QUALITY CONTROL
The designer(s), manufacture and
contractors must ensure that minimum
quality standards are met and
maintained.
They must make sure that the
building will perform as required and
expected by its owners and occupiers.
QUALITY CONTROL
QUALITY CONTROL
QUALITY CONTROL
QUALITY CONTROL
ISO 9001 & QUALITY ASSURANCE
process approach to system;
process measurement
Process management;
customer satisfaction
monitoring;
continual improvement.
ISO 9001 & QUALITY ASSURANCE
ISO 9001: 2000 also puts a stronger
emphasis on the quality management
function of the organization as distinct
from:
quality assurance
quality control activities
five requirements.
ISO 14000 & QUALITY ASSURANCE
 The ISO 14000 series consist of five
standards:
1. Environmental management systems
2. Environmental auditing
3. Environmental labelling
4. Environmental performance evaluation
5. Life cycle assessment
QUALITY CONTROL
Construction Quality and Construction
Quality Control (QC) Inspectors
 All construction processes,
procedures, and workmanship must
be inspected Quality Inspectors.
 Inspection should include the
observations, measurements, and
documentation specified in
contractor’s Method Statement and
the Contract Documents.
QUALITY CONTROL
Quality Control (QC) Testing Staff
 Sampling and testing of field-tested Materials in
accordance with the contract documents.
 Certified Testing Laboratory
 Independent Referee Laboratory
Materials Quality Management
 Contractor is responsible for providing Quality
Control (QC) sampling and testing, and carrying
out Quality Level Analysis during production to
submit when required by the client or client
representative.
QUALITY CONTROL
Quality Assurance
 Client’s QA Program defines the responsibilities
and roles of both contractor and it’s sub-
contractors.
 The QA Program is contained in the contract
document.
 The contractor is responsible for providing QC
sampling and testing of all the Materials
specified in the contract document.
QUALITY CONTROL
 In practice Building Control Officers (BCOs) and
inspectors are prepared to provide some advice
where they can and if they visit.
Large Private Developments – Sites where
main contractor is client
 These sites are often those being developed by a
large private house builder.
 The house builder/developer will often have a
project manager and site manager.
 Larger sites-assistant site managers who have
responsibility for quality control.
QUALITY CONTROL
 BCOs and inspectors from the Local Authorities
are prepared to provide some advice where they
can and if they visit.
 However, it is not their role.
 Often, the emphasis, on sites of this nature, is on
getting the work done as quickly as possible to
the minimum standard required to satisfy the
warranty provider and possibly the BCO.
 This emphasis has developed as a result of
commercial pressures on time and finance and
the lack of skilled tradesmen.
QUALITY CONTROL
Large Private Developments
(where main contractor is not
client)
 The project manager/site manager
for the contractor have to satisfy the
client or their agents that the work
done meets the standard required.
The standard required will normally
have been agreed as part of the
original contract and the
specification.
QUALITY CONTROL
It is the responsibility of the:
project manager
site manager/
assistant site managers
foremen to ensure that the
quality of work carried out meets
the requirement of the
specification.
QUALITY CONTROL
Under Design & Build contracts:
 Most of the responsibility for quality
control of design, specification and
construction rests with the main
contractor.
 Under many forms of Design & Build
contract the client is able to check build
quality through the use of:
1. their own Clerk of Works
2. third-party inspection service providers.
QUALITY CONTROL
Quality Assurance Schemes
 The National Standards Authority of
Ireland (NSAI) is Ireland’s Standards
body.
 They facilitate the development of
voluntary standard documents.
 NSAI is a leading supplier of product and
system certification services, both
domestically and internationally.
 The NSAI represent Irish interests in
European and international Standards
bodies.
QUALITY CONTROL
 The NSAI are responsible for the Timber
Frame Manufacturers’ Quality Approval
Scheme.
 The scheme does not apply to timber
frame buildings, which are fabricated on
site (stick buildings).
 It is based on the requirements of the
Irish Building Regulations, TGDs and
relevant Irish and British Standards.
QUALITY CONTROL
It considers:
 Design
 QA procedures related to design and
manufacture
 Material specifications
 Manufacturing process
 Manufacturing information and
documentation
 Production facilities
QUALITY CONTROL
Site information and documentation
Quality records
Personnel
Training
QUALITY CONTROL
 HomeBond is a private company set up by the
Construction Industry Federation (CIF).
 It operates independently of the CIF
HomeBond is a warrantor and inspects
constructions to determine:
 ‘good practice’ and/or HomeBond requirements
are being met.
 HomeBond does not underwrite developments
 but provides cover in the event that the
developments are not soundly constructed with
the appropriate materials.
QUALITY CONTROL
HomeBond covers the dwelling against:
 Major structural defects such as:
1. major defect in the foundations of a
dwelling
2. the load-bearing part of its floors
3. walls and roof or retaining walls
necessary for its support which affects the
structural stability of the dwelling’.
QUALITY CONTROL
Major non-structural defects which
might lead to problems such as:
1.Smoke
2.Water penetration from an adjacent
building into the completed home.
QUALITY CONTROL
 A variety of sources of technical information
exists for those involved in the design,
manufacture and construction of timber frame
buildings in Ireland.
The principal sources of technical information for
each of the disciplines involved is set out below:
Architects
 Guidance is given in the Technical Guidance
Documents on how to meet the requirements of
the National Building Regulations.
QUALITY CONTROL
 The requirements of HomeBond are
published in their House Building
Manual.
 Appendix B of the House Building Manual
publication relates to timber frame
construction.
 Additional guidance, relating specifically
to on-site practice is given in their Right
On Site leaflets.
QUALITY CONTROL
 The TRADA Technology publication (Timber
Frame Construction) provides a source of
standard details and advice on issues such as:
1. good practice guide
2. a site supervisor checklist
3. guidance on appropriate material specifications.
 In-company standard details or standard details
issued by the timber frame manufacturer.
 WOODSPEC
 TRADA/BRE Design Guide for Multi Storey
Timber Frame Buildings – Timber Stairs.

QUALITY CONTROL
Engineers
 Guidance is given in the Technical
Guidance Documents on how to meet the
requirements of the National Building
Regulations.
 BS 5268: Part 2: 1996: Structural use of
timber – Code of practice for permissible
stress design, materials and
workmanship.
QUALITY CONTROL
IS 193: 1996: Timber trussed rafters
for roofs.
IS 444: 1998: Use of structural
timber in buildings.
BS 5268: Part 4: 1978: Structural
use of timber – Fire resistance of
timber structures.
Section 4.1. Recommendations for
calculating the fire resistance of
timber members.
QUALITY CONTROL
 BS 5268: Part 4: 1978: Structural use of
timber – Fire resistance of timber
structures.
 Section 4.2. Recommendations for
calculating the fire resistance of timber
stud walls and joisted floor constructions.
 BS 5268: Part 6: 1996: Structural use of
timber – Code of practice for timber
framed walls.
 Section 6.1. Dwellings not exceeding four
storeys.
QUALITY CONTROL
Site Managers
 In-company documentation.
 The requirements of HomeBond are published in
their House Building Manual.
 Appendix B of the House Building Manual
publication relates to timber frame construction.
 Additional guidance, relating specifically to on-
site practice is given in their Right On Site
leaflets.
QUALITY CONTROL
 The TRADA Technology publication, Timber
Frame Construction, provides a source of
standard details and advice on good practice
including a site supervisors’ checklist and
guidance on appropriate material specifications.
 Guidance is given in the Technical Guidance
Documents on how to meet the requirements of
the National Building Regulations.
 TRADA/BRE Design Guide for Multi Storey
Timber Frame Buildings – Timber Stairs.
QUALITY CONTROL
Clerk of Works
 In-company documentation.
 The requirements of HomeBond are published in
their House Building Manual.
 Appendix B of the House Building Manual
publication relates to timber frame construction.
Additional guidance, relating specifically to on-
site practice is given in their Right On Site
leaflets.
QUALITY CONTROL
The TRADA Technology publication,
Timber Frame Construction,
provides a source of standard details
and advice on good practice
including a site supervisors’
checklist and guidance on
appropriate material specifications.
QUALITY CONTROL
Guidance is given in the Technical
Guidance Documents on how to meet
the requirements of the National
Building Regulations.
TRADA/BRE Design Guide for Multi
Storey Timber Frame Buildings –
Timber Stairs.

More Related Content

What's hot

Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
SOURAV4798
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
kaladharan pillai
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industry
Mohammed Faazil
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation Slides
SlideTeam
 
Quality plan
Quality planQuality plan
Quality management for civil engineering
Quality management for civil engineeringQuality management for civil engineering
Quality management for civil engineering
Jayanta Sen
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
Aglaia Connect
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Jayson Narito
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
Aglaia Connect
 
Building Construction
Building Construction Building Construction
Building Construction
GAURAV. H .TANDON
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
AB MAKASANA
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
Shankar Ramasamy
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project management
reachfirst01
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
Gaurang Kakadiya
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
Susitra Anandan
 
Bar bending schedule
Bar bending scheduleBar bending schedule
Bar bending schedule
bhusan neupane
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Shanmugasundaram N
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
DAVIDSON ECHIDIKE
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
Rajasekar M
 
Mix design-ppt
Mix design-pptMix design-ppt
Mix design-ppt
narasimha reddy
 

What's hot (20)

Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industry
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation Slides
 
Quality plan
Quality planQuality plan
Quality plan
 
Quality management for civil engineering
Quality management for civil engineeringQuality management for civil engineering
Quality management for civil engineering
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Building Construction
Building Construction Building Construction
Building Construction
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project management
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Bar bending schedule
Bar bending scheduleBar bending schedule
Bar bending schedule
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation Engineering
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
 
Mix design-ppt
Mix design-pptMix design-ppt
Mix design-ppt
 

Viewers also liked

Introduction to Process Improvement & Software Quality Assurance
Introduction to Process Improvement & Software Quality AssuranceIntroduction to Process Improvement & Software Quality Assurance
Introduction to Process Improvement & Software Quality Assurance
Ariful Haque
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality managementejlp12
 
Quality Assurance in Software Ind.
Quality Assurance in Software Ind.Quality Assurance in Software Ind.
Quality Assurance in Software Ind.
Heritage Institute Of Tech,India
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality Control
Yogita patil
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
Leola Ramirez
 
Quality Assurance & Control
Quality Assurance & ControlQuality Assurance & Control
Quality Assurance & Control
Anand Subramaniam
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
Tender Process
 

Viewers also liked (7)

Introduction to Process Improvement & Software Quality Assurance
Introduction to Process Improvement & Software Quality AssuranceIntroduction to Process Improvement & Software Quality Assurance
Introduction to Process Improvement & Software Quality Assurance
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
 
Quality Assurance in Software Ind.
Quality Assurance in Software Ind.Quality Assurance in Software Ind.
Quality Assurance in Software Ind.
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality Control
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
Quality Assurance & Control
Quality Assurance & ControlQuality Assurance & Control
Quality Assurance & Control
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 

Similar to 107 quality control

Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
Munirhaq
 
090701 Link Acseu Ppp
090701 Link Acseu Ppp090701 Link Acseu Ppp
090701 Link Acseu PppACSEU
 
I Miller oct 2016 cv doc
I Miller oct 2016 cv docI Miller oct 2016 cv doc
I Miller oct 2016 cv docIan Miller
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
Dr Fereidoun Dejahang
 
BW Industries : Steel Roof Purlins
BW Industries : Steel Roof PurlinsBW Industries : Steel Roof Purlins
BW Industries : Steel Roof Purlins
bwindustries
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in constructionKhaled Eid
 
Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
Amine BENCHARIF
 
Quality references or standard
Quality references or standardQuality references or standard
Quality references or standard
TAPI DIPLOMA ENGINEERING COLLEGE,SURAT
 
Kristalia Interiors pre qualification 22 05 15
Kristalia Interiors  pre qualification 22  05 15Kristalia Interiors  pre qualification 22  05 15
Kristalia Interiors pre qualification 22 05 15Kristalia Interiors L.L.C
 
Dunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyDunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancy
Vijith Nambiar
 
Kristalia interiors pre qualification 16 05 15
Kristalia interiors  pre qualification 16 05 15Kristalia interiors  pre qualification 16 05 15
Kristalia interiors pre qualification 16 05 15
Kristalia Interiors L.L.C
 
Certificado BBA - Aislamiento con productos Synthesia para suelos
Certificado BBA - Aislamiento con productos Synthesia para suelosCertificado BBA - Aislamiento con productos Synthesia para suelos
Certificado BBA - Aislamiento con productos Synthesia para suelos
Synthesia Technology
 
CIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdfCIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdf
LuisMogrovejo3
 
CIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdfCIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdf
LuisMogrovejo3
 
Creativve Constructiions PROFILE
Creativve Constructiions PROFILECreativve Constructiions PROFILE
Creativve Constructiions PROFILE
Creativve Constructiions
 
Working with an Architect RIAI
Working with an Architect RIAI Working with an Architect RIAI
Working with an Architect RIAI
Sonila Papa
 
Best Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part IIBest Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part II
Cheryl Tulkoff
 

Similar to 107 quality control (20)

Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
 
090701 Link Acseu Ppp
090701 Link Acseu Ppp090701 Link Acseu Ppp
090701 Link Acseu Ppp
 
CV Michael Geer1
CV Michael Geer1CV Michael Geer1
CV Michael Geer1
 
I Miller oct 2016 cv doc
I Miller oct 2016 cv docI Miller oct 2016 cv doc
I Miller oct 2016 cv doc
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
 
BW Industries : Steel Roof Purlins
BW Industries : Steel Roof PurlinsBW Industries : Steel Roof Purlins
BW Industries : Steel Roof Purlins
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
 
Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
 
Quality references or standard
Quality references or standardQuality references or standard
Quality references or standard
 
Kristalia Interiors pre qualification 22 05 15
Kristalia Interiors  pre qualification 22  05 15Kristalia Interiors  pre qualification 22  05 15
Kristalia Interiors pre qualification 22 05 15
 
Dunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancyDunbar Boardman - The elevator, escalator and access equipment consultancy
Dunbar Boardman - The elevator, escalator and access equipment consultancy
 
Kristalia interiors pre qualification 16 05 15
Kristalia interiors  pre qualification 16 05 15Kristalia interiors  pre qualification 16 05 15
Kristalia interiors pre qualification 16 05 15
 
Certificado BBA - Aislamiento con productos Synthesia para suelos
Certificado BBA - Aislamiento con productos Synthesia para suelosCertificado BBA - Aislamiento con productos Synthesia para suelos
Certificado BBA - Aislamiento con productos Synthesia para suelos
 
Paolo CV Jan 2016
Paolo CV Jan 2016Paolo CV Jan 2016
Paolo CV Jan 2016
 
Husains CV
Husains CVHusains CV
Husains CV
 
CIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdfCIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdf
 
CIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdfCIOB_Code_of_Quality_Management.pdf
CIOB_Code_of_Quality_Management.pdf
 
Creativve Constructiions PROFILE
Creativve Constructiions PROFILECreativve Constructiions PROFILE
Creativve Constructiions PROFILE
 
Working with an Architect RIAI
Working with an Architect RIAI Working with an Architect RIAI
Working with an Architect RIAI
 
Best Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part IIBest Practices for Improving the PCB Supply Chain: Part II
Best Practices for Improving the PCB Supply Chain: Part II
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
Dr Fereidoun Dejahang
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
Dr Fereidoun Dejahang
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
Dr Fereidoun Dejahang
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
Dr Fereidoun Dejahang
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
Dr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
Dr Fereidoun Dejahang
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
Dr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
Dr Fereidoun Dejahang
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
Dr Fereidoun Dejahang
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
Dr Fereidoun Dejahang
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
Dr Fereidoun Dejahang
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
Dr Fereidoun Dejahang
 
017 communication
017 communication017 communication
017 communication
Dr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
Dr Fereidoun Dejahang
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
Dr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
Dr Fereidoun Dejahang
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
Dr Fereidoun Dejahang
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
Dr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Recently uploaded

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 

Recently uploaded (20)

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

107 quality control

  • 2. QUALITY CONTROL The designer(s), manufacture and contractors must ensure that minimum quality standards are met and maintained. They must make sure that the building will perform as required and expected by its owners and occupiers.
  • 7. ISO 9001 & QUALITY ASSURANCE process approach to system; process measurement Process management; customer satisfaction monitoring; continual improvement.
  • 8. ISO 9001 & QUALITY ASSURANCE ISO 9001: 2000 also puts a stronger emphasis on the quality management function of the organization as distinct from: quality assurance quality control activities five requirements.
  • 9. ISO 14000 & QUALITY ASSURANCE  The ISO 14000 series consist of five standards: 1. Environmental management systems 2. Environmental auditing 3. Environmental labelling 4. Environmental performance evaluation 5. Life cycle assessment
  • 10.
  • 11.
  • 12. QUALITY CONTROL Construction Quality and Construction Quality Control (QC) Inspectors  All construction processes, procedures, and workmanship must be inspected Quality Inspectors.  Inspection should include the observations, measurements, and documentation specified in contractor’s Method Statement and the Contract Documents.
  • 13. QUALITY CONTROL Quality Control (QC) Testing Staff  Sampling and testing of field-tested Materials in accordance with the contract documents.  Certified Testing Laboratory  Independent Referee Laboratory Materials Quality Management  Contractor is responsible for providing Quality Control (QC) sampling and testing, and carrying out Quality Level Analysis during production to submit when required by the client or client representative.
  • 14. QUALITY CONTROL Quality Assurance  Client’s QA Program defines the responsibilities and roles of both contractor and it’s sub- contractors.  The QA Program is contained in the contract document.  The contractor is responsible for providing QC sampling and testing of all the Materials specified in the contract document.
  • 15. QUALITY CONTROL  In practice Building Control Officers (BCOs) and inspectors are prepared to provide some advice where they can and if they visit. Large Private Developments – Sites where main contractor is client  These sites are often those being developed by a large private house builder.  The house builder/developer will often have a project manager and site manager.  Larger sites-assistant site managers who have responsibility for quality control.
  • 16. QUALITY CONTROL  BCOs and inspectors from the Local Authorities are prepared to provide some advice where they can and if they visit.  However, it is not their role.  Often, the emphasis, on sites of this nature, is on getting the work done as quickly as possible to the minimum standard required to satisfy the warranty provider and possibly the BCO.  This emphasis has developed as a result of commercial pressures on time and finance and the lack of skilled tradesmen.
  • 17. QUALITY CONTROL Large Private Developments (where main contractor is not client)  The project manager/site manager for the contractor have to satisfy the client or their agents that the work done meets the standard required. The standard required will normally have been agreed as part of the original contract and the specification.
  • 18. QUALITY CONTROL It is the responsibility of the: project manager site manager/ assistant site managers foremen to ensure that the quality of work carried out meets the requirement of the specification.
  • 19. QUALITY CONTROL Under Design & Build contracts:  Most of the responsibility for quality control of design, specification and construction rests with the main contractor.  Under many forms of Design & Build contract the client is able to check build quality through the use of: 1. their own Clerk of Works 2. third-party inspection service providers.
  • 20. QUALITY CONTROL Quality Assurance Schemes  The National Standards Authority of Ireland (NSAI) is Ireland’s Standards body.  They facilitate the development of voluntary standard documents.  NSAI is a leading supplier of product and system certification services, both domestically and internationally.  The NSAI represent Irish interests in European and international Standards bodies.
  • 21. QUALITY CONTROL  The NSAI are responsible for the Timber Frame Manufacturers’ Quality Approval Scheme.  The scheme does not apply to timber frame buildings, which are fabricated on site (stick buildings).  It is based on the requirements of the Irish Building Regulations, TGDs and relevant Irish and British Standards.
  • 22. QUALITY CONTROL It considers:  Design  QA procedures related to design and manufacture  Material specifications  Manufacturing process  Manufacturing information and documentation  Production facilities
  • 23. QUALITY CONTROL Site information and documentation Quality records Personnel Training
  • 24. QUALITY CONTROL  HomeBond is a private company set up by the Construction Industry Federation (CIF).  It operates independently of the CIF HomeBond is a warrantor and inspects constructions to determine:  ‘good practice’ and/or HomeBond requirements are being met.  HomeBond does not underwrite developments  but provides cover in the event that the developments are not soundly constructed with the appropriate materials.
  • 25. QUALITY CONTROL HomeBond covers the dwelling against:  Major structural defects such as: 1. major defect in the foundations of a dwelling 2. the load-bearing part of its floors 3. walls and roof or retaining walls necessary for its support which affects the structural stability of the dwelling’.
  • 26. QUALITY CONTROL Major non-structural defects which might lead to problems such as: 1.Smoke 2.Water penetration from an adjacent building into the completed home.
  • 27. QUALITY CONTROL  A variety of sources of technical information exists for those involved in the design, manufacture and construction of timber frame buildings in Ireland. The principal sources of technical information for each of the disciplines involved is set out below: Architects  Guidance is given in the Technical Guidance Documents on how to meet the requirements of the National Building Regulations.
  • 28. QUALITY CONTROL  The requirements of HomeBond are published in their House Building Manual.  Appendix B of the House Building Manual publication relates to timber frame construction.  Additional guidance, relating specifically to on-site practice is given in their Right On Site leaflets.
  • 29. QUALITY CONTROL  The TRADA Technology publication (Timber Frame Construction) provides a source of standard details and advice on issues such as: 1. good practice guide 2. a site supervisor checklist 3. guidance on appropriate material specifications.  In-company standard details or standard details issued by the timber frame manufacturer.  WOODSPEC  TRADA/BRE Design Guide for Multi Storey Timber Frame Buildings – Timber Stairs. 
  • 30. QUALITY CONTROL Engineers  Guidance is given in the Technical Guidance Documents on how to meet the requirements of the National Building Regulations.  BS 5268: Part 2: 1996: Structural use of timber – Code of practice for permissible stress design, materials and workmanship.
  • 31. QUALITY CONTROL IS 193: 1996: Timber trussed rafters for roofs. IS 444: 1998: Use of structural timber in buildings. BS 5268: Part 4: 1978: Structural use of timber – Fire resistance of timber structures. Section 4.1. Recommendations for calculating the fire resistance of timber members.
  • 32. QUALITY CONTROL  BS 5268: Part 4: 1978: Structural use of timber – Fire resistance of timber structures.  Section 4.2. Recommendations for calculating the fire resistance of timber stud walls and joisted floor constructions.  BS 5268: Part 6: 1996: Structural use of timber – Code of practice for timber framed walls.  Section 6.1. Dwellings not exceeding four storeys.
  • 33. QUALITY CONTROL Site Managers  In-company documentation.  The requirements of HomeBond are published in their House Building Manual.  Appendix B of the House Building Manual publication relates to timber frame construction.  Additional guidance, relating specifically to on- site practice is given in their Right On Site leaflets.
  • 34. QUALITY CONTROL  The TRADA Technology publication, Timber Frame Construction, provides a source of standard details and advice on good practice including a site supervisors’ checklist and guidance on appropriate material specifications.  Guidance is given in the Technical Guidance Documents on how to meet the requirements of the National Building Regulations.  TRADA/BRE Design Guide for Multi Storey Timber Frame Buildings – Timber Stairs.
  • 35. QUALITY CONTROL Clerk of Works  In-company documentation.  The requirements of HomeBond are published in their House Building Manual.  Appendix B of the House Building Manual publication relates to timber frame construction. Additional guidance, relating specifically to on- site practice is given in their Right On Site leaflets.
  • 36. QUALITY CONTROL The TRADA Technology publication, Timber Frame Construction, provides a source of standard details and advice on good practice including a site supervisors’ checklist and guidance on appropriate material specifications.