushal Patel
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
GAURAV. H .TANDON
 

Viewers also liked (9)

Plane table surveying
Plane table surveyingPlane table surveying
Plane table surveying
 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveying
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Modern surveying instruments - Assignment
Modern surveying instruments - AssignmentModern surveying instruments - Assignment
Modern surveying instruments - Assignment
 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instruments
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Surveying
Surveying Surveying
Surveying
 

Similar to chain surveying

chain survey ii
chain survey iichain survey ii
chain survey ii
Self-employed
 
Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016
Mitiku Chachu
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
SaddoAjmal
 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-ii
Marvin Ken
 
Recent changes in underground traversing techniques in western australia
Recent changes in underground traversing techniques in western australiaRecent changes in underground traversing techniques in western australia
Recent changes in underground traversing techniques in western australia
brett_grocock
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
Rione Drevale
 
Testing of bored_pile_inclination
Testing of bored_pile_inclinationTesting of bored_pile_inclination
Testing of bored_pile_inclination
Jorge Genes Forcadell
 
Testing of bored_pile_inclination
Testing of bored_pile_inclinationTesting of bored_pile_inclination
Testing of bored_pile_inclination
Jorge Genes Forcadell
 
S2 8 construction surveys
S2 8 construction surveysS2 8 construction surveys
S2 8 construction surveys
Est
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
Nasir Ahmad Aryanfar
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
Bahzad5
 
Surveying 2
Surveying   2Surveying   2
Surveying 2
R VIJAYAKUMAR
 
BCE U3.pptx
BCE U3.pptxBCE U3.pptx
BCE U3.pptx
Gate20241
 
Shahid nazir paray
Shahid nazir parayShahid nazir paray
Shahid nazir paray
Amir nazir paray
 
Basic civil
Basic civilBasic civil
Basic civil
sreejithksasidharan
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
IRJET Journal
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
w ss
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1
Lam Yu
 
lecture_1a.ppt
lecture_1a.pptlecture_1a.ppt
lecture_1a.ppt
ArisamTom
 

Similar to chain surveying (20)

chain survey ii
chain survey iichain survey ii
chain survey ii
 
Fw2
Fw2Fw2
Fw2
 
Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016Lecture note triangulation_and_trilatera2016
Lecture note triangulation_and_trilatera2016
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-ii
 
Recent changes in underground traversing techniques in western australia
Recent changes in underground traversing techniques in western australiaRecent changes in underground traversing techniques in western australia
Recent changes in underground traversing techniques in western australia
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
 
Testing of bored_pile_inclination
Testing of bored_pile_inclinationTesting of bored_pile_inclination
Testing of bored_pile_inclination
 
Testing of bored_pile_inclination
Testing of bored_pile_inclinationTesting of bored_pile_inclination
Testing of bored_pile_inclination
 
S2 8 construction surveys
S2 8 construction surveysS2 8 construction surveys
S2 8 construction surveys
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
Surveying 2
Surveying   2Surveying   2
Surveying 2
 
BCE U3.pptx
BCE U3.pptxBCE U3.pptx
BCE U3.pptx
 
Shahid nazir paray
Shahid nazir parayShahid nazir paray
Shahid nazir paray
 
Basic civil
Basic civilBasic civil
Basic civil
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1
 
lecture_1a.ppt
lecture_1a.pptlecture_1a.ppt
lecture_1a.ppt
 

More from Self-employed

traversing of survey
traversing of surveytraversing of survey
traversing of survey
Self-employed
 
survey measurments
survey measurmentssurvey measurments
survey measurments
Self-employed
 
introduction of surveying
introduction of surveyingintroduction of surveying
introduction of surveying
Self-employed
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2
Self-employed
 
surveying and levelling
surveying and levellingsurveying and levelling
surveying and levelling
Self-employed
 
Portland cement 1
Portland cement 1Portland cement 1
Portland cement 1
Self-employed
 
Concrete aggregates 2
Concrete aggregates 2Concrete aggregates 2
Concrete aggregates 2
Self-employed
 
Concret lec 3
Concret lec 3Concret lec 3
Concret lec 3
Self-employed
 
Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07
Self-employed
 
Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06
Self-employed
 
Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05
Self-employed
 
Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04
Self-employed
 
Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03
Self-employed
 
Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02
Self-employed
 
Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01
Self-employed
 
moments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khanmoments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khan
Self-employed
 

More from Self-employed (16)

traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
survey measurments
survey measurmentssurvey measurments
survey measurments
 
introduction of surveying
introduction of surveyingintroduction of surveying
introduction of surveying
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2
 
surveying and levelling
surveying and levellingsurveying and levelling
surveying and levelling
 
Portland cement 1
Portland cement 1Portland cement 1
Portland cement 1
 
Concrete aggregates 2
Concrete aggregates 2Concrete aggregates 2
Concrete aggregates 2
 
Concret lec 3
Concret lec 3Concret lec 3
Concret lec 3
 
Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07
 
Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06
 
Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05
 
Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04
 
Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03
 
Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02
 
Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01
 
moments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khanmoments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khan
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 

chain surveying

  • 1. Week No.4 Surveying-I Lecture No.4 B-Tech 2015 By: Engr. Shams Ul Islam Lecturer, Civil Engg. Department CECOS University Peshawar
  • 2. Procedure of Chain Surveying In Chain Surveying, the whole area to be surveyed is divided into framework of triangles of suitable sizes. Network of triangles is selected as these are simple geometrical figures which can be easily plotted with the measurements of its sides only. It is advisable to use well-conditioned triangles whose sides are as nearly equal as possible with angles between 30° to 120°. The chain survey is preferred when the ground is nearly flat and open and also when the area to be surveyed is smaller. 2Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 3. Technical Terms Used in chain Surveying Survey Stations These are important point fixed on ground indicating the starting point and the end point of the survey line. These are also the basic control points of the survey. There can be two types of survey stations. Main Station Main stations are control points at the ends of the chain lines commanding the boundaries of survey. 3Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 4. Continue.. Subsidiary or Tie Station These are stations selected on the main survey lines for running auxiliary lines drawn to locate, measure and plot interior details. The survey stations are suitably selected with care so that at least main survey stations are mutually visible and survey lines run through as flat ground as possible and are as close to the boundaries as possible. 4Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 5. Continue.. 5Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 6. Survey Lines The lines joining survey stations are the survey lines. The survey lines between main stations are thus called main survey lines or chain lines. The longest of the main survey line is normally called Base Line (Line BE in Figure 1) running primarily through the middle of the area to be surveyed. The framework of triangles shall have one or two base lines since the entire survey is built around base line. It shall be measured with higher care and accuracy. The survey line joining the subsidiary or tie stations on main line is termed Tie Line 6Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 7. Offsets The details on ground such as fences, buildings and towers, etc. are to be located with reference to main chain lines by means of lateral measurements. These lateral measurements with reference to the chain line are referred to as offsets. Type of Offsets • Perpendicular offset/right angle offset • Oblique offset 7Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 8. Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 9. Operations Involved in Chain Surveying Various operations involved in the process of chain surveying are as follows: (a) Marking the stations (b) Ranging (c) Measurement of survey lines (d) Offset measurements. 9Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 10. Marking the Stations The first step in chain survey is to decide and locate stations so that they are distinctly visible and are quasi-permanently fixed during the surveying process. The position of stations are located on map such that the base survey line and other main survey lines are so aligned that the positions of all salient ground features, either natural or manmade, can be located and measured. The position of stations is fixed with reference to some permanent ground features so that they can be unambiguously and accurately located on ground at any time in future also, if the station pegs are removed/misplaced. 10Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 11. Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 12. Continue… It can be noted that the distance of station A must be measured from at least three permanent ground features, e.g. large tree, electric pole, building or culvert etc. existing in the vicinity of the station. The location sketch of the station as given in Figure (previous slide) is very helpful in retracing the station position in future. The survey stations are marked temporarily on ground by fixing the ranging rod at their location. A wooden peg is driven in the ground such that it is projecting at least 40 mm above the ground to provide some permanency. A cross can be painted or etched on ground if some hard surface like road, pavement or rock is encountered at station location. For permanent marking, a stone or concrete block can be embedded in ground. 12Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 13. Offset Measurements The chain survey is started with measurements along base line and extended along all the frameworks of survey lines. The laying of chain line and making measurement of distances along the survey line were described in earlier section. The next important part of distance measurement is locating the important details of features in the vicinity of survey lines by means of offsets. Offsets up to or less than 15 m from the survey lines are generally termed short offsets while those larger than 15 m are called long offsets. 13Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 14. Continue…. In normal course of chain surveying, perpendicular offsets are measured. Oblique offsets are recorded only in exceptional cases when it is difficult to obtain normal offsets or else these are absolutely essential. Perpendicular offsets can be set either (a) manually by 3-4-5 method or (b) with the help of offset instruments like cross staff or optical square. 14Engr.Shams Ul Islam (shams@cecos.edu.pk)