SlideShare a Scribd company logo
Chain surveying
M.Z Jamali
Chain Surveying
• Chain (Tape) surveying is the simplest form of detail
surveying. In this method the lengths of lines marked on
the field are measured, while the details are measured by
offsets from these line.
• Chain surveying is the type of surveying in which only
linear measurements are taken in the field.
• This type of surveying is done for surveying of small extent
to describe the boundaries of plots of land and to locate the
existing feature on them.
• It is the method of surveying in which the area is divided
into network of triangles and the sides of the various
triangles are measured directly in the field with a chain or a
tape and no angular measurements are taken.
Principles of Chain Surveying
Principles of Chain Surveying
• The principle of chain surveying is to divide the
area into a number of triangles .
• As a triangle is the only simple plane geometrical
figure which can be plotted from the length of the
three sides even if the angles are not known. A
network of triangles is preferred to chain
surveying.
• Triangulation is the principle of chain surveying.
If the area to be surveyed is triangle in shape and
if the lengths and sequence of its three sides are
recorded, the plan of the area can be easily drawn.
Principles of Chain Surveying
Principles of Chain Surveying
Principles of Chain Surveying
Principles of Chain Surveying
Principles of Chain Surveying
• Suitability of chain surveying:
• Chain surveying is recommended when:
Ground surface is more or less level.
Area is small.
Small-scale map is required to prepare.
Formation of well conditioned triangle is easy.
• Chain surveying is not recommended when:
Area is crowded with many details.
Area consists of too many undulations.
Area is very large.
Formation of well conditioned triangle is not
easy.
Well conditioned triangle, ill
conditioned triangle and ideal
triangle.
• A triangle is said to be well conditioned
triangle when no angle in it is neither less
than 30 nor greater than 120.
• If in a triangle an angle is less than 30 or
greater than 120 is called ill conditioned
triangle.
• An equilateral triangle having each angle of 60
is an ideal triangle.
Terms related to Chain
Surveying
Survey Stations
• Survey stations are the points at the beginning
and at the end of a chain line they may also
occur at any convenient position on the chain
line. Such station may be
• Main Stations
• Subsidiary Stations
• Tie Stations
Terms related to Chain
Surveying
• Main Station Stations along the boundary of an
area as controlling points are known as ‘Main
Stations’ The lines joining the main station are
called ‘ Main Survey Lines’. The main survey
lines should cover the whole area to be
surveyed. The main stations are denoted by Δ.
Terms related to Chain
Surveying
• Subsidiary Stations: Stations which are on
the main survey lines or any other survey lines
are known as ‘ Subsidiary Stations’ these
stations are taken to run subsidiary lines for
dividing the area into triangles, for checking
the accuracy of triangles and for locating
interior details.
Terms related to Chain
Surveying
• Tie Stations:
• These stations are also subsidiary stations
taken on the main survey lines. Lines joining
the stations are known as ‘ Tie lines’ Tie lines
are taken to locate interior details.
Terms related to Chain
Surveying
Main Survey Lines:
• The line joining the main stations are called
main survey lines or chain lines.
Terms related to Chain
Surveying
• Base Line: The line on which the framework of the
survey is built is known as ‘ Base line’. It is the most
important line of the survey. Generally the longest of
the main survey lines is considered as the base line.
This lines should be taken through fairly level ground,
and should be measured very carefully and accurately.
Terms related to Chain
Surveying
• Check Line
• The line joining the apex point of a triangle to
some fixed points on its base is known as ‘
Check line’. It is taken to check the accuracy
of the triangle. Sometimes this line helps to
locate interior details.
Terms related to Chain
Surveying
• Tie Line
• A line joining tie stations is termed as a tie
line. It is run to take the interior details which
are far away from the main lines and also to
avoids long offsets. It can also serve as check
line.
Selection of Survey Station
• The following points should be considered while
selecting survey stations:
• It should be visible from at least two or more
stations.
• As far as possible main lines should run on level
ground.
• All triangles should be well conditioned (No
angle less than 30º).
• Main network should have as few lines as
possible.
Selection of Survey Station
• Each main triangle should have at least one
check line.
• Obstacles to ranging and chaining should be
avoided.
• Sides of the larger triangles should pass as
close to boundary lines as possible.
• Base line should be longest survey line.
• Survey line should be taken close to boundary
so that they can be located by short offset.
Operation in Chain Surveying
• The following operations are involved in chain
surveying.
• Chaining
• Ranging
• Offsetting
• These three operations are done
simultaneously during chain Surveying.
Offsets
• Lateral measurements to chain lines for
locating ground features are known as offsets.
For this purpose
• perpendicular or oblique offsets may be taken .
If the object to be located (say road) is curved
more number of offsets should be taken. For
measuring offsets tapes are commonly used.
• Offset which can be judged by naked eye or
offset less than 15m is called short offset and
offset greater than 15m is called long offset.
• Most commonly short offsets are perferred.
Offsets
• Offset may also be classified as Perpendicular
Offsets and oblique offset.
Perpendicular Offsets
• The offsets which are taken perpendicular to the
chain line are termed as perpendicular offsets.
These offsets are taken
• (a) By holding zero end of the tape at the object
and swinging the tape on the chain line. The
shortest distance measured from object to the
chain line is usually the perpendicular offset.
• (b) By setting right angle in 3:4:5
• (c) By cross-staff or optical square.
• Perpendicular offset usually preferred than
oblique.
Perpendicular Offsets
Offsets
Oblique Offset
• Oblique distance is always greater than
perpendicular distance. All the offsets which
are not taken at the right angle to chain line are
known as oblique offsets.
Oblique Offset
Offsets
Offsets
• For setting perpendicular offsets any one of the
following methods are used:
• (i) Swinging
• (ii) Using cross staffs
• (iii) Using optical or prism square.
Perpendicular Offset by
Swinging
• Chain is stretched along the survey line. An
assistant holds the end of tape on the object.
Surveyor swings the tape on chain line and
selects the point on chain where offset distance
is the least.
• and notes chain reading as well as offset
reading in a field book on a neat sketch of the
object
Perpendicular Offset by
Swinging
Perpendicular Offset by
Swinging
Perpendicular Offset by
Swinging
Perpendicular Offset by
Swinging
Perpendicular Offsets Using Cross
Staffs
• Three different types of cross staffs used for setting
perpendicular offsets. All cross staffs are having two
perpendicular lines of sights. The cross staffs are
mounted on stand. First line of sight is set along the
chain line and without disturbing setting right angle line
of sight is checked to locate the object.
• With open cross staff (Fig(a)) it is possible to set
perpendicular only, while with French cross staff
• (Fig(b)), even 45º angle can be set. Adjustable cross
staff can be used to set any angle also, since there are
graduations and upper drum can be rotated over lower
drum.
Perpendicular Offsets Using Cross
Staffs
Perpendicular Offsets Using Cross
Staffs
Perpendicular Offsets Using Optical
Square and Prism Square
Perpendicular Offsets Using Optical
Square and Prism Square
Perpendicular Offsets Using Optical
Square and Prism Square
Perpendicular Offsets Using Optical
Square and Prism Square
Perpendicular Offsets Using Optical
Square and Prism Square
Perpendicular Offsets Using Optical
Square and Prism Square
3-4-5 Method
• AB is the chain line it is required to erect a
perpendicular at C of the chain line. Establish a pt
D at 3 m distance. 5m & 6m marks are brought to
gather to form a loop .The tape is stretched tight
by fastening the end D and C. The point D is
established such that DE = 5 m and CE= 4 m and
CD = 3 m and DE2 = CD2 + DE2
• i.e. 5 2 = 3 2 + 4 2 = 25 thus Angle DCE = 90 0
• i.e. CE is perpendicular to chain line at C
3-4-5 Method
3-4-5 method
3-4-5 method
Procedure of field work
• Reconnaissance
• Index sketch
• Marking the stations on ground
• Reference sketches
• Taking measurement of survey lines and
noting them.
Reconnaissance survey
• The preliminary inspection of the area to be
surveyed is called reconnaissance. The
surveyor inspects the area to be surveyed,
survey or prepares index sketch or key plan.
Walk the whole area and thoroughly examine
the ground, note the position of boundaries,
road, and river etc., various difficulties to
chain lines, select stations, and prepare neat
sketches called index sketches or key plan
• 2. Marking stations
• Stations are marked with ranging rod, or wooden
peg, driving a nail or spikes if hard surface, or
embedding stone with a cross mark.
• 3. Reference sketches
• After marking the station should be referenced
i.e. located by measurement called ties taken
from 3 permanent points which are easily
identified such as corner of building.
• And in the final required measurements are taken
and located on field book.

More Related Content

What's hot

Contouring
ContouringContouring
Contouring
GAURAV. H .TANDON
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
Mujeeb Muji
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
HastarajPandey
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
Rakesh Verma
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
neharajpl
 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chaining
Shital Navghare
 
chain surveying
chain surveyingchain surveying
chain surveying
Self-employed
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
GAURAV. H .TANDON
 
Computation of Area and volume
Computation of Area and volume Computation of Area and volume
Computation of Area and volume
Sujith Velloor Sudarsanakumar Nair
 
Total Station surveying
Total Station surveyingTotal Station surveying
Total Station surveying
RAMPRASAD KUMAWAT
 
surveying contouring
surveying contouring surveying contouring
surveying contouring
ANAND JIBHKATE
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdfGokul Saud
 
Surveying
SurveyingSurveying
traversing of survey
traversing of surveytraversing of survey
traversing of survey
Self-employed
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
sathyan s
 
Theodolite traversing
Theodolite traversingTheodolite traversing
Theodolite traversing
Gaurang Prajapati
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
Dolat Ram
 

What's hot (20)

Contouring
ContouringContouring
Contouring
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chaining
 
chain surveying
chain surveyingchain surveying
chain surveying
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 
Computation of Area and volume
Computation of Area and volume Computation of Area and volume
Computation of Area and volume
 
Total Station surveying
Total Station surveyingTotal Station surveying
Total Station surveying
 
Surveying
Surveying Surveying
Surveying
 
surveying contouring
surveying contouring surveying contouring
surveying contouring
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
 
Method Of Chaining On Sloping Ground
Method Of Chaining On Sloping GroundMethod Of Chaining On Sloping Ground
Method Of Chaining On Sloping Ground
 
Surveying
SurveyingSurveying
Surveying
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Theodolite traversing
Theodolite traversingTheodolite traversing
Theodolite traversing
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 

Viewers also liked

Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
GAURAV. H .TANDON
 
Types of obstacles in chain surveying
Types of obstacles in chain surveyingTypes of obstacles in chain surveying
Types of obstacles in chain surveying
kazi abir
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
Zewdu Minwuye Dessie
 
L#8 batching,mixing
L#8 batching,mixingL#8 batching,mixing
L#8 batching,mixing
Mir Zafarullah
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
Mir Zafarullah
 

Viewers also liked (7)

Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Types of obstacles in chain surveying
Types of obstacles in chain surveyingTypes of obstacles in chain surveying
Types of obstacles in chain surveying
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
 
L#8 batching,mixing
L#8 batching,mixingL#8 batching,mixing
L#8 batching,mixing
 
Solar Refrigeration
Solar RefrigerationSolar Refrigeration
Solar Refrigeration
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 

Similar to Chain surveying and offset

Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
AsadKhan606012
 
Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]
Dr. BASWESHWAR JIRWANKAR
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
PAAVAI ENGINEERING COLLEGE
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
Kamal B
 
Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil Engineering
A Makwana
 
Unit 2
Unit 2Unit 2
Unit 2
Nishma2
 
surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
Rashmi.R.Belur Setty
 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingJackie Arul
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
Janak82
 
UNIT 1_Chapter 2_Adv Survey.pptx
UNIT 1_Chapter 2_Adv Survey.pptxUNIT 1_Chapter 2_Adv Survey.pptx
UNIT 1_Chapter 2_Adv Survey.pptx
Mrunmayee Manjari
 
1. Intro to Surveying.pdf
1. Intro to Surveying.pdf1. Intro to Surveying.pdf
1. Intro to Surveying.pdf
DivyaPriya700213
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868
RahulSinghParihar18
 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.ppt
ArisamTom
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
Nirant Patel
 
Basic civil
Basic civilBasic civil
Basic civil
sreejithksasidharan
 
Classification of Surveying.pptx
Classification of Surveying.pptxClassification of Surveying.pptx
Classification of Surveying.pptx
ivargarud
 
lecture3.pptx
lecture3.pptxlecture3.pptx
lecture3.pptx
ivargarud
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
Ashok Narisetti
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
KHUSHBU SHAH
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
Karnav Rana
 

Similar to Chain surveying and offset (20)

Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
 
Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil Engineering
 
Unit 2
Unit 2Unit 2
Unit 2
 
surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveying
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
 
UNIT 1_Chapter 2_Adv Survey.pptx
UNIT 1_Chapter 2_Adv Survey.pptxUNIT 1_Chapter 2_Adv Survey.pptx
UNIT 1_Chapter 2_Adv Survey.pptx
 
1. Intro to Surveying.pdf
1. Intro to Surveying.pdf1. Intro to Surveying.pdf
1. Intro to Surveying.pdf
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868
 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.ppt
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Basic civil
Basic civilBasic civil
Basic civil
 
Classification of Surveying.pptx
Classification of Surveying.pptxClassification of Surveying.pptx
Classification of Surveying.pptx
 
lecture3.pptx
lecture3.pptxlecture3.pptx
lecture3.pptx
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
 

More from Mir Zafarullah

Introduction to Irrigation System of Pakistan
Introduction to Irrigation System of PakistanIntroduction to Irrigation System of Pakistan
Introduction to Irrigation System of Pakistan
Mir Zafarullah
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
Mir Zafarullah
 
Ranging 170811123447
Ranging 170811123447Ranging 170811123447
Ranging 170811123447
Mir Zafarullah
 
Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641
Mir Zafarullah
 
Errorsandmistakesinchaining 170810071200
Errorsandmistakesinchaining 170810071200Errorsandmistakesinchaining 170810071200
Errorsandmistakesinchaining 170810071200
Mir Zafarullah
 
Friction factor
Friction factorFriction factor
Friction factor
Mir Zafarullah
 
Types of flow in open channel
Types of flow in open channelTypes of flow in open channel
Types of flow in open channel
Mir Zafarullah
 
Types of beam & types of supports
Types of beam & types of supportsTypes of beam & types of supports
Types of beam & types of supports
Mir Zafarullah
 
Hydrographics surveying
Hydrographics surveyingHydrographics surveying
Hydrographics surveying
Mir Zafarullah
 
Levelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levellingLevelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levelling
Mir Zafarullah
 
crashing of project
crashing of project crashing of project
crashing of project
Mir Zafarullah
 
Water pollution and source
Water pollution and sourceWater pollution and source
Water pollution and source
Mir Zafarullah
 
Self purification of river water
Self purification of river waterSelf purification of river water
Self purification of river water
Mir Zafarullah
 
Water sampling , procedure, purpose , techniques and equipments
Water sampling , procedure, purpose , techniques and equipmentsWater sampling , procedure, purpose , techniques and equipments
Water sampling , procedure, purpose , techniques and equipments
Mir Zafarullah
 
Reverse osmosis
Reverse osmosisReverse osmosis
Reverse osmosis
Mir Zafarullah
 
Environmental Pollution and its causess
Environmental Pollution and its causessEnvironmental Pollution and its causess
Environmental Pollution and its causess
Mir Zafarullah
 
Hard and soft water
Hard and soft water Hard and soft water
Hard and soft water
Mir Zafarullah
 
Water Filtration by sand filtration
Water Filtration by sand filtrationWater Filtration by sand filtration
Water Filtration by sand filtration
Mir Zafarullah
 
coagulation and flocculation
coagulation and flocculation coagulation and flocculation
coagulation and flocculation
Mir Zafarullah
 
sedimentation and its types
sedimentation and its typessedimentation and its types
sedimentation and its types
Mir Zafarullah
 

More from Mir Zafarullah (20)

Introduction to Irrigation System of Pakistan
Introduction to Irrigation System of PakistanIntroduction to Irrigation System of Pakistan
Introduction to Irrigation System of Pakistan
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
 
Ranging 170811123447
Ranging 170811123447Ranging 170811123447
Ranging 170811123447
 
Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641Obstaclesinchaining 170811123641
Obstaclesinchaining 170811123641
 
Errorsandmistakesinchaining 170810071200
Errorsandmistakesinchaining 170810071200Errorsandmistakesinchaining 170810071200
Errorsandmistakesinchaining 170810071200
 
Friction factor
Friction factorFriction factor
Friction factor
 
Types of flow in open channel
Types of flow in open channelTypes of flow in open channel
Types of flow in open channel
 
Types of beam & types of supports
Types of beam & types of supportsTypes of beam & types of supports
Types of beam & types of supports
 
Hydrographics surveying
Hydrographics surveyingHydrographics surveying
Hydrographics surveying
 
Levelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levellingLevelling, terms related to levelling, methods of levelling
Levelling, terms related to levelling, methods of levelling
 
crashing of project
crashing of project crashing of project
crashing of project
 
Water pollution and source
Water pollution and sourceWater pollution and source
Water pollution and source
 
Self purification of river water
Self purification of river waterSelf purification of river water
Self purification of river water
 
Water sampling , procedure, purpose , techniques and equipments
Water sampling , procedure, purpose , techniques and equipmentsWater sampling , procedure, purpose , techniques and equipments
Water sampling , procedure, purpose , techniques and equipments
 
Reverse osmosis
Reverse osmosisReverse osmosis
Reverse osmosis
 
Environmental Pollution and its causess
Environmental Pollution and its causessEnvironmental Pollution and its causess
Environmental Pollution and its causess
 
Hard and soft water
Hard and soft water Hard and soft water
Hard and soft water
 
Water Filtration by sand filtration
Water Filtration by sand filtrationWater Filtration by sand filtration
Water Filtration by sand filtration
 
coagulation and flocculation
coagulation and flocculation coagulation and flocculation
coagulation and flocculation
 
sedimentation and its types
sedimentation and its typessedimentation and its types
sedimentation and its types
 

Recently uploaded

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Chain surveying and offset

  • 2. Chain Surveying • Chain (Tape) surveying is the simplest form of detail surveying. In this method the lengths of lines marked on the field are measured, while the details are measured by offsets from these line. • Chain surveying is the type of surveying in which only linear measurements are taken in the field. • This type of surveying is done for surveying of small extent to describe the boundaries of plots of land and to locate the existing feature on them. • It is the method of surveying in which the area is divided into network of triangles and the sides of the various triangles are measured directly in the field with a chain or a tape and no angular measurements are taken.
  • 4. Principles of Chain Surveying • The principle of chain surveying is to divide the area into a number of triangles . • As a triangle is the only simple plane geometrical figure which can be plotted from the length of the three sides even if the angles are not known. A network of triangles is preferred to chain surveying. • Triangulation is the principle of chain surveying. If the area to be surveyed is triangle in shape and if the lengths and sequence of its three sides are recorded, the plan of the area can be easily drawn.
  • 10. • Suitability of chain surveying: • Chain surveying is recommended when: Ground surface is more or less level. Area is small. Small-scale map is required to prepare. Formation of well conditioned triangle is easy. • Chain surveying is not recommended when: Area is crowded with many details. Area consists of too many undulations. Area is very large. Formation of well conditioned triangle is not easy.
  • 11. Well conditioned triangle, ill conditioned triangle and ideal triangle. • A triangle is said to be well conditioned triangle when no angle in it is neither less than 30 nor greater than 120. • If in a triangle an angle is less than 30 or greater than 120 is called ill conditioned triangle. • An equilateral triangle having each angle of 60 is an ideal triangle.
  • 12. Terms related to Chain Surveying Survey Stations • Survey stations are the points at the beginning and at the end of a chain line they may also occur at any convenient position on the chain line. Such station may be • Main Stations • Subsidiary Stations • Tie Stations
  • 13. Terms related to Chain Surveying • Main Station Stations along the boundary of an area as controlling points are known as ‘Main Stations’ The lines joining the main station are called ‘ Main Survey Lines’. The main survey lines should cover the whole area to be surveyed. The main stations are denoted by Δ.
  • 14. Terms related to Chain Surveying • Subsidiary Stations: Stations which are on the main survey lines or any other survey lines are known as ‘ Subsidiary Stations’ these stations are taken to run subsidiary lines for dividing the area into triangles, for checking the accuracy of triangles and for locating interior details.
  • 15. Terms related to Chain Surveying • Tie Stations: • These stations are also subsidiary stations taken on the main survey lines. Lines joining the stations are known as ‘ Tie lines’ Tie lines are taken to locate interior details.
  • 16. Terms related to Chain Surveying Main Survey Lines: • The line joining the main stations are called main survey lines or chain lines.
  • 17. Terms related to Chain Surveying • Base Line: The line on which the framework of the survey is built is known as ‘ Base line’. It is the most important line of the survey. Generally the longest of the main survey lines is considered as the base line. This lines should be taken through fairly level ground, and should be measured very carefully and accurately.
  • 18. Terms related to Chain Surveying • Check Line • The line joining the apex point of a triangle to some fixed points on its base is known as ‘ Check line’. It is taken to check the accuracy of the triangle. Sometimes this line helps to locate interior details.
  • 19. Terms related to Chain Surveying • Tie Line • A line joining tie stations is termed as a tie line. It is run to take the interior details which are far away from the main lines and also to avoids long offsets. It can also serve as check line.
  • 20. Selection of Survey Station • The following points should be considered while selecting survey stations: • It should be visible from at least two or more stations. • As far as possible main lines should run on level ground. • All triangles should be well conditioned (No angle less than 30º). • Main network should have as few lines as possible.
  • 21. Selection of Survey Station • Each main triangle should have at least one check line. • Obstacles to ranging and chaining should be avoided. • Sides of the larger triangles should pass as close to boundary lines as possible. • Base line should be longest survey line. • Survey line should be taken close to boundary so that they can be located by short offset.
  • 22. Operation in Chain Surveying • The following operations are involved in chain surveying. • Chaining • Ranging • Offsetting • These three operations are done simultaneously during chain Surveying.
  • 23. Offsets • Lateral measurements to chain lines for locating ground features are known as offsets. For this purpose • perpendicular or oblique offsets may be taken . If the object to be located (say road) is curved more number of offsets should be taken. For measuring offsets tapes are commonly used. • Offset which can be judged by naked eye or offset less than 15m is called short offset and offset greater than 15m is called long offset. • Most commonly short offsets are perferred.
  • 24. Offsets • Offset may also be classified as Perpendicular Offsets and oblique offset. Perpendicular Offsets • The offsets which are taken perpendicular to the chain line are termed as perpendicular offsets. These offsets are taken • (a) By holding zero end of the tape at the object and swinging the tape on the chain line. The shortest distance measured from object to the chain line is usually the perpendicular offset. • (b) By setting right angle in 3:4:5 • (c) By cross-staff or optical square. • Perpendicular offset usually preferred than oblique.
  • 26. Offsets Oblique Offset • Oblique distance is always greater than perpendicular distance. All the offsets which are not taken at the right angle to chain line are known as oblique offsets.
  • 29. Offsets • For setting perpendicular offsets any one of the following methods are used: • (i) Swinging • (ii) Using cross staffs • (iii) Using optical or prism square.
  • 30. Perpendicular Offset by Swinging • Chain is stretched along the survey line. An assistant holds the end of tape on the object. Surveyor swings the tape on chain line and selects the point on chain where offset distance is the least. • and notes chain reading as well as offset reading in a field book on a neat sketch of the object
  • 35. Perpendicular Offsets Using Cross Staffs • Three different types of cross staffs used for setting perpendicular offsets. All cross staffs are having two perpendicular lines of sights. The cross staffs are mounted on stand. First line of sight is set along the chain line and without disturbing setting right angle line of sight is checked to locate the object. • With open cross staff (Fig(a)) it is possible to set perpendicular only, while with French cross staff • (Fig(b)), even 45º angle can be set. Adjustable cross staff can be used to set any angle also, since there are graduations and upper drum can be rotated over lower drum.
  • 38. Perpendicular Offsets Using Optical Square and Prism Square
  • 39. Perpendicular Offsets Using Optical Square and Prism Square
  • 40. Perpendicular Offsets Using Optical Square and Prism Square
  • 41. Perpendicular Offsets Using Optical Square and Prism Square
  • 42. Perpendicular Offsets Using Optical Square and Prism Square
  • 43. Perpendicular Offsets Using Optical Square and Prism Square
  • 44. 3-4-5 Method • AB is the chain line it is required to erect a perpendicular at C of the chain line. Establish a pt D at 3 m distance. 5m & 6m marks are brought to gather to form a loop .The tape is stretched tight by fastening the end D and C. The point D is established such that DE = 5 m and CE= 4 m and CD = 3 m and DE2 = CD2 + DE2 • i.e. 5 2 = 3 2 + 4 2 = 25 thus Angle DCE = 90 0 • i.e. CE is perpendicular to chain line at C
  • 48. Procedure of field work • Reconnaissance • Index sketch • Marking the stations on ground • Reference sketches • Taking measurement of survey lines and noting them.
  • 49. Reconnaissance survey • The preliminary inspection of the area to be surveyed is called reconnaissance. The surveyor inspects the area to be surveyed, survey or prepares index sketch or key plan. Walk the whole area and thoroughly examine the ground, note the position of boundaries, road, and river etc., various difficulties to chain lines, select stations, and prepare neat sketches called index sketches or key plan
  • 50. • 2. Marking stations • Stations are marked with ranging rod, or wooden peg, driving a nail or spikes if hard surface, or embedding stone with a cross mark. • 3. Reference sketches • After marking the station should be referenced i.e. located by measurement called ties taken from 3 permanent points which are easily identified such as corner of building. • And in the final required measurements are taken and located on field book.