SlideShare a Scribd company logo
Contents
• AACE International
• AACE Sections and Region 7
• AACE Certifications
• What is CCP
• Eligibility Requirements and Registration
• Examination & Recertification
• Certification Challenges
• Skills & Knowledge of Cost Engineering 6.0
AACE International
• Association for the Advancement of Cost Engineering
• A non-profit professional association since 1956
• Members in 87 countries
• Cover 80 local sections in 9 regions
AACE Sections
AACE Region 7
• EGYPT - Greater Cairo
• UAE - United Arab Emirates
• SAUDI ARABIA - Arabian Gulf
• PAKISTAN – Pakistan
• OMAN – Oman
• LEBANON – Lebanon
• KUWAIT – Kuwait
• JORDAN – Jordan
• INDIA - South India
• INDIA - North India
• INDIA - Central India
AACE Certifications
1. Certified Cost Professional (CCP)
2. Earned Value Professional (EVP)
3. Planning & Scheduling Professional (PSP)
4. Certified Forensic Claims Consultant (CFCC)
5. Certified Estimating Professional (CEP)
6. Decision & Risk Management Professional (DRMP)
7. Certified Cost Technician (CCT)
8. Certified Scheduling Technician (CST)
What is (CCP) ?
1. CCP certification recognizes specialists who meet a set of cost and management
criteria by examination, experience, education and ethical qualifications.
2. CCP Certification is independently accredited by the Council of Engineering &
Scientific Specialty Boards (CESB).
3. Formerly known as Certified Cost Engineer (CCE) / Certified Cost Consultant (CCC).
CCP Eligibility Requirements
1. Professional experience
At least 8 full years of professional experience, of which up to 4 years may be
substituted by a college/university degree.
2. Technical Paper
Minimum of 2,500 word technical paper and signed affidavit must be
submitted within 30 days of registration.
3. Accept Canon of Ethics
CCP Registration
1. Registration and payment (US$500 Members, US$625 Non-Members) where
membership cost is ($170).
2. Submit experience verification, education certificate, and technical paper.
3. Receive clearance from AACE to schedule the exam
4. Login to KRYTERION web site to schedule your exam
Examination
Computer Based Test (CBT)
• CBT is 5 Hours (120 Questions)
• Exam is fully closed book
• Calculator is permitted
• Formula guides were developed to assist in specific
questions and available onscreen when needed
• Passing Grade is 70 %
• Results will be sent within 14 days after CBT exam
• Rescheduling is free-of-charge till 72 hours before exam
CCP Exam Location
Recertification
Recertification By Credit Plan
• Accumulation of 15 CEUs over a 3-year period.
• CEUs (Continuing Education Units) are equivalent to 10 hour.
• CEUs are earned in 6 separate categories:
A. Performed (Employment in related field)
B. Learned (Seminars, conferences, workshops, and courses)
C. Taught ( Full-time / part-time instructor)
D. Professional Papers (Published or presented)
E. Served (Volunteer work for AACE)
F. Obtained (Technical certification/license/degree)
Recertification By Exam
• Registration, payment, and passing the examination every 3 years.
• Fees : $500 members; $625 non-members.
• Technical paper is not required.
Certification Challenges
1. Technical Paper
2. Several Authors
3. Various Knowledge Areas
4. Significantly Large Material
5. No Well-known Help Books
Skills & Knowledge of Cost Engineering
• SECTION 1—COST
• SECTION 2—COST ESTIMATING
• SECTION 3—PLANNING & SCHEDULING
• SECTION 4—PROGRESS & COST CONTROL
• SECTION 5—PROJECT MANAGEMENT
• SECTION 6—ECONOMIC ANALYSIS, STATISTICS,
PROBABILITY, & RISK
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Cost
Structuring
Direct
Costs
Indirect
Costs
Fixed
Costs
Variable
Costs
EX:
Cost of
concrete used
for casting
foundation
EX:
Cost of
administrative
work in the
main office
EX:
Payrolls of site
engineers and
other
supervisors
EX:
Material used
and consumed
in producing
the product
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Material
Raw Material
Bulk Material
Fabricated
Material
Engineered
Material
Labor
Base wage
Fringe
Benefits
Medical &
Life Insurance
Overhead &
Profit
Engineering
Pure/Applied
Research
CAM / CAE /
CAD
Prototype
Patents &
Trade Secrets
Equipments
Cost New
Value
Market Value
(Used)
Residual
Values
Residual
Curves
Skills & Knowledge of Cost Engineering
SECTION 1—COST
Cost-Change Concepts:
1- Inflation 2- Deflation 3- Escalation 4- Currency Variation
Sources of Inflation
1- Money Supply 2- Exchange Rate 3- Demand-Pull 4- Cost-Push
Depreciation Techniques
1- Straight Line 2- Double Declining Balance 3- Sum-of-Year Digits
Economic Analysis Techniques
1- Net Present Worth 2- Payback Period
3- Benefit / Cost Ratio 4- Equivalent Uniform Annual Cost
Skills & Knowledge of Cost Engineering
SECTION 2—COST ESTIMATION
Skills & Knowledge of Cost Engineering
SECTION 2—COST ESTIMATION
A- Conceptual Estimating
Units No.
Physical
Dimension
Capacity
Factor
Ratio or
Factor
Parametric
200 Rooms
Hotel 80 KM
Pipeline
(Nonlinear)
(CapA/CapB) e
e= 0.6
Mathematical
Correlation
Factor of
Main
Equipment
B- Deterministic Estimating
Skills & Knowledge of Cost Engineering
SECTION 2—COST ESTIMATION
Review
Scope
IFC
Takeoff HOC
Customs &
Taxes
Fees
If Applicable
Risk Analysis
(Reserve)
Review &
Validation
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Planning
Influencing the future by making decisions based on missions, needs,
and objectives. It is the process of stating goals and determining the
most effective way of reaching them.
Scheduling
It is the process that converts the project work plan into a road map, that
if followed, will assure timely project completion.
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Planning
Tools
Gained
Experience
Hand
Books
Company
Standards
Model
Plans
Checklists
Historical
Database
Chart of
Accounts
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Planning Major Elements:
1. Summarizing Goals & Scope of Work
2. Time Planning
3. Cost Planning
4. Resource Planning
5. Quality Planning
6. Review
7. Planning for Change
Skills & Knowledge of Cost Engineering
SECTION 3—PLANNING & SCHEDULING
Scheduling
Tools
Bar Chart
CPMPERT
Skills & Knowledge of Cost Engineering
• SECTION 4—PROGRESS & COST CONTROL
Earned Value Example
Cost Units Total
Scheduled BC($ 500) WS(40) $ 20’000
Actual AC($ 550) WP(42) $ 23’100
PV (BCWS) = $ 20’000
AC (ACWP) = $ 23’100
EV (BCWP) = $ 500 x 42 = $ 21’000
Cost Performance
• Cost Variance
CV = EV – AC = - 2’100
• Cost Performance Indicator
CPI = EV / AC = 0.91
Over Budget
Schedule Performance
• Schedule Variance
SV = EV – PV = 1’000
• Schedule Performance Indicator
SPI = EV / PV = 1.05
Ahead Schedule
Skills & Knowledge of Cost Engineering
• SECTION 5—PROJECT MANAGEMENT
16. Project Management Fundamentals
17. Project Organization Structure
18. Project Communication
19. Project Labor Cost Control
20. Leadership and Management of Project People
21. Quality Management
22. Value Engineering
23. Contracting for Capital Projects
24. Strategic Asset Management
25. Change Management Practical Guide
26. Construction Claims & Disputes
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
27. Financial & Cash Flow Analysis
28. Corporate Investment Decision
29. Statistics & Probability
30. Optimization
31. Risk Management Fundamentals
32. Risk Management Practice Guide
33. Total Cost Management Overview
34. International System of Units
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Discount Factors
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Ex:
If present value is P=20’000 and i = 10 %
Find Future value after 5 years
F = 20’000 x ( 1 + 0.1)5
= 20’000 * 1.6105 = 32’210
Ex:
If present value is P=20’000 and i = 10 %,
Find Annuity value for the next five years
A = 20’000 x 0.1 x ( 1 + 0.1)5 / [( 1 + 0.1)5 -1]
= 20’000 x 0.1 x 1.61 / 0.61
= 20’000 x .02639 = 5’278
0 1 2 3 4 5
F
P
0 1 2 3 4 5
A
P
A A A A
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Skills & Knowledge of Cost Engineering
• SECTION 6—ECONOMIC ANALYSIS
Ex: For the following Cashflow If the contractor’s minimum attractive
rate of return (MARR) is 6 percent, should the investment be made?
Year Expense Income Net
0 38’000 0 (38’000)
1 0 11’000 11’000
2 1’000 11’000 10’000
3 2’000 11’000 9’000
4 3’000 11’000 8’000
Total 44’000 44’000 0.00
Factor P
1 (38’000)
0.9434 10’377
0.8900 8’900
0.8396 7’556
0.7921 6’337
Total (4’830)
Another Solution : P = P0 + P1 + P2
P0 = (38’000)
P1 = -G (P/G,i,n)=-1,000 (P/G, 6 %, 4)=-1,000 (4.945) = (4’945)
P2 = A (P/A,i,n)=11,000 (P/A, 6 %, 4)=11,000 (3.465) = 38’115
P = (38’000) + (4’945 )+ 38’115 = (4’830)
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Mean : The sum of measurements divided by the number of
measurements
Median: The middle number when the data observations are
arranged in ascending or descending order
Mode: The measurement that occurs most often in the data set
Dispersion
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Variance : The average of the squared
deviations from the mean.
Standard Deviation : The square root of the variance
Central Tendency
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Z Score: Deviation from the mean relative to the standard deviation
Z=(X- μ)/σ
Standard Normal Distribution
Z Probability
1.00 68.3 %
1.282 80 %
1.645 90 %
1.96 95 %
2.00 95.4 %
2.326 98 %
2.576 99 %
3.00 99.7 %
Single In Single Out
34.15 % 15.85 %
40 % 10 %
45 % 5 %
47.5 % 2.5 %
47.7 % 2.3 %
49 % 1 %
49.5 % .5 %
49.85 % .15 %
Skills & Knowledge of Cost Engineering
SECTION 7—STATISTICS, PROBABILITY, & RISK
Standard Normal Distribution
EX: After reviewing the results for a concrete foundation activity that was exuted
several times , we found that the mean duration was 35 days with standard
deviation of 3.04 .
What will be the probability of finishing this activity in 35, 30, and 40 days?
1. For 35 Days, Probability = 50 %
2. Z = (35-30) / 3.04 = 1.645
From table, Probability = 5 %
3. Z = (40-35) / 3.04 = 1.645
From table, Probability = 50 + 45 = 95 %
A lecture on CCP Certificate

More Related Content

What's hot

مقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةمقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةM Maged Hegazy, LLM, MBA, CCP, P3O
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentationjonschofield
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in constructionDr Ezzat Mansour
 
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني M Maged Hegazy, LLM, MBA, CCP, P3O
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsNam N.N Tran M.Eng, PMP
 
Civil Quantity Survey and Estimation
Civil Quantity Survey and EstimationCivil Quantity Survey and Estimation
Civil Quantity Survey and EstimationGide India
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionJaswin Sood
 
Value engineering pom
Value engineering pomValue engineering pom
Value engineering pomVishal Naik
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessAlberto Sanchez
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPMA Consultants
 
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسأسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسM Maged Hegazy, LLM, MBA, CCP, P3O
 

What's hot (20)

مقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافيةمقدمة عن إدارة التكاليف والشهادات الاحترافية
مقدمة عن إدارة التكاليف والشهادات الاحترافية
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentation
 
Introduction to construction contracts fundamentals
Introduction to construction contracts fundamentalsIntroduction to construction contracts fundamentals
Introduction to construction contracts fundamentals
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in construction
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Standard Forms of Construction Contracts
Standard Forms of Construction ContractsStandard Forms of Construction Contracts
Standard Forms of Construction Contracts
 
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
خمسون سؤال في إدارة عقود التشييد أو المقاولات -الإصدار الثاني
 
Forensic schedule analysis acesss
Forensic schedule analysis acesssForensic schedule analysis acesss
Forensic schedule analysis acesss
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
 
Civil Quantity Survey and Estimation
Civil Quantity Survey and EstimationCivil Quantity Survey and Estimation
Civil Quantity Survey and Estimation
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling rendition
 
Value engineering pom
Value engineering pomValue engineering pom
Value engineering pom
 
Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital Projects
 
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامسأسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
أسس علم التخطيط في 50 سؤال وجواب - الاصدار الخامس
 
PMP_Project Procurement Management
PMP_Project Procurement ManagementPMP_Project Procurement Management
PMP_Project Procurement Management
 

Viewers also liked

RPFT Exam Questions
RPFT Exam QuestionsRPFT Exam Questions
RPFT Exam QuestionsExamure4
 
ASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning ApproachASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning ApproachJohn Knotts
 
PMI RMP Training Materials Online
PMI RMP Training Materials OnlinePMI RMP Training Materials Online
PMI RMP Training Materials Onlinestefanhenry
 

Viewers also liked (19)

Construction KPIs & Dashboards
Construction KPIs & DashboardsConstruction KPIs & Dashboards
Construction KPIs & Dashboards
 
PMP Preparation - 10 Communication Management
PMP Preparation - 10 Communication ManagementPMP Preparation - 10 Communication Management
PMP Preparation - 10 Communication Management
 
PMP Preparation - 03 Framework
PMP Preparation - 03 FrameworkPMP Preparation - 03 Framework
PMP Preparation - 03 Framework
 
PMP Preparation - 01 Get Ready
PMP Preparation - 01 Get ReadyPMP Preparation - 01 Get Ready
PMP Preparation - 01 Get Ready
 
PMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk ManagementPMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk Management
 
PMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource ManagementPMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource Management
 
RPFT Exam Questions
RPFT Exam QuestionsRPFT Exam Questions
RPFT Exam Questions
 
Pmp Final Review - M Maged
Pmp Final Review - M MagedPmp Final Review - M Maged
Pmp Final Review - M Maged
 
PMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope ManagementPMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope Management
 
PMP Preparation - 02 FAQ
PMP Preparation - 02 FAQPMP Preparation - 02 FAQ
PMP Preparation - 02 FAQ
 
PMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost ManagementPMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost Management
 
PMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality ManagementPMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality Management
 
PMP Preparation - 06 Time Management
PMP Preparation - 06 Time ManagementPMP Preparation - 06 Time Management
PMP Preparation - 06 Time Management
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
One day master class
One day master classOne day master class
One day master class
 
One day master class
One day master classOne day master class
One day master class
 
ASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning ApproachASQ Keynote Presentation -- PDCA Planning Approach
ASQ Keynote Presentation -- PDCA Planning Approach
 
Project Management Applications Using Google Documents
Project Management Applications Using Google DocumentsProject Management Applications Using Google Documents
Project Management Applications Using Google Documents
 
PMI RMP Training Materials Online
PMI RMP Training Materials OnlinePMI RMP Training Materials Online
PMI RMP Training Materials Online
 

Similar to A lecture on CCP Certificate

Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, betterHarold van Heeringen
 
What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?SwatiKapoor43
 
CHAMP Year 1 Outcomes Leadership Committee December 5 2014
CHAMP Year 1 Outcomes  Leadership Committee December 5 2014CHAMP Year 1 Outcomes  Leadership Committee December 5 2014
CHAMP Year 1 Outcomes Leadership Committee December 5 2014cccschamp
 
Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)Najmul Hussain
 
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...Tarun Singh
 
2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptxAbdul Azeem
 
Career development for chemical engineers
Career development for chemical engineersCareer development for chemical engineers
Career development for chemical engineersDanish Bade
 
Cts pump operator cum mechanic
Cts pump operator cum mechanicCts pump operator cum mechanic
Cts pump operator cum mechanicAtish Verma
 
Implementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini NetherlandsImplementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini NetherlandsNiteen Kumar
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagementDhamo daran
 
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013Nesma
 
day 3-2 PMP.pptx
day 3-2 PMP.pptxday 3-2 PMP.pptx
day 3-2 PMP.pptxAhmedKayed6
 
Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018Roger H. Mandel
 
How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?Meghna Arora
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyMike Poland, CMRP
 

Similar to A lecture on CCP Certificate (20)

Ccp brochure
Ccp brochureCcp brochure
Ccp brochure
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
Project mgt lesson plan
Project mgt lesson planProject mgt lesson plan
Project mgt lesson plan
 
2015 Toronto Section Presentation
2015 Toronto Section Presentation2015 Toronto Section Presentation
2015 Toronto Section Presentation
 
day 3 PMP.pptx
day 3 PMP.pptxday 3 PMP.pptx
day 3 PMP.pptx
 
What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?What to expect in 30 60-90 days in agile transformation journey?
What to expect in 30 60-90 days in agile transformation journey?
 
CHAMP Year 1 Outcomes Leadership Committee December 5 2014
CHAMP Year 1 Outcomes  Leadership Committee December 5 2014CHAMP Year 1 Outcomes  Leadership Committee December 5 2014
CHAMP Year 1 Outcomes Leadership Committee December 5 2014
 
Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)Cost Control for Construction Projects (AACE)
Cost Control for Construction Projects (AACE)
 
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
Benzne Webinar : What to expect in 30-60-90 days in Agile Transformation Jour...
 
2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx2023 - AU - CMA - Pre-result Orientation.pptx
2023 - AU - CMA - Pre-result Orientation.pptx
 
Career development for chemical engineers
Career development for chemical engineersCareer development for chemical engineers
Career development for chemical engineers
 
Cts pump operator cum mechanic
Cts pump operator cum mechanicCts pump operator cum mechanic
Cts pump operator cum mechanic
 
Implementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini NetherlandsImplementing Level 5 Metrics Programme @ Capgemini Netherlands
Implementing Level 5 Metrics Programme @ Capgemini Netherlands
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
Implementing a level 5 metrics programme - Niteen Kumar - NESMA 2013
 
day 3-2 PMP.pptx
day 3-2 PMP.pptxday 3-2 PMP.pptx
day 3-2 PMP.pptx
 
Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?How to Prepare for ASQ Calibration Technician (CCT) Exam?
How to Prepare for ASQ Calibration Technician (CCT) Exam?
 
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management StrategyIdentifying, Mitigating and Eliminating Risk with an Asset Management Strategy
Identifying, Mitigating and Eliminating Risk with an Asset Management Strategy
 

Recently uploaded

Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 

Recently uploaded (20)

Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 

A lecture on CCP Certificate

  • 1.
  • 2. Contents • AACE International • AACE Sections and Region 7 • AACE Certifications • What is CCP • Eligibility Requirements and Registration • Examination & Recertification • Certification Challenges • Skills & Knowledge of Cost Engineering 6.0
  • 3. AACE International • Association for the Advancement of Cost Engineering • A non-profit professional association since 1956 • Members in 87 countries • Cover 80 local sections in 9 regions
  • 5. AACE Region 7 • EGYPT - Greater Cairo • UAE - United Arab Emirates • SAUDI ARABIA - Arabian Gulf • PAKISTAN – Pakistan • OMAN – Oman • LEBANON – Lebanon • KUWAIT – Kuwait • JORDAN – Jordan • INDIA - South India • INDIA - North India • INDIA - Central India
  • 6. AACE Certifications 1. Certified Cost Professional (CCP) 2. Earned Value Professional (EVP) 3. Planning & Scheduling Professional (PSP) 4. Certified Forensic Claims Consultant (CFCC) 5. Certified Estimating Professional (CEP) 6. Decision & Risk Management Professional (DRMP) 7. Certified Cost Technician (CCT) 8. Certified Scheduling Technician (CST)
  • 7. What is (CCP) ? 1. CCP certification recognizes specialists who meet a set of cost and management criteria by examination, experience, education and ethical qualifications. 2. CCP Certification is independently accredited by the Council of Engineering & Scientific Specialty Boards (CESB). 3. Formerly known as Certified Cost Engineer (CCE) / Certified Cost Consultant (CCC).
  • 8. CCP Eligibility Requirements 1. Professional experience At least 8 full years of professional experience, of which up to 4 years may be substituted by a college/university degree. 2. Technical Paper Minimum of 2,500 word technical paper and signed affidavit must be submitted within 30 days of registration. 3. Accept Canon of Ethics
  • 9. CCP Registration 1. Registration and payment (US$500 Members, US$625 Non-Members) where membership cost is ($170). 2. Submit experience verification, education certificate, and technical paper. 3. Receive clearance from AACE to schedule the exam 4. Login to KRYTERION web site to schedule your exam
  • 10. Examination Computer Based Test (CBT) • CBT is 5 Hours (120 Questions) • Exam is fully closed book • Calculator is permitted • Formula guides were developed to assist in specific questions and available onscreen when needed • Passing Grade is 70 % • Results will be sent within 14 days after CBT exam • Rescheduling is free-of-charge till 72 hours before exam
  • 12. Recertification Recertification By Credit Plan • Accumulation of 15 CEUs over a 3-year period. • CEUs (Continuing Education Units) are equivalent to 10 hour. • CEUs are earned in 6 separate categories: A. Performed (Employment in related field) B. Learned (Seminars, conferences, workshops, and courses) C. Taught ( Full-time / part-time instructor) D. Professional Papers (Published or presented) E. Served (Volunteer work for AACE) F. Obtained (Technical certification/license/degree) Recertification By Exam • Registration, payment, and passing the examination every 3 years. • Fees : $500 members; $625 non-members. • Technical paper is not required.
  • 13. Certification Challenges 1. Technical Paper 2. Several Authors 3. Various Knowledge Areas 4. Significantly Large Material 5. No Well-known Help Books
  • 14. Skills & Knowledge of Cost Engineering • SECTION 1—COST • SECTION 2—COST ESTIMATING • SECTION 3—PLANNING & SCHEDULING • SECTION 4—PROGRESS & COST CONTROL • SECTION 5—PROJECT MANAGEMENT • SECTION 6—ECONOMIC ANALYSIS, STATISTICS, PROBABILITY, & RISK
  • 15. Skills & Knowledge of Cost Engineering SECTION 1—COST Cost Structuring Direct Costs Indirect Costs Fixed Costs Variable Costs EX: Cost of concrete used for casting foundation EX: Cost of administrative work in the main office EX: Payrolls of site engineers and other supervisors EX: Material used and consumed in producing the product
  • 16. Skills & Knowledge of Cost Engineering SECTION 1—COST
  • 17. Skills & Knowledge of Cost Engineering SECTION 1—COST Material Raw Material Bulk Material Fabricated Material Engineered Material Labor Base wage Fringe Benefits Medical & Life Insurance Overhead & Profit Engineering Pure/Applied Research CAM / CAE / CAD Prototype Patents & Trade Secrets Equipments Cost New Value Market Value (Used) Residual Values Residual Curves
  • 18. Skills & Knowledge of Cost Engineering SECTION 1—COST Cost-Change Concepts: 1- Inflation 2- Deflation 3- Escalation 4- Currency Variation Sources of Inflation 1- Money Supply 2- Exchange Rate 3- Demand-Pull 4- Cost-Push Depreciation Techniques 1- Straight Line 2- Double Declining Balance 3- Sum-of-Year Digits Economic Analysis Techniques 1- Net Present Worth 2- Payback Period 3- Benefit / Cost Ratio 4- Equivalent Uniform Annual Cost
  • 19. Skills & Knowledge of Cost Engineering SECTION 2—COST ESTIMATION
  • 20. Skills & Knowledge of Cost Engineering SECTION 2—COST ESTIMATION A- Conceptual Estimating Units No. Physical Dimension Capacity Factor Ratio or Factor Parametric 200 Rooms Hotel 80 KM Pipeline (Nonlinear) (CapA/CapB) e e= 0.6 Mathematical Correlation Factor of Main Equipment
  • 21. B- Deterministic Estimating Skills & Knowledge of Cost Engineering SECTION 2—COST ESTIMATION Review Scope IFC Takeoff HOC Customs & Taxes Fees If Applicable Risk Analysis (Reserve) Review & Validation
  • 22. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Planning Influencing the future by making decisions based on missions, needs, and objectives. It is the process of stating goals and determining the most effective way of reaching them. Scheduling It is the process that converts the project work plan into a road map, that if followed, will assure timely project completion.
  • 23. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Planning Tools Gained Experience Hand Books Company Standards Model Plans Checklists Historical Database Chart of Accounts
  • 24. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Planning Major Elements: 1. Summarizing Goals & Scope of Work 2. Time Planning 3. Cost Planning 4. Resource Planning 5. Quality Planning 6. Review 7. Planning for Change
  • 25. Skills & Knowledge of Cost Engineering SECTION 3—PLANNING & SCHEDULING Scheduling Tools Bar Chart CPMPERT
  • 26. Skills & Knowledge of Cost Engineering • SECTION 4—PROGRESS & COST CONTROL Earned Value Example Cost Units Total Scheduled BC($ 500) WS(40) $ 20’000 Actual AC($ 550) WP(42) $ 23’100 PV (BCWS) = $ 20’000 AC (ACWP) = $ 23’100 EV (BCWP) = $ 500 x 42 = $ 21’000 Cost Performance • Cost Variance CV = EV – AC = - 2’100 • Cost Performance Indicator CPI = EV / AC = 0.91 Over Budget Schedule Performance • Schedule Variance SV = EV – PV = 1’000 • Schedule Performance Indicator SPI = EV / PV = 1.05 Ahead Schedule
  • 27. Skills & Knowledge of Cost Engineering • SECTION 5—PROJECT MANAGEMENT 16. Project Management Fundamentals 17. Project Organization Structure 18. Project Communication 19. Project Labor Cost Control 20. Leadership and Management of Project People 21. Quality Management 22. Value Engineering 23. Contracting for Capital Projects 24. Strategic Asset Management 25. Change Management Practical Guide 26. Construction Claims & Disputes
  • 28. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS 27. Financial & Cash Flow Analysis 28. Corporate Investment Decision 29. Statistics & Probability 30. Optimization 31. Risk Management Fundamentals 32. Risk Management Practice Guide 33. Total Cost Management Overview 34. International System of Units
  • 29. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS Discount Factors
  • 30. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS Ex: If present value is P=20’000 and i = 10 % Find Future value after 5 years F = 20’000 x ( 1 + 0.1)5 = 20’000 * 1.6105 = 32’210 Ex: If present value is P=20’000 and i = 10 %, Find Annuity value for the next five years A = 20’000 x 0.1 x ( 1 + 0.1)5 / [( 1 + 0.1)5 -1] = 20’000 x 0.1 x 1.61 / 0.61 = 20’000 x .02639 = 5’278 0 1 2 3 4 5 F P 0 1 2 3 4 5 A P A A A A
  • 31. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS
  • 32. Skills & Knowledge of Cost Engineering • SECTION 6—ECONOMIC ANALYSIS Ex: For the following Cashflow If the contractor’s minimum attractive rate of return (MARR) is 6 percent, should the investment be made? Year Expense Income Net 0 38’000 0 (38’000) 1 0 11’000 11’000 2 1’000 11’000 10’000 3 2’000 11’000 9’000 4 3’000 11’000 8’000 Total 44’000 44’000 0.00 Factor P 1 (38’000) 0.9434 10’377 0.8900 8’900 0.8396 7’556 0.7921 6’337 Total (4’830) Another Solution : P = P0 + P1 + P2 P0 = (38’000) P1 = -G (P/G,i,n)=-1,000 (P/G, 6 %, 4)=-1,000 (4.945) = (4’945) P2 = A (P/A,i,n)=11,000 (P/A, 6 %, 4)=11,000 (3.465) = 38’115 P = (38’000) + (4’945 )+ 38’115 = (4’830)
  • 33. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Mean : The sum of measurements divided by the number of measurements Median: The middle number when the data observations are arranged in ascending or descending order Mode: The measurement that occurs most often in the data set Dispersion
  • 34. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Variance : The average of the squared deviations from the mean. Standard Deviation : The square root of the variance Central Tendency
  • 35. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Z Score: Deviation from the mean relative to the standard deviation Z=(X- μ)/σ Standard Normal Distribution Z Probability 1.00 68.3 % 1.282 80 % 1.645 90 % 1.96 95 % 2.00 95.4 % 2.326 98 % 2.576 99 % 3.00 99.7 % Single In Single Out 34.15 % 15.85 % 40 % 10 % 45 % 5 % 47.5 % 2.5 % 47.7 % 2.3 % 49 % 1 % 49.5 % .5 % 49.85 % .15 %
  • 36. Skills & Knowledge of Cost Engineering SECTION 7—STATISTICS, PROBABILITY, & RISK Standard Normal Distribution EX: After reviewing the results for a concrete foundation activity that was exuted several times , we found that the mean duration was 35 days with standard deviation of 3.04 . What will be the probability of finishing this activity in 35, 30, and 40 days? 1. For 35 Days, Probability = 50 % 2. Z = (35-30) / 3.04 = 1.645 From table, Probability = 5 % 3. Z = (40-35) / 3.04 = 1.645 From table, Probability = 50 + 45 = 95 %