➽=ALL False flag-War Machine-War profiteering-Energy (oil/Gas) Iraq, Iran,…oil and gas
USA invades other countries just to own their natural resources and to place them in the hands of American corporations. Facebook doesn’t call that terrorism. They call it democracy. BBC, CNN, FOX NEWS, FR 24, ITV/CH 4, SKY, EURO NEWS, ITV trash Sun paper,… Facebook all are protector and preserver of the propaganda classifying IR Iran as a dangerous terrorist organization. But FB, BBC, CNN, FOX NEWS, FR 24, ITV/CH 4-SKY, EURO NEWS, ITV do know well, that USA is the biggest terrorist country in the world.
‘terrorism’ the unlawful use of violence and intimidation, especially against civilians, in the pursuit of political aims.
"the fight against terrorism" is the fight against the unlawful use of violence and intimidation and carpet bombing.
Ever since the beginning of the 19th century, the West has been sucking on the jugular vein of the Moslem body politic like a veritable vampire whose thirst for Moslem blood is never sated and who refused to let go. Since 1979, Iran, which has always played the role of the intellectual leader of the Islamic world, has risen up to put a stop to this outrage against God’s law and will, and against all decency.
MY NEWS PUNCH DR F DEJAHANG 28/12/2019
PART 1 (IN TOTAL 12 PARTS)
NEWS YOU WON’T FIND ON BBC-CNN-FOX NEWS, FR 24, EURO NEWS, ITV…
ALL In My Documents: https://www.edocr.com/user/drdejahang02
Also in https://www.edocr.com/v/jqmplrpj/drdejahang02/LINKS-08-12-2019-PROJECT-ONE Click on Social Websites of mine >60
Articles for Political Science, Mathematics and Productivity the Student Room BSc, MSc & PhD Project Mangers etc
PPTs in SLIDESHARE International Studies Research Degrees (MPhilPhD) ➽➜R⇢➤=RESEARCH ➽=ALL
PPTs https://www.slideshare.net/DrFereidounDejahang/16-fd-my-news-punch-rev-16122019
MY NEWS PUNCH 16-12-2019
NEWS YOU WON’T FIND ON BBC-CNN-FOX NEWS, FRNACE 24, EURO NEWS
Articles for Political Science, Mathematics and Productivity the Student Room BSc, MSc & PhD Project Mangers etc
PPTs in SLIDESHARE International Studies Research Degrees (MPhilPhD)
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
2. Fast-tracking Construction
Projects & Cost Overrun
The impact of changes to the original scope of work
on the labour force and the relationship between
change and various types of disruption are important
to project management team.
Any changes made to the original scope of work are
costly and will have an effect on labour productivity.
Although some changes are inevitable, the impact
on site productivity is nonetheless significant.
3. Fast-tracking Construction
Projects & Cost Overrun
If a change occurs in the final stage of a construction
project the crew must stop working until the changes
are carried out first.
The increase in the percentage of work hours spent
on changes will result in a 10-20% loss in
productivity.
Changes in themselves do not decrease
productivity or efficiency, it is the
manpower/machinery involved in the process.
4. Fast-tracking Construction
Projects & Cost Overrun
Once changes occur, routine work will
change, processes will slow down and the
total work hours will be several times greater.
Also, the work method may require changes
as well as more co-ordination being required.
5. Fast-tracking Construction
Projects & Cost Overrun
It is possible to carry out many
changes without a loss of
efficiency.
On average, there is a 30% loss of
efficiency when changes are being
performed.
6. Fast-tracking Construction
Projects & Cost Overrun
Repeat works, disruption and the presence of
change all of which can lower labour performance.
Disputes are common between the client
and contractors when these changes occur.
The variables affecting efficiency are
believed to be the time of the change.
7. Fast-tracking Construction
Projects & Cost Overrun
Efficiency is determined by dividing the
performance ratio equation value on a
normal day by the performance ratio
equation when change order had occurred.
Efficiency is defined as an actual productivity
ratio to baseline productivity.
13. Fast-tracking Construction
Projects & Cost Overrun
Fast-
tracking
• To effectively manage fast-tracking change,
influential factors involved in fast-tracking
projects changes need to be identified fast.
Fast-
tracking
• Proper action is needed to reduce the
negative effects that any changes might
cause to the progress of the project.
Fast-
tracking
• Managerial decisions on change or rework
should be made based on the proper
assessment of any change to original plans.
14. Fast-tracking Construction
Projects & Cost Overrun
Fast-tracked-
Impact of
changes
• Shortening project completion time has
been one of the most critical factors for
productivity improvement in construction
industry and many other industries.
Fast-tracked-
Impact of
changes
• To ensure a faster product development is
possible by reducing product cycle time
through concurrent development.
15. Fast-tracking Construction
Projects & Cost Overrun
Fast-
tracking
• The increasing preference of project owners
and managers to fast-track construction proves
the popularity of concurrent development in
construction.
Fast-
tracking
• Concurrent construction also has greater
potential to impact the project development
process than the traditional methods.
Fast-
tracking
• Potential problems is considered to be
increased level of uncertainty
16. Fast-tracking Construction
Projects & Cost Overrun
Uncertainties make the construction
unpredictable and unstable, mostly by
creating non value-adding change
activities among construction processes
When a project is fast-tracked
without proper planning, change
can cause the disruption of the
construction process.
17. Fast-tracking Construction
Projects & Cost Overrun
Since construction has a physical
manifestation, construction rework is
normally perceived to have a bigger
impact than change.
As a result, construction managers
tend to avoid rework on problematic
tasks by changing the scope of work,
in particular under time constraints.
18. Types of Changes for fast-
tracked
For example, changes in the design work that
have been made by mistake can cause
subsequent changes in construction.
Change to the original plan can cause
changes in other tasks
20. Fast-tracked-Impact of changes
As illustrated in Figure 1, once changes occur
during construction (A and B), changes result
in either subsequent changes (C) or rework
(D), depending on managerial decisions.
The arrows labelled E, F, and G in Figure 1
illustrate the unintended change process.
22. Change and Rework
Change and rework have different
characteristics, as summarized in
Table 1.
Both change and rework are done in the form
of either ‘adding’, ‘deleting’ or ‘replacement
(deleting and adding)’.
23. Fast-tracked-Impact of changes
Table 1. For example, in Case
I on Figure 2, given the
problem (a hump on the
concrete surface), rework
would be done by deleting the
problem, while change would
be done by adding some more
concrete.
26. Fast-tracked-Impact of changes
Where floor tiling has been finished
with less/more than the required
height, although both change and
rework have the same behaviour
pattern (replacement) in solving the
problem, the object would be the
problem area in rework, while the
previous work would be the object in
change.
27. Fast-tracked-Impact of changes
Since construction industry is a labour
intensive industry construction, rework
is usually accompanied with the
demolition of what have been already
built.
This has a bigger direct impact on the
construction performance than the
change option.
28. Fast-tracked-Impact of changes
By adopting the change option, it is
possible to avoid rework on
problematic tasks that may require
more resources.
changed activity can also become a
change source that can cause other
subsequent changes.
This change might have more impact
on the construction performance than
the rework option in certain conditions.
29. Fast-tracked-Impact of changes
For example, the increased concrete
height may trigger subsequent
changes in succeeding tasks, i.e.,
reducing the size of ventilation ducts.
Where some of piles were not
correctly positioned, it still made it
possible to proceed with the
superstructure without correcting the
position of the piles by changing the
position of columns.
34. Fast-tracked-Impact of changes
Park, M. (2001), "Dynamic
Planning and Control
Methodology for Large-Scale
Concurrent Construction
Projects", Doctoral Thesis,
Dept. of Civil Engineering,
MIT, Cambridge, MA
35. Fast-tracking Construction
Projects &Cost Overrun
The ability to manage risks throughout
the construction process has become
a major factor for preventing risk.
Risks have a significant impact on a Fast-
Tracked construction project’s performance
in terms of:
Cost –Time-Quality-Safety
36. Fast-tracking Construction
Projects &Cost Overrun
Risk to a large extent is governed by the
procurement option and the content of the related
contract documents.
Fast-Tracked projects carry significantly more risk
than ordinary projects.
Supply chain must share the risk.
37. Fast-tracking Construction
Projects &Cost Overrun
A systematic process of:
Identifying, assessing and responding
to project risk
Selecting an appropriate project
procurement option is a key issue for
risk reduction.
38. A variety of risk management models with
different numbers of stages can be obtained.
The aims and objectives of the risk
management process is to maximize the
opportunities and minimize the
consequences of a risk event.
39. IEC suggest a model with four steps: 1-risk
identification 2-risk assessment
3-risk treatment 4-risk review monitoring
The international standard “Project risk
management – Application guidelines” (IEC
2001) is a good source for risk management.
45. Fast-tracking Construction
Projects &Cost Overrun
To calculate the cost overrun during
Fast-tracked projects use Model below
and suggested formulas.
To measure Items such as:
Time (increase/decrease),
Cost (increase/decrease),
Labour (increase/decrease),
Material (Material waste
increase/decrease)
Machinery (efficiency
46. Fast-tracking Construction
Projects &Cost Overrun
Formula one
PR (Loss/Gain) =MD [A-X] + HC(EC-
AC)+ HL(EL- AL)
Formula two
AC = a EC (1+Σ xi) and similarly AL = a EL (1+Σ
xi)
xi = % of influential factors such as
weather, crew size, absenteeism,
machinery, accidents on site, etc.
47. Influential factors
(related to early stage
of project)
Economical
Technological
Customers
Stakeholders
Environmental
Legislative
Procurement route
Organizational factors
Financial factors
Sustainability
Etc
Process model of Change Management
Pre-
construction
Activities
Client brief
Project objectives
Specification
Design/build-
ability
Constructability
Contractual
arrangement
Planning
Scheduling
Estimating
Labour
Characteristics
Subcontracting
Labour
Direct labour
Management
System
Planning
Communication
Controlling
Co-ordinating
Resource
Management &
Weather
Labour selection
Labour control
Material selection
Material handling
Plant
Waste on site
Delay and Disruption on site
Motivating Factors
Hygiene Factors
Construction
Productivity
Project
Performance
Time
Cost
Quality
Safety
Customer
satisfaction
Rewards
Effort
Ability and skill of
management and workers
Site/Project
Manager
Characteristics
Experience/capability
Leadership style
Authority/influence
Goal commitment
Involvement
Job
Satisfaction
Product Improvement Tools (PIT) Earned Value Management (Evma) Lean Construction (Lcon)
Benchmark (Ben) Front End Management (Fema) Just In Time (Jiti)
Benchmarking (Bing) Quality Control (Qcon) Supply Chain Management (Scma)
Buildability (Buil) Quality Assurance (Qass) Value Engineering (Veng)
Buildability/Deconstruction (Buil/Deco) Quality Management System (Qmsy) Value Management (Vman)
Otherp Product Improvement Tools
48. Fast-tracking Construction
Projects &Cost Overrun
Let us assume that (Bing)+ (Buil/
Deco)+ (Fema) were all carried out
pre and during construction work.
Also items carried out in the (PIKt)
must be added to productivity loss
formula.
50. Fast-tracking Construction
Projects &Cost Overrun
PR (Loss/Gain) =MD [A-X] + HC (EC- AC) + HL (EL-
AL)
AC = a EC (1+Σ xi) and similarly AL = a EL (1+Σ xi)
PR (Loss) =
MD [A-X] + HC (EC- a EC (1+Σ xi)) + HL (EL- a EL
(1+Σ xi)) + (Z)
The project estimated cost=PC(est)
Z = Σ (PIKt) /100 PC(est)
PR(Loss/Gain) =MD [A-X] + HC (EC- a EC (1+Σ xi))
+ HL (EL- a EL (1+Σ xi)) + Σ(PIKt) /100 x PC(est)
52. 0
25
50
75
100
125
150
Budget 5 10 15 20 25 30 35 40 45 50 55 60
Actuals 10 20 30 40 50 60
Earned 8 15 25 30 35 45
Forecast 70 80 90 100 110 120
J F M A M J J A S O N D
0
25
50
75
100
125
150
5 10 15 20 25 30 35 40 45 50 55 60
10 20 30 40 50 60
8 15 25 30 35 45
70 80 90 100 110 120
J F M A M J J A S O N D
Time Now
53. Fast-tracking Construction
Projects &Cost Overrun
PR(Loss/Gain) =MD [A-X] + HC (EC- a
EC (1+Σ xi)) + HL (EL- a EL (1+Σ xi)) +
Σ (PIKt) /100 PC(est)
Also, add cost of Risk management
team (both in-house and external
experts)
(Rmi ) + (Rme )
(Rmi )=Risk management (In-house)
(Rme )= Risk management (External))
54. Fast-tracking Construction
Projects &Cost Overrun
Planning engineer to decide
% PC(est)= Fees for (Rmi ) + (Rme )
Let us assume 0.50% of PC(est)= Fees
for (Rmi ) + (Rme )
(Rmi ) + (Rme )= (Rtotal )
(Rtotal )= (0.5/100)xPC(est)
PR(Loss/Gain) =MD [A-X] + HC (EC- a
EC (1+Σ xi)) + HL (EL- a EL (1+Σ xi)) +
Σ (PIKt) /100 PC(est) + (Rtotal )
55. For risk management
consider
Bionomial Distribution
Now suppose that we want to know
the probability of getting k good result
in n trials. We can call this event A.
P(A) = pk(1-p)n-k n!/(k!(n-k)!)
Example: k =2 n=3
There are 8 possible outcomes, 3 with
the desired event – P(A)=3/8
56. Fast-tracking Construction
Projects &Cost Overrun
The number of combinations of r
objects taken from a group of n
distinct objects is denoted by nCr and
is given by:
nCr =
n!
(n – r)! • r!
57. Fast-tracking Construction
Projects &Cost Overrun
Risk = penalty * likelihood
Penalty can be in dollars, lives,
injuries, amount deadline missed by
Likelihood is probability that a
particular hazard will be “activated”
and result
in an undesirable outcome
The product can be considered as an
expected value of cost to project