Construction quality process, inspection, quality control and quality assurance,cost of quality, ISO standards. Introduction to concept of Total Quality Management.
Introduction to concepts of HSE as applicable to Construction. Importanceof safety in construction , Safety measures to be taken during Excavation ,Explosives , drilling and blasting , hot bituminous works , scaffolds / platforms /ladder , form work and equipment operation. Storage of materials. Safety through legislation, safety campaign. Insurances.
Construction quality process, inspection, quality control and quality assurance,cost of quality, ISO standards. Introduction to concept of Total Quality Management.
Introduction to concepts of HSE as applicable to Construction. Importanceof safety in construction , Safety measures to be taken during Excavation ,Explosives , drilling and blasting , hot bituminous works , scaffolds / platforms /ladder , form work and equipment operation. Storage of materials. Safety through legislation, safety campaign. Insurances.
Civil Construction Project Management Powerpoint Presentation SlidesSlideTeam
Introducing Civil Construction Project Management PowerPoint Presentation Slides. This presentation will help to analyze and understand the phases of construction management and develop a plan for its efficient delivery. The slide contains project analysis, regulatory requirements, construction phases, risk analysis, quality assurance plan, construction waste management, measuring our efforts. In the project analysis section, various costs that are associated with the construction projects, structure details of the project, power, and electricity requirement, etc are identified. In the construction phases section, phases of construction, layout, and design for the construction site, storage plan for construction management is described. The construction project management slideshow further explains the materials required for construction, machinery, vendor selection, workforce requirements, etc. The post-construction commissioning slide showcases the process of commissioning during and after the completion of construction projects. In the risk analysis section, various risks associated with the construction project are identified and various risk mitigation strategies are showcased for multiple risks. After that, the process of quality assurance plan in sales is described. In the construction waste management section, types of waste in construction management are identified and a waste management plan is developed. Finally, the project management dashboard slide helps to track multiple activities of the project. https://bit.ly/2Ro1vwS
Quality management for civil engineeringJayanta Sen
Quality is important part of construction but managing it at site is very difficult task for any organization. Some importance insights for civil engineering students who are not aware of.
non destructive concrete testing equipment
non destructive concrete testing methods
non destructive test Penetration method
Rebound hammer method
Pull out test method
Ultrasonic pulse velocity method
Radioactive methods
methods of testing concrete
concrete strength testing methods
types of non destructive testing
non destructive concrete testing equipment
concrete tests pdf
destructive and non destructive testing
concrete testing procedures
non destructive test for concrete
destructive and non destructive testing
non destructive testing pdf
types of non destructive testing
non destructive testing methods
non destructive testing methods ppt
It is used as a mould for a structure in which fresh concrete is poured only to harden subsequently.
formwork for concrete slab
beam formwork
steel formwork
doka h20
types of formwork
formwork for concrete
what is formwork in construction
building formwork
plywood disadvantages
advantage plywood
advantages and disadvantages of wood
best plywood for formwork
plywood formwork for concrete
mdf advantages and disadvantages
examples of advantages and disadvantages
advantage steel and construction
advantages of steel
disadvantages of steel structures
examples of advantages and disadvantages
advantages and disadvantages of surveys
wiki advantages and disadvantages
steel formwork design
steel formwork system
Rate analysis and costing - Estimation, Costing and Valuation EngineeringShanmugasundaram N
Standard Data – Observed Data – Schedule of rates – Market rates – Standard Data for Man Hours and Machineries for common civil works – Rate Analysis for all Building works, canals, and Roads– Cost Estimates
This is a short paper presentation on project construction supervisor and supervision delivered to a body professionals in the construction industry in a seminar at Lagos state, Nigeria in May, 2015.
It's simple and straight to understand the various stages that are involved during the construction process and are best mapped with PMI project life cycle.
Civil Construction Project Management Powerpoint Presentation SlidesSlideTeam
Introducing Civil Construction Project Management PowerPoint Presentation Slides. This presentation will help to analyze and understand the phases of construction management and develop a plan for its efficient delivery. The slide contains project analysis, regulatory requirements, construction phases, risk analysis, quality assurance plan, construction waste management, measuring our efforts. In the project analysis section, various costs that are associated with the construction projects, structure details of the project, power, and electricity requirement, etc are identified. In the construction phases section, phases of construction, layout, and design for the construction site, storage plan for construction management is described. The construction project management slideshow further explains the materials required for construction, machinery, vendor selection, workforce requirements, etc. The post-construction commissioning slide showcases the process of commissioning during and after the completion of construction projects. In the risk analysis section, various risks associated with the construction project are identified and various risk mitigation strategies are showcased for multiple risks. After that, the process of quality assurance plan in sales is described. In the construction waste management section, types of waste in construction management are identified and a waste management plan is developed. Finally, the project management dashboard slide helps to track multiple activities of the project. https://bit.ly/2Ro1vwS
Quality management for civil engineeringJayanta Sen
Quality is important part of construction but managing it at site is very difficult task for any organization. Some importance insights for civil engineering students who are not aware of.
non destructive concrete testing equipment
non destructive concrete testing methods
non destructive test Penetration method
Rebound hammer method
Pull out test method
Ultrasonic pulse velocity method
Radioactive methods
methods of testing concrete
concrete strength testing methods
types of non destructive testing
non destructive concrete testing equipment
concrete tests pdf
destructive and non destructive testing
concrete testing procedures
non destructive test for concrete
destructive and non destructive testing
non destructive testing pdf
types of non destructive testing
non destructive testing methods
non destructive testing methods ppt
It is used as a mould for a structure in which fresh concrete is poured only to harden subsequently.
formwork for concrete slab
beam formwork
steel formwork
doka h20
types of formwork
formwork for concrete
what is formwork in construction
building formwork
plywood disadvantages
advantage plywood
advantages and disadvantages of wood
best plywood for formwork
plywood formwork for concrete
mdf advantages and disadvantages
examples of advantages and disadvantages
advantage steel and construction
advantages of steel
disadvantages of steel structures
examples of advantages and disadvantages
advantages and disadvantages of surveys
wiki advantages and disadvantages
steel formwork design
steel formwork system
Rate analysis and costing - Estimation, Costing and Valuation EngineeringShanmugasundaram N
Standard Data – Observed Data – Schedule of rates – Market rates – Standard Data for Man Hours and Machineries for common civil works – Rate Analysis for all Building works, canals, and Roads– Cost Estimates
This is a short paper presentation on project construction supervisor and supervision delivered to a body professionals in the construction industry in a seminar at Lagos state, Nigeria in May, 2015.
It's simple and straight to understand the various stages that are involved during the construction process and are best mapped with PMI project life cycle.
Tender Process | A Complete Procurement GuideTender Process
All about Tenders and its Process | Here you will get all the information regarding tenders (Procurement) like what is tender, what is its process, types of tender, how to search tenders, what to do and what not to do in tendering, how to search tenders and more.... you can check our website for more details which is : http://tenderprocess.weebly.com/
BW Industries manufacture a range of Roof Purlins that can be supplied as Sleeved, Butted, Lapped or Heavy End Bay systems. The most popular system we supply is the sleeved system but each application as its benefits.
ISO 9000 Quality Standards in Construction. There is risk involved in any construction project. ... The ISO 9000 clauses most often complied with are those dealing with (1) inspection and test status; (2) inspection and testing; (3) control of nonconformance product; and (4) handling, storage, and preser- vation.
The clauses least complied with concern (1) design control; (2) internal auditing; (3) training; and (4) statistical techniques. Documentation of a quality system is scarce for the majority of the contractors.
Dunbar Boardman - The elevator, escalator and access equipment consultancyVijith Nambiar
Dunbar and Boardman is the elevator, escalator and access equipment consultancy. Vertical Transportation, Facade Access Consultancy and the management of Building Maintenance Units have been at the heart of Dunbar and Boardman's activities since the company's inception in 1981.
Introducing "Creativve Constructiions", a fast growing, well respected construction company that is involved in a full range of Industrial, institutional, commercial and residential construction work. Creativve Constructiions is recognized for its quality, timely achievement of work, and its workaholic team.
Whether you are planning to build your dream home or are
extending and renovating your existing house, a registered
architect has the qualifications, vision and experience to take
you expertly through your building project.
Best Practices for Improving the PCB Supply Chain: Part IICheryl Tulkoff
The Foundation of a reliable product is a reliable PCB
-PCBs are always custom, critical components
Have a comprehensive strategy for selecting and qualifying PCB suppliers
-Ensures that the foundation is strong
Performing effective on site audits is a critical component of that strategy.
➽=ALL False flag-War Machine-War profiteering-Energy (oil/Gas) Iraq, Iran,…oil and gas
USA invades other countries just to own their natural resources and to place them in the hands of American corporations. Facebook doesn’t call that terrorism. They call it democracy. BBC, CNN, FOX NEWS, FR 24, ITV/CH 4, SKY, EURO NEWS, ITV trash Sun paper,… Facebook all are protector and preserver of the propaganda classifying IR Iran as a dangerous terrorist organization. But FB, BBC, CNN, FOX NEWS, FR 24, ITV/CH 4-SKY, EURO NEWS, ITV do know well, that USA is the biggest terrorist country in the world.
‘terrorism’ the unlawful use of violence and intimidation, especially against civilians, in the pursuit of political aims.
"the fight against terrorism" is the fight against the unlawful use of violence and intimidation and carpet bombing.
Ever since the beginning of the 19th century, the West has been sucking on the jugular vein of the Moslem body politic like a veritable vampire whose thirst for Moslem blood is never sated and who refused to let go. Since 1979, Iran, which has always played the role of the intellectual leader of the Islamic world, has risen up to put a stop to this outrage against God’s law and will, and against all decency.
MY NEWS PUNCH DR F DEJAHANG 28/12/2019
PART 1 (IN TOTAL 12 PARTS)
NEWS YOU WON’T FIND ON BBC-CNN-FOX NEWS, FR 24, EURO NEWS, ITV…
ALL In My Documents: https://www.edocr.com/user/drdejahang02
Also in https://www.edocr.com/v/jqmplrpj/drdejahang02/LINKS-08-12-2019-PROJECT-ONE Click on Social Websites of mine >60
Articles for Political Science, Mathematics and Productivity the Student Room BSc, MSc & PhD Project Mangers etc
PPTs in SLIDESHARE International Studies Research Degrees (MPhilPhD) ➽➜R⇢➤=RESEARCH ➽=ALL
PPTs https://www.slideshare.net/DrFereidounDejahang/16-fd-my-news-punch-rev-16122019
MY NEWS PUNCH 16-12-2019
NEWS YOU WON’T FIND ON BBC-CNN-FOX NEWS, FRNACE 24, EURO NEWS
Articles for Political Science, Mathematics and Productivity the Student Room BSc, MSc & PhD Project Mangers etc
PPTs in SLIDESHARE International Studies Research Degrees (MPhilPhD)
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
2. QUALITY CONTROL
The designer(s), manufacture and
contractors must ensure that minimum
quality standards are met and
maintained.
They must make sure that the
building will perform as required and
expected by its owners and occupiers.
7. ISO 9001 & QUALITY ASSURANCE
process approach to system;
process measurement
Process management;
customer satisfaction
monitoring;
continual improvement.
8. ISO 9001 & QUALITY ASSURANCE
ISO 9001: 2000 also puts a stronger
emphasis on the quality management
function of the organization as distinct
from:
quality assurance
quality control activities
five requirements.
9. ISO 14000 & QUALITY ASSURANCE
The ISO 14000 series consist of five
standards:
1. Environmental management systems
2. Environmental auditing
3. Environmental labelling
4. Environmental performance evaluation
5. Life cycle assessment
10.
11.
12. QUALITY CONTROL
Construction Quality and Construction
Quality Control (QC) Inspectors
All construction processes,
procedures, and workmanship must
be inspected Quality Inspectors.
Inspection should include the
observations, measurements, and
documentation specified in
contractor’s Method Statement and
the Contract Documents.
13. QUALITY CONTROL
Quality Control (QC) Testing Staff
Sampling and testing of field-tested Materials in
accordance with the contract documents.
Certified Testing Laboratory
Independent Referee Laboratory
Materials Quality Management
Contractor is responsible for providing Quality
Control (QC) sampling and testing, and carrying
out Quality Level Analysis during production to
submit when required by the client or client
representative.
14. QUALITY CONTROL
Quality Assurance
Client’s QA Program defines the responsibilities
and roles of both contractor and it’s sub-
contractors.
The QA Program is contained in the contract
document.
The contractor is responsible for providing QC
sampling and testing of all the Materials
specified in the contract document.
15. QUALITY CONTROL
In practice Building Control Officers (BCOs) and
inspectors are prepared to provide some advice
where they can and if they visit.
Large Private Developments – Sites where
main contractor is client
These sites are often those being developed by a
large private house builder.
The house builder/developer will often have a
project manager and site manager.
Larger sites-assistant site managers who have
responsibility for quality control.
16. QUALITY CONTROL
BCOs and inspectors from the Local Authorities
are prepared to provide some advice where they
can and if they visit.
However, it is not their role.
Often, the emphasis, on sites of this nature, is on
getting the work done as quickly as possible to
the minimum standard required to satisfy the
warranty provider and possibly the BCO.
This emphasis has developed as a result of
commercial pressures on time and finance and
the lack of skilled tradesmen.
17. QUALITY CONTROL
Large Private Developments
(where main contractor is not
client)
The project manager/site manager
for the contractor have to satisfy the
client or their agents that the work
done meets the standard required.
The standard required will normally
have been agreed as part of the
original contract and the
specification.
18. QUALITY CONTROL
It is the responsibility of the:
project manager
site manager/
assistant site managers
foremen to ensure that the
quality of work carried out meets
the requirement of the
specification.
19. QUALITY CONTROL
Under Design & Build contracts:
Most of the responsibility for quality
control of design, specification and
construction rests with the main
contractor.
Under many forms of Design & Build
contract the client is able to check build
quality through the use of:
1. their own Clerk of Works
2. third-party inspection service providers.
20. QUALITY CONTROL
Quality Assurance Schemes
The National Standards Authority of
Ireland (NSAI) is Ireland’s Standards
body.
They facilitate the development of
voluntary standard documents.
NSAI is a leading supplier of product and
system certification services, both
domestically and internationally.
The NSAI represent Irish interests in
European and international Standards
bodies.
21. QUALITY CONTROL
The NSAI are responsible for the Timber
Frame Manufacturers’ Quality Approval
Scheme.
The scheme does not apply to timber
frame buildings, which are fabricated on
site (stick buildings).
It is based on the requirements of the
Irish Building Regulations, TGDs and
relevant Irish and British Standards.
22. QUALITY CONTROL
It considers:
Design
QA procedures related to design and
manufacture
Material specifications
Manufacturing process
Manufacturing information and
documentation
Production facilities
24. QUALITY CONTROL
HomeBond is a private company set up by the
Construction Industry Federation (CIF).
It operates independently of the CIF
HomeBond is a warrantor and inspects
constructions to determine:
‘good practice’ and/or HomeBond requirements
are being met.
HomeBond does not underwrite developments
but provides cover in the event that the
developments are not soundly constructed with
the appropriate materials.
25. QUALITY CONTROL
HomeBond covers the dwelling against:
Major structural defects such as:
1. major defect in the foundations of a
dwelling
2. the load-bearing part of its floors
3. walls and roof or retaining walls
necessary for its support which affects the
structural stability of the dwelling’.
26. QUALITY CONTROL
Major non-structural defects which
might lead to problems such as:
1.Smoke
2.Water penetration from an adjacent
building into the completed home.
27. QUALITY CONTROL
A variety of sources of technical information
exists for those involved in the design,
manufacture and construction of timber frame
buildings in Ireland.
The principal sources of technical information for
each of the disciplines involved is set out below:
Architects
Guidance is given in the Technical Guidance
Documents on how to meet the requirements of
the National Building Regulations.
28. QUALITY CONTROL
The requirements of HomeBond are
published in their House Building
Manual.
Appendix B of the House Building Manual
publication relates to timber frame
construction.
Additional guidance, relating specifically
to on-site practice is given in their Right
On Site leaflets.
29. QUALITY CONTROL
The TRADA Technology publication (Timber
Frame Construction) provides a source of
standard details and advice on issues such as:
1. good practice guide
2. a site supervisor checklist
3. guidance on appropriate material specifications.
In-company standard details or standard details
issued by the timber frame manufacturer.
WOODSPEC
TRADA/BRE Design Guide for Multi Storey
Timber Frame Buildings – Timber Stairs.
30. QUALITY CONTROL
Engineers
Guidance is given in the Technical
Guidance Documents on how to meet the
requirements of the National Building
Regulations.
BS 5268: Part 2: 1996: Structural use of
timber – Code of practice for permissible
stress design, materials and
workmanship.
31. QUALITY CONTROL
IS 193: 1996: Timber trussed rafters
for roofs.
IS 444: 1998: Use of structural
timber in buildings.
BS 5268: Part 4: 1978: Structural
use of timber – Fire resistance of
timber structures.
Section 4.1. Recommendations for
calculating the fire resistance of
timber members.
32. QUALITY CONTROL
BS 5268: Part 4: 1978: Structural use of
timber – Fire resistance of timber
structures.
Section 4.2. Recommendations for
calculating the fire resistance of timber
stud walls and joisted floor constructions.
BS 5268: Part 6: 1996: Structural use of
timber – Code of practice for timber
framed walls.
Section 6.1. Dwellings not exceeding four
storeys.
33. QUALITY CONTROL
Site Managers
In-company documentation.
The requirements of HomeBond are published in
their House Building Manual.
Appendix B of the House Building Manual
publication relates to timber frame construction.
Additional guidance, relating specifically to on-
site practice is given in their Right On Site
leaflets.
34. QUALITY CONTROL
The TRADA Technology publication, Timber
Frame Construction, provides a source of
standard details and advice on good practice
including a site supervisors’ checklist and
guidance on appropriate material specifications.
Guidance is given in the Technical Guidance
Documents on how to meet the requirements of
the National Building Regulations.
TRADA/BRE Design Guide for Multi Storey
Timber Frame Buildings – Timber Stairs.
35. QUALITY CONTROL
Clerk of Works
In-company documentation.
The requirements of HomeBond are published in
their House Building Manual.
Appendix B of the House Building Manual
publication relates to timber frame construction.
Additional guidance, relating specifically to on-
site practice is given in their Right On Site
leaflets.
36. QUALITY CONTROL
The TRADA Technology publication,
Timber Frame Construction,
provides a source of standard details
and advice on good practice
including a site supervisors’
checklist and guidance on
appropriate material specifications.
37. QUALITY CONTROL
Guidance is given in the Technical
Guidance Documents on how to meet
the requirements of the National
Building Regulations.
TRADA/BRE Design Guide for Multi
Storey Timber Frame Buildings –
Timber Stairs.