International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1294
IDENTIFICATION OF CRITICAL FACTORS AFFECTING INFRASTRUCTURE
PROJECT PERFORMANCE IN INDIA
Rajat Bansal1, Er. Nasir Ali2 , Er. Abhishek Sharma3
1M.Tech Student, Department of Civil Engineering, Galaxy Global Group of Institutions, Dinarpur, Haryana, India
2Asstt. Professor, Department of Civil Engineering, Galaxy Global Group of Institutions, Dinarpur, Haryana, India
3HOD, Department of Civil Engineering, Galaxy Global Group of Institutions, Dinarpur, Haryana, India
-----------------------------------------------------------------------***--------------------------------------------------------------------
Abstract - Infrastructure refers to structures, systems, and
facilities serving the economy of a business, industry, country,
city, town, or area, including the services and facilities
necessary for its economy to function. Infrastructure project
performance depends on various factors. Inefficiencies in
Infrastructure implementation have substantial negative
impact on India’s economic growth. Thus this study aims at
identifying and prioritizing the critical factors affecting the
project performance. Most of the research articles discuss
about the factors which affects the performance of
Infrastructure project, however a very few articles reported
about the performance parameters and the dependency of
these parameters on various factors. This thesis work is an
attempt to identify the critical factors affecting the
performance of Infrastructure projects in India.
The general methodology of this study relies largely on the
survey questionnaire which was collected from the local
building contractors of different sizes by mail or by personnel
meeting. A thorough literature review is initiallyconducted to
identify the risk factors that affect the performance of
construction industry as a whole. The survey questionnaire is
designed to probe the cross sectional behavioral pattern of
infrastructure projects.
Key Words: Infrastructure, Substantial, Economic
Growth, Dependency, Behavioural.
1. INTRODUCTION
Infrastructure sector is a key driver for the Indian
economy. The sector is highly responsible for
propelling India’s overall development and enjoys
intense focus from Government for initiating policies
that would ensure time-bound creation of world class
infrastructure in the country. Infrastructure sector
includes power, bridges, dams, roads and urban
infrastructure development.
1.1 Objectives
The specific objectives are as follows:
 To identify the critical factors affecting
infrastructure project performance in India.
 To identify and prioritize the performance
parameters.
 To develop the dependency of performance
parameters on various critical factors.
 To develop a framework based on factors
identified.
1.2 Problem Definition
India’s constructionsector is expectedtogrowat7-8%
every year over the next decade after the new
government. The country will see increased economic
growth and the removal of barriers to foreign
investment will ‘spur demand for construction’ over
the coming 12-18 months.
The constructionsector ofIndiapresentlyisworthUS$
310 billion. As per the initiative of ‘Make in India’, the
Indian government has undertaken a number of
measures to ease access to funding for the sector as
well as eased FDI regulations.
Fig.1- Planned and actual spend across sectors in 9th
and 10th plans.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1295
1.3 Scope of Work and Contribution
The scope of our study was based on Infrastructure
sector of India. The factors which we have taken are
taken keeping in mind the Indian construction
industry; it may differ for other countries. Also, the
survey samples size was 96, which can be increased to
get more accurate results.
Inefficiencies in Infrastructure implementation have
substantial negative impact on India’s economic
growth. Eliminating these inefficiencies will require a
common understanding and identification of the key
bottlenecks that hampers infrastructure
implementation during both pre-construction and
construction phase.
As construction is a risky business and possibility of
business failure always exists, companies have to
consider the parameters that can haveadirecteffectto
their success in business. So in this study critical
factors leading to construction industry’s
success/failure has been investigated.
2. LITERATURE REVIEW
The present review of literature is anefforttocarefully
examine and identify an exhaustive list of factors
effecting performance of infrastructure projects
Several articles were explored using keywords suchas
‘infrastructure’,‘successfactors’, ’projectperformance’
etc. A systematic review of the articles published in
journalsfromdatabasessuchas ASCEJOURNALS,ASCE
PROCEEDINGS, SCIENCE DIRECT, SAGE JOURNAL,
PROQUEST, which are available in research institute
library.
Fig.2- List of Journals Referred
3. METHODOLOGY
The research methodologies followed was reviewing
the literature and then conducting a survey using
questionnaire. The target population mainly included
the professional who are already working in the
construction industry and also the students who are
currently pursuing the construction management
courses and in near future who will be joining the
construction firm in some managerial role. The data
collected from questionnaire will be then be analyzed
using Likert scale. The information obtained by this
method will be further used to draw out necessary
conclusion. Further to the factor analysis result,
qualitative analysis is performed to identify major
factors and prioritize performance parameters.
3.1 Research Methods
The research methodology was divided in two parts.
First, review of the literature was done, and secondly
survey was conducted using questionnaire. The
samplingdesignandquestionnairedesignwasdonefor
data collection and qualitative analysis wasperformed
to conclude findings. From the literature review we
found out various factors that were connected to the
project performance of any Infrastructure project. We
grouped these factors in 6 major heads namely,
1. Cost Performance factors
2. Schedule/Time Performance factors
3. Human related factors
4. Quality Performance factors
5. Safety Performance factors
6. Environmental factors.
3.2 Questionnaire Design and Pilot Study
Questionnaire was divided into three sections. In first
section, basic information of the respondent was
inquired like respondent’s name, organization,
designation, experience and area of expertise. The
second sectionconsistedofscalingthedependencyof6
factors on project performance of any infrastructure
project. Then, in third section the respondent were
asked to answer few questions under those 6 factors
mentioned in the second section, to check their
contribution in the project performance. These
questions were formed on the basis of the literature
review. These variables were measuredonLikertscale
given following below:
Rate from 1 to 5, which indicates,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1296
1- Very Small 2- Small 3- Normal 4-Large
5- Very Large
A pilot survey with the questionnaire in the previous
phase and follow-up interviews with local contractors
were conducted. The purpose was to identify the
factors out of the40factorsthatappliedoverseascould
also apply to the local construction industry. The small
number interviews and the structure of the
questionnaire in the pilot study does not allow for
statistical analysis.
Responses to the interviews have beenusedtoidentify
consistent themes, common practices, and insight
provided by active and influential project participants
that would provide additional guidance andassistance
to the research team. The survey results formed the
basis of modifying the questionnaire for the
subsequent full-scale survey. The pilot study attempts
to short-list locally relevant factors. The criteria for a
short-listing are that the chosen factors are relevant in
the local construction industry. As a result, only
important and relevant factors were chosen for
inclusion in the full-scale survey in the secondphaseof
the research.
4. RESULTS AND ANALYSIS
In many companies the questionnaires were given,out
of which some had an effective reply and some had
satisfactory reply. Thus the response rate is 80%,
which is considered a good response in this type of
survey. All the questionnaire survey was done from
project manager of the project or project engineer at
the site. In some cases, consultant gave the answers on
behalf of their clients, both from the owner and the
contractor side.
4.1 Ratings of Parameters
The ratings of various types of parameters are shown
below:-
Ratings of various parameters are dependent on the
responses received from the industries. From the 96
respondents, 50% of them had more then 2 years of
industry experience and out of which 18.8% of them
had more than 10 years of industry exposure.
Cost Performance Parameters Ratings:-
Fig.3- Bar Chart of Ranking of Cost Factors
Schedule / Time Performance Parameters Rating:-
Fig.4- Bar Chart of Ranking of Schedule / Time
Performance Factors
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1297
Human Related Parameters Rating :-
Fig.5- Bar Chart of Ranking of Human Related
Factors
Quality Performance Parameters Rating:-
Fig.6- Bar Chart of Ranking of Quality Performance
Factors
Safety Performance Parameters Rating:-
Fig.7- Bar Chart of Ranking of Safety Performance
Factors
Environmental Performance Parameters Rating:-
Fig.8- Bar Chart of Ranking of Environmental
Performance Factors
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1298
4.2 Analysis of Parameters
1. Cost performance has high impact on the overall
performance of the infrastructure projects in India.
Total 82.1% of respondents agree that the cost
performance make high impact on the performance of
infrastructure projects in India and 4.2% respondents
believe that cost performance doesn’t impact the
performance.
2. Schedule/Time Performance is as importantascost
performance and has a high impact on performance of
Infrastructure projects in India. 86.3% respondents
believe that schedule/time performance has high
impact on performance of infrastructure projects in
India and 11.6% respondents are on neutral side and
2.1% respondents believe that it doesn’t impact the
performance of the infrastructure projects in India.
3. Responses total 65.3% respondents believe that
human related performance has high impact on
performance of infrastructure projects in India and
28.4% respondents are neutral and 6.3% respondents
believethathumanrelatedperformancedoesn’timpact
the performance of the infrastructure projectsinIndia.
4. Overall 76.9% respondents believe that quality
performance has high impact on the overall
performance of the infrastructure projects in India.
21% respondents are neutral and 2.1% respondents
believe that quality performance doesn’t impact the
performance of the infrastructure projects in India.
5. Total 71.5% respondents agree that safety
performance has high impact on the performance of
the infrastructureprojectsinIndia.25.3%respondents
are neutral. 3.2% respondents believe that safety
performance doesn’t impact the performance of the
infrastructure projects in India.
6. 66.3% respondents believe that environmental
performance has high impact on the performance of
the InfrastructureprojectsinIndia.22.1%respondents
are neutral and 11.6% respondents believe that
environmental performance doesn’t impact the
performance of the Infrastructure projects in India.
5. CONCLUSIONS
Overall conclusionoftheworkisthatcostperformance
parameters and time/schedule performance
parameters affects the performance of project to a
large extent as compared to thehumanrelated,quality,
safety , environmental performance parameters. It
does not mean that parameters other than cost and
time does not effect the performance of project but
they have less impact in comparison.
5.1 Limitations and Future Research Directions
This study was conducted on the basis of the available
literature and includesarticleswhichwerefoundusing
the keywords such as ‘Critical factors affecting
Infrastructure projects’, ‘project performance’ etc.
Maximum responses were received from respondents,
who are working in Infrastructure industry. These
responses can be augmented in future research for
coherent results and analysis. Moreover the study
covers only Indian Construction industry specifically
Infrastructure Sector, all together for analysis, and it
can be further extended for sector specific.
Most of the research articles discuss about the factors
which affects the performance of Infrastructure
project, however a very few articlesreportedaboutthe
performance parameters and the dependency of these
parameters on various factors. Hence future research
may be focused on more number of responses, more
performance parameters and canfindoutmorefactors
which affect the Infrastructure projects.
REFRENCES
1. K.C. Iyer& K.N. Jha (2005; Factors affecting cost
Performance; evidence from Indian
Construction Projects. International Journal of
Project Management 23(2005). 283 – 295.
2. Sadi A. Assaf & Sadiq Al-Hejji (2005); Causes
of delay in large Construction Projects.
International Journal of Project Management
24 (2006) 349 – 357.
3. Ram Singh (2009); Delays and cost overrun in
Infrastructure Projects. Working Paper
Number 181, Delhi School of Economics
4. K.N. Jha & K.C. Iyer (2006); Critical Factors
Affecting Performance In Construction, Total
Quality Management,Vol.17,No.9,1155-1170,
Nov 2006 .
5. Roozbeh Kangari (1988); Business Failure In
Construction Project.
6. L&T (2013), Project Management Excellence
on Display in Mumbai High North Project.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1299
7. K.N. Jha& K.C. Iyer(2005),CriticalDeterminants
of Project Coordination
8. Abhijeet Gadekar& Dr. S.S. Pimplikar (2013);
Factors leading to success of Indian
Construction Companies.
9. Roshana Takim& Akintola Akintoye (2002);
Performance Indicator for successful
Construction Project Performance.
10. Victor Sanvido, Kevin Parfit (1992); Critical
Success Factors For Construction Projects.

More Related Content

What's hot

IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET Journal
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET Journal
 
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...SunilVethody2
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
 
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodDelay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodIRJET Journal
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET Journal
 
Attributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewAttributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewA Makwana
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET Journal
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET Journal
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectIRJET Journal
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachIRJET Journal
 
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...IAEME Publication
 
The Organization Motivation on Employee Performance in an Engineering College...
The Organization Motivation on Employee Performance in an Engineering College...The Organization Motivation on Employee Performance in an Engineering College...
The Organization Motivation on Employee Performance in an Engineering College...IRJET Journal
 
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...IRJET Journal
 
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction ProjectsFactors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projectsijtsrd
 

What's hot (18)

IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 
IRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time OverrunIRJET- Influence of Stakeholders on Project Time Overrun
IRJET- Influence of Stakeholders on Project Time Overrun
 
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
Study of Trends and Perspectives of Industrial Engineering Research - By Suni...
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
Delay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index MethodDelay Analysis in Industrial Projects by using Relative Importance Index Method
Delay Analysis in Industrial Projects by using Relative Importance Index Method
 
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
IRJET- Study on Buildability Factors Affecting Formwork Labour Productivity i...
 
Attributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewAttributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a review
 
50120140507007
5012014050700750120140507007
50120140507007
 
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...IRJET-  	  Prediction Model of Factors Causing Increase in Overhead Cost in C...
IRJET- Prediction Model of Factors Causing Increase in Overhead Cost in C...
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
 
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
BRAND IMAGE, SERVICE QUALITY AND HOUSEHOLDER’S SATISFACTION AND LOYALTY TOWAR...
 
The Organization Motivation on Employee Performance in an Engineering College...
The Organization Motivation on Employee Performance in an Engineering College...The Organization Motivation on Employee Performance in an Engineering College...
The Organization Motivation on Employee Performance in an Engineering College...
 
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
 
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction ProjectsFactors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projects
 

Similar to IRJET- Identification of Critical Factors Affecting Infrastructure Project Performance in India

IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...IRJET Journal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...IRJET Journal
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET Journal
 
An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industryijtsrd
 
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...IRJET Journal
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...IRJET Journal
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryIRJET Journal
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewIRJET Journal
 
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in KeralaIRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in KeralaIRJET Journal
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET Journal
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET Journal
 
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...IRJET Journal
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...IRJET Journal
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 

Similar to IRJET- Identification of Critical Factors Affecting Infrastructure Project Performance in India (20)

IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
IRJET-A Study on Factors Affecting Labour Productivity by Application of Rela...
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
Analysis of Cost Variation between Estimated Cost and Actual Cost of Resident...
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industry
 
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...Health and Safety Framework Using Analytic Hierarchy Process For Construction...
Health and Safety Framework Using Analytic Hierarchy Process For Construction...
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
 
A Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction IndustryA Review on Benchmarking Automation in Construction Industry
A Review on Benchmarking Automation in Construction Industry
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
 
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in KeralaIRJET- Analysis of Employee Turnover in Construction Industry in Kerala
IRJET- Analysis of Employee Turnover in Construction Industry in Kerala
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
 
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...IRJET-  	  Construction Equipment Monitoring: By using Relative Important Ind...
IRJET- Construction Equipment Monitoring: By using Relative Important Ind...
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
 
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTIONUSE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
 
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...IRJET- Productivity Improvement in Construction Industry using Automation Tec...
IRJET- Productivity Improvement in Construction Industry using Automation Tec...
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

IRJET- Identification of Critical Factors Affecting Infrastructure Project Performance in India

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1294 IDENTIFICATION OF CRITICAL FACTORS AFFECTING INFRASTRUCTURE PROJECT PERFORMANCE IN INDIA Rajat Bansal1, Er. Nasir Ali2 , Er. Abhishek Sharma3 1M.Tech Student, Department of Civil Engineering, Galaxy Global Group of Institutions, Dinarpur, Haryana, India 2Asstt. Professor, Department of Civil Engineering, Galaxy Global Group of Institutions, Dinarpur, Haryana, India 3HOD, Department of Civil Engineering, Galaxy Global Group of Institutions, Dinarpur, Haryana, India -----------------------------------------------------------------------***-------------------------------------------------------------------- Abstract - Infrastructure refers to structures, systems, and facilities serving the economy of a business, industry, country, city, town, or area, including the services and facilities necessary for its economy to function. Infrastructure project performance depends on various factors. Inefficiencies in Infrastructure implementation have substantial negative impact on India’s economic growth. Thus this study aims at identifying and prioritizing the critical factors affecting the project performance. Most of the research articles discuss about the factors which affects the performance of Infrastructure project, however a very few articles reported about the performance parameters and the dependency of these parameters on various factors. This thesis work is an attempt to identify the critical factors affecting the performance of Infrastructure projects in India. The general methodology of this study relies largely on the survey questionnaire which was collected from the local building contractors of different sizes by mail or by personnel meeting. A thorough literature review is initiallyconducted to identify the risk factors that affect the performance of construction industry as a whole. The survey questionnaire is designed to probe the cross sectional behavioral pattern of infrastructure projects. Key Words: Infrastructure, Substantial, Economic Growth, Dependency, Behavioural. 1. INTRODUCTION Infrastructure sector is a key driver for the Indian economy. The sector is highly responsible for propelling India’s overall development and enjoys intense focus from Government for initiating policies that would ensure time-bound creation of world class infrastructure in the country. Infrastructure sector includes power, bridges, dams, roads and urban infrastructure development. 1.1 Objectives The specific objectives are as follows:  To identify the critical factors affecting infrastructure project performance in India.  To identify and prioritize the performance parameters.  To develop the dependency of performance parameters on various critical factors.  To develop a framework based on factors identified. 1.2 Problem Definition India’s constructionsector is expectedtogrowat7-8% every year over the next decade after the new government. The country will see increased economic growth and the removal of barriers to foreign investment will ‘spur demand for construction’ over the coming 12-18 months. The constructionsector ofIndiapresentlyisworthUS$ 310 billion. As per the initiative of ‘Make in India’, the Indian government has undertaken a number of measures to ease access to funding for the sector as well as eased FDI regulations. Fig.1- Planned and actual spend across sectors in 9th and 10th plans.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1295 1.3 Scope of Work and Contribution The scope of our study was based on Infrastructure sector of India. The factors which we have taken are taken keeping in mind the Indian construction industry; it may differ for other countries. Also, the survey samples size was 96, which can be increased to get more accurate results. Inefficiencies in Infrastructure implementation have substantial negative impact on India’s economic growth. Eliminating these inefficiencies will require a common understanding and identification of the key bottlenecks that hampers infrastructure implementation during both pre-construction and construction phase. As construction is a risky business and possibility of business failure always exists, companies have to consider the parameters that can haveadirecteffectto their success in business. So in this study critical factors leading to construction industry’s success/failure has been investigated. 2. LITERATURE REVIEW The present review of literature is anefforttocarefully examine and identify an exhaustive list of factors effecting performance of infrastructure projects Several articles were explored using keywords suchas ‘infrastructure’,‘successfactors’, ’projectperformance’ etc. A systematic review of the articles published in journalsfromdatabasessuchas ASCEJOURNALS,ASCE PROCEEDINGS, SCIENCE DIRECT, SAGE JOURNAL, PROQUEST, which are available in research institute library. Fig.2- List of Journals Referred 3. METHODOLOGY The research methodologies followed was reviewing the literature and then conducting a survey using questionnaire. The target population mainly included the professional who are already working in the construction industry and also the students who are currently pursuing the construction management courses and in near future who will be joining the construction firm in some managerial role. The data collected from questionnaire will be then be analyzed using Likert scale. The information obtained by this method will be further used to draw out necessary conclusion. Further to the factor analysis result, qualitative analysis is performed to identify major factors and prioritize performance parameters. 3.1 Research Methods The research methodology was divided in two parts. First, review of the literature was done, and secondly survey was conducted using questionnaire. The samplingdesignandquestionnairedesignwasdonefor data collection and qualitative analysis wasperformed to conclude findings. From the literature review we found out various factors that were connected to the project performance of any Infrastructure project. We grouped these factors in 6 major heads namely, 1. Cost Performance factors 2. Schedule/Time Performance factors 3. Human related factors 4. Quality Performance factors 5. Safety Performance factors 6. Environmental factors. 3.2 Questionnaire Design and Pilot Study Questionnaire was divided into three sections. In first section, basic information of the respondent was inquired like respondent’s name, organization, designation, experience and area of expertise. The second sectionconsistedofscalingthedependencyof6 factors on project performance of any infrastructure project. Then, in third section the respondent were asked to answer few questions under those 6 factors mentioned in the second section, to check their contribution in the project performance. These questions were formed on the basis of the literature review. These variables were measuredonLikertscale given following below: Rate from 1 to 5, which indicates,
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1296 1- Very Small 2- Small 3- Normal 4-Large 5- Very Large A pilot survey with the questionnaire in the previous phase and follow-up interviews with local contractors were conducted. The purpose was to identify the factors out of the40factorsthatappliedoverseascould also apply to the local construction industry. The small number interviews and the structure of the questionnaire in the pilot study does not allow for statistical analysis. Responses to the interviews have beenusedtoidentify consistent themes, common practices, and insight provided by active and influential project participants that would provide additional guidance andassistance to the research team. The survey results formed the basis of modifying the questionnaire for the subsequent full-scale survey. The pilot study attempts to short-list locally relevant factors. The criteria for a short-listing are that the chosen factors are relevant in the local construction industry. As a result, only important and relevant factors were chosen for inclusion in the full-scale survey in the secondphaseof the research. 4. RESULTS AND ANALYSIS In many companies the questionnaires were given,out of which some had an effective reply and some had satisfactory reply. Thus the response rate is 80%, which is considered a good response in this type of survey. All the questionnaire survey was done from project manager of the project or project engineer at the site. In some cases, consultant gave the answers on behalf of their clients, both from the owner and the contractor side. 4.1 Ratings of Parameters The ratings of various types of parameters are shown below:- Ratings of various parameters are dependent on the responses received from the industries. From the 96 respondents, 50% of them had more then 2 years of industry experience and out of which 18.8% of them had more than 10 years of industry exposure. Cost Performance Parameters Ratings:- Fig.3- Bar Chart of Ranking of Cost Factors Schedule / Time Performance Parameters Rating:- Fig.4- Bar Chart of Ranking of Schedule / Time Performance Factors
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1297 Human Related Parameters Rating :- Fig.5- Bar Chart of Ranking of Human Related Factors Quality Performance Parameters Rating:- Fig.6- Bar Chart of Ranking of Quality Performance Factors Safety Performance Parameters Rating:- Fig.7- Bar Chart of Ranking of Safety Performance Factors Environmental Performance Parameters Rating:- Fig.8- Bar Chart of Ranking of Environmental Performance Factors
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1298 4.2 Analysis of Parameters 1. Cost performance has high impact on the overall performance of the infrastructure projects in India. Total 82.1% of respondents agree that the cost performance make high impact on the performance of infrastructure projects in India and 4.2% respondents believe that cost performance doesn’t impact the performance. 2. Schedule/Time Performance is as importantascost performance and has a high impact on performance of Infrastructure projects in India. 86.3% respondents believe that schedule/time performance has high impact on performance of infrastructure projects in India and 11.6% respondents are on neutral side and 2.1% respondents believe that it doesn’t impact the performance of the infrastructure projects in India. 3. Responses total 65.3% respondents believe that human related performance has high impact on performance of infrastructure projects in India and 28.4% respondents are neutral and 6.3% respondents believethathumanrelatedperformancedoesn’timpact the performance of the infrastructure projectsinIndia. 4. Overall 76.9% respondents believe that quality performance has high impact on the overall performance of the infrastructure projects in India. 21% respondents are neutral and 2.1% respondents believe that quality performance doesn’t impact the performance of the infrastructure projects in India. 5. Total 71.5% respondents agree that safety performance has high impact on the performance of the infrastructureprojectsinIndia.25.3%respondents are neutral. 3.2% respondents believe that safety performance doesn’t impact the performance of the infrastructure projects in India. 6. 66.3% respondents believe that environmental performance has high impact on the performance of the InfrastructureprojectsinIndia.22.1%respondents are neutral and 11.6% respondents believe that environmental performance doesn’t impact the performance of the Infrastructure projects in India. 5. CONCLUSIONS Overall conclusionoftheworkisthatcostperformance parameters and time/schedule performance parameters affects the performance of project to a large extent as compared to thehumanrelated,quality, safety , environmental performance parameters. It does not mean that parameters other than cost and time does not effect the performance of project but they have less impact in comparison. 5.1 Limitations and Future Research Directions This study was conducted on the basis of the available literature and includesarticleswhichwerefoundusing the keywords such as ‘Critical factors affecting Infrastructure projects’, ‘project performance’ etc. Maximum responses were received from respondents, who are working in Infrastructure industry. These responses can be augmented in future research for coherent results and analysis. Moreover the study covers only Indian Construction industry specifically Infrastructure Sector, all together for analysis, and it can be further extended for sector specific. Most of the research articles discuss about the factors which affects the performance of Infrastructure project, however a very few articlesreportedaboutthe performance parameters and the dependency of these parameters on various factors. Hence future research may be focused on more number of responses, more performance parameters and canfindoutmorefactors which affect the Infrastructure projects. REFRENCES 1. K.C. Iyer& K.N. Jha (2005; Factors affecting cost Performance; evidence from Indian Construction Projects. International Journal of Project Management 23(2005). 283 – 295. 2. Sadi A. Assaf & Sadiq Al-Hejji (2005); Causes of delay in large Construction Projects. International Journal of Project Management 24 (2006) 349 – 357. 3. Ram Singh (2009); Delays and cost overrun in Infrastructure Projects. Working Paper Number 181, Delhi School of Economics 4. K.N. Jha & K.C. Iyer (2006); Critical Factors Affecting Performance In Construction, Total Quality Management,Vol.17,No.9,1155-1170, Nov 2006 . 5. Roozbeh Kangari (1988); Business Failure In Construction Project. 6. L&T (2013), Project Management Excellence on Display in Mumbai High North Project.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 09 | Sep 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 1299 7. K.N. Jha& K.C. Iyer(2005),CriticalDeterminants of Project Coordination 8. Abhijeet Gadekar& Dr. S.S. Pimplikar (2013); Factors leading to success of Indian Construction Companies. 9. Roshana Takim& Akintola Akintoye (2002); Performance Indicator for successful Construction Project Performance. 10. Victor Sanvido, Kevin Parfit (1992); Critical Success Factors For Construction Projects.