 Businesses that still rely on simple
manual tools such as:
 spreadsheets
 reports and emails
 find it increasingly difficult to cope
with the complexities of planning.
Fast React
Productivity Improvement Method
 In the current planning environment of
increased product complexity;
 and rapidly reducing lead times;
 manual systems are now simply
unable to cope.
 Fast React has been specifically
developed in the Textiles sectors to
provide solutions to these problems:
Fast React
Productivity Improvement Method
 Waiting For Raw Materials and
Accessories - Lost Time
 Many companies struggle to clearly
prioritise and communicate what they
need from their suppliers and when.
 Construction industry is no different.
 Often on site as a result of late arrival
of materials works stops.
Fast React
Productivity Improvement Method
 Fast React provides clear targets for each
order/material item.
 Orders are made based on ‘how much and
when required’ in time for production.
 These targets are calculated on Just In
Time (JIT)/Lean principles.
 Clear priorities are set directly from the
latest production plan.
Fast React
Productivity Improvement Method
 Targets are NOT based only on the
delivery date minus a standard
production lead time.
 This does not reflect priorities.
 If there are 10 orders all for the same
delivery date.
 Only the latest production plan can
reflect the true priorities.
 Through Fast React managers exactly
what is needed and when JIT.
Fast React
Productivity Improvement Method
 Fast React can then receive feedback
on expected materials availability.
 For quick and easy reference during
the planning process.
 If expected dates are not met, clear
warnings arise on the planning board.
 Quick and easy re-planning will be
needed.
 Fast- tracking of activities makes
problem solving easier, faster and
reliable.
Fast React
Productivity Improvement Method
Bottlenecks Due to Machine Shortages Or
Capacity Problems
 Many factories fail to see far enough in
advance that they will have an overload or
bottlenecks on some operations or
processes.
 Construction industry should learn from
past experience to see why shortages occur
on construction sites.
 How can manager avoid such problems on
site.
 Fast React/JIT are important for
productivity improvement.
Fast React
Productivity Improvement Method
This will be due to the style
mix at a particular time
leading to:
machine shortages
material shortage
or capacity problems either
before or after operations.
Fast React
Productivity Improvement Method
With an ever-changing plan, it
can be difficult to keep track of
the style mix and loading on key
machines or processes.
With manual and spreadsheet
based systems, this can be an
almost impossible task.
Fast React
Productivity Improvement Method
How Can Fast React Help?
 Fast React allows the user to define
which operations and machines they
wish to monitor.
 As soon as the main plan is created,
the operation bar-charts provide an
easy to read monitor of the loading
on key machines or process areas.
Fast React
Productivity Improvement Method
 In construction industry A-O-A, Line
of balance, Precedence diagram,
software's such as ‘asta,
PRIMAVERA, are powerful tools in the
running of a project.
Fast React
Productivity Improvement Method
 Potential overloads and problems are
highlighted well in advance (by
operation and by day/week/month).
 In plenty of time to take corrective
action.
 Full drill down and ‘modelling’ of
capacity and working hours etc. allow
for rapid ‘what-if’ problem solving.
Fast React
Productivity Improvement Method
Poor Workflow Due to Work In
Progress
(WIP) Problems
 For many factories, day to day
production problems result in
insufficient work for certain production
lines.
 Many factories lose output due to not
having cut/printed the correct orders.
 Or the correct quantities to feed the
production lines.
Fast React
Productivity Improvement Method
 This is often the result of numerous,
changes to the production plan.
 Not being able to quickly
communicate the latest
requirements.
 Priorities to each department.
 Can construction industry learn from
these mistakes?
Fast React
Productivity Improvement Method
How Can Fast React Help?
 Fast React generates work schedules for:
 All departments.
 And subcontractors-from the master
production plan.
 This ensures the latest priorities are
always clearly communicated.
 Daily production updates are also fed into
Fast React.
Fast React
Productivity Improvement Method
Unnecessary Style and Colour Changes
 All of the above problems cause
further productivity losses due to fire
fighting and the changes cause
disruption on the factory floor.
 These problems often result in
unnecessary style and colour
changes.
Fast React
Productivity Improvement Method
 For example due to delays and
urgency.
 a style which was originally planned on
item now has to be re-planned on to 2
or 3 items to catch the delivery date.
 This means more style change losses.
 Lower overall production efficiency
 End users dissatisfaction.
Fast React
Productivity Improvement Method
Fast React allows you plan
and communicate better:
If you can plan better to start
with.
There will be fewer surprises.
Both management and
suppliers will receive clearer
priorities.
Fast React
Productivity Improvement Method
 Potential problems will be seen in
advance and there is more time to fix
them.
 In the inevitable cases where things do go
wrong Fast React allows for quick ‘what-if‘
planning.
 Find and evaluate different solutions.
 Can construction managers learn from
Fast React used in factories?

More Related Content

What's hot

37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
Access MRP - Material Requirements Planning
Access MRP - Material Requirements PlanningAccess MRP - Material Requirements Planning
Access MRP - Material Requirements Planning
Antony Hammond
 
Kanban Board
Kanban BoardKanban Board
Kanban Board
Pratyush Katre
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
GarrettBittner
 
Process Design and Visual Value Streams
Process Design and Visual Value StreamsProcess Design and Visual Value Streams
Process Design and Visual Value Streams
Lean Teams USA
 
Unit1 introduction bpr
Unit1 introduction bprUnit1 introduction bpr
Unit1 introduction bpr
geetanjalibabbar81
 
Footwear Manufacturing Industry In Bangladesh
Footwear Manufacturing Industry In Bangladesh Footwear Manufacturing Industry In Bangladesh
Footwear Manufacturing Industry In Bangladesh
JavedHossain10
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
Varmahk
 
Building a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with KnimeBuilding a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with Knime
Knoldus Inc.
 
Success and Failure Examples of ERP Implementation
Success and Failure Examples of ERP ImplementationSuccess and Failure Examples of ERP Implementation
Success and Failure Examples of ERP Implementation
Sunidhi Kumari
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLM
Adaptive Corporation
 
Productivity action plan
Productivity action planProductivity action plan
Productivity action plan
Saad Bin A.Rashid
 
1.1 Introduction Six sigma.pptx
1.1 Introduction Six sigma.pptx1.1 Introduction Six sigma.pptx
1.1 Introduction Six sigma.pptx
nirajchaudhari27
 
Lean Six Sigma Course Training Part 4
Lean Six Sigma Course Training Part 4Lean Six Sigma Course Training Part 4
Lean Six Sigma Course Training Part 4
Lean Insight
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp system
MRPeasy
 
Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3
Lean Insight
 
Finite capacity planning and scheduling for manufacturing: Odoo frePPLe conn...
Finite capacity planning and scheduling  for manufacturing: Odoo frePPLe conn...Finite capacity planning and scheduling  for manufacturing: Odoo frePPLe conn...
Finite capacity planning and scheduling for manufacturing: Odoo frePPLe conn...
Johan De Taeye
 
CMII & Agile: There's a better way to do it - let's find it
CMII & Agile: There's a better way to do it - let's find itCMII & Agile: There's a better way to do it - let's find it
CMII & Agile: There's a better way to do it - let's find it
Willmund van Aarde - CMIIC, PRINCE2®
 
Corporate Process Management PowerPoint Presentation Slide
Corporate Process Management PowerPoint Presentation SlideCorporate Process Management PowerPoint Presentation Slide
Corporate Process Management PowerPoint Presentation Slide
SlideTeam
 

What's hot (20)

37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
Access MRP - Material Requirements Planning
Access MRP - Material Requirements PlanningAccess MRP - Material Requirements Planning
Access MRP - Material Requirements Planning
 
Kanban Board
Kanban BoardKanban Board
Kanban Board
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Process Design and Visual Value Streams
Process Design and Visual Value StreamsProcess Design and Visual Value Streams
Process Design and Visual Value Streams
 
Unit1 introduction bpr
Unit1 introduction bprUnit1 introduction bpr
Unit1 introduction bpr
 
Footwear Manufacturing Industry In Bangladesh
Footwear Manufacturing Industry In Bangladesh Footwear Manufacturing Industry In Bangladesh
Footwear Manufacturing Industry In Bangladesh
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
Building a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with KnimeBuilding a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with Knime
 
Success and Failure Examples of ERP Implementation
Success and Failure Examples of ERP ImplementationSuccess and Failure Examples of ERP Implementation
Success and Failure Examples of ERP Implementation
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLM
 
Productivity action plan
Productivity action planProductivity action plan
Productivity action plan
 
1.1 Introduction Six sigma.pptx
1.1 Introduction Six sigma.pptx1.1 Introduction Six sigma.pptx
1.1 Introduction Six sigma.pptx
 
Lean Six Sigma Course Training Part 4
Lean Six Sigma Course Training Part 4Lean Six Sigma Course Training Part 4
Lean Six Sigma Course Training Part 4
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp system
 
Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3
 
Finite capacity planning and scheduling for manufacturing: Odoo frePPLe conn...
Finite capacity planning and scheduling  for manufacturing: Odoo frePPLe conn...Finite capacity planning and scheduling  for manufacturing: Odoo frePPLe conn...
Finite capacity planning and scheduling for manufacturing: Odoo frePPLe conn...
 
CMII & Agile: There's a better way to do it - let's find it
CMII & Agile: There's a better way to do it - let's find itCMII & Agile: There's a better way to do it - let's find it
CMII & Agile: There's a better way to do it - let's find it
 
Production english
Production englishProduction english
Production english
 
Corporate Process Management PowerPoint Presentation Slide
Corporate Process Management PowerPoint Presentation SlideCorporate Process Management PowerPoint Presentation Slide
Corporate Process Management PowerPoint Presentation Slide
 

Similar to 026 fast react-productivity improvement

Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Columbus Lietuva
 
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisegaParanda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Columbus Eesti AS
 
Use of ict in organisation Methods of production
Use of ict in organisation Methods of production Use of ict in organisation Methods of production
Use of ict in organisation Methods of production
asad6103
 
Transformational things to do with a whiteboard v.3
Transformational things to do with a whiteboard v.3Transformational things to do with a whiteboard v.3
Transformational things to do with a whiteboard v.3
Association for Project Management
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?gstevick1980
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing concepts
Satyendra Sinha
 
5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes
Metis Automation Ltd
 
Software Solution for Production Planning and Scheduling
Software Solution for Production Planning and SchedulingSoftware Solution for Production Planning and Scheduling
Software Solution for Production Planning and Scheduling
IRJET Journal
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhavPMI_IREP_TP
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass productionSophie Michelot
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
Joanmaines
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
OH!Manufacturing
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
Prof.Mayur Modi
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
Elizabeth Rubio
 
What is six sigma
What is six sigmaWhat is six sigma
What is six sigma
Muhammad Islam
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
festockton
 
Alex syvorotka - QA: Customer Oriented Testing Approaches in theory and practice
Alex syvorotka - QA: Customer Oriented Testing Approaches in theory and practiceAlex syvorotka - QA: Customer Oriented Testing Approaches in theory and practice
Alex syvorotka - QA: Customer Oriented Testing Approaches in theory and practice
Ciklum Ukraine
 
BOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso SolutionsBOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
Panso Solutions India Pvt Ltd
 

Similar to 026 fast react-productivity improvement (20)

Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
 
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisegaParanda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
 
Use of ict in organisation Methods of production
Use of ict in organisation Methods of production Use of ict in organisation Methods of production
Use of ict in organisation Methods of production
 
Transformational things to do with a whiteboard v.3
Transformational things to do with a whiteboard v.3Transformational things to do with a whiteboard v.3
Transformational things to do with a whiteboard v.3
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing concepts
 
5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes
 
Software Solution for Production Planning and Scheduling
Software Solution for Production Planning and SchedulingSoftware Solution for Production Planning and Scheduling
Software Solution for Production Planning and Scheduling
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhav
 
Lean production vs mass production
Lean production vs mass productionLean production vs mass production
Lean production vs mass production
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
 
Chapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERINGChapter 3. CON CURRENT ENGINEERING
Chapter 3. CON CURRENT ENGINEERING
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
What is six sigma
What is six sigmaWhat is six sigma
What is six sigma
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
 
Alex syvorotka - QA: Customer Oriented Testing Approaches in theory and practice
Alex syvorotka - QA: Customer Oriented Testing Approaches in theory and practiceAlex syvorotka - QA: Customer Oriented Testing Approaches in theory and practice
Alex syvorotka - QA: Customer Oriented Testing Approaches in theory and practice
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
BOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso SolutionsBOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
BOM (Bill of Materials) Views in Aras Innovator by Panso Solutions
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
Dr Fereidoun Dejahang
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
Dr Fereidoun Dejahang
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
Dr Fereidoun Dejahang
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
Dr Fereidoun Dejahang
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
Dr Fereidoun Dejahang
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
Dr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
Dr Fereidoun Dejahang
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
Dr Fereidoun Dejahang
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
Dr Fereidoun Dejahang
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
Dr Fereidoun Dejahang
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
Dr Fereidoun Dejahang
 
017 communication
017 communication017 communication
017 communication
Dr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
Dr Fereidoun Dejahang
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
Dr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
Dr Fereidoun Dejahang
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
Dr Fereidoun Dejahang
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
Dr Fereidoun Dejahang
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
Dr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 

Recently uploaded

一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 

Recently uploaded (20)

一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 

026 fast react-productivity improvement

  • 2. Fast React Productivity Improvement Method  Businesses that still rely on simple manual tools such as:  spreadsheets  reports and emails  find it increasingly difficult to cope with the complexities of planning.
  • 3. Fast React Productivity Improvement Method  In the current planning environment of increased product complexity;  and rapidly reducing lead times;  manual systems are now simply unable to cope.  Fast React has been specifically developed in the Textiles sectors to provide solutions to these problems:
  • 4. Fast React Productivity Improvement Method  Waiting For Raw Materials and Accessories - Lost Time  Many companies struggle to clearly prioritise and communicate what they need from their suppliers and when.  Construction industry is no different.  Often on site as a result of late arrival of materials works stops.
  • 5. Fast React Productivity Improvement Method  Fast React provides clear targets for each order/material item.  Orders are made based on ‘how much and when required’ in time for production.  These targets are calculated on Just In Time (JIT)/Lean principles.  Clear priorities are set directly from the latest production plan.
  • 6. Fast React Productivity Improvement Method  Targets are NOT based only on the delivery date minus a standard production lead time.  This does not reflect priorities.  If there are 10 orders all for the same delivery date.  Only the latest production plan can reflect the true priorities.  Through Fast React managers exactly what is needed and when JIT.
  • 7. Fast React Productivity Improvement Method  Fast React can then receive feedback on expected materials availability.  For quick and easy reference during the planning process.  If expected dates are not met, clear warnings arise on the planning board.  Quick and easy re-planning will be needed.  Fast- tracking of activities makes problem solving easier, faster and reliable.
  • 8. Fast React Productivity Improvement Method Bottlenecks Due to Machine Shortages Or Capacity Problems  Many factories fail to see far enough in advance that they will have an overload or bottlenecks on some operations or processes.  Construction industry should learn from past experience to see why shortages occur on construction sites.  How can manager avoid such problems on site.  Fast React/JIT are important for productivity improvement.
  • 9. Fast React Productivity Improvement Method This will be due to the style mix at a particular time leading to: machine shortages material shortage or capacity problems either before or after operations.
  • 10. Fast React Productivity Improvement Method With an ever-changing plan, it can be difficult to keep track of the style mix and loading on key machines or processes. With manual and spreadsheet based systems, this can be an almost impossible task.
  • 11. Fast React Productivity Improvement Method How Can Fast React Help?  Fast React allows the user to define which operations and machines they wish to monitor.  As soon as the main plan is created, the operation bar-charts provide an easy to read monitor of the loading on key machines or process areas.
  • 12. Fast React Productivity Improvement Method  In construction industry A-O-A, Line of balance, Precedence diagram, software's such as ‘asta, PRIMAVERA, are powerful tools in the running of a project.
  • 13. Fast React Productivity Improvement Method  Potential overloads and problems are highlighted well in advance (by operation and by day/week/month).  In plenty of time to take corrective action.  Full drill down and ‘modelling’ of capacity and working hours etc. allow for rapid ‘what-if’ problem solving.
  • 14. Fast React Productivity Improvement Method Poor Workflow Due to Work In Progress (WIP) Problems  For many factories, day to day production problems result in insufficient work for certain production lines.  Many factories lose output due to not having cut/printed the correct orders.  Or the correct quantities to feed the production lines.
  • 15. Fast React Productivity Improvement Method  This is often the result of numerous, changes to the production plan.  Not being able to quickly communicate the latest requirements.  Priorities to each department.  Can construction industry learn from these mistakes?
  • 16. Fast React Productivity Improvement Method How Can Fast React Help?  Fast React generates work schedules for:  All departments.  And subcontractors-from the master production plan.  This ensures the latest priorities are always clearly communicated.  Daily production updates are also fed into Fast React.
  • 17. Fast React Productivity Improvement Method Unnecessary Style and Colour Changes  All of the above problems cause further productivity losses due to fire fighting and the changes cause disruption on the factory floor.  These problems often result in unnecessary style and colour changes.
  • 18. Fast React Productivity Improvement Method  For example due to delays and urgency.  a style which was originally planned on item now has to be re-planned on to 2 or 3 items to catch the delivery date.  This means more style change losses.  Lower overall production efficiency  End users dissatisfaction.
  • 19. Fast React Productivity Improvement Method Fast React allows you plan and communicate better: If you can plan better to start with. There will be fewer surprises. Both management and suppliers will receive clearer priorities.
  • 20. Fast React Productivity Improvement Method  Potential problems will be seen in advance and there is more time to fix them.  In the inevitable cases where things do go wrong Fast React allows for quick ‘what-if‘ planning.  Find and evaluate different solutions.  Can construction managers learn from Fast React used in factories?