SlideShare a Scribd company logo
Quality management

     CIVIL 703 PROJECT MANAGEMENT 1
          AUCKLAND UNIVERISTY




            Quality Management




By KHALED EID
Quality management

    Abstract
    Quality management in construction becoming a demanding requirement by clients
    especially when building large and complex projects , the ISO 9000 serious was
    been introduced as measuring scale for quality .

    This study will analysis the problems that likely face project engineering in medium
    size construction company as a result of implanting quality management process on
    there organization. The methodology used based on literature review and surveys
    results to sample of construction firms in US .

1       Introduction
    Construction related firms recognize the need for providing a quality product that will
    both satisfy the customer and maintain there competitiveness in an ever –changing
    and demanding market. In this context, quality is considered on of the key
    transformation elements of project management techniques, deemed necessary for
    success in the 21st century market place (Kini 2000).

    1.1 Quality management
    Quality in the construction industry is typically understood in terms of “fitness for
    purpose” (Ho, 1995, p. 5) or “quality of workmanship” (Bennett, 1991, p. 5).ISO
    defines quality as the totality of characteristics on an entity that bear on its ability to
    satisfy stated or implied needs (ISO 2000).


    1.2 What is QMS
    QMS is quality management system defined according to Brain and Peter (2004 p3)
    "A formal statement of an origination 's business policy , management responsibilities
    , process and there control, that reflects the most effective ways to meet the
    expectation of those it serves whilst achieving its own prime business objectives".

    1.3 ISO 9000 Serious
    ISO 9000, the series of quality management standards issued by the International
    Organization for Standardization based in Geneva ,is being used by organizations
    involved in construction all over the world.

    1.3.1 ISO 9000
    Is a guideline for selection and use of quality system standards. It provides insight for
    various situations and conditions as well as definitions and explanations.

    1.3.2 ISO 9001
    Defines minimum quality system requirements for design/development, production,
    installation and servicing. It is the most complete standard. It applies to manufacturing
    and service businesses engaged in all these activities.

    1.3.3 ISO 9002
    Ds essentially a subset of 9001. It applies only to production and installation
    activities.
Quality management

    1.3.4 ISO 9003
    Applies to final inspection and test.

    1.3.5 ISO 9004
    Is a guideline for quality system elements. It is like a textbook which describes,
    explains and recommends

2       Implementation process
    The ISO 9000 standards have actively been promoted in the construction industry in
    many countries as a means to assuring quality by building contractors. Some countries
    (for example, Australia, Hong Kong and Singapore) have gone as far as to require all
    contractors to be certified to ISO 9000 requirements before they qualify to bid for
    public sector building projects. This means that quality management systems (QMS)
    certified to ISO 9000 standards are now an ubiquitous feature in the construction
    industry in many countries.
    The 14 essential steps to be followed through in order to implement ISO 9000 quality
    management system successfully.
        • Step 1: Top management commitment
        • Step 2: Establish implementation team
        • Step 3. Start ISO 9000 awareness programs
        • Step 4: Provide Training
        • Step 5. Conduct initial status survey
        • Step 6: Create a documented implementation plan
        • Step 7. Develop quality management system documentation
        • Step 8: Document control
        • Step 9. Implementation
        • Step 10. Internal quality audit
        • Step 11. Management review
        • Step 12. Pre-assessment audit
        • Step 13. Certification and registration
        • Step 14: Continual Improvement

    2.1 Reasons for implementing ISO 9000
    Deming (1986) argued that business contracts should not be awarded on the basis of
    price alone .For most organization, the primary motivation for implementing ISO
    9000 as a QMS is either management need or customer demand.

    2.1.1 Management demand
    Management requirement for implementing ISO 9000 usually to increase
    productivity and product quality and use it as a marketing thus gaining competitive
    advantage, some time only competitive pressure where organization's competitors
    have established or in the process of establishing.
Quality management

    2.1.2 Customer demand
    Customer demands on an existing supplier to implement ISO 9000 is driven by the
    customer's need of an assurance that the supplier is capable of meeting the customer's
    quality requirement.

    2.2 Benefits of implementing ISO 9000
    Implement of ISO 9000 as a QMS in an organization offers near terms and long term
    rewards
       1. Defined process and supporting QMS documentation are the basis of
           repetition.
       2. Enable organization to focus on how to execute its business process.
       3. Fosters continual improvement in the organization productivity.
       4. Results a higher-quality products and service .
       5. Improves customer satisfaction level, which helps improve customer loyalty
           and costumer retention.
       6. Enhance origination to gain competitive advantage due to being perceived as a
           "best-in-class".
       7. Enhance customer confidence in the ability of a supplier products and services
           according to specific quality requirements.
       8. Eliminates an organization dependence on a few individuals for information
           regarding critical process.
       9. Reduces waste of recourses and loss of reputation resulting from rejection and
           rework .
       10. Promotes employee understanding that quality is everyone's responsibility.
       11. Improve communication both internally and externally, which results in
           improvements in efficiency and effectiveness.



3       Problems during implementing ISO 9000
    According to Seddon, ISO 9000 promotes specification, control, and procedures
    rather than understanding and improvement
    A common criticism of ISO 9000 is the amount of money, time and paperwork
    required for registration.[8] According to Barnes, "Opponents claim that it is only for
    documentation. Proponents believe that if a company has documented its quality
    systems, then most of the paperwork has already been completed."[

    3.1 Duration and cost
    The process usually took from one year to two years, which is time consuming and
    costing about 250,000 $ in average .

    3.2 Lack of resources
    Lack of available resources to implement and maintain a quality assurance system
    based on the ISO standards is a major concern barrier in implementation process.
Quality management

    3.3 Increases the documentation
    Most construction projects already involve large amounts of paperwork. These
    include voluminous contract documents, records of plans and amendments, architects'
    instructions, steel bending schedules, change orders, forms to record the requisition,
    order, delivery and movement of material, plant and labor, and material safety data
    sheets.


    3.4 Reduces the productivity of the company
    Some companies consider that documentation requirements are too stringent and can
    turn the system unto a controlled bureaucracy limiting its effectiveness Structural
    changes.

    3.5 Restricts the unique creativity of the company
    The most difficulty encountered is related to documentation and the development of
    the company quality manual, managing and establishing new systems and procedures
    breed many problems.

    3.6 Increases the operating costs of the company
    Another problem is the lack of management staff can be released to do additional
    work with regards to the quality registration , this might result using outside
    management consulting firms impacting the operating cost .
    Measuring sot and benefits of a quality system will require expanding the
    management accounting system to include measurement and reporting of life cycle
    coast .


    3.7 Increases the amount of unnecessary procedures
    Documentation can bring about new and increases procedures that must be
    implemented this also generates additional cost .

    3.8 Requirement of timely information
    Due to the ISO documentation requirement there are fears about speedy flow of
    information that might lead to a serious consequences.

4       Conclusion
       •   Implementing a Quality Management System (QMS) within an organization
           needs to be a decision by top management. The objective of the quality
           system needs to be clearly defined so that the system can be effective.
       •   An important implementation issue is speed. Most firms require 18 months or
           longer to achieve certification. Another issue is the current state of quality
       •   ISO 9000 can be considered an applicable tool for construction firms.
       •   Most certified companies have experienced some difficulties in implementing
           ISO 9000.These are generally related to documentation requirements and
           internal assessment procedures. ( Abdol & Hector 2003)
       •   The cost and duration of the certification process is a great barrier .
Quality management

5       Recommendation
    Some recommendation can be provide to encourage acceptance of ISO 9000 standers
    among construction companies .
       1. The ISO organization and the accredited registrars (auditors) should apply less
          emphasis on the documentation requirements for the certification.
       2. Documentation process must be reviewed to be minimized saving valuable
          time and source.

    A further study to local similar size construction company will be of great benefit,
    local data might be different that US firms.




    References
    Abdol R. Chini and Hector E. Valdez,(2003),ISO 9000 and U.S construction industry
               ,Journal of management in engineering April 2003,69-77.
    Bennett, J. (1991), International Construction Project Management General Theory
            and Practice, Butterworth Heinemann, Oxford.
    Brain Thorpe and Peter Sumner (2004),Quality management in construction, Grower
            ,London.
    Kini, D.U. (2000) Global project management-not business as usual. Journal of
            management in engineering 16(6),29-33.
    Low S. Pheng & Peh Ke –Wei U(1996). A frame work for implementing TQM in
            construction. The TQM magazine Volume 8 number 5 ,39-46.
    Leon Korte . The ISO 9000 international quality registration: an empirical analysis
    of      implication for business firms. International journal of applied quality
            management , volume2 , number1,p59-73
    http://www.qsae.org/web_en/pdf/ISO9000ImpSteps.pdf [Accessed on 13/06/2007]
    http://www.misronet.com/quality_management.htm [Accessed on 13/06/2007]
    http://www.engineers-international.com/qualitysystem.html [Accessed on
            13/06/2007]
    http://www.strategosinc.com/iso_9000.htm [Accessed on 13/06/2007]

More Related Content

What's hot

Quality in Business
Quality in BusinessQuality in Business
Quality in Business
ShadiAR
 
Quality management systems (QMS)
Quality management systems (QMS)Quality management systems (QMS)
Quality management systems (QMS)
salman-fuu
 
Quality Assurance and Quality Control
Quality Assurance and Quality ControlQuality Assurance and Quality Control
Quality Assurance and Quality Control
Xubitech
 
Quality management unit 2
Quality management unit 2Quality management unit 2
Quality management unit 2
RAJKIYA ENGINEERING COLLEGE, BANDA
 
Lecture 2 (quality methodology and quality control)
Lecture  2 (quality methodology and quality control)Lecture  2 (quality methodology and quality control)
Lecture 2 (quality methodology and quality control)
RAJ BAIRWA
 
Quality introduction for Quality Management System
Quality introduction for Quality Management SystemQuality introduction for Quality Management System
Quality introduction for Quality Management System
roshankhetade2
 
An analysis incoming quality control of material in manufacturing company l...
An analysis incoming quality control of material in manufacturing company   l...An analysis incoming quality control of material in manufacturing company   l...
An analysis incoming quality control of material in manufacturing company l...Steve Sapp
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
Prashant Tripathi
 
Quality management
Quality managementQuality management
Quality management
Manthan Chavda
 
QUALITY STANDARDS
QUALITY STANDARDSQUALITY STANDARDS
QUALITY STANDARDS
Jeanie Arnoco
 
Quality Assurance Information Guide
Quality Assurance Information GuideQuality Assurance Information Guide
Quality Assurance Information Guide
William Harbin
 
An overview of_quality_assurance_departm (2)
An overview of_quality_assurance_departm (2)An overview of_quality_assurance_departm (2)
An overview of_quality_assurance_departm (2)
Pranvera Apostoli
 
Ttqc 3
Ttqc 3Ttqc 3
Ttqc 3
mjrtipu
 
Quality management system
Quality management systemQuality management system
Quality management system
POONAM PARDHI
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentationImran Jamil
 
Quality Assurance
Quality Assurance Quality Assurance
Quality Assurance
Sagar Savale
 
Quality control and improvement concepts
Quality control and improvement conceptsQuality control and improvement concepts
Quality control and improvement concepts
Buddy Krishna
 

What's hot (20)

Quality in Business
Quality in BusinessQuality in Business
Quality in Business
 
Quality management systems (QMS)
Quality management systems (QMS)Quality management systems (QMS)
Quality management systems (QMS)
 
Quality Assurance and Quality Control
Quality Assurance and Quality ControlQuality Assurance and Quality Control
Quality Assurance and Quality Control
 
Quality management unit 2
Quality management unit 2Quality management unit 2
Quality management unit 2
 
Lecture 2 (quality methodology and quality control)
Lecture  2 (quality methodology and quality control)Lecture  2 (quality methodology and quality control)
Lecture 2 (quality methodology and quality control)
 
Tqm and quality
Tqm and qualityTqm and quality
Tqm and quality
 
Quality introduction for Quality Management System
Quality introduction for Quality Management SystemQuality introduction for Quality Management System
Quality introduction for Quality Management System
 
An analysis incoming quality control of material in manufacturing company l...
An analysis incoming quality control of material in manufacturing company   l...An analysis incoming quality control of material in manufacturing company   l...
An analysis incoming quality control of material in manufacturing company l...
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Quality control
Quality controlQuality control
Quality control
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Quality management
Quality managementQuality management
Quality management
 
QUALITY STANDARDS
QUALITY STANDARDSQUALITY STANDARDS
QUALITY STANDARDS
 
Quality Assurance Information Guide
Quality Assurance Information GuideQuality Assurance Information Guide
Quality Assurance Information Guide
 
An overview of_quality_assurance_departm (2)
An overview of_quality_assurance_departm (2)An overview of_quality_assurance_departm (2)
An overview of_quality_assurance_departm (2)
 
Ttqc 3
Ttqc 3Ttqc 3
Ttqc 3
 
Quality management system
Quality management systemQuality management system
Quality management system
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentation
 
Quality Assurance
Quality Assurance Quality Assurance
Quality Assurance
 
Quality control and improvement concepts
Quality control and improvement conceptsQuality control and improvement concepts
Quality control and improvement concepts
 

Viewers also liked

Lp simplex method example in construction managment
Lp simplex method example in construction managmentLp simplex method example in construction managment
Lp simplex method example in construction managment
NaghamNagham
 
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Ahmed Fouad, MCIArb, PMP, SP, RMP
 
construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civileng
sulaiman khan
 
Child labour act 1986 ppt
Child labour act 1986 pptChild labour act 1986 ppt
Child labour act 1986 pptAnwar Ahmad
 
Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)Muhammad Sher
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveyinggeddolan
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
Aspects of nepal's rural infrastructure project managment by bhim upadhyaya
Aspects of nepal's rural infrastructure project managment by bhim upadhyayaAspects of nepal's rural infrastructure project managment by bhim upadhyaya
Aspects of nepal's rural infrastructure project managment by bhim upadhyayaBhim Upadhyaya
 
Construction site management for rural infras in nepal
Construction site management for rural infras in nepalConstruction site management for rural infras in nepal
Construction site management for rural infras in nepalBhim Upadhyaya
 
Quality management in construction projects
Quality management in construction projectsQuality management in construction projects
Quality management in construction projectsselinasimpson0901
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In ConstructionIsidro Sid Calayag
 
BMW: A Strategy built on Premium Brands
BMW:  A Strategy built on Premium Brands BMW:  A Strategy built on Premium Brands
BMW: A Strategy built on Premium Brands
Patrick Gallagher
 

Viewers also liked (13)

Presentation1
Presentation1Presentation1
Presentation1
 
Lp simplex method example in construction managment
Lp simplex method example in construction managmentLp simplex method example in construction managment
Lp simplex method example in construction managment
 
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
 
construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civileng
 
Child labour act 1986 ppt
Child labour act 1986 pptChild labour act 1986 ppt
Child labour act 1986 ppt
 
Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)Gaap (generally accepted accounting principles)
Gaap (generally accepted accounting principles)
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Aspects of nepal's rural infrastructure project managment by bhim upadhyaya
Aspects of nepal's rural infrastructure project managment by bhim upadhyayaAspects of nepal's rural infrastructure project managment by bhim upadhyaya
Aspects of nepal's rural infrastructure project managment by bhim upadhyaya
 
Construction site management for rural infras in nepal
Construction site management for rural infras in nepalConstruction site management for rural infras in nepal
Construction site management for rural infras in nepal
 
Quality management in construction projects
Quality management in construction projectsQuality management in construction projects
Quality management in construction projects
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 
BMW: A Strategy built on Premium Brands
BMW:  A Strategy built on Premium Brands BMW:  A Strategy built on Premium Brands
BMW: A Strategy built on Premium Brands
 

Similar to Quality managment impacts in construction

A Review of the Concept of ISO Standard 9000 Family
A Review of the Concept of ISO Standard 9000 FamilyA Review of the Concept of ISO Standard 9000 Family
A Review of the Concept of ISO Standard 9000 Family
Sonali Chawla
 
ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR MEDIUM SIZED ENTERPRISE [SME]
ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR  MEDIUM SIZED ENTERPRISE [SME]ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR  MEDIUM SIZED ENTERPRISE [SME]
ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR MEDIUM SIZED ENTERPRISE [SME]Chee Keong Mah
 
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCESOFTWARE RELIABILITY AND QUALITY ASSURANCE
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.ppt
Oswaldo Gonzales
 
ISO 9000
ISO 9000ISO 9000
RME-085 TQM (unit-5 part 1)
RME-085 TQM (unit-5  part 1)RME-085 TQM (unit-5  part 1)
RME-085 TQM (unit-5 part 1)
ssuserf6c4bd
 
Construction & supervision skills.pptx
Construction & supervision skills.pptxConstruction & supervision skills.pptx
Construction & supervision skills.pptx
ssuser8cff9d
 
ISO-9000.pptx
ISO-9000.pptxISO-9000.pptx
ISO-9000.pptx
DrMeenakshiDhanawat
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-short
drdej19
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-short
Dr Fereidoun Dejahang
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq Govind
Govind Ramu
 
039 Integrating Constructability
039 Integrating Constructability039 Integrating Constructability
039 Integrating Constructability
Dr Fereidoun Dejahang
 
039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-ability
drdej19
 
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB
 
QMS.pdf
QMS.pdfQMS.pdf
QMS.pdf
Khariharan13
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
AhmedAltantawi
 
Certificat iso 9001
Certificat iso 9001Certificat iso 9001
Certificat iso 9001
statebagia
 
Iso 9001 guide
Iso 9001 guideIso 9001 guide
Iso 9001 guide
nobbys303
 
Iso 9001 2008 qms
Iso 9001 2008 qmsIso 9001 2008 qms
Iso 9001 2008 qms
Charlton Inao
 

Similar to Quality managment impacts in construction (20)

A Review of the Concept of ISO Standard 9000 Family
A Review of the Concept of ISO Standard 9000 FamilyA Review of the Concept of ISO Standard 9000 Family
A Review of the Concept of ISO Standard 9000 Family
 
ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR MEDIUM SIZED ENTERPRISE [SME]
ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR  MEDIUM SIZED ENTERPRISE [SME]ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR  MEDIUM SIZED ENTERPRISE [SME]
ISO 9001: 2000 QUALITY SYSTEMS IN THE SMALL OR MEDIUM SIZED ENTERPRISE [SME]
 
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCESOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.ppt
 
ISO 9000
ISO 9000ISO 9000
ISO 9000
 
RME-085 TQM (unit-5 part 1)
RME-085 TQM (unit-5  part 1)RME-085 TQM (unit-5  part 1)
RME-085 TQM (unit-5 part 1)
 
Construction & supervision skills.pptx
Construction & supervision skills.pptxConstruction & supervision skills.pptx
Construction & supervision skills.pptx
 
ISO-9000.pptx
ISO-9000.pptxISO-9000.pptx
ISO-9000.pptx
 
039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-short
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-short
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq Govind
 
039 Integrating Constructability
039 Integrating Constructability039 Integrating Constructability
039 Integrating Constructability
 
039 integrating construct-ability
039 integrating construct-ability039 integrating construct-ability
039 integrating construct-ability
 
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
 
QMS.pdf
QMS.pdfQMS.pdf
QMS.pdf
 
9001 2008 details
9001 2008 details9001 2008 details
9001 2008 details
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Certificat iso 9001
Certificat iso 9001Certificat iso 9001
Certificat iso 9001
 
Iso 9001 guide
Iso 9001 guideIso 9001 guide
Iso 9001 guide
 
Iso 9001 2008 qms
Iso 9001 2008 qmsIso 9001 2008 qms
Iso 9001 2008 qms
 

More from Khaled Eid

What every engineer should know
What every engineer should know What every engineer should know
What every engineer should know
Khaled Eid
 
Steel stacks guide
Steel stacks guideSteel stacks guide
Steel stacks guide
Khaled Eid
 
Loading
LoadingLoading
Loading
Khaled Eid
 
Calculation note 29 11-2014
Calculation note 29 11-2014Calculation note 29 11-2014
Calculation note 29 11-2014
Khaled Eid
 
Design of column base plates anchor bolt
Design of column base plates anchor boltDesign of column base plates anchor bolt
Design of column base plates anchor bolt
Khaled Eid
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study
Khaled Eid
 
Estimation
EstimationEstimation
Estimation
Khaled Eid
 
Opera sydney case study analysis
Opera sydney case study analysisOpera sydney case study analysis
Opera sydney case study analysis
Khaled Eid
 
Cheq plate span
Cheq plate spanCheq plate span
Cheq plate span
Khaled Eid
 
Mathcad anchors (2)
Mathcad   anchors (2)Mathcad   anchors (2)
Mathcad anchors (2)
Khaled Eid
 
Impact of new codes in silos design
Impact of new codes in silos designImpact of new codes in silos design
Impact of new codes in silos design
Khaled Eid
 
Writing engineering report
Writing engineering reportWriting engineering report
Writing engineering reportKhaled Eid
 
Steel detailing guide scope document
Steel detailing guide scope documentSteel detailing guide scope document
Steel detailing guide scope document
Khaled Eid
 

More from Khaled Eid (14)

What every engineer should know
What every engineer should know What every engineer should know
What every engineer should know
 
Steel stacks guide
Steel stacks guideSteel stacks guide
Steel stacks guide
 
Loading
LoadingLoading
Loading
 
Calculation note 29 11-2014
Calculation note 29 11-2014Calculation note 29 11-2014
Calculation note 29 11-2014
 
Design of column base plates anchor bolt
Design of column base plates anchor boltDesign of column base plates anchor bolt
Design of column base plates anchor bolt
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study
 
Estimation
EstimationEstimation
Estimation
 
Opera sydney case study analysis
Opera sydney case study analysisOpera sydney case study analysis
Opera sydney case study analysis
 
Cheq plate span
Cheq plate spanCheq plate span
Cheq plate span
 
Mathcad anchors (2)
Mathcad   anchors (2)Mathcad   anchors (2)
Mathcad anchors (2)
 
Impact of new codes in silos design
Impact of new codes in silos designImpact of new codes in silos design
Impact of new codes in silos design
 
Writing engineering report
Writing engineering reportWriting engineering report
Writing engineering report
 
Steel detailing guide scope document
Steel detailing guide scope documentSteel detailing guide scope document
Steel detailing guide scope document
 
Khaled(beca)
Khaled(beca)Khaled(beca)
Khaled(beca)
 

Recently uploaded

LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
Abida Shariff
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 

Recently uploaded (20)

LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 

Quality managment impacts in construction

  • 1. Quality management CIVIL 703 PROJECT MANAGEMENT 1 AUCKLAND UNIVERISTY Quality Management By KHALED EID
  • 2. Quality management Abstract Quality management in construction becoming a demanding requirement by clients especially when building large and complex projects , the ISO 9000 serious was been introduced as measuring scale for quality . This study will analysis the problems that likely face project engineering in medium size construction company as a result of implanting quality management process on there organization. The methodology used based on literature review and surveys results to sample of construction firms in US . 1 Introduction Construction related firms recognize the need for providing a quality product that will both satisfy the customer and maintain there competitiveness in an ever –changing and demanding market. In this context, quality is considered on of the key transformation elements of project management techniques, deemed necessary for success in the 21st century market place (Kini 2000). 1.1 Quality management Quality in the construction industry is typically understood in terms of “fitness for purpose” (Ho, 1995, p. 5) or “quality of workmanship” (Bennett, 1991, p. 5).ISO defines quality as the totality of characteristics on an entity that bear on its ability to satisfy stated or implied needs (ISO 2000). 1.2 What is QMS QMS is quality management system defined according to Brain and Peter (2004 p3) "A formal statement of an origination 's business policy , management responsibilities , process and there control, that reflects the most effective ways to meet the expectation of those it serves whilst achieving its own prime business objectives". 1.3 ISO 9000 Serious ISO 9000, the series of quality management standards issued by the International Organization for Standardization based in Geneva ,is being used by organizations involved in construction all over the world. 1.3.1 ISO 9000 Is a guideline for selection and use of quality system standards. It provides insight for various situations and conditions as well as definitions and explanations. 1.3.2 ISO 9001 Defines minimum quality system requirements for design/development, production, installation and servicing. It is the most complete standard. It applies to manufacturing and service businesses engaged in all these activities. 1.3.3 ISO 9002 Ds essentially a subset of 9001. It applies only to production and installation activities.
  • 3. Quality management 1.3.4 ISO 9003 Applies to final inspection and test. 1.3.5 ISO 9004 Is a guideline for quality system elements. It is like a textbook which describes, explains and recommends 2 Implementation process The ISO 9000 standards have actively been promoted in the construction industry in many countries as a means to assuring quality by building contractors. Some countries (for example, Australia, Hong Kong and Singapore) have gone as far as to require all contractors to be certified to ISO 9000 requirements before they qualify to bid for public sector building projects. This means that quality management systems (QMS) certified to ISO 9000 standards are now an ubiquitous feature in the construction industry in many countries. The 14 essential steps to be followed through in order to implement ISO 9000 quality management system successfully. • Step 1: Top management commitment • Step 2: Establish implementation team • Step 3. Start ISO 9000 awareness programs • Step 4: Provide Training • Step 5. Conduct initial status survey • Step 6: Create a documented implementation plan • Step 7. Develop quality management system documentation • Step 8: Document control • Step 9. Implementation • Step 10. Internal quality audit • Step 11. Management review • Step 12. Pre-assessment audit • Step 13. Certification and registration • Step 14: Continual Improvement 2.1 Reasons for implementing ISO 9000 Deming (1986) argued that business contracts should not be awarded on the basis of price alone .For most organization, the primary motivation for implementing ISO 9000 as a QMS is either management need or customer demand. 2.1.1 Management demand Management requirement for implementing ISO 9000 usually to increase productivity and product quality and use it as a marketing thus gaining competitive advantage, some time only competitive pressure where organization's competitors have established or in the process of establishing.
  • 4. Quality management 2.1.2 Customer demand Customer demands on an existing supplier to implement ISO 9000 is driven by the customer's need of an assurance that the supplier is capable of meeting the customer's quality requirement. 2.2 Benefits of implementing ISO 9000 Implement of ISO 9000 as a QMS in an organization offers near terms and long term rewards 1. Defined process and supporting QMS documentation are the basis of repetition. 2. Enable organization to focus on how to execute its business process. 3. Fosters continual improvement in the organization productivity. 4. Results a higher-quality products and service . 5. Improves customer satisfaction level, which helps improve customer loyalty and costumer retention. 6. Enhance origination to gain competitive advantage due to being perceived as a "best-in-class". 7. Enhance customer confidence in the ability of a supplier products and services according to specific quality requirements. 8. Eliminates an organization dependence on a few individuals for information regarding critical process. 9. Reduces waste of recourses and loss of reputation resulting from rejection and rework . 10. Promotes employee understanding that quality is everyone's responsibility. 11. Improve communication both internally and externally, which results in improvements in efficiency and effectiveness. 3 Problems during implementing ISO 9000 According to Seddon, ISO 9000 promotes specification, control, and procedures rather than understanding and improvement A common criticism of ISO 9000 is the amount of money, time and paperwork required for registration.[8] According to Barnes, "Opponents claim that it is only for documentation. Proponents believe that if a company has documented its quality systems, then most of the paperwork has already been completed."[ 3.1 Duration and cost The process usually took from one year to two years, which is time consuming and costing about 250,000 $ in average . 3.2 Lack of resources Lack of available resources to implement and maintain a quality assurance system based on the ISO standards is a major concern barrier in implementation process.
  • 5. Quality management 3.3 Increases the documentation Most construction projects already involve large amounts of paperwork. These include voluminous contract documents, records of plans and amendments, architects' instructions, steel bending schedules, change orders, forms to record the requisition, order, delivery and movement of material, plant and labor, and material safety data sheets. 3.4 Reduces the productivity of the company Some companies consider that documentation requirements are too stringent and can turn the system unto a controlled bureaucracy limiting its effectiveness Structural changes. 3.5 Restricts the unique creativity of the company The most difficulty encountered is related to documentation and the development of the company quality manual, managing and establishing new systems and procedures breed many problems. 3.6 Increases the operating costs of the company Another problem is the lack of management staff can be released to do additional work with regards to the quality registration , this might result using outside management consulting firms impacting the operating cost . Measuring sot and benefits of a quality system will require expanding the management accounting system to include measurement and reporting of life cycle coast . 3.7 Increases the amount of unnecessary procedures Documentation can bring about new and increases procedures that must be implemented this also generates additional cost . 3.8 Requirement of timely information Due to the ISO documentation requirement there are fears about speedy flow of information that might lead to a serious consequences. 4 Conclusion • Implementing a Quality Management System (QMS) within an organization needs to be a decision by top management. The objective of the quality system needs to be clearly defined so that the system can be effective. • An important implementation issue is speed. Most firms require 18 months or longer to achieve certification. Another issue is the current state of quality • ISO 9000 can be considered an applicable tool for construction firms. • Most certified companies have experienced some difficulties in implementing ISO 9000.These are generally related to documentation requirements and internal assessment procedures. ( Abdol & Hector 2003) • The cost and duration of the certification process is a great barrier .
  • 6. Quality management 5 Recommendation Some recommendation can be provide to encourage acceptance of ISO 9000 standers among construction companies . 1. The ISO organization and the accredited registrars (auditors) should apply less emphasis on the documentation requirements for the certification. 2. Documentation process must be reviewed to be minimized saving valuable time and source. A further study to local similar size construction company will be of great benefit, local data might be different that US firms. References Abdol R. Chini and Hector E. Valdez,(2003),ISO 9000 and U.S construction industry ,Journal of management in engineering April 2003,69-77. Bennett, J. (1991), International Construction Project Management General Theory and Practice, Butterworth Heinemann, Oxford. Brain Thorpe and Peter Sumner (2004),Quality management in construction, Grower ,London. Kini, D.U. (2000) Global project management-not business as usual. Journal of management in engineering 16(6),29-33. Low S. Pheng & Peh Ke –Wei U(1996). A frame work for implementing TQM in construction. The TQM magazine Volume 8 number 5 ,39-46. Leon Korte . The ISO 9000 international quality registration: an empirical analysis of implication for business firms. International journal of applied quality management , volume2 , number1,p59-73 http://www.qsae.org/web_en/pdf/ISO9000ImpSteps.pdf [Accessed on 13/06/2007] http://www.misronet.com/quality_management.htm [Accessed on 13/06/2007] http://www.engineers-international.com/qualitysystem.html [Accessed on 13/06/2007] http://www.strategosinc.com/iso_9000.htm [Accessed on 13/06/2007]