King Saud University
College of Engineering
Civil Engineering Department
SE 211


                              CHAIN SURVEYING

SUMMARY & ABSTRACT:

Chain (Tape) surveying is the simplest form of detail surveying. In this method the
lengths of lines marked on the field are measured, while the details are measured by
offsets and ties from these lines. This field work will continue for 3 field hours. Every
group is expected to submit a detailed report besides the final plan of the area
surveyed.

OBJECTIVES:

This field work aimed to train the student on the following process:
   1. Selection of a frame work (chain or base lines) and control points.
   2. Direct method of linear measurements (horizontal distance measurement).
   3. Setting out right angles (offsets).
   4. Determining the direction of any line in the field with respect to magnetic
        north "bearing".
   5. Booking Method.
   6. Plotting Method.

APPARATUS & INSTRUMENT

   1.   2 Tapes
   2.   3 Ranging Rods
   3.   Arrows/Marker paints
   4.   Prism Square
   5.   Prismatic Compass
   6.   Booking Board

PROCEDURE:

   1. Make a reconnaissance of the area and select a suitable framework (chain
      lines) and stations based on the criterion given in Note 1.
   2. Mesure all the chain (based) lines once in each direction using the direct
      measurement method. See Note 2.
   3. Measure the offsets/or ties from every necessary point on the detail to the
      corresponding base line. Use the procedure explained in Note 3.
   4. You may need some measurements on the details (on the building sides…).
   5. Measure the bearing of one of the chain lines by using the prismatic compass.
      See Note 4.
   6. Record all the information and measurements properly in the booking papers
      as explained in Note 5.
   7. Make the necessary calculations and corrections.
8. Draw the details in a suitable scale to produce a detailed map of the area. See
      Note 6.

Note 1: CHAIN LINES & STATIONS SELECTIOS

To locate a suitable stations and chain lines, a reconnaissance of the area should be
undertaken by walking around the area required to be surveyed. Any obstacles should
be noticed. The selected stations should produce a well formed linked triangles or
braced quadrilaterals.
The principles to be considered are:
    1. Few long lines should be used.
    2. Avoid any obstacles to ranging or chaining.
    3. Angles should be > 30o & <120o.
    4. Make check lines when possible to detect errors when plotting.
    5. The lines should be closed to the details (Avoid long offsets (>10m) and ties.
After selection of the framework you should draw sketch of the area and mark the
stations by wooden pegs or marker paints, and give a number for each station.

NOTE 2: DIRECT DISTANCE MEASUREMENT

For measuring any distance between A and B, especially when it is longer than the
tape length, the following ranging is needed: "ranging by eye".
    1. The ranging rode should be placed at the beginning point A and the end point
        B. The first man should place the tape zero point at A.
    2. The second man holding the third raging rod and the tape should move to the
        direction of B to a point of the end of the tape length. Then he should hold the
        ranging rod vertically.
    3. The first man at point A lines up the ranging rod with that on point B. "by
        sighting as low as possible".
    4. Then, the second man should straighten the tape and mark this point.
    5. Both men move ahead repeat the whole steps beginning from the first mark.
    6. As measurements processes, the second man should record the length.

Note 3: SETTING THE OFFSET

Any point on the detail can be related to the chain line by offset or ties. This is
accomplished by measuring all X's and Y's as shown in the figure.
To set out offsets, a prism square can be used. To locate the point at which a 1 from
any point on the feature would meet the chain line (say AB) you can follow the
following steps:
    1. One man should hold the ranging pole at the given point, while the other pole
        is placed at any point on the chain line AB.
    2. The observer holds the instrument and walk along the line AB until he see
        both poles coincide in each other. Then the distance to this point along the
        chain line can be measured beside the length of the perpendicular.
Another method can be used by holding the zero point of the tape at the given point
and swinging tape over the chain line and mark the point on the chain line at
minimum reading.


NOTE 4: MEASURING THE BEARING OF A LINE

To measure the angle that any line makes with the magnetic direction, you can use a
prismatic compass. The procedure is as follow:
    1. Place the ranging pole vertically at point B.
    2. Place the prismatic compass over its tripod at point A and level it using the
       bubble and screws.
    3. Rotate the compass until it is directed to the pole and read the angle.
    4. Repeat the whole procedure for point B.

NOTE 5: BOOKING

The field book should be neat and consistent:
   1. Each chain line is represented by double line drawn through the corner of the
        page.
   2. Entries start at the bottom of the page.
   3. Detail that is on the right-hand side of the line is booked on the right-hand side
        of the page and voice versa.
   4. The lengths from the beginning of the line are written inside the double lines
        while the offset lengths outside.

NOTE 6: PLOTTING

A. Plot the framework of chain lines by:
   1. Draw the longest line according to its bearing.
   2. Build up the other chain lines by using beam compasses.
   3. Draw the check lines, and if there are any errors, check the drawn lines in the
       incorrect triangles. (You may need to measure them in the field).

B. Draw the detail for each chain line based on offsets and ties information. Then
   connect these points to get the details.

More Related Content

What's hot

Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurementMujeeb Muji
 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouringAbdul Majid
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641Mir Zafarullah
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
 
Chain surveying
Chain surveyingChain surveying
Chain surveyingJNTUK
 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1Decentumang
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouringANAND JIBHKATE
 
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
Ce6304 surveying 1   contour (iv unit) lecture ppt notesCe6304 surveying 1   contour (iv unit) lecture ppt notes
Ce6304 surveying 1 contour (iv unit) lecture ppt notesnandishsajjan
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
 
Area and volume_Surveying, Civil Engineering
Area and volume_Surveying, Civil EngineeringArea and volume_Surveying, Civil Engineering
Area and volume_Surveying, Civil EngineeringA Makwana
 

What's hot (20)

Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouring
 
Curves
CurvesCurves
Curves
 
Surveying
Surveying Surveying
Surveying
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Levelling
LevellingLevelling
Levelling
 
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
Ce6304 surveying 1   contour (iv unit) lecture ppt notesCe6304 surveying 1   contour (iv unit) lecture ppt notes
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
 
Curves
CurvesCurves
Curves
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Area and volume_Surveying, Civil Engineering
Area and volume_Surveying, Civil EngineeringArea and volume_Surveying, Civil Engineering
Area and volume_Surveying, Civil Engineering
 

Viewers also liked

Factors to be considered for motor selection
Factors  to be considered for motor selectionFactors  to be considered for motor selection
Factors to be considered for motor selectionshanmu m
 
Types of obstacles in chain surveying
Types of obstacles in chain surveyingTypes of obstacles in chain surveying
Types of obstacles in chain surveyingkazi abir
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveyingMir Zafarullah
 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instrumentsShanALi
 
Modern surveying instruments - Assignment
Modern surveying instruments - AssignmentModern surveying instruments - Assignment
Modern surveying instruments - AssignmentVijay Parmar
 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveyingShaker Ullah
 
Plane table survey
Plane table surveyPlane table survey
Plane table surveyKushal Patel
 

Viewers also liked (12)

Factors to be considered for motor selection
Factors  to be considered for motor selectionFactors  to be considered for motor selection
Factors to be considered for motor selection
 
Types of obstacles in chain surveying
Types of obstacles in chain surveyingTypes of obstacles in chain surveying
Types of obstacles in chain surveying
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instruments
 
Modern surveying instruments - Assignment
Modern surveying instruments - AssignmentModern surveying instruments - Assignment
Modern surveying instruments - Assignment
 
chain surveying
chain surveyingchain surveying
chain surveying
 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveying
 
Plane table surveying
Plane table surveyingPlane table surveying
Plane table surveying
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 

Similar to Chain surveying

Chain Surveying Lecture notes very important 2.pptx
Chain Surveying Lecture  notes very important 2.pptxChain Surveying Lecture  notes very important 2.pptx
Chain Surveying Lecture notes very important 2.pptxsahaniashish582003
 
Summerlin Map Reading
Summerlin Map ReadingSummerlin Map Reading
Summerlin Map Readingsbeck46
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying SHAMJITH KM
 
LINEAR MEASUREMENT techniques in civil engineering
LINEAR MEASUREMENT techniques  in civil engineeringLINEAR MEASUREMENT techniques  in civil engineering
LINEAR MEASUREMENT techniques in civil engineeringUjasPandya2
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfKumkumaIp
 
Geometry unit 1.6
Geometry unit 1.6Geometry unit 1.6
Geometry unit 1.6Mark Ryder
 
S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingEst
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring SurveyingBahzad5
 
btech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdfbtech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdfSaloniSingh252386
 
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptChain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptImashaSJayathissa
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...sharmajivijay99
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...sharmajivijay99
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.pptAsadKhan606012
 
Plane table surveying
Plane table surveyingPlane table surveying
Plane table surveyingNikMankar26
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) PartBishnuBhandari12
 
Week 27 online part 3 recording survey data
Week 27 online part 3 recording survey dataWeek 27 online part 3 recording survey data
Week 27 online part 3 recording survey datavikkis
 
Horizontal and Vertical Line
Horizontal and Vertical LineHorizontal and Vertical Line
Horizontal and Vertical LineBahzad5
 

Similar to Chain surveying (20)

Chain Surveying Lecture notes very important 2.pptx
Chain Surveying Lecture  notes very important 2.pptxChain Surveying Lecture  notes very important 2.pptx
Chain Surveying Lecture notes very important 2.pptx
 
Summerlin Map Reading
Summerlin Map ReadingSummerlin Map Reading
Summerlin Map Reading
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying
 
LINEAR MEASUREMENT techniques in civil engineering
LINEAR MEASUREMENT techniques  in civil engineeringLINEAR MEASUREMENT techniques  in civil engineering
LINEAR MEASUREMENT techniques in civil engineering
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
 
Geometry unit 1.6
Geometry unit 1.6Geometry unit 1.6
Geometry unit 1.6
 
S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveying
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
 
btech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdfbtech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdf
 
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptChain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
 
Geometric Construction 1.pptx
Geometric Construction 1.pptxGeometric Construction 1.pptx
Geometric Construction 1.pptx
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
 
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
unit-5-plane-table-survey-orientation-radiation-intersection-traversing-resec...
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
Plane table surveying
Plane table surveyingPlane table surveying
Plane table surveying
 
Plastica 1º eso
Plastica 1º eso Plastica 1º eso
Plastica 1º eso
 
Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
 
Week 27 online part 3 recording survey data
Week 27 online part 3 recording survey dataWeek 27 online part 3 recording survey data
Week 27 online part 3 recording survey data
 
Horizontal and Vertical Line
Horizontal and Vertical LineHorizontal and Vertical Line
Horizontal and Vertical Line
 

Recently uploaded

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.htj82vpw
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...ssuserf63bd7
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...bleessingsbender
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxseemajojo02
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Klinik kandungan
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...yulianti213969
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacovaimostorept
 
Top Quality adbb 5cl-a-d-b Best precursor raw material
Top Quality adbb 5cl-a-d-b Best precursor raw materialTop Quality adbb 5cl-a-d-b Best precursor raw material
Top Quality adbb 5cl-a-d-b Best precursor raw materialsunnyly512
 
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptxBoundify
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Holger Mueller
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEJIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEkajalroy875762
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 

Recently uploaded (20)

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.Ital Liptz - all about Itai Liptz. news.
Ital Liptz - all about Itai Liptz. news.
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
Abortion pills in Jeddah ! +27737758557, cytotec pill riyadh. Saudi Arabia" A...
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptx
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
Jual obat aborsi Hongkong ( 085657271886 ) Cytote pil telat bulan penggugur k...
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
Top Quality adbb 5cl-a-d-b Best precursor raw material
Top Quality adbb 5cl-a-d-b Best precursor raw materialTop Quality adbb 5cl-a-d-b Best precursor raw material
Top Quality adbb 5cl-a-d-b Best precursor raw material
 
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024Progress Report - Oracle's OCI Analyst Summit 2024
Progress Report - Oracle's OCI Analyst Summit 2024
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDEJIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
JIND CALL GIRL ❤ 8272964427❤ CALL GIRLS IN JIND ESCORTS SERVICE PROVIDE
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 

Chain surveying

  • 1. King Saud University College of Engineering Civil Engineering Department SE 211 CHAIN SURVEYING SUMMARY & ABSTRACT: Chain (Tape) surveying is the simplest form of detail surveying. In this method the lengths of lines marked on the field are measured, while the details are measured by offsets and ties from these lines. This field work will continue for 3 field hours. Every group is expected to submit a detailed report besides the final plan of the area surveyed. OBJECTIVES: This field work aimed to train the student on the following process: 1. Selection of a frame work (chain or base lines) and control points. 2. Direct method of linear measurements (horizontal distance measurement). 3. Setting out right angles (offsets). 4. Determining the direction of any line in the field with respect to magnetic north "bearing". 5. Booking Method. 6. Plotting Method. APPARATUS & INSTRUMENT 1. 2 Tapes 2. 3 Ranging Rods 3. Arrows/Marker paints 4. Prism Square 5. Prismatic Compass 6. Booking Board PROCEDURE: 1. Make a reconnaissance of the area and select a suitable framework (chain lines) and stations based on the criterion given in Note 1. 2. Mesure all the chain (based) lines once in each direction using the direct measurement method. See Note 2. 3. Measure the offsets/or ties from every necessary point on the detail to the corresponding base line. Use the procedure explained in Note 3. 4. You may need some measurements on the details (on the building sides…). 5. Measure the bearing of one of the chain lines by using the prismatic compass. See Note 4. 6. Record all the information and measurements properly in the booking papers as explained in Note 5. 7. Make the necessary calculations and corrections.
  • 2. 8. Draw the details in a suitable scale to produce a detailed map of the area. See Note 6. Note 1: CHAIN LINES & STATIONS SELECTIOS To locate a suitable stations and chain lines, a reconnaissance of the area should be undertaken by walking around the area required to be surveyed. Any obstacles should be noticed. The selected stations should produce a well formed linked triangles or braced quadrilaterals. The principles to be considered are: 1. Few long lines should be used. 2. Avoid any obstacles to ranging or chaining. 3. Angles should be > 30o & <120o. 4. Make check lines when possible to detect errors when plotting. 5. The lines should be closed to the details (Avoid long offsets (>10m) and ties. After selection of the framework you should draw sketch of the area and mark the stations by wooden pegs or marker paints, and give a number for each station. NOTE 2: DIRECT DISTANCE MEASUREMENT For measuring any distance between A and B, especially when it is longer than the tape length, the following ranging is needed: "ranging by eye". 1. The ranging rode should be placed at the beginning point A and the end point B. The first man should place the tape zero point at A. 2. The second man holding the third raging rod and the tape should move to the direction of B to a point of the end of the tape length. Then he should hold the ranging rod vertically. 3. The first man at point A lines up the ranging rod with that on point B. "by sighting as low as possible". 4. Then, the second man should straighten the tape and mark this point. 5. Both men move ahead repeat the whole steps beginning from the first mark. 6. As measurements processes, the second man should record the length. Note 3: SETTING THE OFFSET Any point on the detail can be related to the chain line by offset or ties. This is accomplished by measuring all X's and Y's as shown in the figure.
  • 3. To set out offsets, a prism square can be used. To locate the point at which a 1 from any point on the feature would meet the chain line (say AB) you can follow the following steps: 1. One man should hold the ranging pole at the given point, while the other pole is placed at any point on the chain line AB. 2. The observer holds the instrument and walk along the line AB until he see both poles coincide in each other. Then the distance to this point along the chain line can be measured beside the length of the perpendicular. Another method can be used by holding the zero point of the tape at the given point and swinging tape over the chain line and mark the point on the chain line at minimum reading. NOTE 4: MEASURING THE BEARING OF A LINE To measure the angle that any line makes with the magnetic direction, you can use a prismatic compass. The procedure is as follow: 1. Place the ranging pole vertically at point B. 2. Place the prismatic compass over its tripod at point A and level it using the bubble and screws. 3. Rotate the compass until it is directed to the pole and read the angle. 4. Repeat the whole procedure for point B. NOTE 5: BOOKING The field book should be neat and consistent: 1. Each chain line is represented by double line drawn through the corner of the page. 2. Entries start at the bottom of the page. 3. Detail that is on the right-hand side of the line is booked on the right-hand side of the page and voice versa. 4. The lengths from the beginning of the line are written inside the double lines while the offset lengths outside. NOTE 6: PLOTTING A. Plot the framework of chain lines by: 1. Draw the longest line according to its bearing. 2. Build up the other chain lines by using beam compasses. 3. Draw the check lines, and if there are any errors, check the drawn lines in the incorrect triangles. (You may need to measure them in the field). B. Draw the detail for each chain line based on offsets and ties information. Then connect these points to get the details.