SlideShare a Scribd company logo
F&N Dairies
Pulau Indah
Klang
TPM Assessment/
Implementation
Towards World
Class Manufacturing
timothywooi2@gmail.com No part of this training manual may be reproduced.
• Principal Consultant for Lean Management.
Certified TPM & Kaizen Specialist with 30 over years
working experience.
• Provides Technical Consulting Services on TPM,
Kaizen and Cellular System set up.
• A Mechanical background Green Innovator
recycling and reusing Idle resources to eliminate
waste to add Value to promote Green.
• Founder of Tim’s Waterfuel, an alternative Hydroxy
Fuel supplement using Water that adds power and
reduce Co2 emission on automobiles.
• An NGO Community worker for Prison, Drug
Rehabilitation and CREST North (Crisis Relieve &
Training) Malaysia, an organization that respond to
Crisis & Flood.
Timothy Wooi
Add: 20C, Taman Bahagia, 06000,
Jitra, Kedah
Email: timothywooi2@gmail.com
H/p: 019 4514007 (Malaysia)
Introduction
• Yourself
• Your name ?
• Department / Section
Why are you here?
Parable of the Pencil.
TPM Implementation
Planning and Preparation:
1. Top management commits to TPM implementation
2. Introductory Education and Training
3. Establish TPM promotion organization
4. Value stream map and select pilot model
5. Collect OEE data / Select a Baseline
6. Set basic policies and targets
7. Create master plan for TPM implementation
8. TPM kickoff
Full TPM Implementation
Implementation
9. Establish system to improve production efficiency
– Autonomous Maintenance (Workshop)
– Kaizen
– Planned Maintenance
– Skill enhancement
– Small Group Activities
10. Early equipment management
11. Establish a quality maintenance system
12. Improve operation efficiency in the office environment
13. Establish safety, hygiene and working environmental
protection system
14. Total application of TPM and raising the level
TPM Strategy
Day 1
– Team Charter/ formation and TPM kick-off
– Establish TPM policies, TPM schedule steps
– Gather Info/data for AM checklist,
– Clean n Inspect, Clean, Oil, Dirt
Day 2
– Re access maintenance activities, gather data
and validate info for A.M. Check - pictures before.
– Identify Improvement Activities
Day 3
– Focused Improvements(Kaizen)
– Improvement Action Plan-Clean, Dust, Oil
– Preparation for Improvement Projects
Action List Proposal/AM Training
Day 4
– AM Training/Action Implementation
– Document Report using standard formats
Day 5
– Report Out & Presentation
Day 1 Morning
TPM policies,6 Steps to TPM Installation
• Establish basic TPM policies and SMART goals.
Analyze the existing conditions and set goals
that are SMART.
(Gather Info for AM checklist, Clean n Inspect)
• 6 Steps to TPM Installation
(until Clean & Inspect)
• TPM kick-off.
Implementation will begin at this stage.
Noon
Cleaning and Inspection
• Log Out Tag Out on Machine.
• Actual Cleaning and Inspection of Machine to
externalize to Autonomous Maintenance.
Operators routine cleaning and inspection will help
stabilize conditions and stop accelerated deterioration.
(reference Clean & Inspection Checklist for Production
Machine)
Day 2 Morning
Autonomous maintenance for Operators
• Develop an autonomous maintenance program for
Operators.
• Create a DAILY Autonomous Maintenance Checklist,
(Use Visual Roadmap/log out tag out procedures/TPM
Board)
Operators routine cleaning and inspection will help stabilize conditions and stop accelerated deterioration.
(Reference: AM Cleaning and Inspecting followed by AM Checklist for Printing Machine)
Noon Assessment/Improvements
• Identify problems found during Clean & Inspect.
• Identify Improvements projects for Moonshine
activities
– improve 5S
– Address dust
– Oil n Lubrication
(Reference: AM Cleaning and Inspecting followed by AM Checklist
for Production Machine)
Day 3
Focused Improvements (KAIZEN)
• Improvement Action Plan-Clean, Dust, Oil
Identify causes of Dust and Contamination and
Brainstorm actions to address n prevent
occurance
• Preparation for Moonshine Projects
Action List Proposal/AM Training
(Use 1H n 4 WHs approach to identify root cause.)
Day 4
AM Training and Action Implementation
• AM Training/Action Implementation
• Document Report *
(Use Target & Scope, Before n After Cartoon &Kaizen
Newspaper to record activities with Pictures with
Road Map & Visual identifications for AM. on TPM
Board).
Day 5 Report Out and Presentation
• Report out presentation.
– Objective/Target and Scope
– Improvement Cartoon
– Kaizen Newspaper
– Review
Where are we today?
Is most of your time spent fire fighting?
Are equipment failures and quality issues a problem?
Is very little time spent on preventing
the failures and quality defects from occurring?
Do you have institutionalized rework in
your facilities?
Total Productive Maintenance
Why TPM?
• TPM combines the traditionally American practice of
Preventive Maintenance with Total Quality Control
and Total Employee Involvement, to create a culture
in which the user partners with the Maintenance in
maintaining the Equipment towards a “ready to use
condition” using energy efficiently.
• It is a company-wide team-based effort to build
quality into equipment and to improve overall
equipment effectiveness
Why Implement TPM?
Cost Reduction
for Survival
Strict Quality
Demands
World
ClassDiversification
of Needs,
Shorter Delivery
Time
Change Work
Environment
Reduce cost
dramatically by
pursuing the
extreme in
equipment
(production)
effectiveness
Establish
conditions that
will not allow
defects and
manage
conditions that
will prevent
defects
Create unmanned
operations and
people friendly
working
equipment
Minimize
machine setup
time and get the
product to the
customer on
time World Class Qualifiers
Set-Up and
Adjustment
Idling and
Minor Stoppage Reduced
Speed
Quality:
Defects in Process
& Rework
Reduced
Yield
Equipment
Failures
Easy to measure
Low impact on profit
High impact
on profits
Labor
Materials/spares
Outside services
Maintenance overhead
Equipment Production Losses
(Six Big Losses)
Autonomous Maintenance
I run it,
you fix it
I fix it,
you run it

More Related Content

What's hot

Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
Pramod A
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
博行 門眞
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Operational Excellence Consulting
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 
Tpm
TpmTpm
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
Anand Subramaniam
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
Muhammad Mueez Nazakat
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
W3 Group Canada Inc.
 
OEE
OEEOEE
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
Timothy Wooi
 
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Antonius Pompi Bramono
 
TPM: Autonomous Maintenance
TPM: Autonomous MaintenanceTPM: Autonomous Maintenance
TPM: Autonomous Maintenance
Operational Excellence Consulting
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
Karl Suni Vatnhamar
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
Suraj1911
 
TPM & OEE
TPM & OEETPM & OEE
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
Operational Excellence Consulting
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
Lean for U
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
Pramod A
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
Ankit Gupta
 

What's hot (20)

Tpm
TpmTpm
Tpm
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Tpm
TpmTpm
Tpm
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
 
OEE
OEEOEE
OEE
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abn...
 
TPM: Autonomous Maintenance
TPM: Autonomous MaintenanceTPM: Autonomous Maintenance
TPM: Autonomous Maintenance
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 

Viewers also liked

TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
Anand Subramaniam
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
Kailas Sree Chandran
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
Anand Subramaniam
 
F&N Program Niaga Makan Minum
F&N Program Niaga Makan MinumF&N Program Niaga Makan Minum
F&N Program Niaga Makan MinumShana Valli
 
Ite v5.0 chapter4
Ite v5.0 chapter4Ite v5.0 chapter4
Ite v5.0 chapter4
Kazi Rafsun Shaanto
 
ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)Ashish Gupta
 
Masonry: Tools and Preventive Maintenance
Masonry: Tools and Preventive MaintenanceMasonry: Tools and Preventive Maintenance
Masonry: Tools and Preventive Maintenance
Alyssa Natano
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overviewWebseology
 
training & development ppt
training & development ppttraining & development ppt
training & development ppt
Monishaangel
 
5 Storytelling Lessons From Superhero Stories
5 Storytelling Lessons From Superhero Stories5 Storytelling Lessons From Superhero Stories
5 Storytelling Lessons From Superhero Stories
HighSpark | Visual Storytelling Agency
 

Viewers also liked (14)

TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
F&N Program Niaga Makan Minum
F&N Program Niaga Makan MinumF&N Program Niaga Makan Minum
F&N Program Niaga Makan Minum
 
ITE - Chapter 4
ITE - Chapter 4ITE - Chapter 4
ITE - Chapter 4
 
Ite v5.0 chapter4
Ite v5.0 chapter4Ite v5.0 chapter4
Ite v5.0 chapter4
 
Tpm
TpmTpm
Tpm
 
ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)ASHISH GUPTA CN3343 THT2(WEAVING)
ASHISH GUPTA CN3343 THT2(WEAVING)
 
Masonry: Tools and Preventive Maintenance
Masonry: Tools and Preventive MaintenanceMasonry: Tools and Preventive Maintenance
Masonry: Tools and Preventive Maintenance
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
Chapter 7 Training And Development
Chapter 7   Training And DevelopmentChapter 7   Training And Development
Chapter 7 Training And Development
 
training & development ppt
training & development ppttraining & development ppt
training & development ppt
 
5 Storytelling Lessons From Superhero Stories
5 Storytelling Lessons From Superhero Stories5 Storytelling Lessons From Superhero Stories
5 Storytelling Lessons From Superhero Stories
 

Similar to 5 days TPM Workshop/Implementation Strategies at F&N

Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Timothy Wooi
 
TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2) TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2)
Timothy Wooi
 
Phoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxPhoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptx
Sumit697996
 
Tpm guide
Tpm guideTpm guide
Tpm guide
Yesica Adicondro
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
sshoaib1
 
tqm ch total production maintainance.pptx
tqm ch total production maintainance.pptxtqm ch total production maintainance.pptx
tqm ch total production maintainance.pptx
UsamaLatif23
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_ResumeSean Hougham
 
20 hand out on cp assessment methodology -samantha
20  hand out on cp assessment methodology -samantha20  hand out on cp assessment methodology -samantha
20 hand out on cp assessment methodology -samantha
zubeditufail
 
Total quality management
Total quality managementTotal quality management
Total quality management
Aanand Gajjar
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
Timothy Wooi
 
Introduction to Productivity SA presentation with GAD
Introduction to Productivity SA presentation with GADIntroduction to Productivity SA presentation with GAD
Introduction to Productivity SA presentation with GAD
Precious Mvulane CA (SA),RA
 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
Ricky Smith CMRP, CMRT
 
Total quality management (TQM) for IM students of JNTUH
Total quality management (TQM) for IM students of JNTUHTotal quality management (TQM) for IM students of JNTUH
Total quality management (TQM) for IM students of JNTUH
Management
 
Total quality management (tqm)
Total quality management (tqm)Total quality management (tqm)
Total quality management (tqm)
Management
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
Prof.Mayur Modi
 
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredTotal Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Enterprise Wired
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Timothy Wooi
 
Muhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedMuhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedAzharu786
 

Similar to 5 days TPM Workshop/Implementation Strategies at F&N (20)

Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
 
TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2) TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2)
 
Phoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptxPhoenix Symposium update 2023.pptx
Phoenix Symposium update 2023.pptx
 
Tpm guide
Tpm guideTpm guide
Tpm guide
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
 
tqm ch total production maintainance.pptx
tqm ch total production maintainance.pptxtqm ch total production maintainance.pptx
tqm ch total production maintainance.pptx
 
Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
 
Tpm final
Tpm finalTpm final
Tpm final
 
20 hand out on cp assessment methodology -samantha
20  hand out on cp assessment methodology -samantha20  hand out on cp assessment methodology -samantha
20 hand out on cp assessment methodology -samantha
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
Introduction to Productivity SA presentation with GAD
Introduction to Productivity SA presentation with GADIntroduction to Productivity SA presentation with GAD
Introduction to Productivity SA presentation with GAD
 
Preventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop BrochurePreventive Maintenance Best Practices workshop Brochure
Preventive Maintenance Best Practices workshop Brochure
 
Total quality management (TQM) for IM students of JNTUH
Total quality management (TQM) for IM students of JNTUHTotal quality management (TQM) for IM students of JNTUH
Total quality management (TQM) for IM students of JNTUH
 
Total quality management (tqm)
Total quality management (tqm)Total quality management (tqm)
Total quality management (tqm)
 
Yogesh Sharma
Yogesh SharmaYogesh Sharma
Yogesh Sharma
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise WiredTotal Productive Maintenance: A Comprehensive Guide | Enterprise Wired
Total Productive Maintenance: A Comprehensive Guide | Enterprise Wired
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
Muhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedMuhammed First Draft CV_Updated
Muhammed First Draft CV_Updated
 

More from Timothy Wooi

Story of The Soldier Son Portrait who died to save others
Story of The Soldier Son Portrait who died to save othersStory of The Soldier Son Portrait who died to save others
Story of The Soldier Son Portrait who died to save others
Timothy Wooi
 
MV Thailand Leadership Training 2023.ppt
MV Thailand Leadership Training 2023.pptMV Thailand Leadership Training 2023.ppt
MV Thailand Leadership Training 2023.ppt
Timothy Wooi
 
Faith Walk Servant LEADERSHIP.ppt
Faith Walk Servant LEADERSHIP.pptFaith Walk Servant LEADERSHIP.ppt
Faith Walk Servant LEADERSHIP.ppt
Timothy Wooi
 
SEAIETI Online Educational Administration Practices with TQM
SEAIETI Online Educational Administration Practices with TQMSEAIETI Online Educational Administration Practices with TQM
SEAIETI Online Educational Administration Practices with TQM
Timothy Wooi
 
LATEST INNOVATION in EDUCATION.pptx
LATEST INNOVATION in EDUCATION.pptxLATEST INNOVATION in EDUCATION.pptx
LATEST INNOVATION in EDUCATION.pptx
Timothy Wooi
 
Profesionalism in efficient customer service
Profesionalism in efficient customer serviceProfesionalism in efficient customer service
Profesionalism in efficient customer service
Timothy Wooi
 
Innovative Leadership in Education for the New Normal
Innovative Leadership in Education for the New Normal Innovative Leadership in Education for the New Normal
Innovative Leadership in Education for the New Normal
Timothy Wooi
 
Leadership and the teaching and learning culture in the new normal
Leadership and the teaching and learning culture in the new normalLeadership and the teaching and learning culture in the new normal
Leadership and the teaching and learning culture in the new normal
Timothy Wooi
 
Communication & Interpersonal Skills at Multi Cultural Workplace
Communication & Interpersonal Skills at Multi Cultural WorkplaceCommunication & Interpersonal Skills at Multi Cultural Workplace
Communication & Interpersonal Skills at Multi Cultural Workplace
Timothy Wooi
 
The Seven Habits of Highly Effective People by Steven Covey
The Seven Habits of Highly Effective People by Steven CoveyThe Seven Habits of Highly Effective People by Steven Covey
The Seven Habits of Highly Effective People by Steven Covey
Timothy Wooi
 
Digital Workplace Leadership 3 sessions
Digital Workplace Leadership 3 sessionsDigital Workplace Leadership 3 sessions
Digital Workplace Leadership 3 sessions
Timothy Wooi
 
Kaizen in Education Online Teaching
Kaizen in Education Online TeachingKaizen in Education Online Teaching
Kaizen in Education Online Teaching
Timothy Wooi
 
Touraride Penang Downing Street to London Downing Street
Touraride Penang Downing Street to London Downing StreetTouraride Penang Downing Street to London Downing Street
Touraride Penang Downing Street to London Downing Street
Timothy Wooi
 
Disruptive Pandemic School Leadership Management Shift
Disruptive Pandemic School Leadership Management ShiftDisruptive Pandemic School Leadership Management Shift
Disruptive Pandemic School Leadership Management Shift
Timothy Wooi
 
Waste Management & Recycle based on the 3R's
Waste Management & Recycle based on the 3R'sWaste Management & Recycle based on the 3R's
Waste Management & Recycle based on the 3R's
Timothy Wooi
 
INTERNATIONAL TRAINNG on Innovation in Education
INTERNATIONAL TRAINNG on Innovation in EducationINTERNATIONAL TRAINNG on Innovation in Education
INTERNATIONAL TRAINNG on Innovation in Education
Timothy Wooi
 
Implication of Ir4.0 to Teaching
Implication of Ir4.0 to TeachingImplication of Ir4.0 to Teaching
Implication of Ir4.0 to Teaching
Timothy Wooi
 
8D Problem Solving Approach
8D Problem Solving Approach8D Problem Solving Approach
8D Problem Solving Approach
Timothy Wooi
 
Service Excellence at Workplace
Service Excellence at WorkplaceService Excellence at Workplace
Service Excellence at Workplace
Timothy Wooi
 
My Teacher Shamed me when I could not read
My Teacher Shamed me when I could not readMy Teacher Shamed me when I could not read
My Teacher Shamed me when I could not read
Timothy Wooi
 

More from Timothy Wooi (20)

Story of The Soldier Son Portrait who died to save others
Story of The Soldier Son Portrait who died to save othersStory of The Soldier Son Portrait who died to save others
Story of The Soldier Son Portrait who died to save others
 
MV Thailand Leadership Training 2023.ppt
MV Thailand Leadership Training 2023.pptMV Thailand Leadership Training 2023.ppt
MV Thailand Leadership Training 2023.ppt
 
Faith Walk Servant LEADERSHIP.ppt
Faith Walk Servant LEADERSHIP.pptFaith Walk Servant LEADERSHIP.ppt
Faith Walk Servant LEADERSHIP.ppt
 
SEAIETI Online Educational Administration Practices with TQM
SEAIETI Online Educational Administration Practices with TQMSEAIETI Online Educational Administration Practices with TQM
SEAIETI Online Educational Administration Practices with TQM
 
LATEST INNOVATION in EDUCATION.pptx
LATEST INNOVATION in EDUCATION.pptxLATEST INNOVATION in EDUCATION.pptx
LATEST INNOVATION in EDUCATION.pptx
 
Profesionalism in efficient customer service
Profesionalism in efficient customer serviceProfesionalism in efficient customer service
Profesionalism in efficient customer service
 
Innovative Leadership in Education for the New Normal
Innovative Leadership in Education for the New Normal Innovative Leadership in Education for the New Normal
Innovative Leadership in Education for the New Normal
 
Leadership and the teaching and learning culture in the new normal
Leadership and the teaching and learning culture in the new normalLeadership and the teaching and learning culture in the new normal
Leadership and the teaching and learning culture in the new normal
 
Communication & Interpersonal Skills at Multi Cultural Workplace
Communication & Interpersonal Skills at Multi Cultural WorkplaceCommunication & Interpersonal Skills at Multi Cultural Workplace
Communication & Interpersonal Skills at Multi Cultural Workplace
 
The Seven Habits of Highly Effective People by Steven Covey
The Seven Habits of Highly Effective People by Steven CoveyThe Seven Habits of Highly Effective People by Steven Covey
The Seven Habits of Highly Effective People by Steven Covey
 
Digital Workplace Leadership 3 sessions
Digital Workplace Leadership 3 sessionsDigital Workplace Leadership 3 sessions
Digital Workplace Leadership 3 sessions
 
Kaizen in Education Online Teaching
Kaizen in Education Online TeachingKaizen in Education Online Teaching
Kaizen in Education Online Teaching
 
Touraride Penang Downing Street to London Downing Street
Touraride Penang Downing Street to London Downing StreetTouraride Penang Downing Street to London Downing Street
Touraride Penang Downing Street to London Downing Street
 
Disruptive Pandemic School Leadership Management Shift
Disruptive Pandemic School Leadership Management ShiftDisruptive Pandemic School Leadership Management Shift
Disruptive Pandemic School Leadership Management Shift
 
Waste Management & Recycle based on the 3R's
Waste Management & Recycle based on the 3R'sWaste Management & Recycle based on the 3R's
Waste Management & Recycle based on the 3R's
 
INTERNATIONAL TRAINNG on Innovation in Education
INTERNATIONAL TRAINNG on Innovation in EducationINTERNATIONAL TRAINNG on Innovation in Education
INTERNATIONAL TRAINNG on Innovation in Education
 
Implication of Ir4.0 to Teaching
Implication of Ir4.0 to TeachingImplication of Ir4.0 to Teaching
Implication of Ir4.0 to Teaching
 
8D Problem Solving Approach
8D Problem Solving Approach8D Problem Solving Approach
8D Problem Solving Approach
 
Service Excellence at Workplace
Service Excellence at WorkplaceService Excellence at Workplace
Service Excellence at Workplace
 
My Teacher Shamed me when I could not read
My Teacher Shamed me when I could not readMy Teacher Shamed me when I could not read
My Teacher Shamed me when I could not read
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 

5 days TPM Workshop/Implementation Strategies at F&N

  • 1. F&N Dairies Pulau Indah Klang TPM Assessment/ Implementation Towards World Class Manufacturing timothywooi2@gmail.com No part of this training manual may be reproduced.
  • 2. • Principal Consultant for Lean Management. Certified TPM & Kaizen Specialist with 30 over years working experience. • Provides Technical Consulting Services on TPM, Kaizen and Cellular System set up. • A Mechanical background Green Innovator recycling and reusing Idle resources to eliminate waste to add Value to promote Green. • Founder of Tim’s Waterfuel, an alternative Hydroxy Fuel supplement using Water that adds power and reduce Co2 emission on automobiles. • An NGO Community worker for Prison, Drug Rehabilitation and CREST North (Crisis Relieve & Training) Malaysia, an organization that respond to Crisis & Flood. Timothy Wooi Add: 20C, Taman Bahagia, 06000, Jitra, Kedah Email: timothywooi2@gmail.com H/p: 019 4514007 (Malaysia)
  • 3. Introduction • Yourself • Your name ? • Department / Section Why are you here? Parable of the Pencil.
  • 4. TPM Implementation Planning and Preparation: 1. Top management commits to TPM implementation 2. Introductory Education and Training 3. Establish TPM promotion organization 4. Value stream map and select pilot model 5. Collect OEE data / Select a Baseline 6. Set basic policies and targets 7. Create master plan for TPM implementation 8. TPM kickoff
  • 5. Full TPM Implementation Implementation 9. Establish system to improve production efficiency – Autonomous Maintenance (Workshop) – Kaizen – Planned Maintenance – Skill enhancement – Small Group Activities 10. Early equipment management 11. Establish a quality maintenance system 12. Improve operation efficiency in the office environment 13. Establish safety, hygiene and working environmental protection system 14. Total application of TPM and raising the level
  • 6. TPM Strategy Day 1 – Team Charter/ formation and TPM kick-off – Establish TPM policies, TPM schedule steps – Gather Info/data for AM checklist, – Clean n Inspect, Clean, Oil, Dirt Day 2 – Re access maintenance activities, gather data and validate info for A.M. Check - pictures before. – Identify Improvement Activities Day 3 – Focused Improvements(Kaizen) – Improvement Action Plan-Clean, Dust, Oil – Preparation for Improvement Projects Action List Proposal/AM Training Day 4 – AM Training/Action Implementation – Document Report using standard formats Day 5 – Report Out & Presentation
  • 7. Day 1 Morning TPM policies,6 Steps to TPM Installation • Establish basic TPM policies and SMART goals. Analyze the existing conditions and set goals that are SMART. (Gather Info for AM checklist, Clean n Inspect) • 6 Steps to TPM Installation (until Clean & Inspect) • TPM kick-off. Implementation will begin at this stage.
  • 8. Noon Cleaning and Inspection • Log Out Tag Out on Machine. • Actual Cleaning and Inspection of Machine to externalize to Autonomous Maintenance. Operators routine cleaning and inspection will help stabilize conditions and stop accelerated deterioration. (reference Clean & Inspection Checklist for Production Machine)
  • 9. Day 2 Morning Autonomous maintenance for Operators • Develop an autonomous maintenance program for Operators. • Create a DAILY Autonomous Maintenance Checklist, (Use Visual Roadmap/log out tag out procedures/TPM Board) Operators routine cleaning and inspection will help stabilize conditions and stop accelerated deterioration. (Reference: AM Cleaning and Inspecting followed by AM Checklist for Printing Machine)
  • 10. Noon Assessment/Improvements • Identify problems found during Clean & Inspect. • Identify Improvements projects for Moonshine activities – improve 5S – Address dust – Oil n Lubrication (Reference: AM Cleaning and Inspecting followed by AM Checklist for Production Machine)
  • 11. Day 3 Focused Improvements (KAIZEN) • Improvement Action Plan-Clean, Dust, Oil Identify causes of Dust and Contamination and Brainstorm actions to address n prevent occurance • Preparation for Moonshine Projects Action List Proposal/AM Training (Use 1H n 4 WHs approach to identify root cause.)
  • 12. Day 4 AM Training and Action Implementation • AM Training/Action Implementation • Document Report * (Use Target & Scope, Before n After Cartoon &Kaizen Newspaper to record activities with Pictures with Road Map & Visual identifications for AM. on TPM Board).
  • 13. Day 5 Report Out and Presentation • Report out presentation. – Objective/Target and Scope – Improvement Cartoon – Kaizen Newspaper – Review
  • 14. Where are we today? Is most of your time spent fire fighting? Are equipment failures and quality issues a problem? Is very little time spent on preventing the failures and quality defects from occurring? Do you have institutionalized rework in your facilities?
  • 16. Why TPM? • TPM combines the traditionally American practice of Preventive Maintenance with Total Quality Control and Total Employee Involvement, to create a culture in which the user partners with the Maintenance in maintaining the Equipment towards a “ready to use condition” using energy efficiently. • It is a company-wide team-based effort to build quality into equipment and to improve overall equipment effectiveness
  • 17. Why Implement TPM? Cost Reduction for Survival Strict Quality Demands World ClassDiversification of Needs, Shorter Delivery Time Change Work Environment Reduce cost dramatically by pursuing the extreme in equipment (production) effectiveness Establish conditions that will not allow defects and manage conditions that will prevent defects Create unmanned operations and people friendly working equipment Minimize machine setup time and get the product to the customer on time World Class Qualifiers
  • 18. Set-Up and Adjustment Idling and Minor Stoppage Reduced Speed Quality: Defects in Process & Rework Reduced Yield Equipment Failures Easy to measure Low impact on profit High impact on profits Labor Materials/spares Outside services Maintenance overhead Equipment Production Losses (Six Big Losses)
  • 19. Autonomous Maintenance I run it, you fix it I fix it, you run it

Editor's Notes

  1. The first 8 steps are part of our preparation, and you can plan on spending 3 to six months on this stage depending on the size of your company. Step 1 Top management Commits to Implement TPM: The success or failure of TPM greatly depends on the determination and enthusiasm of top management. The top person should personally declare the determination to implement TPM at a staff meeting and that declaration should be printed in a company bulletin or newsletter Step 2 Introductory education and training: Top executives and management should be educated first so they know what their roles are in TPM. The training should then be cascaded down to the rest of the employees. Step 3 Establish TPM promotional organization: TPM is promoted through overlapping small group activities. A TPM promotion office should be established and staffed with full time person’s to promote TPM. Step 4 Value stream map and select pilot model: A value stream map of the area that you intend on first introducing TPM too should be conducted and machine’s prioritized. You should then select your pilot model it is recommended that you do not select the most critical bottleneck as your pilot model machine. You want to make sure you pick a winnable pilot. Step 5 Collect OEE data and Baseline: If OEE data is not available for your pilot model then 2-3 months of OEE data should be collected. This holds true for reliability data as well. This is also the time that you should get the finance department involved to help track costs and benefits of TPM. Step 6 Set basic Policies and targets: Implementing TPM is not a goal in itself. TPM is executed as a means of attaining corporate needs, principles and targets. This should always be kept in mind when setting basic principles and target of TPM. Step 7 Create Master Plan for TPM implementation: The master plan specifies the details of the principle TPM activities and gives start and completion dates for implementation of each of the pillar activities Step 8 TPM Kickoff: TPM kickoff can be as simple as letter from the top executive kicking off the TPM program or as elaborate as a large scale event where all employees are invited to a formal TPM kickoff ceremony.
  2. Steps 9- 14 are the actual implementation of TPM, and begin immediately following the kickoff. It generally takes 2 1/2 to 3 years to reach world class levels. However Larger businesses with many employees may require 3 to 5 years
  3. Ask for examples of each of these losses. Which loss is usually the biggest? (Setup is typically the biggest loss.) Many AIW activities are strictly focused on setup reduction with the goal being less than 10 minutes. An example is of a machine setup improvement within Boeing where the setup was reduced from over 4 hours to 3 seconds. Key Points: What gets measured gets done. Let’s make what’s important more measurable, Instead of what’s measurable more important!!!
  4. The way things usually are today. This can apply to almost any department, take engineering and Maintenance for instance. Instead of I run it you fix it. It would be I design it, you fix and vise versa.