International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 261
Construction Equipment Monitoring: By Using Relative Important
Indices (Rii) Analysis
Vishal D. Sakhare1, Gomatesh S. Patil2
1Assistant Professor (Dept. of Civil Engineering, DKTE’s Textile & Engineering Institute, Ichalkaranji)
2Assistant Professor (Dept. of Civil Engineering, DKTE’s Textile & Engineering Institute, Ichalkaranji)
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - During the construction phase, selection of right
equipment is a important key factor in the success of any
construction project. Equipment usage will give fast and
accurate results at a reduced cost. Advantage of equipment
utilization includes increased rate of output, reduction in
overall cost, carrying out activities that cannot be carried out
manually etc. Thus proper choice and use of the equipment
contributes to quality, economy, safety, speed and timely
completion of the project. But the selection of most
appropriate equipment from the available options is highly
challenging. Therefore, this paper aims to determine a
selection criteria based on the fundamental concept of
sustainability and provides an assessment framework.
Key Words: selection of right equipment; Selection criteria;
sustainability; assessment framework.
1. INTRODUCTION
The improper selection and use of equipment can cause
excessive costs, time and injuries to labors. Time required
for equipment work depends on the performance of
equipment. There are various factors that can affect
equipment’s performance and productivity.All construction
projects require different types of equipment and
machineries having their own level of application. For
example residential projects have a low level of equipment
usage. It requires simple and traditional machines like
backhoes, haulingandhoistingequipment,material handling
along with pneumatic tools.
Commercial projects have moderateusageof equipmentand
machineries. Industrial and heavy construction projects
required high utilization of machinery for carrying out mass
excavation, stabilizing, compacting, asphalt paving and
finishing, pipelines, railroads and many other special
activities. Good equipment management in construction
projects is strongly possible with the efficient utilization of
equipment. the most appropriate equipment from the
available options is highly challenging. Therefore,thispaper
aims to determine a selection criteria based on the
fundamental concept of sustainability and provides an
assessment framework.
1.1 OBJECTIVES
In this paper it is proposed to do the following work,
To study the equipment optimization and benefit analysisat
the site through equipment production analysis
To do survey of various construction companies for their
equipment management strategies on the basis of economy.
To study the different costs affecting the economy in
construction.
To identify how to improve a economy of Construction
equipment.
2. METHODOLOGY:
Ranking Criteria for Effective Equipment Management
In consultation with top management of organizations
associated with case study and other experts and their past
experience from similar kind of projects, following Relative
Importance Indices (RII) were identified for analysis with
respect to projects/sites.For theresearchundertaken,itisto
be observed that feedbacks were received on a
(1 – 5) Likert scale. Therefore, use of parametric methods is
not practicable and applicable for assessing preferences of
the respondents so, relative importance index method was
used for determining the relative importance of sustainable
criteria.
Relative Importance Index (RII) is a non-parametric
technique widely used by construction and facilities
management researchers for analyzing structured
questionnaire responses for data involving ordinal
measurement of attitudes.
For this part of the questionnaire, the five-point Likertscale
of 1 to 5
1 = not at all important,
2 = low important,
3 = neutral,
4 = very important
5 = extremely important
This adopted and the Relative Importance Indices (RII) for
each of the sustainable criteria. Formula for finding RII for
each of sustainable criteria is as follows,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 262
RII =
Where, W = weighting that is assigned to each variable by
the respondent,
A = highest weight and
N = total number of respondents.
The RII value ranges from 0 to 1 with 0 not inclusive. It
shows that higher the value of RII, more important was the
sustainable criteria and vice versa. The comparison of RII
with the corresponding importance level is measured from
the transformation matrix as proposedbyChen etal.(2010).
According to him, derived importance levels from RII are as
follows:
Table -1: Importance Level from RII
High (H) 0.8 < RII < 1.0
High-Medium (H-M) 0.6 < RII < 0.8
Medium (M) 0.4 < RII < 0.6
Medium-Low (M-L) 0.2 < RII < 0.4
Low (L) 0.0 < RII < 0.2
High (H) 0.8 < RII < 1.0
Table shows the Relative Importance Index (RII) of the
sustainable criteria along with the corresponding ranking
and their importance level. Ratings opinions on 5-point
Likert Scale on the following criteria in terms of their
importance in the selectionofonsitemechanical equipments
and in relation to sustainable criteria.
3. ANALYSIS AND RESULTS:
Relative Importance Indices (RII)
Case study, different experts from the construction
industries and their past experience from similar kind of
projects, following Relative Importance Indices (RII) were
identified for analysis.
Name of Organization- Sanskruti & Associates
RII=
=
=0.915
1. Name of Organization- Sawant & Associates
RII=
=
=0.763
2. Name of Organization- Patil-Bhagwat Developers
RII=
=
=0.863
3. Name of Organization- Swati Construction
RII=
=
=0.873
Table -2: Relative Important Indices
Sr.No
Name of
Organization
RII
Importance
Level
1 Sanskruti
Associates
0.915 High (H)
2 Sawant
Associates
0.763 High to
Medium (H-
M)
3 Patil-Bhagwat
Developers
0.863 High (H)
4 Swati
Construction
0.873 High (H)
Chart -1: RII of sample Construction organizations.
4. CONCLUSION:
1. Only one third of the construction industries were found
to have documented policies, it was found that there is a
uniform practice of management among industries, which
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 263
indicates that there is a policy for management althoughitis
not properly documented.
2. Incorrect equipment selection may directly affect to its
productivity for that particular work. Eg. Excavation is
generally faster for soft soil as compared to hard strata.
3. Greater angle of swing results in greater cycle time which
may lead the work to delay.
4. Time saved per cycle is nothing if the operator’s skill is
poor.
5. The choice for equipment will varycasebycasedepending
upon terrain, task, time of completion of project and
construction cost.
REFERENCES:
1. Dushyant A. Deshmukh, Parag S. Mahatme,“Factors
Affecting Performance ofExcavatingEquipment:An
Overview” International Journal of Science and
Research (IJSR) ISSN (Online): 2319-7064 ,Volume
5 Issue 1, January 2016
2. Kunal R Ghadge1, Ashish B Ugale2 Construction
Equipment Management for Construction of Dam
Site International Journal of Science and Research
(IJSR) ISSN (Online): 2319-7064 ,Volume 4 Issue 5,
May 2015
3. Saurabh Rajendra Kadam, Prof. Dhananjay S. Patil,
“Construction Equipment Fleet Management: Case
Study of Highway Construction Project”
International Journal of ScienceandResearch(IJSR)
ISSN (Online): 2319-7064,Volume 4 Issue 6, June
2015
4. Amir Tavakoli[1] Member ASCE, Emmanuel D.
Tayeand[2], MehmetErktin[3]“Equipmentpolicyof
top 400 contractors: Survey”, Journal of
Construction Engineering and Management, Vol.
115, No. 2June, 1989
5. Aviad Shapira and Marat Goldenberg, Soft
considerations in equipment selection for building
construction projects. Journal of Construction
Engineering and Management), Vol. 133, No. 10,
October 1, 2007
6. Fadi A. Kara[1]and Anas Y. Nasr[2] ,Resource
management in construction Journal of
Construction Engineering, Vol. 112, No. 3
September1986
7. Govindan Kannan (Field studies in construction
equipment economics and productivity)[(ASCE)
CO.1943-7862.0000335. © 2011 American Society
of Civil Engineers].
8. Kjell B. Zandin:“Maynard’s Industrial Engineering
Handbook,Fifth Edition contributors. Total
Productive Maintenance chapter”, McGraw-Hill
Professional, 2001
9. Michael C. Vorster [ 1] Member, ASCE and Jesus M.
De Galarza[2]“Consequential equipment costs
associated with lack of availability and downtime”,
Journal of Construction Engineering and
Management, Vol. 116, No.4 December, 1990.
10. Nizar Markiz, Ahmad JRADE “A decision-support
model utilizing a linear cost optimization approach
for heavy equipment selection”, International
Journal of Structronics & Mechatronics, Manuscript
No: I12725-06, 3 July, 2012
11. M. Waris[1],Mohd. Shahir Liew[2], Mohd. Faris
Khamidi[3],Arazi Idrus[4] “Criteria fortheselection
of sustainable onsite construction equipment”, Gulf
Organisation for R & D , International Journal of
Sustainable Built Environment 17 June 2014
12. Douglas Gransberg, Calin M. Popescu, Richard C.
Ryan.(Construction equipment management for
engineers, estimators, and owners by ISBN 0-8493-
4037-3).
13. David I. Cleland; Roland Gareis : (Global Project
Management Handbook: Planning, Organizing, and
Controlling International Projects, Second Edition
14. Contributors. Japanese project management
practices on global projects, Chapter (McGraw-Hill
Professional, 2006 1994)

More Related Content

What's hot

IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET Journal
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET Journal
 
IRJET- Value Engineering: Better Way of Implementing Conventional Methods
IRJET- Value Engineering: Better Way of Implementing Conventional MethodsIRJET- Value Engineering: Better Way of Implementing Conventional Methods
IRJET- Value Engineering: Better Way of Implementing Conventional MethodsIRJET Journal
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayIRJET Journal
 
Industrial Engineering At A glance.
Industrial Engineering At A glance.Industrial Engineering At A glance.
Industrial Engineering At A glance.Greejesh Prakash
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
Towards The Development of an Index to Measure the Performance of Multi-Produ...
Towards The Development of an Index to Measure the Performance of Multi-Produ...Towards The Development of an Index to Measure the Performance of Multi-Produ...
Towards The Development of an Index to Measure the Performance of Multi-Produ...IJERA Editor
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...IRJET Journal
 
Design and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using FeaDesign and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using Feaijtsrd
 
Introduction of Industrial Engineering
Introduction of Industrial EngineeringIntroduction of Industrial Engineering
Introduction of Industrial Engineeringvijay kumar
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersIAEME Publication
 
IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...Husain Mehdi
 

What's hot (19)

Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
Bf34357368
Bf34357368Bf34357368
Bf34357368
 
H012544751
H012544751H012544751
H012544751
 
IRJET- Value Engineering: Better Way of Implementing Conventional Methods
IRJET- Value Engineering: Better Way of Implementing Conventional MethodsIRJET- Value Engineering: Better Way of Implementing Conventional Methods
IRJET- Value Engineering: Better Way of Implementing Conventional Methods
 
An empirical study on key determinants of construction Delay
An empirical study on key determinants of construction DelayAn empirical study on key determinants of construction Delay
An empirical study on key determinants of construction Delay
 
Industrial Engineering At A glance.
Industrial Engineering At A glance.Industrial Engineering At A glance.
Industrial Engineering At A glance.
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
Towards The Development of an Index to Measure the Performance of Multi-Produ...
Towards The Development of an Index to Measure the Performance of Multi-Produ...Towards The Development of an Index to Measure the Performance of Multi-Produ...
Towards The Development of an Index to Measure the Performance of Multi-Produ...
 
engineering
engineering engineering
engineering
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
IRJET- Development of Conceptual Model for Effective Selection of Subcontract...
 
B44090512
B44090512B44090512
B44090512
 
Design and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using FeaDesign and Analysis of Runout Measuring Machine using Fea
Design and Analysis of Runout Measuring Machine using Fea
 
Introduction of Industrial Engineering
Introduction of Industrial EngineeringIntroduction of Industrial Engineering
Introduction of Industrial Engineering
 
Knowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated membersKnowledge and skill requirements in the installation of prefabricated members
Knowledge and skill requirements in the installation of prefabricated members
 
There is Always A Better Way: The Argument for Industrial Engineering
There is Always A Better Way: The Argument for Industrial EngineeringThere is Always A Better Way: The Argument for Industrial Engineering
There is Always A Better Way: The Argument for Industrial Engineering
 
IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...
 

Similar to IRJET- Construction Equipment Monitoring: By using Relative Important Indices (RII) Analysis

IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryIRJET Journal
 
Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...IRJET Journal
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSAmy Roman
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectseSAT Journals
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
IRJET- S.W.O.T Analysis: Current Status of Construction
IRJET-  	  S.W.O.T Analysis: Current Status of ConstructionIRJET-  	  S.W.O.T Analysis: Current Status of Construction
IRJET- S.W.O.T Analysis: Current Status of ConstructionIRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
IRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential BuildingIRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential BuildingIRJET Journal
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET Journal
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction SitesIRJET Journal
 

Similar to IRJET- Construction Equipment Monitoring: By using Relative Important Indices (RII) Analysis (20)

IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction Industry
 
Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...Development of Building Quality Measurement Tool: Building Construction Quali...
Development of Building Quality Measurement Tool: Building Construction Quali...
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projects
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time Overrun
 
Aircraft
AircraftAircraft
Aircraft
 
Aircraft
AircraftAircraft
Aircraft
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
IRJET- S.W.O.T Analysis: Current Status of Construction
IRJET-  	  S.W.O.T Analysis: Current Status of ConstructionIRJET-  	  S.W.O.T Analysis: Current Status of Construction
IRJET- S.W.O.T Analysis: Current Status of Construction
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
Ijciet 08 04_220
Ijciet 08 04_220Ijciet 08 04_220
Ijciet 08 04_220
 
IRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential BuildingIRJET- Feasibility Study of Residential Building
IRJET- Feasibility Study of Residential Building
 
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
IRJET- Analysis of Risk Factors Affecting Management and Maintenance of Urban...
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction Sites
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 

Recently uploaded (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 

IRJET- Construction Equipment Monitoring: By using Relative Important Indices (RII) Analysis

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 261 Construction Equipment Monitoring: By Using Relative Important Indices (Rii) Analysis Vishal D. Sakhare1, Gomatesh S. Patil2 1Assistant Professor (Dept. of Civil Engineering, DKTE’s Textile & Engineering Institute, Ichalkaranji) 2Assistant Professor (Dept. of Civil Engineering, DKTE’s Textile & Engineering Institute, Ichalkaranji) ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - During the construction phase, selection of right equipment is a important key factor in the success of any construction project. Equipment usage will give fast and accurate results at a reduced cost. Advantage of equipment utilization includes increased rate of output, reduction in overall cost, carrying out activities that cannot be carried out manually etc. Thus proper choice and use of the equipment contributes to quality, economy, safety, speed and timely completion of the project. But the selection of most appropriate equipment from the available options is highly challenging. Therefore, this paper aims to determine a selection criteria based on the fundamental concept of sustainability and provides an assessment framework. Key Words: selection of right equipment; Selection criteria; sustainability; assessment framework. 1. INTRODUCTION The improper selection and use of equipment can cause excessive costs, time and injuries to labors. Time required for equipment work depends on the performance of equipment. There are various factors that can affect equipment’s performance and productivity.All construction projects require different types of equipment and machineries having their own level of application. For example residential projects have a low level of equipment usage. It requires simple and traditional machines like backhoes, haulingandhoistingequipment,material handling along with pneumatic tools. Commercial projects have moderateusageof equipmentand machineries. Industrial and heavy construction projects required high utilization of machinery for carrying out mass excavation, stabilizing, compacting, asphalt paving and finishing, pipelines, railroads and many other special activities. Good equipment management in construction projects is strongly possible with the efficient utilization of equipment. the most appropriate equipment from the available options is highly challenging. Therefore,thispaper aims to determine a selection criteria based on the fundamental concept of sustainability and provides an assessment framework. 1.1 OBJECTIVES In this paper it is proposed to do the following work, To study the equipment optimization and benefit analysisat the site through equipment production analysis To do survey of various construction companies for their equipment management strategies on the basis of economy. To study the different costs affecting the economy in construction. To identify how to improve a economy of Construction equipment. 2. METHODOLOGY: Ranking Criteria for Effective Equipment Management In consultation with top management of organizations associated with case study and other experts and their past experience from similar kind of projects, following Relative Importance Indices (RII) were identified for analysis with respect to projects/sites.For theresearchundertaken,itisto be observed that feedbacks were received on a (1 – 5) Likert scale. Therefore, use of parametric methods is not practicable and applicable for assessing preferences of the respondents so, relative importance index method was used for determining the relative importance of sustainable criteria. Relative Importance Index (RII) is a non-parametric technique widely used by construction and facilities management researchers for analyzing structured questionnaire responses for data involving ordinal measurement of attitudes. For this part of the questionnaire, the five-point Likertscale of 1 to 5 1 = not at all important, 2 = low important, 3 = neutral, 4 = very important 5 = extremely important This adopted and the Relative Importance Indices (RII) for each of the sustainable criteria. Formula for finding RII for each of sustainable criteria is as follows,
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 262 RII = Where, W = weighting that is assigned to each variable by the respondent, A = highest weight and N = total number of respondents. The RII value ranges from 0 to 1 with 0 not inclusive. It shows that higher the value of RII, more important was the sustainable criteria and vice versa. The comparison of RII with the corresponding importance level is measured from the transformation matrix as proposedbyChen etal.(2010). According to him, derived importance levels from RII are as follows: Table -1: Importance Level from RII High (H) 0.8 < RII < 1.0 High-Medium (H-M) 0.6 < RII < 0.8 Medium (M) 0.4 < RII < 0.6 Medium-Low (M-L) 0.2 < RII < 0.4 Low (L) 0.0 < RII < 0.2 High (H) 0.8 < RII < 1.0 Table shows the Relative Importance Index (RII) of the sustainable criteria along with the corresponding ranking and their importance level. Ratings opinions on 5-point Likert Scale on the following criteria in terms of their importance in the selectionofonsitemechanical equipments and in relation to sustainable criteria. 3. ANALYSIS AND RESULTS: Relative Importance Indices (RII) Case study, different experts from the construction industries and their past experience from similar kind of projects, following Relative Importance Indices (RII) were identified for analysis. Name of Organization- Sanskruti & Associates RII= = =0.915 1. Name of Organization- Sawant & Associates RII= = =0.763 2. Name of Organization- Patil-Bhagwat Developers RII= = =0.863 3. Name of Organization- Swati Construction RII= = =0.873 Table -2: Relative Important Indices Sr.No Name of Organization RII Importance Level 1 Sanskruti Associates 0.915 High (H) 2 Sawant Associates 0.763 High to Medium (H- M) 3 Patil-Bhagwat Developers 0.863 High (H) 4 Swati Construction 0.873 High (H) Chart -1: RII of sample Construction organizations. 4. CONCLUSION: 1. Only one third of the construction industries were found to have documented policies, it was found that there is a uniform practice of management among industries, which
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 263 indicates that there is a policy for management althoughitis not properly documented. 2. Incorrect equipment selection may directly affect to its productivity for that particular work. Eg. Excavation is generally faster for soft soil as compared to hard strata. 3. Greater angle of swing results in greater cycle time which may lead the work to delay. 4. Time saved per cycle is nothing if the operator’s skill is poor. 5. The choice for equipment will varycasebycasedepending upon terrain, task, time of completion of project and construction cost. REFERENCES: 1. Dushyant A. Deshmukh, Parag S. Mahatme,“Factors Affecting Performance ofExcavatingEquipment:An Overview” International Journal of Science and Research (IJSR) ISSN (Online): 2319-7064 ,Volume 5 Issue 1, January 2016 2. Kunal R Ghadge1, Ashish B Ugale2 Construction Equipment Management for Construction of Dam Site International Journal of Science and Research (IJSR) ISSN (Online): 2319-7064 ,Volume 4 Issue 5, May 2015 3. Saurabh Rajendra Kadam, Prof. Dhananjay S. Patil, “Construction Equipment Fleet Management: Case Study of Highway Construction Project” International Journal of ScienceandResearch(IJSR) ISSN (Online): 2319-7064,Volume 4 Issue 6, June 2015 4. Amir Tavakoli[1] Member ASCE, Emmanuel D. Tayeand[2], MehmetErktin[3]“Equipmentpolicyof top 400 contractors: Survey”, Journal of Construction Engineering and Management, Vol. 115, No. 2June, 1989 5. Aviad Shapira and Marat Goldenberg, Soft considerations in equipment selection for building construction projects. Journal of Construction Engineering and Management), Vol. 133, No. 10, October 1, 2007 6. Fadi A. Kara[1]and Anas Y. Nasr[2] ,Resource management in construction Journal of Construction Engineering, Vol. 112, No. 3 September1986 7. Govindan Kannan (Field studies in construction equipment economics and productivity)[(ASCE) CO.1943-7862.0000335. © 2011 American Society of Civil Engineers]. 8. Kjell B. Zandin:“Maynard’s Industrial Engineering Handbook,Fifth Edition contributors. Total Productive Maintenance chapter”, McGraw-Hill Professional, 2001 9. Michael C. Vorster [ 1] Member, ASCE and Jesus M. De Galarza[2]“Consequential equipment costs associated with lack of availability and downtime”, Journal of Construction Engineering and Management, Vol. 116, No.4 December, 1990. 10. Nizar Markiz, Ahmad JRADE “A decision-support model utilizing a linear cost optimization approach for heavy equipment selection”, International Journal of Structronics & Mechatronics, Manuscript No: I12725-06, 3 July, 2012 11. M. Waris[1],Mohd. Shahir Liew[2], Mohd. Faris Khamidi[3],Arazi Idrus[4] “Criteria fortheselection of sustainable onsite construction equipment”, Gulf Organisation for R & D , International Journal of Sustainable Built Environment 17 June 2014 12. Douglas Gransberg, Calin M. Popescu, Richard C. Ryan.(Construction equipment management for engineers, estimators, and owners by ISBN 0-8493- 4037-3). 13. David I. Cleland; Roland Gareis : (Global Project Management Handbook: Planning, Organizing, and Controlling International Projects, Second Edition 14. Contributors. Japanese project management practices on global projects, Chapter (McGraw-Hill Professional, 2006 1994)