Operations Involved in Chain Surveying
Various operations involved in the process of chain surveying
are as follows:
(a) Marking the stations
(b) Ranging
(c) Measurement of survey lines
(d) Offset measurements.
2Engr.Shams Ul Islam (shams@cecos.edu.pk)
Marking the Stations
The first step in chain survey is to decide and locate stations so that
they are distinctly visible and are quasi-permanently fixed during the
surveying process. The position of stations are located on map such
that the base survey line and other main survey lines are so aligned
that the positions of all salient ground features, either natural or
manmade, can be located and measured. The position of stations is
fixed with reference to some permanent ground features so that they
can be unambiguously and accurately located on ground at any time in
future also, if the station pegs are removed/misplaced.
3Engr.Shams Ul Islam (shams@cecos.edu.pk)
Engr.Shams Ul Islam (shams@cecos.edu.pk)
Continue…
It can be noted that the distance of station A must be measured from at least
three permanent ground features, e.g. large tree, electric pole, building or
culvert etc. existing in the vicinity of the station. The location sketch of the
station as given in Figure (previous slide) is very helpful in retracing the
station position in future.
The survey stations are marked temporarily on ground by fixing the ranging
rod at their location. A wooden peg is driven in the ground such that it is
projecting at least 40 mm above the ground to provide some permanency. A
cross can be painted or etched on ground if some hard surface like road,
pavement or rock is encountered at station location. For permanent marking, a
stone or concrete block can be embedded in ground.
5Engr.Shams Ul Islam (shams@cecos.edu.pk)
Ranging
Ranging is essential step in chain surveying to ensure that
measurements are made in a straight path along the survey line.
If the end stations are inter-visible, direct ranging can be
resorted.
Ranging are of two types:
• Direct Ranging
• Indirect Ranging
6
Engr.Shams Ul Islam (shams@cecos.edu.pk)
Direct Ranging
Direct ranging are of two types:
• Ranging by Visions
• Ranging by Line Ranger
7
Engr.Shams Ul Islam (shams@cecos.edu.pk)
Ranging by Visions
Direct ranging by vision alone is done by stretching the tape or chain
approximately along the survey line AB as in Figure. At least two persons
are involved in chaining and ranging. One surveyor called follower is
stationed behind starting station A at the end of chain, while the other one
called leader is situated at the distance of equal to or less than the chain
length from A, holding the other ranging rod at an arm’s length from the
body . Follower, situated behind A directs leader to align ranging rod L
along line AB. If the distance AL is large, sign language can be used in
giving and following the directions. When L is perfectly aligned to exactly
lie along sight line AB, the intermediate station L is fixed by driving the
ranging rod or wooden peg in ground at correct position
8
Engr.Shams Ul Islam (shams@cecos.edu.pk)
Engr.Shams Ul Islam (shams@cecos.edu.pk)
Offset Measurements
The chain survey is started with measurements along base line and
extended along all the frameworks of survey lines. The laying of
chain line and making measurement of distances along the survey
line were described in earlier section. The next important part of
distance measurement is locating the important details of features in
the vicinity of survey lines by means of offsets. Offsets up to or less
than 15 m from the survey lines are generally termed short offsets
while those larger than 15 m are called long offsets.
10Engr.Shams Ul Islam (shams@cecos.edu.pk)
Continue….
In normal course of chain surveying, perpendicular offsets are
measured. Oblique offsets are recorded only in exceptional cases
when it is difficult to obtain normal offsets or else these are
absolutely essential. Perpendicular offsets can be set either (a)
manually by 3-4-5 method or (b) with the help of offset
instruments like cross staff or optical square.
11Engr.Shams Ul Islam (shams@cecos.edu.pk)

More Related Content

What's hot

73941338 surveying-lab-manual-1
73941338 surveying-lab-manual-173941338 surveying-lab-manual-1
73941338 surveying-lab-manual-1Anu Parameswaran
 
instruments of levelling
instruments of levellinginstruments of levelling
instruments of levellingNIKUL PITHVA
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aRai University
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traversesEst
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineersmusadoto
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manualsavineshgautam
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringA Makwana
 
Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Warish Khan
 
S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingEst
 
Chain surveying
Chain surveyingChain surveying
Chain surveyingsathyan s
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying SHAMJITH KM
 
Surveying & prismatic compass survey
Surveying & prismatic compass surveySurveying & prismatic compass survey
Surveying & prismatic compass surveySuman Das
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSVISHNU VIJAYAN
 

What's hot (20)

73941338 surveying-lab-manual-1
73941338 surveying-lab-manual-173941338 surveying-lab-manual-1
73941338 surveying-lab-manual-1
 
SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033
 
instruments of levelling
instruments of levellinginstruments of levelling
instruments of levelling
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manuals
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil Engineering
 
Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2
 
S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveying
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying
 
Chain survey
Chain surveyChain survey
Chain survey
 
Surveying & prismatic compass survey
Surveying & prismatic compass surveySurveying & prismatic compass survey
Surveying & prismatic compass survey
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
 

Viewers also liked

introduction of surveying
introduction of surveyingintroduction of surveying
introduction of surveyingSelf-employed
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveyingstooty s
 
KS Project Consultancy_Overview of supply chain survey
KS Project Consultancy_Overview of supply chain surveyKS Project Consultancy_Overview of supply chain survey
KS Project Consultancy_Overview of supply chain surveySovanarith Ly
 
Supply Chain Edge: Building a Better Supply Chain Survey Results
Supply Chain Edge: Building a Better Supply Chain Survey ResultsSupply Chain Edge: Building a Better Supply Chain Survey Results
Supply Chain Edge: Building a Better Supply Chain Survey ResultsjoebradySCE
 
Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05Self-employed
 
Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03Self-employed
 
Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04Self-employed
 
Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06Self-employed
 
Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02Self-employed
 
Surveying - chain, compass and plane table surveying
Surveying - chain, compass and plane table surveyingSurveying - chain, compass and plane table surveying
Surveying - chain, compass and plane table surveyingMalla Reddy University
 
Green Supply Chain Survey Webinar_Mar2013
Green Supply Chain Survey Webinar_Mar2013Green Supply Chain Survey Webinar_Mar2013
Green Supply Chain Survey Webinar_Mar2013Lora Cecere
 
SLOPE Final Conference - tls tools for forest survey and forest
SLOPE Final Conference - tls tools for forest survey and forestSLOPE Final Conference - tls tools for forest survey and forest
SLOPE Final Conference - tls tools for forest survey and forestSLOPE Project
 
traversing of survey
traversing of surveytraversing of survey
traversing of surveySelf-employed
 

Viewers also liked (20)

30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 
introduction of surveying
introduction of surveyingintroduction of surveying
introduction of surveying
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
survey measurments
survey measurmentssurvey measurments
survey measurments
 
Surveying
Surveying Surveying
Surveying
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
KS Project Consultancy_Overview of supply chain survey
KS Project Consultancy_Overview of supply chain surveyKS Project Consultancy_Overview of supply chain survey
KS Project Consultancy_Overview of supply chain survey
 
Supply Chain Edge: Building a Better Supply Chain Survey Results
Supply Chain Edge: Building a Better Supply Chain Survey ResultsSupply Chain Edge: Building a Better Supply Chain Survey Results
Supply Chain Edge: Building a Better Supply Chain Survey Results
 
Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05Engineering Mechanice Lecture 05
Engineering Mechanice Lecture 05
 
Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03Engineering Mechanice Lecture 03
Engineering Mechanice Lecture 03
 
Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04Engineering Mechanice Lecture 04
Engineering Mechanice Lecture 04
 
Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06Engineering Mechanice Lecture 06
Engineering Mechanice Lecture 06
 
Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02Engineering Mechanice Lecture 02
Engineering Mechanice Lecture 02
 
Surveying - chain, compass and plane table surveying
Surveying - chain, compass and plane table surveyingSurveying - chain, compass and plane table surveying
Surveying - chain, compass and plane table surveying
 
Reinforce Concrete Design I - By Dr. Iftekhar Anam
Reinforce Concrete Design I - By Dr. Iftekhar AnamReinforce Concrete Design I - By Dr. Iftekhar Anam
Reinforce Concrete Design I - By Dr. Iftekhar Anam
 
Green Supply Chain Survey Webinar_Mar2013
Green Supply Chain Survey Webinar_Mar2013Green Supply Chain Survey Webinar_Mar2013
Green Supply Chain Survey Webinar_Mar2013
 
SLOPE Final Conference - tls tools for forest survey and forest
SLOPE Final Conference - tls tools for forest survey and forestSLOPE Final Conference - tls tools for forest survey and forest
SLOPE Final Conference - tls tools for forest survey and forest
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 

Similar to chain survey ii

Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyRione Drevale
 
m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...
m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...
m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...shucaybcabdi
 
S2 8 construction surveys
S2 8 construction surveysS2 8 construction surveys
S2 8 construction surveysEst
 
Contouring Survey.ppt
Contouring Survey.pptContouring Survey.ppt
Contouring Survey.pptJaveria Ishaq
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdfGokul Saud
 
civil engineering LINEAR SURVEYING.pptx
civil engineering  LINEAR SURVEYING.pptxcivil engineering  LINEAR SURVEYING.pptx
civil engineering LINEAR SURVEYING.pptxAyushsharma131736
 
Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Pramesh Hada
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Est
 
B.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingB.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingRai University
 
B.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingB.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingRai University
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: TransversingFarah Sham
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESBahzad5
 

Similar to chain survey ii (20)

Shahid nazir paray
Shahid nazir parayShahid nazir paray
Shahid nazir paray
 
Fpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_surveyFpt 3163 water_science_chapter_4_level_survey
Fpt 3163 water_science_chapter_4_level_survey
 
Levelling
LevellingLevelling
Levelling
 
Fw2
Fw2Fw2
Fw2
 
m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...
m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...
m1vrhqoqsoxyptiol1b4-signature-7f20760b9f97167ae74c1ef33fe58a16817ef3afaab94a...
 
S2 8 construction surveys
S2 8 construction surveysS2 8 construction surveys
S2 8 construction surveys
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Contouring Survey.ppt
Contouring Survey.pptContouring Survey.ppt
Contouring Survey.ppt
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
 
civil engineering LINEAR SURVEYING.pptx
civil engineering  LINEAR SURVEYING.pptxcivil engineering  LINEAR SURVEYING.pptx
civil engineering LINEAR SURVEYING.pptx
 
PLANE TABLE SURVEYING
PLANE TABLE SURVEYINGPLANE TABLE SURVEYING
PLANE TABLE SURVEYING
 
Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
Unit 1
Unit 1Unit 1
Unit 1
 
B.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingB.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 leveling
 
B.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingB.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 leveling
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: Transversing
 
surveyor.pptx
surveyor.pptxsurveyor.pptx
surveyor.pptx
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 

More from Self-employed

surveying instruments
surveying instrumentssurveying instruments
surveying instrumentsSelf-employed
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2Self-employed
 
surveying and levelling
surveying and levellingsurveying and levelling
surveying and levellingSelf-employed
 
Concrete aggregates 2
Concrete aggregates 2Concrete aggregates 2
Concrete aggregates 2Self-employed
 
Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07Self-employed
 
Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01Self-employed
 
moments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khanmoments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khanSelf-employed
 

More from Self-employed (9)

surveying instruments
surveying instrumentssurveying instruments
surveying instruments
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2
 
surveying and levelling
surveying and levellingsurveying and levelling
surveying and levelling
 
Portland cement 1
Portland cement 1Portland cement 1
Portland cement 1
 
Concrete aggregates 2
Concrete aggregates 2Concrete aggregates 2
Concrete aggregates 2
 
Concret lec 3
Concret lec 3Concret lec 3
Concret lec 3
 
Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07Engineering Mechanice Lecture 07
Engineering Mechanice Lecture 07
 
Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01Engineering Mechanice Lecture 01
Engineering Mechanice Lecture 01
 
moments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khanmoments couples and force couple systems by ahmad khan
moments couples and force couple systems by ahmad khan
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

chain survey ii

  • 1. Week No.5 Surveying-I Lecture No.4 B-Tech 2015 By: Engr. Shams Ul Islam Lecturer, Civil Engg. Department CECOS University Peshawar
  • 2. Operations Involved in Chain Surveying Various operations involved in the process of chain surveying are as follows: (a) Marking the stations (b) Ranging (c) Measurement of survey lines (d) Offset measurements. 2Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 3. Marking the Stations The first step in chain survey is to decide and locate stations so that they are distinctly visible and are quasi-permanently fixed during the surveying process. The position of stations are located on map such that the base survey line and other main survey lines are so aligned that the positions of all salient ground features, either natural or manmade, can be located and measured. The position of stations is fixed with reference to some permanent ground features so that they can be unambiguously and accurately located on ground at any time in future also, if the station pegs are removed/misplaced. 3Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 4. Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 5. Continue… It can be noted that the distance of station A must be measured from at least three permanent ground features, e.g. large tree, electric pole, building or culvert etc. existing in the vicinity of the station. The location sketch of the station as given in Figure (previous slide) is very helpful in retracing the station position in future. The survey stations are marked temporarily on ground by fixing the ranging rod at their location. A wooden peg is driven in the ground such that it is projecting at least 40 mm above the ground to provide some permanency. A cross can be painted or etched on ground if some hard surface like road, pavement or rock is encountered at station location. For permanent marking, a stone or concrete block can be embedded in ground. 5Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 6. Ranging Ranging is essential step in chain surveying to ensure that measurements are made in a straight path along the survey line. If the end stations are inter-visible, direct ranging can be resorted. Ranging are of two types: • Direct Ranging • Indirect Ranging 6 Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 7. Direct Ranging Direct ranging are of two types: • Ranging by Visions • Ranging by Line Ranger 7 Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 8. Ranging by Visions Direct ranging by vision alone is done by stretching the tape or chain approximately along the survey line AB as in Figure. At least two persons are involved in chaining and ranging. One surveyor called follower is stationed behind starting station A at the end of chain, while the other one called leader is situated at the distance of equal to or less than the chain length from A, holding the other ranging rod at an arm’s length from the body . Follower, situated behind A directs leader to align ranging rod L along line AB. If the distance AL is large, sign language can be used in giving and following the directions. When L is perfectly aligned to exactly lie along sight line AB, the intermediate station L is fixed by driving the ranging rod or wooden peg in ground at correct position 8 Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 9. Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 10. Offset Measurements The chain survey is started with measurements along base line and extended along all the frameworks of survey lines. The laying of chain line and making measurement of distances along the survey line were described in earlier section. The next important part of distance measurement is locating the important details of features in the vicinity of survey lines by means of offsets. Offsets up to or less than 15 m from the survey lines are generally termed short offsets while those larger than 15 m are called long offsets. 10Engr.Shams Ul Islam (shams@cecos.edu.pk)
  • 11. Continue…. In normal course of chain surveying, perpendicular offsets are measured. Oblique offsets are recorded only in exceptional cases when it is difficult to obtain normal offsets or else these are absolutely essential. Perpendicular offsets can be set either (a) manually by 3-4-5 method or (b) with the help of offset instruments like cross staff or optical square. 11Engr.Shams Ul Islam (shams@cecos.edu.pk)